Ways to Measure Your

Asset Health Management


Maturity Matrix
Elements LEVEL
LEVEL 11 LEVEL
LEVEL 22 LEVEL 3 LEVEL
LEVEL 44 LEVEL
LEVEL 55
NOT
NOT ENGAGED
ENGAGED EXPERIMENTING
EXPERIMENTING ENLIGHTENED GOOD
GOOD PRACTICE
PRACTICE BEST
BEST PRACTICE
PRACTICE

Hierarchy exists down to the component


No functional hierarchy exists. Plant Plant utilizes a CMMS identification Plant has a hierarchy down to the system Plant has a hierarchy down to the
level. List is very consistent across
uses the asset list from accounting. No number for hierarchy purposes. level. Some machines exist on their own machine level. Some components exist
Functional Hierarchy understanding of the difference between Machines, components, and parts exist indenture level. No real consistency; list on their own indenture level. List is fairly
different areas and +95% accurate. Data
is validated at a frequent and regular
asset and equipment. on the same indenture levels. not accurate. consistent and at least 70% accurate.
interval.
Most of the system definitions exist, but
All systems have definitions and match
Some of the system definitions exist, but do not necessarily match the equipment Most systems have definitions and they
System Definition No system definitions exist.
only for a few critical systems. hierarchy and are not utilized on a daily match the equipment hierarchy.
the equipment hierarchy. Data is under
document control.
basis.

Redundancy definition exists for all of the


Redundancy definition exists for all critical Redundancy definition exists for almost
Redundancy definition exists for a few equipment in the facility. Data is under
Redundancy Definition No redundancy definition exists.
pieces of critical equipment.
equipment. Data can be modified by all of the equipment in the facility. Data is
document control and validated at a
ASSET CATALOG

anyone. validated on an as-needed basis.


regular and frequent interval.

Component configuration and parent- Component configuration and parent-child


Component configuration and parent-child Component configuration and parent-child
No component configuration list exists child relationships exist for all critical relationships exist for all of the equipment
Component relationships exist for a few pieces of relationships exist for almost all of the
and no parent-child relationships are equipment. Data is consistent only on in the facility. Data is under document
Configuration critical equipment, but are not consistent equipment in the facility. Data is validated
documented. like equipment. Data can be modified by control and validated at a regular and
on like pieces of equipment. on an as-needed basis.
anyone. frequent interval.
All component attributes are databased.
Component attribute data is recorded All component attributes are databased.
Component Attribute Some component attributes are recorded Records are under document control and
No component attribute library exists. for all critical equipment. Data can be Records can only be changed by Planner.
Library for a few pieces of critical equipment. data is validated at regular and frequent
modified by anyone. Data is validated on an as-needed basis.
intervals.
Detailed location maps exist for all Detailed location maps exist for all
Natural Equipment Route maps exist only for the machines Detailed route maps exist for all machines
No route maps exist. machines. Drawings can be edited by machines and are under document
Grouping on a PdM route. on both PdM and PM inspection routes.
anyone. control.
P&ID drawings are accurate. PFDs exist
All P&ID and PFD drawings exist and are
Drawings (P&ID, PFD, Only original construction drawings exist Only the electrical 1-line drawings are Most of the P&ID drawings are accurate. for most areas. RBDs exist for most
up-to-date. RBDs exist and match the
RBD, etc.) and are no longer accurate. up-to-date. RBDs exist for only a few systems. areas, but do not always match the
system designations in the hierarchy.
hierarchy.

All systems have criticality scores


No system level analysis has been A few critical systems have been All of the critical systems have been +80% of the systems in the plant have recorded in the CMMS. Scores are used
System Level Analysis performed; no value seen in it. analyzed. analyzed. been analyzed. for downtime planning and resource
allocation.

+80% of the machines in the plant have All machines have their own score.
A few pieces of equipment within the
No machine level analysis has been All equipment within the designated been analyzed. Scores are entered into Scores are in the CMMS and used for
Machine Level Analysis performed.
designated critical systems have been
critical systems have been analyzed. the CMMS and occasionally used for backlog sorting, labor allocation, spares
analyzed.
planning. inventory, etc.

