HIGH PRESSURE (HP) AND LOW PRESSURE (LP) BYPASS SYSTEMS
ARE USED FOR QUICK START
START--UP OF THE UNIT AS WELL AS DURING
TRIP--OUT, WHERE LOAD REJECTION AT THE TURBINE DOES NOT
TRIP
AUTOMATICALLY LEAD TO A BOILER TRIP
TRIP..
WITH A BYPASS SYSTEM, START
START--UP IS QUICKER
QUICKER.. THE SYSTEM
DIVERTS THE STEAM GENERATED BY THE BOILER TO THE RE- RE-
HEATER/CONDENSER, AT THE SAME TIME REDUCING THE PRESSURE
AND TEMPERATURE OF STEAM, THUS MAINTAINING A MINIMUM
CIRCULATION OF STEAM THROUGH THE BOILER
BOILER..
THIS ENABLES RUNNING THE BOILER WITHOUT THE TURBINE IN
SERVICE, ENSURING FLOW THROUGH RE-
RE-HEATER COILS
COILS..
PROVIDED TO INCREASE THE RATE OF STEAM TEMPERATURE RISE
AND WARM UP THE HRH, CRH, IPT & TRANSFER PIPE LINES ( AT
60
60%% MCR FULL PRESSURE & TEMP
TEMP..)
MAXIMUM MS : 5400C
6
INJECTOR WATER : CONDENSATE WATER
7
8
BEFORE HP/LP BYPASS STATIONS ARE BROUGHT
INTO OPERATION CHECK
CHECK::
ESV, IV ARE CLOSED
OIL SYSTEM OF THE BYPASS STATION IS PUT INTO
OPERATION BY SWITCHING ON ITS MOTOR
VACUUM IN THE CONDENSER IS AT RATED ROUGHLY 600
mm OF Hg
CONDENSATE FLOW TO STEAM THROW OFF DEVICES IN THE
CONDENSER ARE ESTABLISHED BY OPENING OF THE VALVES
ENSURE THAT THE VALVES OF THE BYPASS SYSTEM ARE
FULLY CLOSED BY READING THE RESPECTIVE POSITION
INDICATORS
SET THE TEMPERATURE SET POINT OF HP BYPASS STATION
AT RATED VALUE WITH THE HELP OF PUSH BUTTON
9
PUT THE PRESSURE CONTROLLERS AND SLAVE POSITIONS OF
EACH HP BYPASS VALVES ON MANUAL MODE WITH THE HELP
OF PUSH BUTTON
OPEN THE ESV TO CVs DRAIN VALVES AND OPEN ESV BY ABOUT 1010--
20 mm AS PER THE SCALE ACCORDING TO INSTRUCTION AND HEAT
THE STEAM ADMISSION PIPE UPTO CONTROL VALVES TO A TEMP.
TEMP. OF
150°
150 °C AS RATED AND RISE OF METAL TEMP
TEMP.. SHOULD NOT BE MORE
THAN 4°C PER MINUTE
11
12
CHECK BEFORE CHARGING HP/LP BYPASS SYSTEM
MS PRESSURE 12 Kg/cm2 , CRH AND HRH STEAM LINE DRAINS ARE
OPEN..
OPEN
HP BYPASS OIL UNIT'S OIL LEVEL NORMAL, ITS PUMP ON AND ITS
PRESSURE ADEQUATE
ADEQUATE..
LP BYPASS RACK IS LINED UP AND ALL SETTING & TRIPPING
VALUES CHECKED
CHECKED..
HP BYPASS DOWNSTREAM TEMPERATURE SET POINT IS AT 200OC
APPROX..
APPROX
HP BYPASS SPRAY PRESSURE SET POINT
POINT:: 70 Kg/cm2
Kg/cm2.
ALL ISOLATING VALVES BEFORE THE SPRAY PRESSURE
CONTROLLER ARE OPEN
OPEN..
