Sunteți pe pagina 1din 5

SITE TEST REPORT

Molded case Circuit


Breaker

Project : FADHILI Gas Program Project Po:


SS/SWGR D46-462-MCC-001
Section Number: 5A Feeder ID: D46-462-XFR(T)-008
Equipment Tag : D46-462-XFR(T)-008 Comm. Date: Page : 1 of 5

1- MGENERAL DATA AND INFORMATION:

Type THERMAL Service Voltage 480V


MEGNETIC
Manufacturer SQUARE D Frame Rating. 60 AF
Model No. POWER PACT Plug Rating-Trip Unit 35 A
HL 60
Serial No. 0202323571950021 Rating Current 35 A

2- MECHANICAL CHECK AND VISUAL INSPECTION:

With Breaker de-energized condition

ITEM DESCRIPTION CHECKED

1 Inspect for any physical damage or defects. OK


2 Check racking mechanism for alignment and smoothness of operation. OK
3 Check tightness of all bolted connections OK
5 Check operation of all mechanical interlocks. OK
6 Check for correct breaker position indication. OK
7 Check for correct spring status indication N/A
Check the arc chutes for damage and correct positioning above the N/A
8
interrupter contacts.
Perform all specific checks on the breaker mechanism according to the OK
9
manufacturer’s instructions.

ASEC M.Anwar TR QC Witness TAHIR PID witness VICTOR


Signature Signature Signature
SEG QC ASIF PMT Witness MARLON proponent/
Approved
Signature Signature Signature
Date 31-5-2018 Date Date
SITE TEST REPORT
Molded case Circuit
Breaker

Project : FADHILI Gas Program Project Po:


SS/SWGR D46-462-MCC-001
Section Number: 5A Feeder ID: D46-462-XFR(T)-008
Equipment Tag : D46-462-XFR(T)-008 Comm. Date: Page : 2 of 5

2- ELECTRICAL TEST:

1. Insulation Resistance:
With Breaker de-energized/Open condition
Low Voltage System Test Voltage (1000 V)

Phase Measured Resistance Remarks

A-a 2 TΩ OK
B-b 1.5 TΩ OK
C-c 2 TΩ OK
N-n NA

2. Insulation Resistance:
With Breaker de-energized/Close condition
Low Voltage System Test Voltage (1000 V)

Phase Measured Resistance Remarks

A-E 1.39 TΩ OK
B-E 2 TΩ OK
C-E 2 TΩ OK
N-E NA -
A-B 2 TΩ OK
B-C 2 TΩ OK
C-A 2 TΩ OK
A-N NA -
B-N NA -
C-N NA -

ASEC M.Anwar TR QC Witness TAHIR PID witness VICTOR


Signature Signature Signature
SEG QC ASIF PMT Witness MARLON proponent/
Approved
Signature Signature Signature
Date 31-5-2018 Date Date
SITE TEST REPORT
Molded case Circuit
Breaker

Project : FADHILI Gas Program Project Po:


SS/SWGR D46-462-MCC-001
Section Number: 5A Feeder ID: D46-462-XFR(T)-008
Equipment Tag : D46-462-XFR(T)-008 Comm. Date: Page : 3 of 5

3. Contact Resistance :
With Breaker de-energized/Close condition
Test Current (10 A)

TP# Phase A Phase B Phase C Phase N Remarks

1 4.8 mΩ 4.59 mΩ 2.9 mΩ NA OK


NOTE :-)Microohm or millivolt drop values shall not exceed the high levels of the normal range as
indicated in the manufacturer’s published data. If manufacturer’s data is not available, investigate any
values which deviate from similar connections by more than 50 percent of the lowest value (NETA
standard).

4. Primary Trip Time Test:


a. Long Time @ 3 ×In=Ir

DESCRIPTION A B C N
CURRENT SETTING (A) 35 A 35 A 35 A N/A
INJECTED CURRENT 105 A 105 A 105 A N/A
EXPECTED TRIP TIME (s) 10-45 S 10-45 S 10-45 S N/A
MEASURED TRIP TIME (s) 18.73 S 22.2 S 20.74 S N/A
REMARKS OK OK OK N/A

b.Short time @ × Ir=Isd

DESCRIPTION A B C N
CURRENT SETTING (A) N/A N/A N/A N/A
INJECTED CURRENT(A) N/A N/A N/A N/A
EXPECTED TRIP TIME (s) N/A N/A N/A N/A
MEASURED TRIP TIME (s) N/A N/A N/A N/A
REMARKS N/A N/A N/A N/A