Only a single category was used for the Categories for all stakeholders in the
No categories were used in the analysis; Two categories were used for the All stakeholder categories were used, but
Category Definition and analysis, such as Production Impact. plant were used in the analysis. Weighting
if they were used, no weighting was analysis, such as Safety Impact and no category weighting was used, or all
Weighting Some weighting was used in the assigned to all categories based on
considered. Production Impact . categories had the same weighting factor.
calculation. corporate values.

Total number of questions and answers


Less than 10 questions with 2-3 answers
Many categories contained Yes/No More than 10 questions with 2-3 answers equals the square root of the number of
each were used for the analysis. Analysis
Adequate Resolution This topic was not considered. questions, creating an A-B-C style
results were numerical, but only contained
each were used, producing a numerical equipment in the plant. Analysis produced
analysis. result with three significant digits. a numerical result with four significant
two significant digits.
digits.

A representative from production, A stakeholder from production,


A representative from production and
Cross Functional Only a few maintenance people worked maintenance, and at least one other maintenance, and at least two other Each stakeholder area of the plants had a
maintenance worked together to complete
Analysis Team together to complete the analysis. functional area of the plant completed the functional areas of the plant were present representative on the analysis team.
the analysis.
analysis together. during the analysis.

Answer distribution utilized after


Statistical analysis of the results shows
Review ensures that at least one completing analysis on a few machines
a No Mode distribution; the entire range
machine selected any given answer. to identify questions/answers that need
No methods exist for testing the quality of QA/QC consisted of a review to ensure was used and there are no gaps in the
QA/QC of Results the results. that all machines answered all questions.
Review occurred after all questions were modifying, but not reviewed again until the
range. Answer distribution checked
answered. Some equipment assumptions end of the process. Analysis assumptions
periodically throughout the analysis to
were used during the analysis. listed, documented, and used during the
improve initial equipment assumptions.
process.

Use of the criticality analysis results are Formal document exists that details the
No document exists that shows the Usage is called out in company
Defined Usage of mentioned in training classes, but no Formal document exists that details the usage for maintenance, operations, and
organization how the criticality ranking standards, but no evidence of daily use
Results official expectations of use on a daily daily usage. Evidence of daily usage. stores. Document managed and updated
index is to be used. is found.
basis. regularly.

FMA performed on selected critical FMA exists for all critical equipment, with FMA exists for top 50% of equipment in FMA exists for top 80% of equipment,
No Failure Modes Analysis (FMA) has
Asset Health Matrix been performed.
equipment, mostly after costly failure some mapping to the appropriate PM/ plant, with healthy balance between PM with EMP optimized for correct PM/PdM
events. PdM techniques and PdM techniques. balance.

Reliability Centered A few RCM analyses have been RCM analyses done proactively on the RCM analyses are complete for the top RCM analyses are complete for the top
performed after costly failure events, but top 5% of the equipment and action item 10% of the equipment and action item 20% of the equipment and action item
Maintenance (RCM) No RCM analysis has been performed.
action items from the analyses were not lists are +80% complete within 60 days of lists are +90% complete within 60 days of lists are +95% complete within 60 days of
Analysis completed. the analysis. the analysis. the analysis.

Top 5% of the bad actors are analyzed Top 10% of the bad actors are analyzed Top 20% of the bad actors are analyzed
EQUIPMENT MAINTENANCE PLAN

