Documente Academic
Documente Profesional
Documente Cultură
Training Manual
Table of Contents
TABLE OF CONTENTS ..................................................................................................................... III
EXERCISE 1: STARTING A PROJECT IN THE ROCKWORKS17 BOREHOLE MANAGER
...................................................................................................................................................................1
EXERCISE 2: USING ROCKWORKS17 TO VIEW YOUR RAW DATA ................................... 11
EXERCISE 3: CREATING STRATIGRAPHIC MODELS AND DIAGRAMS IN THE
BOREHOLE MANAGER .................................................................................................................... 25
EXERCISE 4: CREATING LITHOLOGY SOLID MODELS AND DIAGRAMS IN THE
BOREHOLE MANAGER .................................................................................................................... 37
EXERCISE 5: CREATING I-DATA AND P-DATA SOLID MODELS AND DIAGRAMS
USING THE BOREHOLE MANAGER ............................................................................................. 43
EXERCISE 6: WORKING WITH WATER LEVELS AND T-DATA IN THE BOREHOLE
MANAGER ............................................................................................................................................ 55
EXERCISE 7: INTRODUCTION TO THE ROCKWORKS UTILITIES – THE MAP MENU. 61
EXERCISE 8: GRID AND SOLID MODEL TOOLS IN THE ROCKWORKS UTILITIES ...... 71
EXERCISE 9: USING IMAGES, CAD AND GIS FILES IN ROCKPLOT3D .............................. 79
EXERCISE 10: LAYING OUT A REPORT PAGE IN REPORTWORKS ................................... 81
EXERCISE 11: OVERVIEW OF GRIDDING ALGORITHMS FOR CONTOURING SPARSE
DATA IN ROCKWORKS UTILITIES ............................................................................................... 85
EXERCISE 12: MAPPING TOLUENE CONCENTRATIONS OVER TIME WITH
ANIMATION ......................................................................................................................................... 95
EXERCISE 13: ADVANCED LESSONS WITH PLUME AND LITHOLOGY MODELS ......... 103
EXERCISE 14: WORKING WITH FAULTED SURFACES ........................................................ 115
EXERCISE 15: RECTIFYING IMAGES ........................................................................................ 119
EXERCISE 16: USING THE STRATIGRAPHY PICKER TO ADD STRATIGRAPHY TOPS
AND BASES TO THE BOREHOLE MANAGER DATABASE .................................................... 121
Click on the Borehole Manager tab and choose Folder | Create New Project to display the
Create New Project Wizard dialog box.
Accept the default location for the project
folder (C:\Users\<username>
\Documents\RockWorks17 Data\New Project\)
or click on the yellow folder icon to
specify a different folder. Click the Next
button to accept the default settings and
proceed to the Project Coordinates step.
Change the Horizontal Coordinates
and Units to UTM.
Verify that the datum is set to WGS-
84 (NAD-83), the Zone is set to 13
(Northern Hemisphere), and the
horizontal Units are set to Meters.
Verify that the Vertical Units are set
to Meters, and click the Finish button
to display the Confirm dialog box.
• Skip Existing Record will not import any data if the borehole
already exists in the database.
• Create New Record will create a new borehole if the
borehole already exists.
• Replace Existing Record will delete the existing borehole
data and replace it with the new data from the Excel file.
• Update Existing Record will add new data types to an
existing borehole, but it will overwrite data in existing data
types.
• Warn on Existing Record will let you specify the desired
method for each borehole.
Click the Finish button to display the Confirm dialog box. Verify
that the Units, Datum, and Zone are correct, and then click the Yes button.
RockWorks loads the data and calculates the XY location and elevation of each data point within the
boreholes. When it finishes, the Confirm dialog box give you the option to Update Project Dimensions.
Click Yes to display the Output Dimensions dialog box.
You can click on a column heading to have the terms sorted by that column. For example, clicking on the
G-Value column will sort the table in ascending order based on the entered G value.
Close the Lithology Type Table by clicking the X in the upper right corner.
RockWorks 17 assigns the order to the formations based on the first occurrence of each formation in
the file. Change the Order values of the formations to match the following list:
o 1.0 - A-Horizon
o 2.0 - Spergen Fm.
o 3.0 - Leadville Ls.
o 4.0 - Potosi Fm.
o 5.0 - Basement
These numbers represent the order in which the units were deposited, with the largest number representing
the first deposited or oldest formation. This is an important step because this controls the order in which
Stratigraphic models are created by the RockWorks program.
Next, double click on each pattern, and assign a unique color and pattern to each Formation. You can
also experiment with varying the Fill Percent for the units.
!! Assign a different background color for each formation if you plan to display 3D plots. 3D plots use
only the background color to display the formation, and patterns are not displayed. 2D plots have the
option to display patterns and/or background colors.
When you have finished you should have a Stratigraphy Types table that looks similar to the one below.
Click on the Optional Fields button to display the Optional Fields for Location dialog box.
Required fields are displayed with a blue/gray background to indicate that they cannot be changed.
Click OK to close the dialog and display the new field in the Optional Fields dialog box. Final
changes can be made to the Order, Width, and Group settings, and then click OK to return to the
Location table. RockWorks will update the database
to display the new fields and tabs.
Next, let’s take a look at how you can add additional
columns to the I-Data, T-Data and P-Data tabs.
Click on the I-Data tab and to display Interval Data
for the selected borehole.
Right click on any one of the column title cells at the
top of the data tab (such as Benzene Soil) and select
Show Column Names Dialog.
Click on row containing Mg, and press the down
arrow on your keyword to add a new
row to the table.
Type in the name of a new data type
(for example Na).
When creating a new data type, you
have the option to type in information
about the expected range of values that
you will encounter, the units, as well
as a general description of the data
type, but this data is not required.
Click on the Striplogs menu and choose Striplogs | 2-Dimensional | Single Log to display
the 2D Striplog menu.
A 2D Striplog options window opens up with some menu options in the panel to the left, and two tabs to
the right: Instructions and 2D Striplog Designer.
Click on the 2D Striplog Designer tab.
This window allows the user to establish which data items will be displayed in the 2D log. The user can
also adjust column placement and appearance settings for each column.
To view/adjust an item's
settings, click on its name
in the Visible Items column,
and modify the settings as
necessary in the Options
pane in the bottom right.
In the 2D Striplog Designer, insert check marks for the following items in the Visible Items pane. All
of the other items should be unchecked.
Title
Depths
Lithology
Stratigraphy
Well Const.
