2 Col C2
Longitudinal Bars 16 1 4 4 12.50 - - - 24.05 50 10.50 2.00
12 1 4 4 12.50 - - 13.54 - 50 10.50 2.00
Stirrups 8 1 32 32 5.17 19.91 - - - #VALUE! 165.33 5.17
2 Col C3 - - - - - -
Longitudinal Bars 16 1 4 4 12.50 - - - 24.05 50 10.50 2.00
12 1 8 8 12.50 - - 27.07 - 100 10.50 2.00
Stirrups 10 1 32 32 5.17 - 31.10 - - 82.23 165.33 5.17
3 Col C1B
foundations 12 1 16 16 5.50 - - 23.82 - 88 3.50 2.00
8 1 6 6 21.00 15.17 - - - 126 19.00 2.00
12 1 16 16 3.50 - - 15.16 - 56 1.50 2.00
8 1 6 6 26.00 18.79 - - - 156 24.00 2.00
72.95
2 Col C3B - - - - - - - -
upto Plinth Lvl 25 4 16 64 21.50 - - - - - 1616.38
Ground/ first floor 25 4 16 64 28.75 - - - - - 2161.44
Second floor 20 4 16 64 16.75 - - - - 805.96 -
3 Col C2A - - - - - - - -
upto Plinth Lvl 25 4 12 48 21.50 - - - - - 1212.29
Ground/ first floor 25 4 12 48 28.75 - - - - - 1621.08
Second floor 20 4 12 48 16.75 - - - - 604.47 -
4 Col C1A - - - - - - - -
upto Plinth Lvl 25 4 10 40 21.50 - - - - - 1010.24
Ground/ first floor 25 2 10 20 28.75 - - - - - 675.45
Second floor 20 2 10 20 16.75 - - - - 251.86 -
5 Retaining Wall - - - - - - - -
B TOTAL COLUMN REBAR 0.00 5976.34 1725.10 0.00 3475.71 16796.97 27974.11
2 Flight 2 - - - - - - - -
main bar 12 1 12 12 25.00 - - 81.22 - - -
12 1 12 12 9.50 - - 30.86 - - -
12 1 12 12 9.50 - - 30.86 - - -
distribution bar 10 2 48 96 6.66 - 120.27 - - - -
nosing bar 12 1 10 10 6.00 - - 16.24 - - -
step bars 10 5 10 50 2.66 - 25.02 - - - -
3 Flight 3
main bar 12 1 12 12 23.75 - - 77.16 - - -
12 1 12 12 9.50 - - 30.86 - - -
12 1 12 12 12.00 - - 38.99 - - -
Sub Total for Staircase at Ground Floor 0.00 420.56 552.29 0.00 0.00 0.00
Staircase 1 for first, second and third floor 3 0.00 1261.68 1656.88 0.00 0.00 0.00
C TOTAL for STAIRCASE 1 0.00 1682.24 2209.17 0.00 0.00 0.00 3891.41
- - - - - - - -
D BEAM at GF lvl -0'-0" - - - - - - - -
1 Grid 9/ 8 ( 2 nos) B2 - - - - - - - -
Bottom bars 20 2 2 4 110.50 - - - - 332.31 -
ld 20 2 6 12 3.75 - - - - 33.83 -
Bottom bars 16 2 2 4 109.00 - - - 209.76 - -
ld 20 2 6 12 3.00 - - - - 27.07 -
Top Bars 20 2 2 4 110.50 - - - - 332.31 -
ld 20 2 6 12 3.75 - - - - 33.83 -
extra top bars at G 25 2 2 4 12.42 - - - - - 58.36
25 2 2 4 16.17 - - - - - 75.98
25 2 2 4 16.17 - - - - - 75.98
25 2 2 4 16.17 - - - - - 75.98
25 2 3 6 16.17 - - - - - 113.97
25 2 3 6 12.42 - - - - - 87.54
Stirrups 10 2 300 600 4.99 - 563.20 - - - -
2 Grid 7 ( 1 nos) B1 - - - - - - - -
3 Grid 5 - - - - - - - -
Bottom bars 20 1 2 2 29.50 - - - - 44.36 -
16 1 2 2 29.50 - - - 28.38 - -
Top Bars 20 1 2 2 29.50 - - - - 44.36 -
extra top bars 25 1 2 2 12.42 - - - - - 29.18
25 1 2 2 12.42 - - - - - 29.18
Sub Total for Beam at Level 0'-0" 0.00 2251.02 132.39 1507.26 2611.08 1542.49
