TOPIC

INTRODUCTION
TRANSFER POINT
1. INTRODUCTION
In a coal based thermal power plant, the initial process in the power generation is “Coal
Handling”.
The coal is taken from the unloading site to dead storage by belt conveyors. The belt deliver the
coal to 0m level to the pent house and further moves to transfer point.
The transfer points are used to transfer coal to the next belt. The belt elevates the coal
to breaker house. It consists of a rotary machine, which rotates the coal and separates the light
dust from it through the action of gravity and transfer this dust to reject bin house through belt.
The belt further elevates the coal to the transfer point and it reaches the crusher through belt.

Transfer Point System Representation


2. Geometry
The geometry of the entire unit is decided upon considering the probable location of
concentrated and uniform loads and thereby providing required beams for sustaining those loads.
Main beams are connected to columns, First primary beams are connected to main beams using
shear connection and later secondary beams are connected to primary beam using shear
connection.
The location of elements and system here in this case are shown as per below.
s
Plan at Lvl 39 and 42.5 m
Plan at lvl 46.5m

Plan at Lvl 52.5 m


Plan at Lvl 57 m

Plan at Lvl 61 m
Plan at lvl 67 m
2.2 Plan Bracings
Plan Bracings are provided considering the location of opening and also the location of machine
placement.
Plan bracing at various plans lvl are as follow.
Plan Bracing at Level 39 and 42.5 m

Plan Bracing at Level 46.5 m


Plan Bracing at Level 52.5 m

Plan Bracing at Level 57 m


Plan Bracing at Level 61 m

Plan Bracing at Level 67 m


3. LOAD CALCULATION
Loads calculation are done according to IS and machine loads are according to Mechanical
General Arrangement Drawing.
Followings loads Are Considered for Application
3.2 SUMMARY OF LOAD CALCULATION
Summary of Loads at plan lvl 39 m
Load:
Load Value = 10 kN
Load Times: 4 Times
Load: Column Load
Load Value = 1 kN
Load Times: 8 Times
Summary of Loads at plan lvl 42.5 m
Load: Column Load
Load Value = 1 kN
Load Times: 8 Times
Summary of Loads at plan lvl 46.5 m
Load: F7
Load Value = 23.3 kN Vertical
Load Value = 5.4 kN Horizontal
Load Times: 4 Times
Load: F8
Load Value = 26.2 kN Vertical
Load Value = 26.9 kN Horizontal
Load Times: 4 Times
Load: F11
Load Value = 4.8 kN Vertical
Load Times: 6 Times
Load: F12
Load Value = 4.8 kN Vertical
Load Times: 6 Times
Summary of Loads at plan lvl 52.5 m
Load: F4
Load Value = 65.4 kN Vertical
Load Value = 40.7 kN Horizontal
Load Times: 4 Times
Load: F5
Load Value = 25.5 kN Vertical
Load Value = 36 kN Horizontal
Load Times: 4 Times
Load: F6
Load Value = 20.2 kN Vertical
Load Value = 20.4 kN Horizontal
Load Times: 4 Times
Load: IP4
Load Value = 48 kN Vertical
Load Times: 2 Times
Load: IP2
Load Value = 32 kN Vertical
Load Times: 3 Times
Load: Machinery Loading
Load Value = 20 kN Floor Load
Load Times: 1 Times
Summary of Loads at plan lvl 57 m
Load: IP3
Load Value = 55 kN Vertical
Load Times: 6 Times
Load: Machinery Loading
Load Value = 20 kN Vertical
Load Times: 1 Times
Summary of Loads at plan lvl 61 m
Load: IP1
Load Value = 38 kN Vertical
Load Times: 6 Times
Load: F1
Load Value = 70.8 kN Vertical
Load Value = 6.1 kN Horizontal
Load Times: 4 Times
Load: F2
Load Value = 35.4 kN Vertical
Load Value = 57.2 kN Horizontal
Load Times: 4 Times
Load: F3
Load Value = 50 kN Vertical
Load Value = 20.5 kN Horizontal
Load Times: 4 Times