HP BYPASS UPSTREAM PRESSURE (MAIN STEAM PRESSURE) SET
POINT IS AT 10 Kg/cm2.
13
14
TRANSFER LP BYPASS CONTROL TO AUTO AND SWITCH ON THE
AUTOMATIC CONTROL INTERFACE (ACI)
(ACI)..
HRH FIXED SET POINT COMES TO 3 Kg/cm
Kg/cm22.
17
OPEN THE BYPASS VALVES ACROSS THE NRVs IN THE COLD REHEAT
LINE AND THE DRAIN VALVES OF HPT AND HEAT THE HP TURBINE
UPTO 150
150°°C
18
CLOSE BYPASS VALVE OF MSV IN THE COLD REHEAT LINES WHEN
STEAM PARAMETER BEFORE MSV ARE 20
20--25 kg/cm2
kg/cm2 AND 280-
280-300°
300°C
& STEAM ADMISSION PIPE OF HPT AND IPT ARE HEATED UPTO
150°
150 °C & 100°
100°C RESPECTIVELY
19
20
OBJECTIVE::
OBJECTIVE
THE OBJECTIVE OF STARTING UP OF THE
TURBOGENERATOR IS TO BRING A UNIT ON LOAD
AND RAISE IT TO THE RATED OUTPUT WITHIN THE
OPTIMUM TIME BUT WITHOUT UNDUE STRESSES ON
THE TURBINE COMPONENTS
COMPONENTS..
21
TURBINE START UP ARE CLASSIFIED AS
COLD, HOT & WARM START UP
22
23
AFTER HAVING ACCOMPLISHED THE HEATING, CHECK AND
NOTE DOWN THE FOLLOWING READINGS IN THE LOG SHEET
BEFORE ROLLING THE TURBINE
METAL TEMP
TEMP.. OF PIPES BEFORE MSV, AND ALSO BEFORE ESV,
NOTE:: WHILE HEATING THE MAIN STEAM AND REHEAT STEAM
NOTE
PIPES, THE DIFFERENCE IN TEMPERATURE OF PIPES SHOULD NOT
EXCEED 1515°
°C. BUT WHEN THE TURBINE IS ON LOAD, THIS
DIFFERENCE SHOULD NOT BE MORE THAN 10
10°°C
METAL TEMP
TEMP.. OF STEAM ADMISSION LINES
METAL TEMP
TEMP.. OF HOT REHEAT LINE
METAL TEMP. OF INTERCEPTOR VALVE
METAL TEMP. OF HPT AND IPT TOP/BOTTOM
STEAM PARAMETER BEFORE MSV
24
DIFFERENTIAL EXPANSION OF HP ROTOR, IP ROTOR AND LP
ROTOR
25
SLOWLY OPEN THE BYPASS VALVES OF MAIN STEAM VALVE BEFORE
ESV
ALLOW THE STEAM TO ROLL THE TURBINE AND CHECK DURING THE
PROCESS OF RAISING THE SPEED, BEARING VIBRATION SHOULD
NOT EXCEED 40 MICRONS
CHECK THAT BARRING GEAR HAS GOT DISENGAGED AND ITS MOTOR
GETS SWITCHED OFF AUTOMATICALLY
AT A SPEED OF 500 RPM, STOP THE STEAM SUPPLY TO THE TURBINE
BY CLOSING THE BYPASS VALVES OF MSV AND LISTEN CAREFULLY
FOR ANY RUBBING SOUND, IF ANY ABNORMALITY IS FOUND STOP
THE ROLLING OF THE TURBINE
IF THE TURBINE IS IN HEALTHY STATE, AGAIN RAISE THE SPEED TO
500 RPM BY OPENING THE BYPASS VALVES OF MS VALVE AND SOAK
THE SET FOR 5-10 MTS
IT IS PROHIBITED TO RAISE THE SPEED OF TURBINE IF THE
DIFFERENTIAL EXPANSION OF THE TURBINE ROTOR REACHES TO
THE MAXIMUM PERMISSIBLE VALUES