Two new tabs titled "Striplog Section" and "Striplog Section Index Map" appear, displaying a cross-section
with legends and a borehole location map.
Click on the Striplog Section tab and move the mouse over your cross-section to display the X and Y
coordinates at the bottom of the window. X is distance along the cross-section and Y is elevation.
Let’s recreate this section quickly, with one change to the Stratigraphy settings.
Remove the check mark from the Create Location Map option.
Create Location Map
Click on the 2D Striplog Designer tab.
Click to add a check mark in the Stratigraphy Text item, and make sure that the following options
are checked on in the Options panel to the right. Remove the check marks from the other items.
Keywords
Borders
Once you’ve made these changes, click on the Process button in the lower left corner.
Once you have chosen your line, click on the Process button in the lower left.
Two new tabs named Striplog Profile Index Map and Striplog Profile are displayed.
Click on the Striplog Profile Index Map tab and save it with the File | Save menu RockPlot2D pane in
the Multi-Log Profile window.
In the Striplog Profile tab, you should get an image that looks similar to the figure below. The left side
represents the first point that you clicked to start the profile. You may want to minimize the Rules & Filters
pane on the far right side of the window, and the Layers pane to the left of that to free up some space for
viewing. Notice that with this type of diagram, the program shows the true geometry of your boreholes.
Save your profile by choosing the File | Save menu in the RockPlot2D pane of the Multi-Log Profile
window. Name your Rw2D file Projected Section.Rw2D.
Choose the Separate radio button and expand the options for Separate layers by clicking on the +
sign next to Separate.
RockWorks gives you the option to turn on and off different types of objects. The program has the
user specify a Root Name for all layers and different names for each layer.
Explore the other options you have for the DXF output.
The Include Elevations option should be turned off unless exporting a contour map. We will be
covering contour maps later in the course.
See the Help pane for explanation of the other export options.
Be sure that the Plot with Default Viewer option is not checked if you do not have AutoCAD or
another DXF viewer installed on your computer. In your own work this is a great way to view the
exported file immediately if you have AutoCAD or another DXF viewer.
Once you have explored your options, click on the Process button to create the DXF file and close the
window.
Close the Multi-Log Profile window using the "X" button in the upper right corner. There is no need
to save these Rw2D files.
Let’s clean this up a little bit so you can better see your data.
Expand the window so that it takes up most of your screen. Note that you can move the divider
between the object list which starts with the Reference item and the image by dragging your mouse.
Reposition the divider so that the majority of the Windows is used to view the 3D scene.
In the upper right hand corner, click on the "[–]" button next to "Rules & Filters". This will free up
space as well.
Finally, note that you can free up even more space by clicking the [-] button in the middle of the
divider between the program menu tree on the far left and the RockPlot3D window.
Your window should now look similar to this:
Click on the Scaling | Options button, choose Automatic, and click the OK button.
Expand the options for "Shape" by clicking the "+" to the left of the item and choose Oblates.
In the menu options to the left, check off the following items:
Clip (Truncate Logs)
Reference Cage
Click on the Legend(s) | Options button to display the Legends dialog box. Add a check mark to the
following item, then click the Ok button.
Aquifers
Lithology
Stratigraphy
Well Construction
Aquifers
Click on the Process button in the lower left.
Extra Credit – Explore Additional Options for Plotting P-Data and I-Data
Next, we’ll explore some additional tools for plotting downhole Point and Interval-based data.
Select borehole DH-01 again, and choose the Striplog | 2-Dimensional | Single Log menu
command.
Make sure that the following items are selected in the 2D Striplog Designer:
Title
P-Data #1
Click on the P-Data #1 item to display the P-Data Curve #1 Options pane. Click Fill Options |
Options button to display the P-Data Curve-Plotting Options dialog box. Add a check mark to
the Fill Region Within Curve option and select Gradational. Click on the Ok button to return to
the 2D Striplog menu.
Click on the Process button in the lower left to display a striplog with color fill varying based on
Gamma values.
Inverse Distance
In the Additional Options section to the right, click on the Dimensions tab and select Based
On Output Dimensions.
Base-to-Top (Onlap)
Click OK to close the Stratigraphic Modeling Options window.
Click the Diagram | Options button and remove the check marks from the following items.
Plot Faults
Explode
Hide Thin Zones
Plot Logs
Reference Cage
Stratigraphy Legend
Click Ok to close the Diagram Options dialog box.
Click on the Process button in the lower left corner of the Stratigraphic Model window.
The program will interpolate grid files for the top and base of each Stratigraphy Formation to form the
Stratigraphic block model and display it in a new RockPlot3D tab named Stratigraphy Model.
Click on the blue Stretch button in the horizontal toolbar at the top so you can get a better look at the
different layers in the model.
Click the "+" sign to the left of the Stratigraphy Model item in the data tree to the left of the 3D model
to expand the list.
You should now see a list of the Stratigraphy Formations in the model (circled above).
Click on the "+" sign next to the Spergen Fm. unit and note that the unit is composed of a Top, Base
and Sides.
Next, let’s regenerate this stratigraphic model, but take advantage of an option that allows us to better view
pinched out and thin units.
Back in the options along the left edge of the window, make the following changes:
Close the Stratigraphic Section window, you do not need to save it.
Click on the diagram and drag the mouse to rotate the diagram.
Experiment with removing/inserting check-marks in the different layer names to see their effect on the
display.
Close this window by clicking the Close button in the lower left corner . You do not need to save
the RW2D file.
Go back to the settings along the left edge of the window, and click on the Diagram Options
button, then click on the Colored Intervals tab.
Select the Radio button next to Custom, and then click on the Edit button to the right.
A listing of all of the existing color tables in the current database will be shown. For this map,
we'll create a new one.
Click on the New Table button, and enter a name for this table: Potosi Isopach, and click OK.
A Color Fill Table is used to define a listing of value intervals and their corresponding colors, to
be used by the program when building 2D or 3D color-filled contour maps, solid models, and
striplogs. Either enter the Order, Minimum, Maximum, and Color manually, or use the Palette
button in the next step to fill the table automatically. You may list as many value intervals and
colors as you wish. You may declare uneven and discontinuous intervals.
Click on the Palette button.
In the Palettes window, type in a Minimum of 0, a Maximum of 45, and an Increment of 5.
Experiment with the different Color Schemes (click on the OK button to see what the different
color schemes look like in the color table). An example is shown here.
Once you have found one you are happy with, click the Exit button to close the table.
Back at the COLORFILL TABLE selection window, click on the name of the table you just
created: Potosi Isopach, and click OK.
