Sunteți pe pagina 1din 347

COSTO HORARIO POR EQUIPOS DE CMHSA

COSTO WINCHES
CMHSA PEC
WINCHES ELECTRICOS DE ARRASTRE JOY DE 20 13,125.00
VIDA ECONOMICA (6 AÑOS) 72.00 6 años
COSTO MENSUAL 182.29
REPUESTOS (40%) 72.92
MECANICOS 62.13

TOTAL COSTO MENSUAL 317.34


HORAS /MES 90.00
COSTO HORARIO 3.53 4.00

COSTO PALAS DE LINEA


CMHSA PEC

PALA NEUMATICA 12B 17,187.50


VIDA ECONOMICA (6 AÑOS) 60.00 5 años
COSTO MENSUAL 286.46
REPUESTOS (55%) 157.55
MECANICOS 105.62
TOTAL COSTO MENSUAL 549.63
HORAS /MES 90.00
COSTO HORARIO 6.11 8.00

COSTO BOMBA
CMHSA PEC
BOMBA SUMERGIBLE GRINDEX MODELO MAJOR H, 6,000.00
VIDA ECONOMICA (5 AÑOS) 60.00
COSTO MENSUAL 100.00
REPUESTOS (150%) 150.00
MECANICOS 31.69
TOTAL COSTO MENSUAL 281.69
HORAS /MES 180.00
COSTO HORARIO 1.56 1.80

COSTO VENTILADOR
CMHSA PEC
VENTILADORES ELECT 6000CFM 15H 4,500.00
VIDA ECONOMICA (5 AÑOS) 60.00
COSTO MENSUAL 75.00
REPUESTOS (80%) 60.00
MECANICOS 25.35
TOTAL COSTO MENSUAL 160.35
HORAS /MES 180.00
COSTO HORARIO 0.89 0.80

COSTO SHOTCRETERA
CMHSA PEC 16,154
SHOCRETERA ALIVA MODELO AL-246.5 VERSION 18,624.88 720.00
VIDA ECONOMICA (5 AÑOS) 60.00 752.20
COSTO MENSUAL 310.41 999.09
REPUESTOS (70%) 217.29 18,625
MECANICOS 115.22
TOTAL COSTO MENSUAL 642.92
HORAS /MES 180.00
COSTO HORARIO 3.57 $ 17
BOMBA HIDRABOLT
CMHSA PEC
BOMBA HIDRABOLT 2,000.00
VIDA ECONOMICA (2 AÑOS) 24.00
COSTO MENSUAL 83.33
REPUESTOS (70%) 58.33
MECANICOS 31.69
TOTAL COSTO MENSUAL 173.35
HORAS /MES 180.00
COSTO HORARIO 0.96 $ 17

COSTO LOCOMOTORA

LOCOMOTORA TROJAN DE 3.5 TON A BATERIA 42,187.50


VIDA ECONOMICA (6 AÑOS) 72.00 5 años
COSTO MENSUAL 585.94
BATERIA 2 205.56
REPUESTOS (65%) 380.86
MECANICOS 211.24
TOTAL COSTO MENSUAL 1,383.59 $ 1,379

LOCOMOTORA CLAYTON DE 5.5 A BATERIA 72,187.50


VIDA ECONOMICA (6 AÑOS) 72.00 5 años
COSTO MENSUAL 1,002.60
BATERIA 2 361.11
REPUESTOS (60%) 601.56
MECANICOS 211.24
TOTAL COSTO MENSUAL 2,176.51 $ 2,172

LOCOMOTORA TROLLEY 5.5 136,250.00


VIDA ECONOMICA (5 AÑOS) 60.00
COSTO MENSUAL 2,270.83
REPUESTOS (40%) 908.33
MECANICOS 211.24
TOTAL COSTO MENSUAL 3,390.40 $ 3,386

ANEXO IX

COSTO HORARIO DE LOS EQUIPOS EN


OPERACIONES
DESCRIPCION UNIDAD COSTO
WINCHE ELECTRICO DE 20 HP U.S.$/Hr 3.53
PALA DE LINEA U.S.$/Hr 6.11
BOMBA SUMERGIBLE U.S.$/Hr 1.56
VENTILADOR 6000 CFM U.S.$/Hr 0.89
SHOTCRETERA ALIVA 246 U.S.$/Hr 3.57
LOCOMOTORA DE 3.5 TON A BATERIA U.S.$/Mes 1,384
LOCOMOTORA DE 5.5 TON A BATERIA U.S.$/Mes 2,177
LOCOMOTORA A TROLLEY DE 5.5 TONS U.S.$/Mes 3,390
MECANICOS DE MANTENIMIENTO
TIPO CAMBIO 3.40
LEYES SOCIALES
EMPLEADO 66.85% OBRERO 104.77%

