UB INTERFACE DOCUMENTS REQUIREMENTS

S no Description schedule of delivery


UB comprehensive DCS/PLC I/O list( including H/W signal exchange between
1 DCS/PLC and BMS PLC, Soot blower I/O's)
2 UB final load list( including 220V DC, 24 V DC,110 V A/C UPS)
UB Drive list( including MOVs, HT and LT drives, valves, soot blowers drives
3 etx)

UB P&ID's( including Air Flue gas path,Steam and Feed water , fuels, HP
4 dosing)
5 UB control loop drawing and writup
6 UB drive logics( for all LT drives, MOV's as per drive list)
7 Instrument Index/schedule of UB
8 JB grouping of UB Field instruments( including Control valves )
9 JB grouping of UB MOV's
10 SOOT Blower MCC drawings( with termination details of DCS signals)
11 SOOT Blower cable schedule

12 Analyzer panel GA drawings( for Steam & Feed water, Flue gas analysers etc)
13 Modbus signal list for Flue gas analysers soft link( for engineering DCS)
BMS PLC panel GA drawnings, BMS operation and Engineering console GA
14 drawings
15 BMS operation philosophy writup
16 Soot blower operation phil. Writup