Documente Academic
Documente Profesional
Documente Cultură
(PROCESS FMEA)
Prepared by: Core Team
Part: Raw materials & components Process Responsibility FMEA Date (Orig.) 2/10/2009
Model Year(s)/Program(s) N/A Key Date 2/10/2009 FMEA Date (Rev.) 6/2/2009
Core Team:
Responsibility
Classification
Occurrence
Completion
Step Current Current
Detection
Occurrence
Severity
Potential Potential Potential
Detection
Target
Process Process Recommende
RPN
Severity
Date
Requirements Failure Effect(s) Causes(s) Actions Effective
RPN
Controls Controls d Action
Mode of Failure of Failure Taken Date
Prevention Detection
Function
10.a Verify Product free Damaged Significant 7 Product damaged in 2 Specified Visual 7 98 None
shipment & of damage product production transit carrier to evaluation
unload received delays; supplier prior to
deviation unloading
from primary
Shipment Supplier process 7 Supplier did not have 2 Quantity Visual 7 98 None
must match partial quantity avaialble inquiry prior to evaluation
bill of lading shipment order release after unloading
10.b Review Pallet labels Missing Significant 7 Inadequate labeling by 1 Labeling Visual 7 49 None
& receive and/or part product production supplier requirements evaluation of
shipment number on identification delays; specified to each box or
each deviation supplier container
container/box from primary
process
Lot number on Missing lot 7 1 7 49 None
each number
container or
box
Product Certification 7 Inadequate lot controls 2 Supplier Visual 7 98 None
certification for not included by supplier selection and evaluation of
each new lot w/ shipping performance each lot
(every lot for documents monitoring
outsourced process
product)
Part: Raw materials & components Process Responsibility FMEA Date (Orig.) 2/10/2009
Model Year(s)/Program(s) N/A Key Date 2/10/2009 FMEA Date (Rev.) 6/2/2009
Core Team:
Responsibility
Classification
Occurrence
Completion
Step Current Current
Detection
Occurrence
Severity
Potential Potential Potential
Detection
Target
Process Process Recommende
RPN
Severity
Date
Requirements Failure Effect(s) Causes(s) Actions Effective
RPN
Controls Controls d Action
Mode of Failure of Failure Taken Date
Prevention Detection
Function
10.c Identify Internal label Missing Moderate 4 Not enough labels 2 Lables printed Product 5 40 None
& inventory on each internal label production printed or lost labels for each lot scanned to
product container/box delays only inventory
10.d Inspect Material Wrong Loss of 8 Data entry error 2 TMM warning Visual 5 80 None
& release certification & material material for new lot evaluation &
product to sample with certification traceability, numbers TMM release
use each new lot entered may scrap or
(every lot for return 100%
outsourced of product
product)
Characteristic Product does Moderate 6 Nonconforming 3 Receiving log Dimensional & 5 90 None
s must match not conform disruption; product quality visual
specifications 100% of delivered by supplier inspection per
product may receiving log
have to be
reworked
Completeness Shipment must Visual Shipmen Each TMM receiving Notify Purchasing of any
match bill of lading t updates discrepancies
10b Review & receive Computer system Identification Pallet labels and/or Visual Containe Each Product Identify product w/ Do
shipment TMM database part number on each r or box identification by Not Use tag, move to
container/box supplier Hold Area, then notify
Purchasing & QC
Certification Lot number on each Visual Containe Each Material
container or box r or box certification &
sample sent to QC
Product certification Visual Lot Each
for each new lot
(every lot for
outsourced product)
Inventory Product inventory Scanner & Visual Lot Each TMM inventory &
updated w/ new qty. receiving reports
10d Inspect & release Computer system Certification Material certification Visual Lot Each Product released Identify product w/ Do
product to use TMM database & sample with each in TMM database Not Use tag, move to
new lot (every lot for Hold Area, then notify
outsourced product) Purchasing & QC