Only equipment that fails more than once every six months for failure patterns; every three months for failure patterns; every month for failure patterns; +80%
Bad Actor Analysis No bad actor analysis is being performed.
within a given month is flagged for RCA. action items are assigned, but not +60% of the action items are completed of the action items are completed within
managed tightly. This is a formal process. within two months. a month.
PM program for top 10% of equipment
Legacy PM program has been cleaned of Failure mode driven PM program exists Failure mode driven PM program exists
based on FMA. PM is actually an
Preventive Maintenance Legacy PM program based on OEM tasks that do not address a known failure for 50% of the equipment. PM is a for +80% of the equipment. PM is a
executable procedure instead of a simple
Program recommendations exists. mode. PM is still more of a task list than well-defined procedure with quantifiable well-defined procedure with quantifiable
task list. Balance of plant PM program is
an executable procedure. inspections and repeatable task steps. inspections and repeatable task steps.
still the legacy style.
A single technology is in use (vibration A minimum of three technologies are in A minimum of five technologies are fully A minimum of five technologies are fully
No PdM is in use or only low tech tools
Predictive Maintenance analysis, oil analysis, infrared use with some integration of the PdM utilized (e.g. electrical and mechanical utilized with integrated NDT program,
such as overall vibe pens or free oil
Program thermography, ultrasound, or motor circuit data into the maintenance work flow infrared) and integrated into the maintenance work flow processes, and
analysis are used in a few areas.
analysis). processes. maintenance work flow processes. production planning.

Triggers are refined; many employees,


Some formal RCAs occur based on high Triggers are in place (e.g. cost, number
Root Cause Analysis Investigations rarely happen and are not including operations, are trained in RCA.
Informal RCAs ocur. cost failures; limited number of employees of failures, operational involvement);
(RCA) documented. Metrics are in place to measure results,
are formally trained in RCA. RCAs are documented and published.
willingness to incorporate OEM experts.

Identified defects are a subject of Formal elimination strategy exists for all
Identified defects are monitored for all Identified defects and the rate at which
discussion for the top 2-3 critical identified defects on a monthly basis.
Defect Elimination critical equipment. The elimination of they are being produced is a subject at all
No defect elimination program in place. machines in the plant. No proactive use Defect elimination rate and defect
Program these defects is still an optional call for backlog meetings. Defect elimination is a
of the information though, only used to ingression rate are KPIs for operations
the asset owner. KPI for the maintenance manager.
optimize the run-to-failure strategy. and maintenance managers.

EMPs exist for most equipment. Details EMP labor and downtime requirements
EMPs exist for a few machines, but the EMPs exist for most critical equipment.
Equipment Maintenance are integrated into the CMMS for are integrated into the maintenance
EMP is an unknown term. details are known only to the engineer Details are published, but not integrated
Plan (EMP) Details execution. Some tasks are skipped due to budgeting and production planning
and planner who developed it. with the CMMS for execution.
cost or equipment availability. processes.

Continued on back...
North America • Europe • Latin America • Middle East • Asia-Pacific
World Headquarters GPAllied EMEA
4200 Faber Place Drive Guldensporenpark 21-Blok C
Charleston, SC 29405 B-9820 Merelbeke, Belgium
o. 888.335.8276 o. +32(0)9.210.17.20
f. 843.414.5779 f. +32(0)9.210.17.28
www.gpallied.com
Ways to Measure Your
Asset Health Management
Maturity Matrix
Elements LEVEL
LEVEL 11 LEVEL
LEVEL 22 LEVEL 3 LEVEL
LEVEL 44 LEVEL
LEVEL 55
NOT
NOT ENGAGED
ENGAGED EXPERIMENTING
EXPERIMENTING ENLIGHTENED GOOD
GOOD PRACTICE
PRACTICE BEST
BEST PRACTICE
PRACTICE