Beam 1 for first, second and third floor 3 0.00 6753.07 397.16 4521.78 7833.24 4627.48
D TOTAL for BEAM 0.00 9004.10 529.55 6029.04 10444.32 6169.97 32176.98
2 S1 23'x20' 3 nos - - - - - - - -
main bars 10 3 24 72 26.67 - 361.22 - - - -
10 3 24 72 26.67 - 361.22 - - - -
binders 8 6 12 72 15.00 130.06 - - - - -
distribution bars 10 3 20 60 35.17 - 396.95 - - - -
10 3 20 60 30.17 - 340.52 - - - -
binders 8 6 12 72 15.00 130.06 - - - - -
extra bars - - - - - - - -
3 S3 23'x7' 5 nos - - - - - - - -
main bars 12 5 46 230 13.67 - - 851.21 - - -
12 5 46 230 13.67 - - 851.21 - - -
Sub Total for Slab at Level 0'-0" 433.54 2765.40 2551.52 0.00 0.00 0.00
Slab for first, second and third floor 3 1300.61 8296.20 7654.55 0.00 0.00 0.00
E TOTAL for SLAB 1734.15 11061.61 10206.07 0.00 0.00 0.00 23001.82
TOTAL REBAR (A+B+C+D+E) 1.73 27.72 17.81 6.03 45.67 22.97 121.93
tonn
2 Col C3B - - - - - - - -
upto Plinth Lvl 25 4 16 64 21.50 - - - - - 1616.38
Ground/ first floor 25 4 16 64 28.75 - - - - - 2161.44
Second floor 20 4 16 64 16.75 - - - - 805.96 -
5 Retaining Wall - - - - - - - -
upto Plinth Lvl vertical 12 1 228 228 18.00 - - 1111.08 - - -
B TOTAL COLUMN REBAR 0.00 4100.44 1111.08 0.00 2543.81 12428.86 20184.20
2 Grid 7 ( 1 nos) B1 - - - - - - - -
Bottom bars 20 1 2 2 90.50 - - - - 136.08 -
ld 20 1 4 4 3.75 - - - - 11.28 -
Bottom bars 16 1 2 2 89.00 - - - 85.64 - -
ld 20 1 4 4 3.00 - - - - 9.02 -
Top Bars 20 1 2 2 90.50 - - - - 136.08 -
ld 20 1 4 4 3.75 - - - - 11.28 -
extra top bars at A 20 1 2 2 12.42 - - - - 18.68 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 3 3 12.42 - - - - 28.01 -
Stirrups 10 1 240 240 4.17 - 188.26 - - - -
Sub Total for Beam at Level 0'-0" 0.00 1679.64 99.90 1093.68 1802.22 996.54
Beam 1 for first, second and third floor 3 0.00 5038.92 299.70 3281.04 5406.67 2989.62
C TOTAL for BEAM 0.00 6718.57 399.60 4374.72 7208.90 3986.16 22687.95
2 S1 23'x20' 3 nos - - - - - - - -
main bars 10 3 24 72 26.67 - 361.22 - - - -
10 3 24 72 26.67 - 361.22 - - - -
binders 8 6 12 72 15.00 130.06 - - - - -
distribution bars 10 3 20 60 35.17 - 396.95 - - - -
10 3 20 60 30.17 - 340.52 - - - -
binders 8 6 12 72 15.00 130.06 - - - - -
extra bars - - - - - - - -
3 S3 23'x7' 4 nos - - - - - - - -
main bars 12 4 46 184 13.67 - - 680.97 - - -
12 4 46 184 13.67 - - 680.97 - - -
binders - - - - - - - -
distribution bars 10 4 14 56 27.17 - 286.21 - - - -
10 4 14 56 27.17 - 286.21 - - - -
binders - - - - - - - -
extra bars - - - - - - - -
Sub Total for Slab at Level 0'-0" 346.83 2327.31 1786.48 0.00 0.00 0.00
Slab for first, second and third floor 3 1040.49 6981.93 5359.45 0.00 0.00 0.00
TOTAL REBAR (A+B+C+D) 1.39 20.13 11.01 4.37 24.77 16.42 78.09
tonn
2 Col C2B - - - - - - - -
upto Plinth Lvl 25 4 6 24 4.75 - - - - - 133.92
