Documente Academic
Documente Profesional
Documente Cultură
“ Enabling Effective
IT Service
Continuity process
by automating and
The client was facing the multiple challenges related to IT
service continuity. Post discussion with ProVise, client decided
to initiate an IT service continuity project to overcome the
following challenges.
Identifying IT critical services and its infrastructure
requirement for service continuity
rationalization of Rationalizing RTO / RPO values and communicating to business
”
on MTD
RTO / RPO Evolving strategy for identifying alternate site and plan testing
Testing IT services in alternate site and operationalization
Automation of switch over to alternate site
Scope of work
The IT senior management of the bank took the advise of the ProVise to initiate an IT disaster recovery project.
The client already have an IT service management system working, ProVise advised the client to look at
continuity from a service point of view. Client was convinced and awarded the project to ProVise. The brief
overview of the scope of work is establishing IT service continuity process for IT critical systems, develop and
maintain IT service continuity plan and procedures. Develop test plans, switch over procedures and testing
Key Achievements:
ProVise Approach Successfully implemented
and transitioned the
service continuity plan to
We followed the approach of Thought Leadership to Benefit Realization in alternate site
order to establish a self sustaining and continually improving IT service Developed organization
continuity framework meeting the following objectives: specific switch over plans
including run book for
Conducted Business Impact Analysis / Risk Assessment;
effectiveness
Formulated Service Continuity Strategy and Plan; Successful completion
DR plan includes procedures including Run Book; switch over and switch
Co implemented Service Continuity Strategy and Plan; back of critical IT services
Engaged with IT resources and developed scripts for switch over and Successful completion of
automation and
back; rationalization of RTO
Developed scenarios for switch over testing and on job training ;
Automation of Switch over / back testing carried out existing BPA tool;
Continuous improvement by measuring success of service continuity by KPI’s
Value Delivered