Personnel qualifications exist with varying Personnel qualifications exist with varying
Personnel qualifications exist with levels of technical expertise and are levels of technical expertise and are
varying levels of technical expertise, but developed and maintained (every 2-3 developed and maintained on an annual
Personnel qualifications do not exist for Personnel qualifications exist, but they do
are developed and maintained by the years) by the company with input and basis by the company with input and
Personnel Qualifications PdM analysts or technicians, or they are not provide granularity for varying levels
company without regard or consideration oversight of technical expertise. Third oversight of technical expertise. Third
identical to that of the craftsmen. of technical expertise.
to third party certification standards such party certification standards such as party certification standards such as
as ASNT. ASNT are utilized and referenced where ASNT are utilized and referenced where
applicable. applicable.
Technical certifications are administered
Technical certifications are administered
through a recognized third party
Technical certifications exist, but through Technical certifications are encouraged through a recognized third party
Technical certifications are not promoted certification process and exist for all
Minimum Certifications or present.
vendor-specific training and certification for all analysts with multiple levels of certification process and exist for all
analysts and technicians with varying
processes. certification for 1 or 2 PdM technologies. analysts with varying levels of certification
levels of certification for the five core PdM
for 2-3 PdM technologies.
technologies.
A comprehensive BOK exists and
methodologies are adhered to on
A BOK exists for 3 or 4 of the core
Body of Knowledge A BOK does not exist for any PdM A BOK exists for 1 or 2 PdM technologies, A BOK exists for all five of the core PdM a consistent basis. There is also a
PdM technologies and are generally
(BOK) technologies. but is generally basic in detail. technologies and are generally detailed. formal Management of Change (MOC)
EXECUTION STANDARDS

descriptive.
process in place for BOK continuous
improvement.
Personnel are fully qualified for data Collection practices and policies are in
collection. Collection frequencies and Collection practices and policies are in place for dedicated personnel. Condition
Ad-hoc data collection practices and
procedures have been established. place for dedicated personnel. Condition monitoring data collection activities occur
No clear process, procedure, or definition frequencies are utilized. Data is collected
Data Collection Methods in place for data collection methods. when opportunities arise or problems are
Activities typically occur on schedule, monitoring data collection activities occur on schedule and are considered priority
but resources may be pulled or activity on schedule and are considered priority work. Metrics and/or audit processes are
suspected.
may be missed due to other pressing work. in place and monitored to ensure data
maintenance activities. quality/integrity.

Collection specifications have been


Collection specifications have been developed for each technology in
developed for each technology in accordance with recognized industry
Collection specifications have been
General collection specifications have accordance with recognized industry standards. A machine library has been
Data Collection No clear process, procedure, or definition developed for each technology in
been established for technology data standards. A machine library has been developed to allow asset-specific
Specifications in place for data collection specifications. accordance with recognized industry
acquisition requirements. developed to allow asset-specific parameter sets to support unique
standards.
parameter sets to support unique equipment attributes. A formal MOC
equipment attributes. process is in place to support continuous
improvement.

Alarm limits are well documented and


based on industry specific values, along
Alarm limits are well documented and
with the application of statistical alarm
based on industry-specific values
bands for given equipment design and
Standardized Alarm No clear process, procedure, or definition Alarm limits based on discretion of General alarm limits based on for given equipment design and
configuration. Other outside standards are
Limits in place for alarm limits. technician or analyst. technician's or analyst's experience. configuration. Other outside standards are
considered and utilized where appropriate
considered and utilized where appropriate
(i.e. Vibe Institute, IEEE, etc). Continuous
(i.e. Vibe Institute, IEEE, etc).
improvement of alarming standards is
ongoing.

Asset health metric has been developed


with FMA being the primary method
Asset health metric has been developed
of applied maintenance initiative
Asset health metric has been developed with FMA being the primary method
Asset health metric exists, but is based on assignment. Multiple condition monitoring,
with FMA being the primary method of applied maintenance initiative
Asset Health Metric No such metric is utilized. perceived equipment status and assigned
of applied maintenance initiative assignment. Multiple condition monitoring,
PM, and operator care tasks are used to
to limited asset base. evaluate equipment health, maintenance
assignment. PM, and operator care tasks are used to
strategies are applied with application
evaluate equipment health.
standards and procedures to a large
percentage of the asset base.
ASSET HEALTH REPORTING

Integrated reporting of the five core PdM


technologies, along with other recognized
Integrated reporting does not occur. Ad-hoc integration of reporting through Integrated reporting of 2-3 PdM Integrated reporting of the five core PdM
Integrated Reporting Separate reports for each testing method. the use of word processor-type reporting. technologies. technologies.
maintenance testing practices (i.e. NDT,
power quality, energy consumption)
integrated with CMMS/EAM system.

