1.0 Introduction
2.0 Contract Particulars Date for Mobilization
Date of Commencement
Date of Completion
Contract Value
Contract Total Duration
3.0 Powers of Engineer/Engineer’s Representative Delegation & Authority (Scope, Money, Time)
Authorized Signatories (Names for all parties)
Delivery of Correspondence (etc 2 copies)
4.0 Contractor’s Authorized Personnel Acceptance of instructions
Authorized Signatories
Delivery of Correspondence etc
5.0 Contract Documents Availability for Signature (Signd & Stamped Contract Docs)
Clear understanding of Contract Clause 2
Dsicuss up to date clarifications and/or any discrpancies.
6.0 Construction Drawings /Shop Drawings Issue for Construction (Revision, Drawings Logs)
Subsequent revisions
Revisions vs clarifications and RFI
7.0 Programme (Particulars of Clause 14) Format Proposed & Content
To include Gross Resources Forecast (Major Trades)
Availability for Engineers review
Schedule of submissions for Engineering and Construction
18.0 Monthly Reports Delivery date by end of the month submitted by Consultant
Delivery date by 7th day of the following month
Contractor’s Report Approved Format and Table of Content
Monthly statements are required relating actual to programme
Consultant’s Report in respect of labour, submissions, progress programme and
payments, Approved Format
Statement are also required on outstanding information
19.0 Meetings Frequency & Location
Technical Meetings Chairmanship by Consultant
Progress Meetings Minuting by whom
Monthly Breakdown of Preliminaries Bill
20.0 Valuations of Payment Breakdown of Lumpsum items failure to provide breakdown
may have an adverse affect on payment
GPD-COM-F-002
(GPD-COM-P-006
Doc Ref: GMD-COM-F-002 Revision: 3 Issued: 01/03/2004 Page 3 of 3