PACKAGE 1: CADANGAN MEMBINA KEMUDAHAN PENGURUSAN ENAPCEMAR
DI LRA PALONG TIMUR, SEGAMAT, JOHOR
List to follow up as at 08/03/2018 Deadline Date Deadline Date No Description Action By Status (Proposed) (Actual) WORKS & MATERIALS 1 Shop drawing for M & E (inclusive fabrication, type of materials that PBE 28.02.2018 09.03.2018 PBE start to issue / have discrepency) update anything pertaining shop drawing for M & E thru email - by Wednesday 14/03/3018 PBE team go down to Kuantan to discuss with mechanical team there. PNSB to issue letter appointment of Murshed as PM for PBE. 2 Shop drawing for Roof Truss & Covering PBE 09.03.2018 in-progress 3 Bending & tensile test for steel bar - Ayer Keroh, Melaka (Y10, Y12, PBE 27.02.2018 reschedule - 27.03.2018 (tues) - Y16) - 2 sets each rod (total - 6pcs) Azreen to confirm with the factory to makesure that factory independent. 4 Vibrator (currently only 1 unit) - at least 2 units PBE 12.03.2018 to deliver vibrator add. 1 unit 5 Detail of schedule for C & S (WWCT/SBT, Polymer & Geotube PBE 22.02.2018 DONE 23.02.2018 6 Detail of schedule for M & E PBE 26.02.2018 DONE - require amend 06.03.2018 05.03.2018 7 Work programme (panel casting) for WWCT/SBT, Polymer & PBE 22.02.2018 DONE 23.02.2018 Geotube 8 Method of repairs for honeycomb PBE 26.02.2018 DONE 26.02.2018 9 Method of repairs for cold joints PBE 02.03.2018 reschedule - 09.03.2018 10 Material to get ready on-site ASAP: i 300mm dia. Pipe - 2 units of paddle flange (700m length) PBE 05.03.2018 in-progress ii 200mm dia. Pipe - 1 unit PBE 05.03.2018 in-progress iii 100mm dia. Pipe - 4 units paddle flange (Ductiles Pipe) PBE 05.03.2018 in-progress iv 100mm dia. Pipe - 4 units (MS Pipe - 700mm length) PBE 05.03.2018 wrong material delivered 28.02.2018 v 100mm dia. Pipe - 80 units (MS Pipe) PBE 05.03.2018 in-progress vi WS for dry well & wall (foam ties + rubber + inner unit) PBE ASAP DONE 28.02.2018 vii Reinforcement bar for dry well, wall & top slab PBE ASAP DONE 15.02.2018 viii Binding Wire PBE ASAP DONE - continuoues 27.02.2018 ix Formwork - plywood, kokcai, kayu 2" x 3" PBE ASAP DONE - continuoues 27.02.2018 x Scaffold & Stagging (50 sets) - safety & working platform PBE ASAP DONE - continuoues 27.02.2018 xi Y10 reinforcement for Top Slab SBT & WWCT PBE ASAP DONE - continuoues 27.02.2018 PACKAGE 1: CADANGAN MEMBINA KEMUDAHAN PENGURUSAN ENAPCEMAR DI LRA PALONG TIMUR, SEGAMAT, JOHOR List to follow up as at 08/03/2018 Deadline Date Deadline Date No Description Action By Status (Proposed) (Actual) 11 To mobilize long arm excavator from Tangkak PBE 28.02.2018 DONE 03.03.2018 12 To fabricate Y12 & Y16 reinforcement for WWCT & SBT PBE ASAP DONE 04.03.2018 13 To update CCC monitoring checklists PBE & PNSB ASAP to be updated by Ishak 14 To prepare CNC letter - to be issued to PBE on 03.06.2018 PNSB ASAP READY 26.02.2018 15 To add up additional Y10 reinforcement at the top of wall to reduce PBE ASAP when installation of rebar for wall concrete cover by 25mm completed 16 To submit claim for March 2018 ending 18hb (PBE to report no PBE 25.02.2018 17 To carry out concrete cube test for WWCT/SBT slab i 7 days - 9 samples PBE 27.02.2018 DONE 27.02.2018 ii 28 days - 9 samples PBE 20.03.2018 18 To propose FAT for horizontal screw pump - ask Ishak to send an email direct PBEto Mursyed02.03.2018 to request