Client:
Project:
Job No.:
Author Approved by Client Approval
Name
Title
Date
Document Approval
Acknowledge Receipt by
P.E. Receive Drawings and QP-02 Client
Signing and Dating Client N/A R
P.M. Specification. QP-03 Drawings/Specifications
Transmittal.
QP-02
P.M. Review Drawing and Contract. Finalise Full Work scope. N/A Contract Documentation R
QP-03
PM Submit Weld Procedures For Client Ensure Compliance with Weld Procedures
Approved procedures QP-09 H/R H/A R (2)
Q.C Approval. Client Requirements. Approval Sheets.
Ensure Welders
Welder Qualifications
Q.C Review Welder Qualifications Qualified To Approved N/A QP-09 H/R R R (2)
Matrix.
Weld Procedure.
Material Control
Client: Rev: 1
Project: Pipe Spools & Supports Fabrications Page: Page 3 of 7
Fabrication
Client: Rev: 1
Project: Pipe Spools & Supports Fabrications Page: Page 4 of 7
Fabrication cont.
Client: Rev: 1
Project: Pipe Spools & Supports Fabrications Page: Page 5 of 7
Hydrotesting
CarryCheck Welds
Out Dimensional
QC Dimensional Control. Complete Monitor Job Spec QP-09 AFC Drawings M/R M M (2)
Survey.
Test in Accordance
ClientProcedure.
Approval ofCarry
NDT Clients Specs Hydrotest
QC
WS Hydrotest Pipespools.
Submit NDT Items
Procedures. with Approved Procedures QP-10 NDT Procedures. W/R
H/R W (1)
R (2) WR(1)
(2)(2)
Procedures. Reports/Graphs
Out Final Visual. Carry
OutCheck
NDT NDT
where QP-05
QC Carry out NDT On Welds required.
Requirements. Raise PO Client spec QP-09 NDT Reports/Radiographs H/R/M R R (2)
For NDT Sub Contractor. QP-10
Identify Non-Conforming
Welds, Place on Hold QP-09 NDT Reports/Radiographs
WP Repair Welds As Required. Job Spec H/R/M R
Until Disposition QP-10
Actioned.
Check Loadtest
QP-05
Requirements/Raise PO
QC Load testing Job spec QP-09 Reports H/R/M R R (2)
for Loadtest Sub
QP-10
Contractor
Check Reports for QP-09
QC Loadtest / Post load test ndt Client spec Reports H/R/M R R (2)
Accuracy QP-10
Client: Rev: 1
Project: Pipe Spools & Supports Fabrications Page: Page 6 of 7
Sample Check On
Completion That
WS Submit Coating Requirements QP-05
Coating Is Per Client spec Coating Reports. R/W R/W
QC Procedure. QP-10
PO/Procedure. Carry
Out Visual.
Documentation
Check All QC
Documentation Is In
Order, Prepare Contract QC Documentation
QC Documentation QP-15 H/R R/A R (2)
Completed Contract Requirements. Package
QC Pack. Submit To