26
AT A SPEED OF 1200 RPM SOAK THE SET FOR ABOUT 20 MTS, NOTE
THAT THE CONTROL VALVES OF HPT TEND TO CLOSE WITH THE RISE
OF SPEED
27
28
A. AT THE SPEED OF 500
500,, 1200 AND 3000 RPM NOTE DOWN
THE FOLLOWING READINGS IN THE LOG BOOK
BOOK::
1. CONDENSER VACUUM
2. AXIAL SHIFT
3. DIFFERENTIAL EXPANSION OF HPT, IPT AND LPT
4. OVERALL TOTAL EXPANSION OF HPT, IPT
5. BEARING VIBRATION
6. TURBINE LPT EXHAUST HOOD TEMP
7. STEAM PARAMETER AT MSV
8. MOP DISCHARGE PRESSURE
31
PURPOSE
CHAMBER HEATING IS TO BE CARRIED OUT WHENEVER THE
DIFFERENTIAL EXPANSION OF HP & IP CYLINDERS ARE TOO
MUCH ON THE NEGATIVE SIDE THAT MEANS BEYOND HP (-) 0.5
AND IP(-
IP(-) 1.5 mm (FOR THE TURBINE OF 210 MW INSTALLED
AT BTPS SUPPLIED BY BHEL)
32
PROCESS
CHAMBER HEATING IS REQUIRED GENERALLY DURING HOT
START UP OF TURBINE
33
STEPS TO BE TAKEN FOR CHAMBER HEATING
CHAMBER HEATING SHOULD BE STARTED ONLY WHEN HP
DIFFERENTIAL EXPANSION IS MORE THAN -0.5 mm AND IP
DIFFERENTIAL EXPANSION EXCEEDS -1.5 mm
34
DURING THE PROCESS OF CHAMBER HEATING IF THE
BARRING GEAR STOPS CHAMBER HEATING MUST BE
STOOPED IMMEDIATELY
35
THE 210 MW TURBINE HAS BEEN PROVIDED WITH A DEVICE
FOR HEATING FLANGES AND STUDS OF HP AND IP CASING
36
ALARM TRIP
HPT +4.5mm +5.5mm
-2.5mm -3.5mm
37
LIVE STEAM IS BLED FROM MAIN STEAM PIPE LINE BEFORE
MAIN GATE VALVES OF THE TURBINE FOR HEATING FLANGES
AND STUDS
THE DEVICE CONSISTS OF JACKETS WELDED TO SIDE WALL
OF CASING FLANGES AND SPECIAL PIPING COMPLETE WITH
FITTING AND MEASURING INSTRUMENTS FOR STEAM INLET,
OUTLET AND DRAINS.
DRAINS. SPECIAL RECESSES ARE PROVIDED IN
THE HORIZONTAL FLANGES OF THE HP & IP CASING JOINT
PLANE FOR PASSAGE OF HEATING STEAM TO THE STUDS
IN THE LOWER HALF FLANGES, RECESSES ARE PROVIDED
AND IN THE UPPER HALF OF THE CASING ALONG THE HEIGHT
OF STUDS THERE ARE BAFFLES FOR GUIDING THE STEAM
FLOW OVER THE STUDS
38
THE SPECIAL PIPE LINES EACH DELIVERING STEAM TO TWO
SEPARATE HEADERS HAVE BEEN PROVIDED, TWO HEADERS
ARE MEANT TO SUPPLY STEAM TO FLANGES AND STUDS
SEPARATELY
39
THE USE OF DEVICE FOR HEATING FLANGES AND STUDS OF THE
CASING IS PERMITTED ONLY IF A CAREFUL CHECK IS KEPT OVER
THE TEMPERATURE DIFFERENCE ACROSS THE METAL AT THE
AVAILABLE REFERENCES POINTS
46
CLOSE EXCITER FIELD BREAKER
BREAKER.. GIVE CLOSING IMPULSE FOR
ABOUT 5-SEC.