FAT for horizontal screw pump 19 To update revised MIP (1st Revision) by adding up schedule % PBE 02.03.2018 no need - problem with Microsoft 08.03.2018 complete & unit % complete Project 20 To remind PBE site team not to do any works outside hording PBE & PNSB 02.03.2018 DONE 04.03.2018 21 To collect invert level data for installation of pipe from PBE ASAP DONE - submitted to Khatim 05.03.2018 sedimentation tanks to WWCT & SBT 22 Inaccurate level of slab for WWCT/SBT, causing height of wall is PBE 13.03.2018 & to get advice from Ishak - get MEMO 65mm higher than actual 3800mm. The difference level between 15.03.2018 from him by 15.03.2018 (azizi to existing drain & top slab only 148mm which is less 152mm than submit rough estimation by suppose 300mm. 12.03.2018) Recommendation: PBE to submit taking off & calculation for that additional 152mm ( refer attachment H & I ). 23 To issue 2nd reminder letter for absent from weekly meeting PNSB 02.03.2018 DONE 02.03.2018 (28/02/2018) 24 PBE 18.03.2018 PBE to update - 3 months before To submit related supporting document for application of EOT. (1st completion date must be submitted reminder letter already issued on 15/02/2018) to PNSB & PAAB 25 Waterproofing materials (3 coats) - PBE to submit MATERIAL PBE 20.03.2018 PBE to update by 20.03.2018 / to APPROVEL & Method of Statement submit specification of the coating 26 PNSB to issue NCR-003 for lack of safety during working at site PNSB 02.03.2018 DONE 02.03.2018 PACKAGE 1: CADANGAN MEMBINA KEMUDAHAN PENGURUSAN ENAPCEMAR DI LRA PALONG TIMUR, SEGAMAT, JOHOR List to follow up as at 08/03/2018 Deadline Date Deadline Date No Description Action By Status (Proposed) (Actual) 27 No concreting work shall be carried out for wall until repair of cold PBE & PNSB ASAP Subject to discussion with Mr Zul & joints is done - as per discussion during weekly meeting on Rozaidi 08.03.2018, PBE to send an email (inclusive MOS for concreting of wall) and repair of cold joints/honeycomb to be done later. 28 To submit report & recommendations to PAAB for special meeting PNSB 09.03.2018 Ishak to prepare with HODIVISION (current delay, less commitment) 29 To lower down the level of reinforcement for WALL 'A' & 'C'. PBE 09.03.2018 Dimension is 500mm 30 To remove debris on kickers prior to installation of formwork. (NCR- PBE 09.03.2018 004) 31 To prepare ahead 1-week planning by weekly as per requested by PBE & PNSB Weekly PAAB 32 Mursyid to send an email to PNSB for MOS (mark on drawing) of 33 To submit slide presentation for Monthly Meeting on 12.03.3018 PBE 09.03.2018 submit to Mr Zul thru email ADDITIONAL OR DISCREPANCY OF DRAWING - PBE to submit Request For Information (RFI) 1 To get detail of drawing for 2 units of pipe at WALL 'D' PNSB 02.03.2018 further discussion with Ishak (refer attachment B) 2 To get detail of drawing for 1 unit of vertical pipe at PNSB further discussion with Ishak Section B-B (refer attachment A) 3 To get drawing for top slab plan & detail of rebar at WALL 'D' (refer PNSB further discussion with Ishak attachment D) 4 To get drawing for detail of rebar for Top Slab at WALL 'E' PNSB further discussion with Ishak (refer attachment E) 5 Why length of this slab in section WALL 'D' is longer than what PNSB further discussion with Ishak shown in Top Slab Plan? (refer attachment F & G)