1.0 PURPOSE & SCOPE:


To define and establish the Quality Management System Planning to meet the
requirement of clause 4.1 of the standard and to maintain the integrity of the
system, should changes in the QMS be necessary.
It covers the entire Quality Management System.
2.0 RELEVANT ISO CLAUSES: 4.1, 4.2, 5.2, 5.3, 5.4.1, 5.4.2
3.0 INPUTS:
3.1 Status of establishment of processes and methodical working
3.2 Status of system approach and ISO awareness
3.3 Commitment & support of top management and its vision
3.4 Strategies of the organization
4.0 RESPONSIBILITY:
4.1 Management Representative
4.2 SWSL Chief
4.3 All employees of SWSL

5.0 DEFINITION:
5.1 QM – Quality Manual
5.2 MMA – Monitoring, Measuring & Analysis Sheet
6.0 METHOD:
6.1 MR shall arrange seminars / interactive sessions, at all locations to increase
awareness of the requirements of the ISO 9001 : 2000 and its advantages and
necessity. The difference between approach and requirements of the earlier
standard and the ISO 9001 : 2000 shall be highlighted along with importance
and use of “8 Quality Management Principles:
6.2 SWSL shall also organize training session / seminar for preparation of
establishment of the QMS per ISO 9001: 2000 for maximum possible
personnel of the organization. All the requirements of the clauses in brief and
methodology of preparation of the QMS shall be explained. A brief action plan /
road map shall also be prepared for re-certification as per ISO 9001: 2000.
6.3 MR / SWSL Chief shall convene a three / four days discussion session with
maximum possible participation from the heads of functionalities / site-in-
charges and personnel actually carrying out various processes / activities.

6.3.1 Initially SWSL Chief shall explain Top Management’s approach, and its
advantages and necessity. The difference between approach and
requirements of the earlier standard and ISO 9001 : 2000 strategy and the

Prepared By: Checked By: Approved By: Revisio


Page 1 of 4
Date: Date: Date: n No:
Jk_ISO/Proc/MR/PMR02_QMS_pla
Sign Sign: Sign:
01 nning_R01.doc
Apex Manual Section Reference 14
ISO
Procedure for Quality Management System 9001:2000

SWSL
Planning P
Procedure No: P: MR:02 / Rev 01 / 07.08.2004 Issue No.1

vision. With basic direction decided, Quality Policy draft shall be discussed
and prepared.

6.3.2 In accordance with the Quality Policy, the basic heads of the draft Quality
Objectives shall be discussed and prepared.
6.3.3 With help from MR, the processes / activities shall be discussed and identified
with its inputs / outputs (internal customer / supplier) & interrelationships;
control methods, resource requirements, monitoring & measurement methods,
acceptance criteria and the data gathering for analysis over a period.
Relevance and importance to ISO clauses and fulfillment of the ISO
requirement shall also be considered.
6.3.4 It shall be discussed and decided as to which required actions are to be taken
with priority and which actions can be taken in phases. For this informal impact
Analysis (effect; if not done) and feasibility and possibility of carrying out an
activity shall also be considered.
6.3.5 Respective functional heads / site-in-charges shall be requested to prepare the
“Monitoring / Measuring and Analysis” sheet and send the same to MR.
6.4 On receipt of these ‘MMA’ sheet, MR shall collate & consolidate these, to arrive
at ‘MMA” for important processes / activities. Based on these and in
consultation with SWSL Chief and Steering Committee, MR shall finalize first
draft of the Quality Manual.
6.5 This QM shall be circulated to all functional heads / site-in-charges. Based on
the QM and the MMA, functional heads / Site-in-Charges shall prepare draft
documentation in consultation with MR. It shall comprise of Quality Procedures,
Quality Work Instructions and Formats.
6.6 SWSL Chief and MR shall convene a two / three day session, similar to one in
6.3 above, where in the preparations done till then shall be reviewed,
discussed and finalized.
6.7 Based on the above, MR shall collate and complete the documentation. The
Quality Objectives shall be restudied and based on available data, shall be
redefined in quantitative terms. The completed QMS documentation shall
comprise of:
a) Quality Apex Manual with Quality Policy and Quality Objectives
b) Quality Procedures
c) Quality Work Instructions
d) Records, formats, registers, specifications and documents.

Prepared By: Checked By: Approved By: Revisio


Page 2 of 4
Date: Date: Date: n No:
Jk_ISO/Proc/MR/PMR02_QMS_pla
Sign Sign: Sign:
01 nning_R01.doc
Apex Manual Section Reference 14
ISO
Procedure for Quality Management System 9001:2000

SWSL
Planning P
Procedure No: P: MR:02 / Rev 01 / 07.08.2004 Issue No.1

6.8 MR shall circulate the QMS documentation as per procedure for Document
Control P: MR: 04. Functional heads / Site-in-Charge shall actually start
implementing the same.
6.9 All functional heads / site-in-charges shall conduct QMS awareness sessions
for minimum of 2 hours a week preferably in vernacular language to facilitate
implementation of the QMS. It shall be recorded in “Report of QMS awareness
sessions”, format no. F: MR: 23.

6.10 Any observation / difficulty shall be sent to the MR through site-in-charges /


functional heads.
6.11 MR shall monitor the effectiveness of the QMS implementation and
achievement of Quality Objectives, through feedback to MR and through the
Internal Audits.
6.12 As mentioned in the Procedure for Document Control P: MR: 04, after
establishment of the QMS; any modification to the QMS shall be done only
after full consideration of the effects in totality on the QMS and its
effectiveness.
7.0 OUTPUTS:
7.1 Achievable and feasible still stretching – Quality Policy and Quality
Objectives and the Quality Management System
7.2 Systematic & methodical working and Continual Improvement.
7.3 Positive approach and attitude of the employees
8.0 CROSS REFERENCE:
8.1 P: MR: 01 – Procedure for MR functionality
8.2 P: MR: 06 – Procedure for Steering Committee
8.3 P: MR: 07 – Procedure for internal Communication
8.4 P: MR: 08 – Procedure for Internal Quality Audits
9.0 RECORDS:
Sr.No. Description Format No. Period Disposition

1 Report on QMS awareness F: MR: 23 One year Any

10. HISTORY OF MODIFICATIONS:

Sr. Proc.No./Rev REMARKS


DATE DETAILS OF REVISION Symbol
No. No./
1 P:MR:02 / Rev 01 07.08.2004 Document Structure Modified and Corrections for
Co Name Changed from SWPL to
Prepared By: Checked By: Approved By: Revisio
Page 3 of 4
Date: Date: Date: n No:
Jk_ISO/Proc/MR/PMR02_QMS_pla
Sign Sign: Sign:
01 nning_R01.doc
Apex Manual Section Reference 14
ISO
Procedure for Quality Management System 9001:2000

SWSL
Planning P
Procedure No: P: MR:02 / Rev 01 / 07.08.2004 Issue No.1

SWSL Status Change.

Prepared By: Checked By: Approved By: Revisio


Page 4 of 4
Date: Date: Date: n No:
Jk_ISO/Proc/MR/PMR02_QMS_pla
Sign Sign: Sign:
01 nning_R01.doc