Click OK to close the Map Options dialog box.
Once you are back in the 2-Dimensional Isopach window, click on the Process button to recreate
the isopach map with the new colors.
If you have additional time, you may want to experiment with other mapping options for creating a
Stratigraphy Isopach map. We would recommend that you take a look at the different Contour Line
options for creating maps.
When you are done, close the map window; you don’t need to save the map.
Choose Create New Model, and expand the new model options by clicking on the "+" sign to the
left.
Name the model Lithology1.RwMod.
Click on the Options button to the right of the Modeling Options item.
Algorithms (Modeling Methods): Use these settings to define the modeling method.
Lateral Blending: Choose this option
to randomize the horizontal contacts
in the middle third distance between
boreholes. (Previously called
Advanced in older versions of
RockWorks.)
Interpolate Outliers: Check this option.
Check on and off the following items under Additional Options:
Decluster
Smoothing
Polygon
Superface: Check this.
Automatic (Based on borehole surface elevations) – This option hides the interpolated
nodes above the top of the boreholes. RockWorks will create a grid model representing
the elevation at the borehole tops (the ground surface) and set to "null" all model nodes
above that. Note: In a later lesson, you'll use the "Manual" filter, selecting an existing grid
model.
Subface: Check this.
Automatic (Based on maximum borehole depths) – This hides the interpolated nodes that
lie below the base of the boreholes. As above, RockWorks will automatically create a grid
surface for the borehole base elevations and hide lithology nodes that lie below.
Tilting
Warping
Faulted
Click OK to close the Lithologic Modeling Options dialog box.
Be sure these options under Create New Model are not checked:
Limit Input to Selected G-Values
Limit Model to Selected G-Values
Insert a check in Create 3-Dimensional Diagram, and expand that heading. Check on and off these
items:
Plot Faults
Choose Use Existing Model and select the Lithology1.rwmod file that was created in the previous
step.
Check on and off the following Diagram Options:
Plot Faults
Include Lithology Legend
Plot Outline Around Each Panel
Plot Surface Profile
Plot Logs
Reference Cage
Create Location Map
Include Volumetrics
Click on the 3D Striplog Designer tab.
In the Striplog Layout Options under Visible Items, check on:
Title,
Axis
Lithology
All other Striplog items should be checked off.
Click on the Fence Selection Map tab to the right.
You should see the fence panels you used in the last exercise.
Erase the panels by clicking the Clear button in the toolbar above the map.
This time, let’s have the program draw fence panels for us.
Click on the Hatch button in the toolbar to the left.
The program will automatically draw several evenly-spaced panels trending in the North-West/South-East
and the North-East/South-West directions.
Click on the Process button in the lower left.
Save the fence diagram as Lithology fence.Rw3D and close the window.
Choose the Lithology | Section menu command, and select the Create New Model option.
Name the new Lithology model Lithology2.RwMod.
Click on the Options button to the right of the Modeling Options item, and set the Algorithm to:
Lateral Extrusion. (Older versions of RockWorks named this option Simple: Use Closest
Lateral Point.)
Click OK to close the Solid Modeling Options window.
Select the section line that you would like to create in the Section Selection Map tab.
Click on the Process button in the lower left.
The resulting section displays blocky transitions between boreholes. The boundaries between lithology
units are more abrupt because the Lateral Extrusion method does not randomize the middle third of the area
between boreholes.
If you have additional time, we would suggest that you experiment with the "Tilted Modeling" and "Warp
Model Based on Grid" options as well.
Choose Create New Model, and view the options by clicking on the "+" sign to the left.
Click on the I-Data Track item and specify Benzene Soil as the data to be modeled.
Expand the I-Data Track heading, if necessary, to establish these settings:
Filter Based on G-Values
Resample at Regularly-Spaced Intervals
Name the model to be interpolated Benzene01.RwMod.
Click on the Options button to the right of the Solid Modeling Options item to display the Solid
Modeling Options dialog box.
Algorithms: Choose IDW-Anisotropic.
This method uses Inverse Distance interpolation, but only uses the closest eight control points when
computing a value for each voxel. You can find a detailed explanation of the interpolation methods
available in the RockWorks Help file.
Under "Additional Options", be sure the items listed below are turned on and off:
Decluster
Create 3-Dimensional Diagram: Be sure this is checked, and verify that the following
options are selected or deselected as follows.
Plot Logs
Include Color Legend
Click on the Options button to the right to display the Block Diagram Options dialog box.
Click on the Diagram Type tab, and set the type to Isosurface.
Verify that the check boxes for the other tabs are not checked.
Isomesh
Cage
Faults
Click the OK button to close the Block Diagram Options dialog box.
Append the Benzene logs.rw3d scene that we created in a previous exercise to your model by going to File
Append and choosing Benzene logs rw3d. Answer No when prompted "Do you want to overwrite the
current Stratigraphy, Lithology and Well Construction tables?".
Close the current window. Do not save the changes to your RW3D file.
Choose Use Existing Model. Click on the yellow folder to the right of the Model Name item to
browse for the Benzene01.RwMod file you just created.
Check on and off the following diagram options:
Contour Lines
Colored Intervals
Plot Logs
Plot Surface Profile
Create Additional Parallel Profiles
Show Fault(s)
Show Infrastructure
Create Location Map
Click on the Options button to the right of the Colored Intervals item, click on the Scheme tab and
select 2-Colors (Min -> Max) color scheme. Click OK to close this window.
Click on the "X" button in the lower right to close the RockPlot2D window.
Choose Create New Model and expand the options by clicking on the "+" sign to the left.
Make sure that the Gamma P-Data Track is specified and that the name of the solid model being
created is Gamma.RwMod
Add a check mark to the Create 3-Dimensional Diagram option and click on the Options button to
the right to display the Block Diagram Options dialog box.
Click on the Create 3-Dimensional Diagram Options… button, specify the Diagram Type Voxels
tab, and select Full Voxel.
In the Visible Items column, uncheck Lithology and check on P-Data #1.
In the P-Data #1 Options setting to the right, be sure the Track is set to Gamma. The remaining
default settings should be fine.
Click the Process button to proceed with model generation.
Double click on the Gamma Model icon in the data pane on the left hand side of the screen to
display the RockPlot3D Options window and the Solid Model Options - Gamma tab.
Notice that this looks a little different than the previous options window you used. One difference is that
you can filter values from above or below. This tool can be used to isolate both high and low values.
