Government of India (Ministry of Road Transport & Highways)

Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 8/1/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time

1 REP/NH-216/STR/105 8/1/2018 5.00 PM Check the excavation for Pipe Culvert Head 150+420 BHS 8/2/2018 11.00 AM
wall

Checking and allow to M15 PCC leveling


2 REP/NH-216/STR/106 8/1/2018 5.00 PM
Course for Pipe Culvert head wall
150+420 BHS 8/2/2018 4.00 PM

3 REP/NH-216/STR/107 8/1/2018 5.00 PM Check the excavation for Line Drain 151+900 152+000 LHS 8/2/2018 11.30 AM

Checking and allow to M15 PCC leveling


4 REP/NH-216/STR/108 8/1/2018 5.00 PM 151+900 151+950 LHS 8/2/2018 5.00 PM
Course for Line Drain
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 8/2/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time

1 REP/NH-216/STR/109 8/2/2018 5.00 PM Check the excavation for Pipe Culvert Head 154+303 BHS 8/3/2018 11.00 AM
wall

Checking and allow to M25 PCC for Pipe


2 REP/NH-216/STR/110 8/2/2018 5.00 PM
culvert Head wall 2nd Lif
148+548 LHS 8/3/2018 4.00 PM

3 REP/NH-216/STR/111 8/2/2018 5.00 PM


Checking and allow to M30 RCC for 160+000 160+100 RHS 8/3/2018 11.30 AM
Drain Raf
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 8/5/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time
Checking and allow to M15 PCC leveling
1 REP/NH-216/STR/112 8/5/2018 5.00 PM
Course for Pipe Culvert head wall
154+303 BHS 8/6/2018 11.00 AM

Checking and allow to M25 PCC for Pipe


2 REP/NH-216/STR/113 8/5/2018 5.00 PM
culvert Head wall 3rd Lif
148+548 LHS 8/6/2018 4.00 PM

Checking and allow to M25 PCC for Pipe


3 REP/NH-216/STR/114 8/5/2018 5.00 PM culvert Head wall 2nd Lif 150+940 LHS 8/6/2018 12.00 PM

Checking and allow to M40 RCC for 2 x 2


4 REP/NH-216/STR/115 8/5/2018 5.00 PM Precast Box Segment Casting yard - 8/6/2018 10.00 AM

Checking and allow to M25 PCC for Pipe


5 REP/NH-216/STR/116 8/5/2018 5.00 PM
culvert Head wall 1st Lif
150+420 BHS 8/6/2018 2.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 8/6/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time

1 REP/NH-216/STR/117 8/6/2018 5.00 PM Checking and allow to M40 RCC for Precast Casting yard LHS 8/7/2018 10.00 AM
Shear Key Segment for 155+586

Checking and allow to M25 PCC for Pipe


2 REP/NH-216/STR/118 8/6/2018 5.00 PM
culvert Head wall 1st Lif
154+303 LHS 8/7/2018 11.00 AM

Checking and allow to M25 PCC for Pipe


3 REP/NH-216/STR/119 8/6/2018 5.00 PM culvert Head wall 1st Lif 154+303 RHS 8/7/2018 11.30 AM

Checking of Concrete bedding M15 PCC


4 REP/NH-216/STR/120 8/6/2018 5.00 PM 148+548 LHS 8/7/2018 12.00 PM
for pipe portion
Checking of Concrete bedding M15 PCC
5 REP/NH-216/STR/121 8/6/2018 5.00 PM
for pipe portion
150+940 LHS 8/7/2018 2.00 PM

Checking of Concrete bedding M15 PCC


6 REP/NH-216/STR/122 8/6/2018 5.00 PM
for pipe portion
163+247 RHS 8/7/2018 4.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 8/7/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time

1 REP/NH-216/STR/123 8/7/2018 5.00 PM Checking and allow to M40 RCC for Precast Casting yard RHS 8/8/2018 10.00 AM
Shear Key Segment for 155+586

