Original Message --------

Subject: Re: [Fwd: BORL- DCS PLC IO ESTIMATION]


Date: Thu, 01 Mar 2007 10:44:36 +0530
From: R. Jeyaprakash Narayanan <rjpn@bheltry.co.in>
To: SUDHIR BABU P/PED/BORL <sudheerbabu@bhelhyd.co.in>,
"Ramachandraiah. A" <arc@bhelhyd.co.in>
CC: Biswajit Sarkar <sarkar@bheltry.co.in>, "Jayaprakash S,
SDGM/FBC&HRSG/Elec.C&I" <srijp@bheltry.co.in>, "Venkataraman P,
SPE/FBC&HRSG/C&I" <pvraman@bheltry.co.in>, "Rajagopalan C V,
Sr.Manager/ERP/HPBP" <rajagopalan@bheltry.co.in>, "Vinay Kishore,
AGM, IS-PM&CR" <vk@bhelindustry.com>
References:<45E00FC3.6080900@bheltry.co.in> <45E5692F.7000901@bheltry.co.in>

Dear Sir,
Please note the following wrt the I/O list furnished.
1. We have indicated the Soot blower control logic I/O in the BOP PLC, which may be
shifted to BMS PLC if required. Also add 1 no AO for the same.
3. .Three nos. of BMS PLC per boiler seem to be higher side. This may be reviewed and
may be considered 1 no. for BMS cum SB PLC per boiler.
2. We have indicated the I/O list for Boiler protection and drive control logic in BOP
PLC. 40 no. AI and 25 nos. more DO also to be considered in this on account of BP-1 and
SG cool down requirement.
3. We have considered the I/O list as per the BHEL (T) portion P&ID and auto control
loops.
Regards
R.J.Narayanan,
SM / C&I