Choose Use Existing Model. Expand this heading if necessary by clicking on the + sign to the left,
and direct the program to the Gamma.RwMod model.
Check on and off the following diagram items:
Plot Faults
Include Color Legend
Plot Outline Around Each Panel
Plot Surface Profile
Plot Logs
Reference Cage
Create Location Map
Click on the Fence Selection Map tab to the right.
Turn off the Gamma logs by unchecking the first Logs item in the data tree (you may have to
experiment to determine which "Logs" item is which).
In the data pane on the left hand side of the screen, click the "+" button to the left of the Legends item
to expand the list.
Notice that both legends are listed. You can turn them on and off using the check boxes. We are going to
shift the Lithology legend up and the Gamma legend down so that they do not overlap.
On the Scheme tab, click in the Custom radio button. Click the Edit button to the right, select the
Benzene Colors table that you created, and click OK. Back at the Colorization Options dialog box,
click Ok to return to the I-Data Section window.
Click on the Section Selection Map tab to the right. You should see the last section line you drew.
You can accept this line, or draw a new line as you wish (click Clear to clear the display as needed).
When you are ready to create the diagram, click the Process button at the bottom of the window.
The resulting diagram should use the new color scheme to display the diagram. Once you are
finished experimenting with this tool, you can close the window. You do not need to save the
image.
Next, choose the I-Data Fence menu command.
Click on the "+" button to the left of the Fill Style item to expand the list. Select Table-Based, and
click on the "+" button to the left to expand the list. Click on the Table Name prompt. Select the
Benzene Colors table. (You may need to enlarge the selection window to see all of the table names.)
Click on the Clear button, and remove the check mark from the Snap check box. Click the
Horizontals button to draw automatic panels from the west to the east.
When you are ready to proceed, click the Process button at the bottom of the window.
In the resulting diagram, your 3D logs and fence panels are using the color scheme specified in the
color fill table.
Superface Elevations
Click on the Diagrams Options button, check on and off the following options:
Background Image
Borehole Locations
Contour Lines
Colored Intervals
Labeled Cells
Gradient Vectors
Fault Polylines
Overlay
Border
Click on the Colored Intervals tab, then click on the Scheme tab.
Add a check to the Aquifer Data option and establish these settings:
In the menu tree on the left, make sure that Create New Model is selected.
Expand this item and verify that the T-Data Track is set to Arsenic.
Change the Solid Model Name to: Arsenic_2_14_07.RwMod.
Click on the Options button to the right of the Solid Modeling Options item.
IDW - Advanced.
For the Weighting Exponents,
specify a Horizontal as 2.00, and a
Vertical as 5.00.
Under "Search Methods", select
All Points.
Click on the Options button to the right of the Create 3-Dimensional Diagram item and change
the Diagram Type to
Remove the check marks from the following items: Isomesh, Cage, Faults, Legend.
Click Ok.
Now, check on the Logarithmic option under the Additional Options section, and click on the
Ok button.
Click on the Process button to recreate the grid and map.
Column-Based
Under the "Column-
Based" options, set the
Symbol Column option to
Symbol. This tells the
program to pull the
symbol designs for the
map from the Symbol
column in the datasheet.
Dimensions can be set to
Uniform at a size of 1.
Add a check mark to the Fill Bkgnd. column and set the Background Color to yellow.
Enter the Prefix: "Well ID:"
Turn on Plot Southeast Label, and select one of the cation columns such as Ca. Assign an
opaque Background Color of your choice and type in a Prefix for the concentration label that
will be plotted. For example, for Calcium, you could enter: "Ca:"
Turn on Plot Southwest Label, selecting a different cation column. Choose a background
color, and type in a label Prefix.
Turn on Plot Northwest Label, selecting another cation column and background color, and
type in a Prefix for the label.
Click on the Dimensions tab and make sure the Automatic Offset option is checked on.
Click OK to close the Map Options dialog box.
Click the Process button to continue.
You should get a map that looks similar to this one:
Next, let’s recreate this map with just a single label, and without the opaque backgrounds for the text.
Back on the left side of this window, click on the Map Layers Options button again.
Click on the Symbol Labels tab and turn off all of the labels except the Northeast label.
Let’s take this map into RockPlot3D so that we can view it with one of the models created previously.
To do this, choose the File Export RockPlot/3D menu command.
Select Create New Grid, and name it Na.RwGrd. Upper and lower case letters can be used for the
file name, but are not required.
Click on the Options button to the right of the Gridding Options item.
Check the Create 2-Dimensional Grid Diagram item. Click on the Options button to the right of
this item to display the Map Options dialog box.
Check on and off the following diagram options:
Background Image
Symbols
Symbol Labels
Contour Lines
Colored Intervals
Labeled Cells
Fault Polylines
Polygon(s)
Overlay
Border
Save your contour map as Sodium Contours.Rw2D and close the Grid-Based Map window.
Save your map as: Pie chart map.Rw2D and close the RockPlot2D Window.
Extra Credit: Creating Piper and Stiff Diagrams in the RockWorks Utilities
Choose the HydroChem Piper Diagram menu command.
Confirm that the Input Columns on the left side of the window are correct. For example, the Sample
ID input should be set to the column labeled ID.
Click on the Options button to the Ion Columns item to display the Ion Columns dialog box. Verify
that the Cations and Anions are assigned correctly, then click on the Ok button.
Explore the different options for plotting TDS Circles (Total Dissolved Solids), Dividers, Titles,
Labels, etc.
Click on the Process button to display the Piper diagram in a new tab. You may wish to experiment
with other options before you continue on to the Stiff diagram.
Once you are done, you can close the RockPlot2D window, without saving the Rw2D file.
Next, choose the HydroChem Stiff Diagram menu command.
Name the Output grid (Model "C") as Leadville Ls_Isopach.RwGrd.
Set the Null Value Handling Options to Result Always Null then click OK.
Check the Create 2-Dimensional Grid Diagram (Map) option to display the Map Options dialog
box.
Click on the Colored Intervals tab and insert a check in the Confirm prompt. Click Ok to close the
window.
In the real world, your initial models may not always look like you think they should. If you take a closer
look at your Stratigraphy data, you’ll notice that the Leadville Limestone should really pinch out
completely on the west side of the project. One way to make sure that the unit pinches out properly is to
edit the isopach grid and use the new isopach grid to create new surfaces for the unit.
Click on the Borehole Locations Options add check marks to Symbols and Borehole IDs.
Remove the other check marks, and click Ok then Process.
Save the resulting Rw2D file as Excavation Boundary.Rw2D.