SEC., AND RELEASE THE SWITCH WHEN RED LAMP GLOWS
INDICATING THE CLOSING OF BREAKER
BREAKER..
VOLTAGE WILL START BUILDING UP DUE TO RESIDUAL
MAGNETISM.. CHECK THAT THE VOLTAGE IS EQUAL IN ALL THREE
MAGNETISM
PHASES..
PHASES
PUT AUTO/MANUAL EXCITATION MODE SELECTOR SWITCH ON
"AUTO" POSITION VOLTAGE WILL START BUILDING UPUP.. CHECK
THAT THE RATE OF BUILDING UP IS NORMAL
NORMAL.. IF THE RATE OF
VOLTAGE BUILD UP IS MORE THAN THE PERMISSIBLE LIMITS,
SWITCH OVER TO "MANUAL” MODE AND BUILD UP VOLTAGE
MANUALLY..
MANUALLY
47
WHEN THE VOLTAGE HAS BUILT UP APPROX
APPROX.., UPTO 15 KV, CHECK
THAT THE VOLTAGE AND FREQUENCY OF THE INCOMING MACHINE
AND THAT OF THE SYSTEM AND APPROXIMATELY EQUAL
EQUAL..
IF THE FREQUENCY IS NOT APPROX.
APPROX., EQUAL, GIVE IMPULSE TO THE
LOAD CHANGER TO BRING THE FREQUENCY APPROX
APPROX.. EQUAL.
EQUAL.
IF THE EXCITATION MODE IS ON "AUTO" IT WILL AUTOMATICALLY
MATCH THE VOLTAGE
VOLTAGE;; OTHERWISE IN "MANUAL” MODE, GIVE
IMPULSE TO FIELD RHEOSTAT SWITCH TO MATCH THE VOLTAGE
VOLTAGE..
SWITCH ON THE SYNCHROSCOPE
SYNCHROSCOPE.. IF THE FREQUENCY OF THE
INCOMING M/C IS HIGHER THAN THE SYSTEM FREQUENCY, THE
SYNCHROSCOPE POINTER WILL MOVE IN THE CLOCKWISE
DIRECTION, AND IF THE FREQUENCY IS LOWER, IT WILL MOVE IN
ANTI--CLOCKWISE DIRECTION
ANTI DIRECTION..
SPEED OF ROTATION OF THE POINTER WILL DEPEND UPON THE
DIFFERENCE IN FREQUENCIES
FREQUENCIES.. GIVE IMPULSE BY LOAD CHANGE
SWITCH TO HAVE VERY SLOW CLOCKWISE ROTATION
ROTATION..
48
WHEN THE VOLTAGE AND FREQUENCY MATCH, THE SYNCHROSCOPE
WILL MOVE VERY SLOWLY IN THE CLOCKWISE DIRECTION
DIRECTION.. THIS
POSITION SHOWS THAT
THAT::
1. PHASE SEQUENCE OF GENERATED VOLTAGE AND SYSTEM
VOLTAGE IS SAME
SAME..
2. EFFECTIVE VALUES OF BOTH THE VOLTAGE ARE SAME.
SAME.
TAKE 10
10--20 MW LOAD ON THE MACHINE
MACHINE.. ASK FSSS/BOILER DESK
ENGINEER TO CARRY OUT NECESSARY OPERATIONS ON BOILER
SIDE TO RAISE THE STEAM PRESSURE AND TEMPERATURE, SO THAT
LOAD CAN BE RAISED
RAISED..
49
50
PUT SYNCHROSCOPE SWITCH TO "OFF" POSITION
POSITION.. RETURN
SYNCHRONISING SWITCH TO "OFF" POSITION AND LOCK IT.
IT. ASK
TURBINE DESK ENGINEER TO CARRY OUT NECESSARY OPERATIONS
ON TURBINE SIDE REQUIRED FOR RAISING THE LOAD
LOAD..
52
HP/LP BYPASS CLOSED
53
THANK YOU!