Sunteți pe pagina 1din 8

KNR is fully equipped office with all required

software packages for design and engineering


services for Substation and Transmission line.

KNR has the distinct experience of working with


reputed consulting organization namely PGCIL,
NTPC, DCPL, MECON, TCS, FICHTNER,
VOLTECH & AVANTI-GARDE.

KNR has over 26 qualified engineering


professionals.

KNR Engineers & Consultants was KNR has an exclusive team of High Voltage
established in 2003 and converted into Pvt Engineering professionals to carry-out Insulation
Limited in 2008. KNR has an exclusive team Coordination study for EHV GIS substation using
of experts and engineering professionals lead EMTP-RV / MICROTRAN 3.22 software packages
by Mr. N.K. Nathan from Esquire Engineers & from Powersys - France.
Consultants, unit of Best & Crompton
Engineering Ltd. KNR has built up an impressive client base since
inception.
KNR has grown in size and strength to
undertake Design & Engineering work for KNR's key personnel have worked in GCC and
large T&D projects upto 765kV and Industrial are conversant with the codes of practice of West
power systems. Asian countries.

Gas insulated substations upto 765kV KNR has a power system study group to handle
voltage class load flow, short circuit, transient stability,
Grounding design using ETAP and harmonic
KNR has completed over 250 assignments analysis.
since inception.
KNR has built up an impressive client base which
includes all giants of Power industry during the last
13 years.

KNR owes its reputation for technical excellence


coupled with problem solving skills of professional
team of engineers.

Overhead Distribution lines up to 33kV

Overhead Transmission lines up to 765kV


KNR offers the following services for
Transmission and Distribution projects.

Design & Detail engineering for EHV substations


and transmission lines upto 765kV.

Gas Insulated substation

Power system studies.

Insulation Co-ordinations studies.

Owner engineering services for EHV substations


CIVIL AND STRUCTURAL
Wind & Solar power
 Analysis between PEB and RCC
Infrastructure sector building
 Economic selection of width of
Desalination plants (RO & MSF) sea water intake GIS building
systems  Study of soil investigation report
 Design of GIS building columns
and beams
 Selection of foundation type
SERVICES IN DETAIL  Design of foundation
GAS INSULATED SUBSTATION  Architectural drawings
 Floor & roof slab design
ELECTRICAL  Crane corbel beam design
 Review of schemes & selection SUBSTATION DETAIL
 Protection SLD ENGINEERING
 Technical specification for Gas Insulated
Switchgear KNR has done over 250 assignments of
 Analysis & selection of bay width & detailed engineering services for
depth substations up to 765kV for national and
 Plot plan for GIS overseas clients
 Interface connection and take off
arrangement ELECTRICAL
 GIS layout
 Transformer yard layout  Protection and Metering SLD
 Grounding design of GIS substation using  Substation Layout Plan and
CDEGS as per CIGRE-44 Sections
 Lightning protection.  Substation Clearance Diagram
 Indoor-outdoor lighting  Erection Key Diagram
 Ventilation system  Earthing & Lightning Protection
 Lighting System Design.
 Road, Drain and Duct Bank
 Transformer and Reactor Foundation
 Transformer Fire Wall and Soak Pit
 Project Bill Of Materials

TRANSMISSION LINE DESIGN AND


DETAILED ENGINEERING SERVICES:

KNR offers complete range of consulting services


for Transmission Line projects.

 Cable Routing and Schedule  Transmission Line Route Survey


 Control Room Equipment Layout  Tower Spotting
 Structural loading layout  Conductor Sizing
 Battery and LVAC System  Single Line Diagram
 CT & PT sizing calculation  Transmission Line Design to 'ROW'
 SCADA System Constraints
 Project Bill Of Materials

CIVIL AND STRUCTURAL


 Foundation Design and
Engineering
 Structure Design and Engineering
 Control Room Building Design
and Engineering
 Lightning & Lighting Mast
 Foundation and Cable Trench
Layout
 Storm Water Drainage System

 STADD Analysis Report.


 Foundation Design and Drawing for all
types of soil
 Tower Drawing, Elevation & Clearance
Drawing
 Sag Tension Chart - Mathematical
Optimization
 Technical Support for testing of
Transmission Line Tower at Recognized
Testing Centre
 Transmission Line Bill Of Materials
Using EMTP package EMTP-RV from
Powersys, insulation co-ordination study for
lightning and switching over voltage
performance is being carried out.