Step 6: Use the Polygon Table to Edit your Ground Surface Model
In the RockWorks Utilities, go to Grid Filters Polygon Clip.
For the Input (Grid) Model, choose A-Horizon_Top.RwGrd.
Name the Output (Grid) Model: Excavation Surface.RwGrd.
For the Polygon Table, specify the Polygon_02 table.
Let’s assume that we want to excavate within the Polygon to an elevation of 1720 m.
Under Filter Type, choose Interior, and assign a New Interior Value of 1720.
Under Operation, select Replace Nodes Below Grid, and type in a value of -1E27 (which is the
"null" value in RockWorks).
Turn on the Create 3-Dimensional Diagram, click on the Options button to the right to display the
Block Diagram Options dialog box. Click on the Diagram Type tab, click on the Voxels tab and
select the Full Voxel option. Click the Ok button to return to the Solid Grid Filter menu.
You can add a Lithology Legend by choosing the Edit Add Legend Lithology menu
command.
Finally, append the Lithology Logs.Rw3D file so that you can see where the excavated area is relative
to your borings.
In the new window, choose the File Import DXF (AutoDesk Data eXchange Format) menu
command to display the DXF Import menu.
For the DXF File, choose Utilities.dxf. Click on the Process button to display the window titled
Set the Diagram Type and Coordinate Units.
On the Diagram + Units tab, change the Diagram from None to Map. Change the XY Coordinates
from Undefined to UTM Meters. Specify the UTM settings to Datum = WGS-84 (NAD-83). Click
on the UTM Zone button to display the UTM Zone Map, and click on zone 13 north of the equator
for Colorado. Click the OK button to display the DXF file in a new RockPlot2D window titled
DXF Import.
Next, transfer the map into RockPlot3D by choosing File Export RockPlot/3D to display the
RockPlot2D RockPlot3D menu.
Choose to Float the image and assign it an elevation of 1770 m. Click on the Process button to
display the map in a new RockPlot3D window.
Save the image in RockPlot3D as Utilities.Rw3D and close the RockPlot3D and the DXF Import
Options windows. Save the 2D Map as Utilities.Rw2D when you close the window.
In the RockWorks main window, click on the ReportWorks button along the left edge of
the program screen. You can also launch ReportWorks from the Window ReportWorks
menu command. The ReportWorks program will launch and you’ll see a new, blank window.
Choose the File Page Setup and click on the Printer Select + Set button. Change the
Orientation to Landscape. The options that you see are dependent upon the printer you have
on your system. Click OK to return to the Page Setup window. Click OK to return to the
ReportWorks window.
Embed or Link: Click on the Link radio button. With this setting, ReportWorks will store
the file name and path in the ReportWorks file. To include the contents of the profile in the
ReportWorks file, choose the Embed option.
Scaling: Choose Best Fit (Equal). This tells ReportWorks to keep the horizontal (profile
distance) and vertical (profile elevation) scales equal. The scales are displayed in the Current
View section on the right.
Outline: Click the Outline tab, displayed to the right of the RockPlot (*.Rw2D) tab. Change
the Style to from Solid to None by clicking the down-arrow button.
Fill (Background): Click on this tab to set the background appearance. Be sure Stock Fills
is selected, with the Style to "None" (for no fill).
Click the Apply button at the bottom of the window, and you’ll now see your log profile
displayed on the page. Click the Close button to close the dialog box.
Adjust the profile position on the layout sheet by clicking and dragging it.
Now we’ll insert a small map showing the position of this profile within the study area.
Embed or Link: Click in the Link button. As above, ReportWorks will read the image
information from the external file.
Scaling: Choose Best Fit. As above, this sets the horizontal and vertical scales equal. For
the map, unlike the profile, the horizontal and vertical axes both represent UTM map units.
Outline: Click the Outline tab, displayed to the right of the RockPlot (*.Rw2D) tab. Set the
Style to None by clicking the down-arrow button.
In the Layers panel on the left side of the screen, highlight the "Layer 1" layer with your
mouse. Note that when you do this, only the items in Layer 1 will be editable.
Adjust the position of the profile image and the map in the "company template" so that the
profile is in the top section and the map is in the lower section, to the left. You can click-and-
drag as well as resize as necessary. Use the right-click Send to Back and Bring to Front
menu commands to help with stacking order. These are also available in the Edit menu.
Save these changes using the File Save menu item.
Click on the Raster (Bitmap) button or choose Tools Raster (BMP, JPG, TIFF).
File Name: Click the small open-file button at the upper prompt to browse for the sample
file: 1955_airphoto.png and double-click on that file name.
Scaling: Choose Best Fit. ReportWorks will keep the horizontal to vertical aspect ratio at
1:1 as you size the bitmap.
Outline: Click the Outline tab, to the right of the Raster tab. Set the Style to None by clicking
the down-arrow button.
Click the Apply button at the bottom of the window, and you’ll now see the image displayed
on the page. Click the Close button to close the dialog box.
Adjust the image’s position on the layout sheet by clicking and dragging it. Remember that
you can use the right-click Send to Back and Bring to Front options to help with stacking
order of the layout items.
Choose File Save to save the layout.
At this time, in your own work, you could send the page to your printer, using the File Print command.
Here, make sure that Uniform is checked on, and choose a symbol to use to represent well
locations. Dimensions can be set to Uniform at a size of 1.
Click on the Symbol Labels tab to display the settings you can use to customize your point map
labels.
On the Content tab, turn on Northeast Label, and set the Data Column to Well, Text Color
to Black, Opaque background should be checked on and the color should be yellow. The
Prefix field can be left blank.
Turn on Southwest label, and select the GW Elevation column. Choose a background
color, and leave the Prefix field blank here as well.
Click on the Dimensions tab and turn on the Automatic Offset option.
Click on the Border tab.
Under the Additional Options section, click on the Dimensions tab. Choose the Variable (Based
On Data Coordinates) option, choose the Manual option, and enter a Node Density of 50.
Check the Create 2-Dimensional Grid Diagram item, and click on the Options button to the right to
display the Map Options dialog box.
Check on and off the following diagram options:
Uncheck the Create 3-Dimensional Grid Diagram option and the Create Grid Statistics
Report option.
Click the Process button.
You should get a contour map that looks somewhat similar to this:
The bull’s eye effect has been muted somewhat, but still may not be ideal. Let’s experiment with some
other interpolation methods to see if they do a better job.
Kriging.
Change the number of Neighbors
from 16 to 4.