ASEC M.Anwar TR QC Witness TAHIR PID witness VICTOR


Signature Signature Signature
SEG QC ASIF PMT Witness MARLON proponent/
Approved
Signature Signature Signature
Date 31-5-2018 Date Date
SITE TEST REPORT
Molded case Circuit
Breaker

Project : FADHILI Gas Program Project Po:


SS/SWGR D46-462-MCC-001
Section Number: 5A Feeder ID: D46-462-XFR(T)-008
Equipment Tag : D46-462-XFR(T)-008 Comm. Date: Page : 4 of 5

C. Instantaneous @ 18 × In=Ii
DESCRIPTION A B C N
CURRENT SETTING (A) 35 A 35 A 35 A N/A
INJECTED CURRENT(A) 660 A 660 A 660 A N/A
EXPECTED TRIP TIME (ms) 18 ms 18 ms 18 ms N/A
MEASURED TRIP TIME (ms) 23 ms 19 ms 20 ms N/A
REMARKS ok ok Ok N/A

d.
Ground @ × In=Ig
DESCRIPTION A B C
CURRENT SETTING (A) N/A N/A N/A
INJECTED CURRENT(A) N/A N/A N/A
EXPECTED TRIP TIME (ms) N/A N/A N/A
MEASURED TRIP TIME (ms) N/A N/A N/A
REMARKS N/A N/A N/A

5. Secondary Trip Time Test:


a. Long Time @ ×In=Ir
DESCRIPTION A B C N
CURRENT SETTING (A) N/A N/A N/A N/A
INJECTED CURRENT N/A N/A N/A N/A
EXPECTED TRIP TIME (s) N/A N/A N/A N/A
MEASURED TRIP TIME (s) N/A N/A N/A N/A
REMARKS N/A N/A N/A N/A

a. Short time @ × Ir=Isd


DESCRIPTION A B C N
CURRENT SETTING (A) N/A N/A N/A N/A
INJECTED CURRENT(A) N/A N/A N/A N/A
EXPECTED TRIP TIME (s) N/A N/A N/A N/A
MEASURED TRIP TIME (s) N/A N/A N/A N/A
REMARKS N/A N/A N/A N/A

ASEC M.Anwar TR QC Witness TAHIR PID witness VICTOR


Signature Signature Signature
SEG QC ASIF PMT Witness MARLON proponent/
Approved
Signature Signature Signature
Date 31-5-2018 Date Date
SITE TEST REPORT
Molded case Circuit
Breaker

Project : FADHILI Gas Program Project Po:


SS/SWGR D46-462-MCC-001
Section Number: 5A Feeder ID: D46-462-XFR(T)-008
Equipment Tag : D46-462-XFR(T)-008 Comm. Date: Page : 5 of 5

b. Instantaneous @ × In=Ii
DESCRIPTION A B C N
CURRENT SETTING (A) N/A N/A N/A N/A
INJECTED CURRENT(A) N/A N/A N/A N/A
EXPECTED TRIP TIME (ms) N/A N/A N/A N/A
MEASURED TRIP TIME (ms) N/A N/A N/A N/A
REMARKS N/A N/A N/A N/A

c. Ground @ × In=Ig
DESCRIPTION A B C
CURRENT SETTING (A) N/A N/A N/A
INJECTED CURRENT(A) N/A N/A N/A
EXPECTED TRIP TIME (ms) N/A N/A N/A
MEASURED TRIP TIME (ms) N/A N/A N/A
REMARKS N/A N/A N/A

Test Equipment List:

Device Make Serial Calibration Date. Calibration Exp.

Insulation Tester Megger 101687798 21-Mar-2018 20-SEP-2018


Contact resistance Megger 101428600 03-FEB-2018 02-AUG-2018
Primary Injection Programma 1802681 26-Apr-2018 26-Apr-2019
- Remarks:

ASEC M.Anwar TR QC Witness TAHIR PID witness VICTOR


Signature Signature Signature
SEG QC ASIF PMT Witness MARLON proponent/
Approved
Signature Signature Signature
Date 31-5-2018 Date Date

S-ar putea să vă placă și