WIND POWER

ELECTRICAL

 Equipment Selection
 Protection and Metering SLD
 Unit Substation (USS) & Package
POWER SYSTEM STUDIES Substation (PSS)
 Skid mounted substation layout
KNR has done over 14 assignments of system  Substation Layout Plan and Sections
studies for AIS & GIS substations up to 400kV  Substation Clearance Diagrams
for national and overseas clients.  Erection Key Diagram
 Earthing for WTGs
Using ETAP 12.0 Software Package, Power  Earthing & Lightning Protection
system studies covering the following have  Lighting System Design
been carried out  MV & LV Cable sizing, routing
layout and schedule
 Short Circuit studies  Control Room Equipment Layout
 Transient Stability  Battery and LVAC System
 Relay Co-ordination  SCADA System
 Load Flow studies  Project Bill Of Materials
 Dynamic Stability  Cost estimate
 Motor starting Analysis
 Harmonic Analysis
 KNR recently completed a
Transient stability study for a 220kV
system fed by 4x210MW generator
plus 5X45 MW generators in GUP-
ABUDHABI

INSULATION COORDINATION
STUDIES

KNR has done over 20 assignments of


insulation coordination study for gas insulated
substations up to 400kV for national and
overseas clients.
CIVIL AND STRUCTURAL

 Foundation Design and Engineering


 Structure Design and Engineering
 Control Room Building Design and
Engineering
 Lightning & Lighting Mast
 Foundation and Cable Trench Layout
 Storm Water Drainage System
 Road, Drain, Duct
 Transformer Foundation
 Transformer Fire Wall and Soak Pit
 Project Bill Of Materials

PV SOLAR POWER CIVIL AND STRUCTURAL


ELECTRICAL  Foundation Design and
Engineering for PV panels,
 Equipment Selection equipment & tower
 Protection and Metering SLD  Structure Design and Engineering
 Sizing of String & Inverter for PV panels, equipment &
 Design and layout for PV solar panels, tower
junction boxes and inverter  Control Room Building Design
 Substation Layout Plan and Sections and Engineering
 Substation Clearance Diagrams  Lightning & Lighting Mast
 Erection Key Diagram  Foundation and Cable Trench
 Earthing for WTGs Layout
 Earthing & Lightning Protection  Storm Water Drainage System
 Lighting System Design  Road, Drain, Duct
 MV & LV Cable sizing, routing layout  Transformer Foundation
and schedule  Transformer Fire Wall and Soak
 Control Room Equipment Layout Pit
 Battery and LVAC System  Project Bill Of Materials
 SCADA System
 Project Bill Of Materials
 Cost estimate
OFFICE  Nano CAD
 STADD PRO
450 sq.m well equipped office located in  STADD PRO ANSI
Chennai central district about 8 kms from the  STADD PRO Foundation
international airport.  Access to CDEGS & CYME

HARDWARE LIBRARY

KNR has a well equipped engineering office with  KNR has a dedicated library that
11 CADD workstations networked with required comprises books and journals in
software packages to extend turnkey consulting electrical domain.
services for T & D projects:  Indian standards, IEC, IEEE Std.
JSA, BS, SABS & relevant to
 1 - Plotter HP Design Jet T120 capable Design & Engineering of EHV
of printing up to A1. substation, Transmission line.
 1 - Scanner/Printer/Xerox HP M5025.  Technical Hand books of TNEB,
 1 - Samsung Laser Printer ML2550. KSEB, TL EPRI and other
 1- Canon LBP6200 printer. utilities.
 3 - Broad band Internet connections.  Central Board of Irrigation
Power (CBIP) Manual on
substation layout and
specifications
SOFTWARE DETAILS  Hand books of ABB, Siemens,
RCC and Steel Structure Design
 AutoCAD 2012
Book & Technical Hand Book
 AutoCAD LT
for Power Distribution, etc.,
 EMTP-RV3.4
 Over 200 Technical Books on
 BRICSCAD 2014
Power, Transmission,
 MICROTRAN 3.22
Distribution and utilization.
 ETAP 12.0
 Knowledge Document of the
• LOAD FLOW
project done by KNR is
• SHORT CIRCUIT
Securely Stored in (cloud) for
• TRANSIENT STABILITY
Convenient Retrieval any time
from anywhere.

S-ar putea să vă placă și