Click Ok to Exit the Gridding Options
dialog box and then on the Process button to
create the map.
This may be a little bit more to your liking, but the general groundwater flow direction could still be better
represented along the borders of the map. Just to cover all of our bases, let’s recreate the map using the
Triangulation gridding algorithm.
Click on the Gridding Method Options button.
You may wish to experiment with how increasing and decreasing the number of Densify Iterations
affects the shape of the contours. You also might want to turn on the Kriging Edit/Examine Variogram
option to see how the Densify option affects the shape of the experimental variogram.
Finally, let’s experiment with the Polyenhance option, which should be used for the interpolation of
surfaces following a trend that is generally reflected by the data already (such as a groundwater elevation or
structural surface).
Click on the Gridding Options button.
Inverse Distance
Under Additional Options, turn on the
Polyenhance option. (The other options
that you’ve been experimenting with
should stay checked on as well).
Select a 2nd Order polynomial.
Click Ok then Process.
If you experiment further with other interpolation methods such as Kriging and Triangulation, you’ll
notice that all of the maps look very similar, with just slight differences in how the contour lines are drawn
around the wells.
In real life, we’ve found the polynomials to the first, second and third order are useful when creating
groundwater contour maps – especially when the groundwater gradient is fairly constant.
Click on the "+" button to the left of the T-Data Track heading to expand the list.
The options for Date/Time Filtering and Spatial (XYZ) Filtering are accessed in the Rules &
Filters panel on the far right. These should be unchecked as well.
Date/Time Filtering
In the Titles section, change the Secondary title for the histogram (it probably reads "Linear
Scaling") to: Toluene – All Dates.
The remaining diagram defaults should work well, but feel free to look at the options that are
available.
RockWorks will read all of the Toluene measurements for all of the active boreholes, for all of the dates
listed, and display them in a frequency histogram. The horizontal axis represents Toluene concentrations,
and the vertical axis represents percent.
Note that the range of data along the X axis is from 0 to 500, with the vast bulk of the
measurements less than the mean of 15.6. Since the high values are very anomalous, it's important
Choose the File Save menu command, and type in this name: Toluene Histogram All
Dates.Rw2D.
Right-click on the Color Fill Table item, and select Add a Color Fill Table.
Type in the name: Toluene Concentrations and click OK to display the Color Fill Table: Toluene
Concentrations dialog box.
You'll see a blank Color Fill table. Here, you can type in value ranges and choose a specific color to be
used to represent those values in a contour map. There are also tools for creating quick gradational ranges.
Click the Palette button in the toolbar to the left.
Enter the Minimum value of 0 and the Maximum value of 500 (which corresponds to our Toluene
concentration range). Set the Increment to 50 (which will result in 10 color divisions), and leave
the Cycles at 1.
Set the Color Schemes to Min/Max, and pick any color you like for the minimum color by clicking
on the color box to the left of the gradational bar. Pick another color for the maximum by clicking
on the color box to the right of the bar. Uncheck the Reverse Order (High to Low) checkbox.
Back in the menu tree on the left, set the Map Type to: Z = Highest T-Data Value
Click on the Gridding Method Options button and change the Algorithms to Inverse Distance.
Turn off all the Additional Options and click Ok to return to the T-Data 2D Statistics Map menu.
Select the Toluene Concentrations table, which you just created, and click Ok.
Border: Be sure this is checked, and click on the tab to view the options.
RockWorks will read the Toluene measurements for the indicated date, pick the highest value for each
location for that date, interpolate a grid model, store the grid under the name Toluene 2-14-2007.rwgrd and
generate a color-contour map using your custom table. The annotation at the top of the map should contain
the date you entered.
Note that depending on the interpolation methods that you experimented with in the previous exercise, the
contours you create may look slightly different than those displayed in the following images.
Choose File Export JPEG to export this map to a raster JPG format.
Compression Quality: Drag this slider all the way to the right, for low compression and high
quality.
Click OK.
The program will assign this a default file name of Toluene 2-14-2007.jpg – click the Save
button to accept this.
In the Rules & Filters panel on the right side of the screen, set the Exact Date/Time filter to:
5/15/2007.
In the menu tree on the left, assign the Output Grid this name: Toluene 5-15-2007
Click on the Diagram Options / Border / Axis Titles / North, type in:
Toluene Concentrations 5/15/2007
You may need to insert your cursor into the prompt box and use your right-arrow key to scroll to
the right to access any hidden characters. Click Ok to close the Map Options dialog box.
Click the Process button to create this map for May 15th.
Width: 7
Compression Quality: Drag this slider all the way to the right, for low compression and high
quality.
Click Ok.
The program will assign this a default file name of Toluene 5-15-2007.jpg – click the Save
button to accept this.
In the right pane under Rules & Filters, set the Exact Date/Time filter to: 8/6/2007 .
Click on the Diagram Options / Border / Axis Titles / North, type in:
Toluene Concentrations 8/6/2007
Click Ok to close this window.
Click the Process button to create this map for August 6th.
File Save this new map under the name: Toluene 8-6-2007
Width: 7
Compression Quality: Drag this slider all the way to the right, for low compression and high
quality.
Click Ok.
The program will assign this a default file name of Toluene 8-6-2007.jpg – click the Save
button to accept this.
Click on the Diagram Options / Border / Axis Titles / North, type in:
Toluene Concentrations 11/18/2007
Click the Process button to create this map for November 18th.
File Save this new map under the name: Toluene 11-18-2007
Width: 7
Compression Quality: Drag this slider all the way to the right, for low compression and high
quality.
The program will assign this a default file name of Toluene 11-18-2007.jpg – click the Save
button to accept this.
Choose the Imagery PicShow menu command. You’ll see a datasheet embedded along the left side
of the window. Here you will choose the names of the images you just created for display in the slide
show.
Double-click in the first row in the File Name column and browse for the name of the first JPG
map you created: Toluene 2-14-2007.jpg
Click the Open button to select that file.
If you need to widen the first column to see the full name, grab the right edge of the File Name
header and drag to the right.
Double-click in the second row under File Name and browse for: Toluene 5-15-2007.jpg
Choose the File Save As menu command, save this listing as: Toluene Animation List
and click the Save button.
Now that the datasheet is ready, let’s check the animation settings in the pane to the right. First, be
sure the File Column prompt is set to the datasheet column labeled File Name.
Click the Export button to display the Animation Options dialog box.
AVI Output File Name: Type in a name for the video, such as Toluene Animation.
RockWorks will create an AVI file with the map images, and load this animation into your default viewer.
