3443-SK-LE-001
Plant: 320 KT/Y HDPE Client: Basell Polyolefins Location: Münchsmünster Sheet 1 of 1
2PAHH11102; 2PAHH11103
1A 111A 3443-SK-FP-001 2S11102 Permissive to open 2HV11102 SIL 1 YES OK No comment SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 2
(1oo2)
2PAHH11107; 2PAHH11108
1B 111A 3443-SK-FP-018 2S11104 Permissive to open 2HV11107 SIL 1 YES OK No comment SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 2
(1oo2)
2TAHH12101D;
2 121A 3443-SK-FP-002 (2PAHH12101\03B (1oo2)) 2S12101 2HV12104 SIL 1 YES OK No comment SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 6
(1oo2)
A test Interval for the on-off valve of 1 year is acceptable from process point of
view considering that the complete full stroke test of valve can be done in less
than 10" (pipe of 6"). An appropriate procedure for the test, involving also the
control of 2FV12103 valve, in order to avoid overfilling once the test 2HV12106 is
complete, is proposed as below:
2TAHH12201D;
4 122A 3443-SK-FP-003 2S12201 2HV12204 SIL 1 YES OK No comment SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 17
(2PAHH12201\03 (1oo2)) (1oo2)
5 122A 3443-SK-FP-003 2PAHH12201 2S12201 2FV12203; 2HV12206 (1oo2) SIL 2 YES See No.3 See No.3 SIL Class MG of Changes MuMu 3443-SZ-RT-101 Att.8.4c SIF 1
2TAHH12301D;
6 123A 3443-SK-FP-004 (2PAHH12301\03B (1oo2)) 2S12301 2HV12304 SIL 1 YES OK No comment SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 28
(1oo2)
7 123A 3443-SK-FP-004 2PAHH12301 2S12301 2FV12303; 2HV12306 (1oo2) SIL 2 YES See No.3 See No.3 SIL Class MG of Changes MuMu 3443-SZ-RT-101 Att.8.4c SIF 1
10 312 3443-SK-FP-006 2TAHH31204/05/06 (1oo3) 2S31201 2FV31203; 2XV31201 (1oo2) SIL 1 NO See No.9 See No.9 SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 51
11 321B 3443-SK-FP-006 2TAHH32108A/09A/10A (1oo3) 2S31201 2FV31203; 2XV31201 (1oo2) SIL 1 NO See No.9 See No.9 SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 51
12 321B 3443-SK-FP-006 2TAHH32108B/09B/10B (1oo3) 2S31201 2FV31203; 2XV31201 (1oo2) SIL 1 NO See No.9 See No.9 SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 51
13 312 3443-SK-FP-007 2TAHH31209A/B (1oo2) 2S31205 Stop 2E3107 SIL 1 NO OK No comment SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 55
2PAH-33103A; 2PAHH-33103B In order to achieve SIL 2 Test Interval for the pumps The pumps do not run in the same time (the second pump is a spare pump), so
14 331 3443-SK-FP-008 2S33104 2P3301A stop; 2P3301B stop (2oo2) SIL 2 NO SIL Class Main Changes MuMu 3443-SZ-RT-101 Att.6.4 SIF 21
(1oo2) should be reduced to 6 months. that they can be tested every 6 months without any process upset.
2PAHH33305A; 2PAHH33307A
15 333B 3443-SK-FP-009 2S33302A 2HV33601A/B (1oo2) SIL 1 NO OK No comment SIL Class Main Changes MuMu 3443-SZ-RT-101 Att.6.4 SIF 6
(1oo2)
2PAHH33305; 2PAHH33307
16 333D 3443-SK-FP-010 2S33302B 2HV33601A/B (1oo2) SIL 1 NO OK No comment SIL Class Main Changes MuMu 3443-SZ-RT-101 Att.6.4 SIF 10
(1oo2)
AD A6 Comments after SIL calculation considering
No. P&ID Loop Dossier N. Initiator Logic Solver Final Element SIL Safety Comments after internal Process, HSE and Instrumentation assessment Notes Reference Doc. and SIF
Check Vendor reliability data.
In order to achieve SIL 2 Test Interval for the valves The valve is operated more than once every six months as normal operation for
2PAHH33305A; 2PAHH33307A
17 333B 3443-SK-FP-011 2S33303A 2HV33301A; 2HV33302 (2oo2) SIL 2 NO should be reduced to 6 months. wax discharge, therefore the test interval of 6 months should be acceptable in SIL Class Main Changes MuMu 3443-SZ-RT-101 Att.6.4 SIF 13
(1oo2)
this case.
21 413 3443-SK-FP-013 2LAHH41301 2S41301 2XV41401;2HV41404 (1oo2) SIL 1 NO OK No comment SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 65
23 414 3443-SK-FP-015 2HZLL41405A/B (1oo2) 2S41402 Permissive to open 2HV41404 SIL 1 NO OK No comment SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 67
25 621 3443-SK-FP-017 2TAHH62107/08 (1oo2) 2S62102 2PV62103; 2XV62107 (1oo2) SIL 1 NO OK No comment SIL Class Poland 3443-SZ-RT-101 Att.3 Sheet 69
In order to achieve SIL 2 Test Interval for the valve Test Interval acceptable, valves can be tested while plant is running without
26 212 3443-SK-FP-019 2PAHH21201 2S21201 2HV21201 SIL 2 YES SIL Class Poland - Revised 3443-SZ-RT-101 Att.3 Sheet 37
2HV21201 should be reduced to 1 year. major operational problems
In order to achieve SIL 2 Test Interval for the valve Test Interval acceptable, valves can be tested while plant is running without
27 212 3443-SK-FP-019 2PAHH21201 2S21201 2HV21202 SIL 2 YES SIL Class Poland - Revised 3443-SZ-RT-101 Att.3 Sheet 37
2HV21202 should be reduced to 1 year. major operational problems
In order to achieve SIL 2 Test Interval for the valve Test Interval acceptable, valves can be tested while plant is running without
28 212 3443-SK-FP-019 2PAHH21201 2S21201 2HV21203 SIL 2 YES SIL Class Poland - Revised 3443-SZ-RT-101 Att.3 Sheet 37
2HV21203 should be reduced to 1 year. major operational problems
2PAHH13101/02; 2LAHH13101A
29 131 3443-SK-FP-020 2S13101 2LV12303; 2HV13102 (1oo2) SIL 1 YES OK SIL 1 applied to comply with AD Merkblatt A6 Requirements SIL Class Poland - Revised 3443-SZ-RT-101 Att.3 Sheet 36
(1oo3)
NOTES:
1) For the SIL calculation the only SIL Levels for safety consequences have been considered.
2) The mentioned test intervals have been already checked with Licensor (Basell Process Design) and considered acceptable from Process point of view.