Checking and allow to M40 RCC for 2 x 2


2 REP/NH-216/STR/124 8/7/2018 5.00 PM
Precast Box Segment
Casting yard - 8/8/2018 4.00 PM

3 REP/NH-216/STR/125 8/7/2018 5.00 PM


Checking of Granular bed for pipe 154+303 BHS 8/8/2018 11.00 AM
portion
Checking of Pipe laying & Jointing for
4 REP/NH-216/STR/126 8/7/2018 5.00 PM 150+940 LHS 8/8/2018 12.00 PM
Pipe Culvert
Checking of Pipe laying & Jointing for
5 REP/NH-216/STR/127 8/7/2018 5.00 PM
Pipe Culvert
163+247 RHS 8/8/2018 3.00 PM

Checking and allow to M25 PCC for Pipe


6 REP/NH-216/STR/128 8/7/2018 5.00 PM
culvert Head wall 3rd Lif
162+666 LHS 8/8/2018 5.00 PM

7 REP/NH-216/STR/129 8/7/2018 5.00 PM Check the excavation for Line Drain 159+900 160+100 LHS 8/8/2018 11.30 AM

Checking and allow to M15 PCC leveling


8 REP/NH-216/STR/130 8/7/2018 5.00 PM
Course for Line Drain
160+000 160+100 LHS 8/8/2018 2.00 PM

Checking and allow to M30 RCC for


9 REP/NH-216/STR/131 8/7/2018 5.00 PM
Drain Raf
159+900 160+000 RHS 8/8/2018 4.30 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 8/8/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time
Checking and allow to M15 PCC leveling
1 REP/NH-216/STR/132 8/8/2018 5.00 PM
Course for Line Drain
159+800 159+900 RHS 8/9/2018 10.00 AM

2 REP/NH-216/STR/133 8/8/2018 5.00 PM Check the excavation for Line Drain 152+000 152+100 LHS 8/9/2018 11.00 AM

3 REP/NH-216/STR/134 8/8/2018 5.00 PM


Checking and allow to M15 PCC leveling 151+950 152+050 LHS 8/9/2018 12.00 PM
Course for Line Drain

4 REP/NH-216/STR/135 8/8/2018 5.00 PM Check the excavation for Line Drain 159+800 159+900 LHS 8/9/2018 2.00 PM

5 REP/NH-216/STR/136 8/8/2018 5.00 PM Check the excavation for Pipe Culvert Head 145+506 BHS 8/9/2018 3.00 PM
wall

Checking of Concrete bedding M15 PCC


6 REP/NH-216/STR/137 8/8/2018 5.00 PM
for pipe portion
154+303 BHS 8/9/2018 10.30 AM

Checking and allow to M25 PCC for Pipe


7 REP/NH-216/STR/138 8/8/2018 5.00 PM
culvert Head wall 3rd Lif
150+940 LHS 8/9/2018 4.00 PM

Checking and allow to M25 PCC for Pipe


8 REP/NH-216/STR/139 8/8/2018 5.00 PM
culvert Head wall 2nd Lif
163+247 RHS 8/9/2018 5.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 8/9/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time
Checking and allow to M25 PCC for Pipe
1 REP/NH-216/STR/140 8/9/2018 5.00 PM culvert Head wall 3rd Lif 163+247 RHS 8/10/2018 12.00 PM

Checking and allow to M15 PCC leveling


2 REP/NH-216/STR/141 8/9/2018 5.00 PM
Course for Pipe Culvert head wall
145+506 BHS 8/10/2018 10.00 AM

3 REP/NH-216/STR/142 8/9/2018 5.00 PM


Checking of Pipe laying & Jointing for 154+303 BHS 8/10/2018 4.00 PM
Pipe Culvert
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 8/11/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time
Checking and allow to M40 RCC for 2 x 2
1 REP/NH-216/STR/143 8/11/2018 9.00 AM Precast Box Segment Casting yard - 8/11/2018 5.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 8/11/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time
Checking and allow to M40 RCC for 2 x 2
1 REP/NH-216/STR/144 8/11/2018 5.00 PM Precast Box Segment Casting yard - 8/12/2018 5.00 PM

Checking and allow to M25 PCC for Pipe


2 REP/NH-216/STR/145 8/11/2018 5.00 PM culvert Head wall 2nd Lif 154+303 BHS 8/12/2018 11.00 AM