You'll see the display advance in sequence through the contour maps.
• Retrieve two models you created earlier (Benzene and Lithology) and display them in 3D.
• Adjust the display of the lithology model to view the distribution of the Clay material in relation to the
Benzene hot spot.
• Create a 2D map representing the thickness of that clay layer.
• Create a 2D map representing the Benzene plume, and overlay these with transparency applied.
• Draw a clipping polygon on this map and create a polygon table.
• Clip your Benzene and Lithology models with this polygon, and display them in 3D.
• Create a 3D display of this polygon as vertical barrier panels.
Click on the arrow to the left to expand the Solid Models heading.
Double-click on the model named Benzene01.RwMmod, which you created in an earlier lesson. You'll
see the Solid Model Display Options window.
Click on the Options button to the right of the Display Options heading. Click on the Diagram
Type tab and choose
Isosurface
Don't worry about the Input Columns – the program will ignore these since no source data points
are being included in this drawing.
Click Process.
Just below the middle of this window, look for the Iso-Level
Value prompt, and type in: 45
Let's save this view: Choose the File Save menu command or click the Save icon in the toolbar and
type in the name: Benzene01 Isosurface.Rw3D and click Save.
When prompted if you wish to Overwrite the Lithology or Stratigraphy Types tables, click No.
RockWorks will append your lithology model display to the plume display.
Let's filter the lithology model for a different material type. Double-click on the Lithology Model item
in the data tree.
You'll see the Benzene plume and the underlying Clay layers, as represented in the lithology model.
Take a moment to adjust the view, zooming in and out, rotating the image, etc.
Choose File Save As to save this combined scene under a new name.
Click on the Lithology Model Name prompt and browse for: Lithology1.RwMod.
This is the solid model that was displayed in the previous 3D scene.
For the Output Grid, type in the name: Clay Isopach RwGrd. If you opened the Save RockWare
Grid File dialog box to enter the file name, click Save.
Click on the Diagram Options button to display the Map Options dialog box. Specify the
following settings.
Click on the Scheme tab and set the color scheme to the first option: 2 Colors (Min –
Max). In the following images, we’ll use the default 2 Color scheme, which is a medium
cold-to-hot gradation.
Overlay: Unchecked.
Border: Checked.
Under Axis Titles / North, change the title back to: Easting.
RockWorks will read the lithology solid model and determine the uppermost and lowermost elevations for
the Clay voxels in each vertical column of nodes in the input model. The thickness of this interval will be
stored for the corresponding node in the output grid model (RwGrd file). A "null" value is assigned to any
grid nodes that do not have any Clay within the original lithology block model.
Make note of the thickness values represented in this map. The blank spaces (white) represent
areas with no clay. The pink and blue areas represent thin zones, greens medium-thick zones, and
oranges and reds the thickest zones.
Click on the Diagram Options button to display the Map Options dialog box.
Add a check mark to the Omit Lows option to hide low-value contours.
Be sure the Legend option is checked so that a color legend will be included in the map.
The remaining settings will work fine – click Process to create your map.
Let's do some image preparation so that we can append this display to the Lithology Isopach map.
Expand the Layers pane on the right side of the mapping window to see the different map layers. You
can widen and lengthen that pane as necessary.
Check/uncheck the following so that only the contour bands and legend remain.
Choose File Save and save this map as: Benzene Soil Highs.Rw2D.
RockWorks will append the clay contours on top of the benzene contours, and display the combined map in
a new plot window.
You can return the Benzene layer to the front of the display by right-clicking on the Highest Benzene
Soil.Contour.Bands layer name, and selecting Bring to Front.
Other layer tips: You can rename layers if you don't like the automatic names, and you can delete layers
entirely from the view.
Click the Save button (or select File Save) and name this combined map: Benzene Soil Highs +
Lithology Isopach.Rw2D and click Save.
This will activate the polygon drawing tool. Note the "Draw Polygon" button at the bottom of the window.
Draw a polygon around the outside of the visible plume by clicking and releasing your mouse to
insert the vertices; you can insert these points in a clockwise or counterclockwise fashion.
When you wish to close the polygon, double-click on the last vertex, and RockWorks will display
the polygon with the current fill settings on the map.
With the Edit arrow now selected, click on the polygon to select it, then right-click on the polygon to
display a pop-up menu.
Close this map window; you do not need to save the drawing changes.
Close the Benzene Soil Highs map in the I-Data 2D Statistics Map window.
Back at the main RockWorks window, access the Project Manager pane, and expand the Project
Tables heading (at the top of the list), and expand the Map/Model Tables item.
Expand the Polygon Tables heading and double-click on the table you just created: Benzene
Clipping Polygon to display the Polygon Table window.
Click on Polygon Table and select the table you just created and viewed:
Benzene Clipping Polygon
Check the Create 3-Dimensional Diagram option, and click on the Options button to the right.
Click on the Diagram Type tab and choose Voxels and Full Voxel.
Click the Process button to clip the model and create the diagram.
Since this solid model filtering program is generic – it works with lithology solids as well real number
solids, the image will be displayed using a default cold-to-hot color scheme for the voxels. Let's change the
coloration back to reflect the lithology types.
Double-click on the Polygon-Clipped Solid item in the data tree to the left of the diagram.
In the RockPlot3D Options window, click the Color Scheme item and select Lithology Table
from the drop-down list.
Now let's filter again for the Clay voxels only: Insert a check in the Filter box.
Set the Low value to 1.9 and the High value to 2.1.
Click Apply, and you'll see only the Clay layer in the clipped model.
Click No when prompted if you wish to save changes (we'll save in a minute).
Save this scene by choosing the File Save menu command and
entering the name: Clipped Lithology + Plume.Rw3D
and click the Save button.
Choose the View Compass Points East menu command. This will generate a head-on
view of the scene from the east.
Use your mouse to point to the upper part of the Benzene plume. Note the X, Y, and Z
(elevation) coordinates at that point will be displayed at the bottom of the plot window. This
can be a handy tool to determine specific points in space. If the coordinates are overwritten
by the file name, click on the stippled vertical bar to the right of the menu options to collapse
the menu pane.
Point to any other portion of the plume or clay layer, and see that the XYZ coordinates will be
updated. RockPlot3D also includes a digitize tool that you can use in your own work to
capture coordinates from the 3D scene.
You can zoom in/out and rotate the display as you like, to get a good view of the scene.
If you have extra time, you can use the File Append menu command to append any of the DXF
or image files you imported into RockPlot3D in an earlier lesson: Draped Image.Rw3D, Streets
3D.Rw3D and/or Utilities.Rw3D.
