ELECTRICAL
5.00.0 MOTORS
5.01.0 GENERATORS
Generator Installation
5.01.1 Preservation & Storage Record
Generator Installation
5.01.2 Generator Test Record
Generator Installation
5.01.3 Generator Inspection/Run-in Checklist
Generator Installation
5.01.4 Generator Inspection Checklist
5.02.0 ELECTRICAL
Grounding Systems
5.02.2 Ground/Earth Resistance Readings Installation
Conduit Installation
5.02.3 Conduit/Cable Sealing Inspection Record Cable Tray Installaiton
Power Transformer
Installation
5.02.4 Insualtion Resistance (Transformer) Test Record
Power Transformer
5.02.6 Neutral Grounding/Earth Resistance Test Record Installation
Low Voltage Switchgear
Installation
Insulation Resistance (Wire & Cable) Test Low-Medium and High Voltage
5.02.11
Record Shielded Cable
5.02.12 D.C. High Potential (Cable) Test Record Low-Medium and High Voltage
Shielded Cable
Generator Installation
5.02.13 Generator Run-in Test Record
Generator Installation
5.02.14 Generator Cold Resistance Test Record
Mechanical Equipment
Installation
5.02.18 Packaged Equipment Test Records Skid Mounted Equipment
Installation
5.02.20 DC High Potential Test (Equipment) Test Record Low-Medium and High Voltage
Shielded Cable
UPS System and Battery
5.02.21 Inverter & Static Switch Inspection Checklist Installation
5.02.26 Insulation Resistance Power Cable Test Record Low-Medium and High Voltage
Shielded Cable
SUB-CONTRACTOR
CONTRACTOR
INSPECTOR
INSPECTOR
INITIAL DATE INITIAL
Checklist
Checklist
Checklist
Checklist
Checklist
Checklist
Checklist
Checklist
Checklist
ENTS
AUTHORIZED
INSPECTOR
INSPECTOR
OWNER QA
DATE INITIAL DATE INITIAL DATE