upto Plinth Lvl 20 4 4 16 4.75 - - - - 57.14 -
Ground/ first floor 25 4 6 24 28.75 - - - - - 810.54
Ground/ first floor 20 4 4 16 28.75 - - - - 345.84 -
Second floor 20 4 10 40 16.75 - - - - 503.73 -
3 Col C1B - - - - - - - -
upto Plinth Lvl 25 6 6 36 4.75 - - - - - 200.87
upto Plinth Lvl 16 6 2 12 4.75 - - - 27.42 - -
Ground/ first floor 25 6 6 36 28.75 - - - - - 1215.81
Ground/ first floor 16 6 2 12 28.75 - - - 165.98 - -
Second floor 20 6 6 36 16.75 - - - - 453.35 -
Second floor 16 6 2 12 16.75 - - - 96.70 - -
B TOTAL COLUMN REBAR 0.00 3382.59 0.00 290.10 2569.00 6138.96 12380.65
2 Landing - - - - - - - -
main bar 12 1 8 8 9.67 - - 20.94 - - -
12 1 8 8 10.67 - - 23.11 - - -
Sub Total for Staircase at Ground Floor 0.00 306.62 300.34 0.00 0.00 0.00
Staircase 1 for first and second floor 2 0.00 613.24 600.68 0.00 0.00 0.00
C TOTAL for STAIRCASE 2 0.00 919.86 901.02 0.00 0.00 0.00 1820.87
- - - - - - - -
D BEAM at GF lvl -0'-0" - - - - - - - -
1 Grid L/M ( 2 nos) B2 - - - - - - - -
Bottom bars 20 2 2 4 85.50 - - - - 257.13 -
ld 20 2 2 4 3.75 - - - - 11.28 -
Bottom bars 16 2 2 4 84.00 - - - 161.65 - -
ld 20 2 2 4 3.00 - - - - 9.02 -
Top Bars 20 2 2 4 85.50 - - - - 257.13 -
ld 20 2 2 4 3.75 - - - - 11.28 -
extra top bars at 1 25 2 2 4 22.17 - - - - - 104.17
25 2 2 4 16.17 - - - - - 75.98
16 2 2 4 13.17 - - - 25.34 - -
16 2 2 4 22.00 - - - 42.34 - -
Stirrups 10 2 226 452 4.99 - 424.28 - - - -
2 Grid K ( 1 nos) B1 - - - - - - - -
Bottom bars 20 1 2 2 85.50 - - - - 128.56 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Bottom bars 16 1 2 2 84.00 - - - 80.82 - -
ld 20 1 2 2 3.00 - - - - 4.51 -
Top Bars 20 1 2 2 85.50 - - - - 128.56 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra top bars at G 20 1 2 2 22.17 - - - - 33.34 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 2 2 13.17 - - - - 19.80 -
20 1 2 2 22.00 - - - - 33.08 -
Stirrups 10 1 226 226 4.17 - 177.28 - - - -
Sub Total for Beam at Level 0'-0" 0.00 1494.79 58.75 918.26 1764.08 948.54
Beam 1 for first, second floor 2 0.00 2989.57 117.50 1836.52 3528.15 1897.09
D TOTAL for BEAM 0.00 4484.36 176.25 2754.78 5292.23 2845.63 15553.25
2 S1 23'x17' 3 nos - - - - - - - -
3 S3 20'x7' 5 nos - - - - - - - -
main bars 12 5 20 100 13.67 - - 370.09 - - -
12 5 20 100 13.67 - - 370.09 - - -
binders - - - - - - - -
distribution bars 10 5 14 70 23.67 - 311.68 - - - -
10 5 14 70 23.67 - 311.68 - - - -
binders - - - - - - - -
extra bars - - - - - - - -
Sub Total for Slab at Level 0'-0" 329.49 2186.36 1164.73 0.00 0.00 0.00
Slab for first, second floor 2 658.98 4372.72 2329.46 0.00 0.00 0.00
E TOTAL for SLAB 988.46 6559.07 3494.19 0.00 0.00 0.00 11041.73
TOTAL REBAR (A+B+C+D+E) 0.99 15.35 6.72 3.04 27.98 8.98 63.06
tonn
291892.5 kgs