RockWorks will list the polygon vertex coordinates in columns 1 and 2 in the datasheet. We'll add two
additional columns to the datasheet.
Right-click in the gray portion of the column header for column 3.
Click in the Column Title prompt to change it from "3" to "Barrier Base".
Now, to define the type of data which will be listed here, select the Linear (Z) Dimension option,
and verify the Units are set to Meters.
Type in the new Column Title name as Barrier Top, select the Linear (Z) Dimension option and
verify the units are Meters.
The RockWorks polygon table does not duplicate the first coordinate pair at the end of the listing to close
the polygon, since it already knows it's supposed to be a polygon. However, the tool we'll be using does
not make that assumption (the barriers are assumed to be open) so we need to manually close the polygon.
Duplicate the first coordinate pair at the end of the list:
Use your mouse to select the first X Y coordinate pair, on row 1 of the listing (columns 1 and
2).
Use your arrow keys on your keyboard to scroll down in the listing, until you reach the first
blank row.
With the cell in the first column active, right-click and choose Paste (or just type Ctrl + V).
You should see the first coordinate pair now listed there.
Enter a values of 1680 and 1770 in row 1 of the columns for Barrier Base and Barrier Top. Copy
these values for the other rows with data.
Choose the File Save menu command to save this data to the project folder.
Click Process.
RockWorks will create vertical panels between the defined vertices and elevations in RockPlot3D.
Append your clipped models:
Click No at the prompt Do you want to save changes to the Perimeter Diagram?
Superface (Top)
Grid (Output): Click here and enter the name: Potosi Structure
Gridding Method: Click on the Options button and be sure the Gridding Algorithm is set to
Inverse-Distance, with Faulted NOT checked. Click the Ok button to return to the 2D
Structure Map menu.
Diagram Options: Click the Options button and verify that the following map layers are checked:
Background Image: Unchecked.
Borehole Locations: Click on this tab and set the following options:
Symbols
Borehole IDs
Stratigraphy Data: Click on this tab.
Set the Stratigraphic Unit to Potosi Fm.
Check the Superface Elevation check-box to display labels for the surface elevations.
Delete the text from the Prefix box.
Contour Lines
Colored Intervals: Click on this tab and be sure the Scheme is set to the default 2-Colors
"Cold-to-Hot" method.
Uncheck the remaining Colored Intervals options (Confirm, Omit Lows, Omit Highs,
Legend)
Uncheck the Labeled Cells, Gradient Vectors, Fault Polylines, and Overlay layers.
When displayed in the RockPlot2D tab, click the button to copy this map to a new, stand-alone
window.
In this new window, select File Save, and save this map under the name: Potosi Structure Contours
This is important – it is this multiplier that creates the fault. It does so by telling RockWorks, as it
is computing the value for a grid node, to consider neighboring control points on the other side of
the fault to be 10 times further away than they really are. In Inverse Distance, the further a point is
from a grid node, the less its influence, so the effect of this multiplier is that points on the other
side of the fault will have virtually no influence on the node. Thus a "barrier" is created.
Click Ok to close the Gridding Options window.
Click on the Diagram Options button, insert a check in the Fault Polylines option, and click on the
Line Style example to select a brightly-colored, wide line.
Click the Ok button to exit the Map Options dialog box and return to the 2D Structure Map menu.
Click the Process button to create the new grid model and contour map.
The new map should have a more abrupt boundary along the fault line.
Unfaulted:
Tip: To create a 3D surface of an existing .RwGrd file, just locate that grid model name in the Project
Manager, under the Grid Models heading, and double-click on it. Choose Create 3-Dimensional Grid
Diagram in the Grid Plotting window, and click Process.
Clip Image: Be sure this is checked. For its sub-options, choose Project Dimensions. This
tells RockWorks that once the image is geo-referenced, you also wish to clip the image to fit the
project boundaries.
Create World File: Check this option. For its sub-options, select Append “W”. This means
that the world file will be named automatically to "Aerial Photo Rectified.jpgw"
Show 2D Results: Check this option for the map to be output to RockPlot2D.
Set Project Image to Output File: Check this. This tells RockWorks to define the output,
rectified image as your “project image” which can then be easily added to future maps.
Click the Perform Rectification button.
RockWorks will now display the image in a large window. At the top of the window, you will see that the
program is prompting you to click on the first point.
First, zoom out of the image by changing the Size (%) setting in the upper-left to 90%. You can
do this using the up-arrow or by typing in that value.
Now, use the scroll bars to view the portion of the map shown below.
Once you have clicked on the third point, the rotated, geo-referenced, and clipped image will be displayed
in a RockPlot2D tab to the right. If you've made any mistakes, you can simply click the process button
again to re-select the three points.
Save this view by choosing File Save and entering the name: Aerial Photo Rectified.Rw2D.
Now that you have this image saved in the project folder, you can open it at a later date, you can append
other saved Rw2D maps to it, and you can use it as a background layer in new maps that you create.
Add a check mark to the Striplog Options: Hang From Top of Borehole setting.
In the Striplog Spacing section, specify the option for Equal Spacing - Automatic.
Click on the 2D Striplog Designer to specify the columns to display in the striplogs.
In the Visible Items column, verify that the following items are checked:
Title
Depths
Lithology
Note that you can display geophysical logs with the P-Data item or the Bitmaps item.
Click on the Lithology item under the Visible Items listing to view the Lithology Options
below the Layout Preview.
Click on the Column Layout button. Change the column Width to 1.0. Click OK to close the
Lithology Column Layout window.
These two items are contiguous in the boreholes, and we can pick both at the same time. Click at the
base of the gravel unit (red circles, yellow fill) in each borehole. The Spergen is filled with yellow
from top to base between boreholes, and a blue line is drawn for the top of the Leadville.
Continue with the other stratigraphy units. You can change or delete a pick in the table at the bottom,
then click on the View tab at the top and click on the Redraw button to see the changes.
If there are gaps between the formations, click on the Edit tab at the top and click on the Adjust button
to remove the gaps.
To add a new formation, click on the Stratigraphy button to display the Close Options dialog box.
Click on the option to Adjust contacts & save change to display the Stratigraphy Types table. Add a
new formation and click OK. The new formation shows in the Active Contact(s) list at the left.
When finished, click the Exit button. Choose the desired options and click OK to save the picks to the
Stratigraphy table in the Borehole Manager. Click on DH-31 in the Borehole list, and click on the