Anomalies are directly linked to specific


Anomalies are linked to failure modes, Anomalies are directly linked to specific Anomalies are directly linked to specific
Anomalies are not linked to specific failure modes utilizing a standardized
Linked to Failure Data failures.
but are generic in nature and not failure modes utilizing a standardized failure modes utilizing a standardized
library of failure modes and reasons while
standardized. library of failure modes. library of failure modes and reasons.
linked to specific failure codes.
CMMS integration is performed manually CMMS integration is automatic with
CMMS integration is performed manually
CMMS integration is performed manually by multiple individuals. Integration input provided by multiple individuals.
by multiple individuals. Integration
CMMS Integration CMMS integration does not exist. by single individual. Integration only
includes test data results and work
includes test data results, work execution Integration includes test data results,
includes test data results. tracking, and job closing analysis/ work execution tracking, and job closing
execution tracking.
comments. analysis/comments.
Scorecard is automatically populated
Scorecard is automatically populated and displayed for all stakeholders. The
Scorecard is automatically populated
and displayed for all stakeholders. The metrics are clearly understood, along with
Automatic Scorecard Scorecard does not exist. Scorecard is generated manually. from the site CMMS/EAM system and/or
metrics are clearly understood, along with associated goals and targets. Action items
condition monitoring software.
associated goals and targets. are developed and followed up on based
on scorecard review.

Goal: +95% Asset Health on +50% of the Goal: +95% Asset Health on +70% of the Goal: +95% Asset Health on +90% of
No goals or objectives have been Goal: Improve asset health on critical
Goals and Objectives established for the process. equipment in the facility.
mechanical and electrical equipment in mechanical and electrical equipment in the mechanical, electrical, and stationary
the plant. the plant. equipment in the plant.
MATURITY PROGRESSION

Continuous No process steps defined for continuous Process steps defined as "as much as we Initial Step: Top 10% of equipment. Initial Step: Top 20% of equipment. Initial Step: Top 20% of equipment.
Improvement improvement. can afford, as quickly as we can afford it." Follow-on: 10%, 10%, 10%, 10% Follow-on: 20%, 15%, 15% Follow-on: 15%, 15%, 15%, 15%, 10%

"When the boss thinks it is okay to take "When +90% Asset Health is achieved, "When +90% Asset Health is achieved, +90% Asset Health that is sustained for at +90% Asset Health that is sustained for at
Triggers the next step, we will." we will discuss taking the next step." we will immediately take the next step." least 1 month. least 3 months.

No program duration defined. "We might "It takes as long as it takes. We are not 3-year plan. "Steps should take 4-6
5-year plan. "Some steps will take longer 3-year plan. No individual step can take
Duration change our mind on this if we find it going to change our current methods or
than others to achieve."
months to achieve. Some might take
longer than 6 months to achieve.
doesn't work." systems too quickly." longer, others shorter."

Action plans defined, approved,


Certain KPIs specific to developed
"We will evaluate missed triggers on an "We will evaluate missed triggers on an documented, filed, and distributed.
Action Plans for Missed triggers have been developed. These KPIs and action plans are communicated
as-needed basis and determine if they are as-needed basis and determine if they are Plans are built into the financial budget.
Triggers are evaluated on a consistent basis by and understood by all stakeholders.
a big deal at that time." a big deal at that time." Production budget is keyed off of
responsible personnel.
improvements in Asset Health.

North America • Europe • Latin America • Middle East • Asia-Pacific


World Headquarters GPAllied EMEA
4200 Faber Place Drive Guldensporenpark 21-Blok C
Charleston, SC 29405 B-9820 Merelbeke, Belgium
o. 888.335.8276 o. +32(0)9.210.17.20
f. 843.414.5779 f. +32(0)9.210.17.28
www.gpallied.com