Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 8/1/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time
1 REP/NH-216/STR/105 8/1/2018 5.00 PM Check the excavation for Pipe Culvert Head 150+420 BHS 8/2/2018 11.00 AM
wall
3 REP/NH-216/STR/107 8/1/2018 5.00 PM Check the excavation for Line Drain 151+900 152+000 LHS 8/2/2018 11.30 AM
1 REP/NH-216/STR/109 8/2/2018 5.00 PM Check the excavation for Pipe Culvert Head 154+303 BHS 8/3/2018 11.00 AM
wall
1 REP/NH-216/STR/117 8/6/2018 5.00 PM Checking and allow to M40 RCC for Precast Casting yard LHS 8/7/2018 10.00 AM
Shear Key Segment for 155+586
1 REP/NH-216/STR/123 8/7/2018 5.00 PM Checking and allow to M40 RCC for Precast Casting yard RHS 8/8/2018 10.00 AM
Shear Key Segment for 155+586
7 REP/NH-216/STR/129 8/7/2018 5.00 PM Check the excavation for Line Drain 159+900 160+100 LHS 8/8/2018 11.30 AM
2 REP/NH-216/STR/133 8/8/2018 5.00 PM Check the excavation for Line Drain 152+000 152+100 LHS 8/9/2018 11.00 AM
4 REP/NH-216/STR/135 8/8/2018 5.00 PM Check the excavation for Line Drain 159+800 159+900 LHS 8/9/2018 2.00 PM
5 REP/NH-216/STR/136 8/8/2018 5.00 PM Check the excavation for Pipe Culvert Head 145+506 BHS 8/9/2018 3.00 PM
wall