CARGO CANTIDAD S/. X MES L.SOCIALES TOTAL S/. TOTAL U.S.$


TECNICOS 5.00 1,200.00 802 10,011 2,944
MECANICOS WINCH-PALA-SHOTCRETERA 5.00 1,200.00 1,257 12,286 3,614
MECAN.LOCOMOT 1.00 1,200.00 1,257 2,457 723
ELECTRIC.LOCOMOTOR 2.00 1,200.00 802 4,004 1,178
MEC.-ELECTRICISTA BOMBERO-VENTILAD-WINCH 5.00 1,400.00 1,467 14,334 4,216

T O T A L 18.00 TOTAL 43,092 12,674

DISTRIBUCION

DESCRIPCION CANTIDAD % U.S.$/MES $/EQUIPO-MES


WINCHES $ 51 25% 3,169 62
PALAS $ 18 15% 1,901 106
BOMBA $ 40 10% 1,267 32 20%
VENTILADOR $ 50 10% 1,267 25 10%
SHOTCRETE $ 11 10% 1,267 115 15%
LOCOMOTORA $ 18 30% 3,802 211 15%
TOTAL 100% 12,674

Tanque dosificador
Manguera Dosificadora
Mesclador
COSTOS FIJOS CONTRATA OPERACIONES - PROPUESTA SEMIGLO
OPERACIONES Y PROFUNDIZACIÓN MINA SUBTERRANEA PARCOY

A) PLANILLA SUPERVISION
Nº L.Sociales E L.Sociales O TOT.GRAL
Ingresos
DESCRIPCION CATEGORIA Mensual VIAJES X DIA LIBRE ALIMENTACION
S/. 66.85% 66.52% S/.
T.C. 3.40
Vuelo Parcoy-Trijillo-
Ing. Residente Empleado 1.00 15,000 10,027 25,027 25,027 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Superintendente Recursos Humanos Empleado 1.00 9,000 6,016 15,016 15,016 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Ing. Asistente de Residente Empleado 1.00 8,000 5,348 13,348 13,348 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Ing. Jefes de turno Empleado 6.00 6,500 4,345 10,845 65,071 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Ing. de Seguridad Empleado 1.00 9,000 6,016 15,016 15,016 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Ing. Asistente de seguridad Empleado 1.00 5,000 3,342 8,342 8,342 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Jefe de Productividad y Costos Empleado 1.00 6,000 4,011 10,011 10,011 Parcoy 100% CMHSA
Topografo (1) Empleado - 6,000 4,011 10,011
Ayudante Topografo(2) Empleado - 6,000 4,011 10,011
Vuelo Parcoy-Trijillo-
Asistente de productividad y costos Empleado 1.00 3,500 2,340 5,840 5,840 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Ing. Jefe de Mantenimiento Empleado 1.00 7,000 4,679 11,679 11,679 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Ing. Asistente de Mantenimiento Empleado 1.00 4,500 3,008 7,508 7,508 Parcoy 100% CMHSA
Pasaje Bus Pacroy
Capataz Tecnico 9.00 2,750 1,838 4,588 41,288 -Huamachuco_parcoy 100% CMHSA
Pasaje Bus Pacroy
Inspector Seguridad Tecnico 3.00 2,500 1,671 4,171 12,514 -Huamachuco_parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Jefe de Logística Empleado 1.00 3,500 2,340 5,840 5,840 Parcoy 100% CMHSA
Pasaje Bus Pacroy
Asistente de Logística Tecnico 1.00 2,000 1,337 3,337 3,337 -Huamachuco_parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Jefa de Bienestar Social Empleado 1.00 3,500 2,340 5,840 5,840 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Asistenta Social Empleado 2.00 3,000 2,005 5,005 10,011 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Administrador Empleado 1.00 5,000 3,342 8,342 8,342 Parcoy 100% CMHSA
Vuelo Parcoy-Trijillo-
Asistente de administración Empleado 1.00 2,500 1,671 4,171 4,171 Parcoy 100% CMHSA
COSTO S/. / MES 34.00 268,203
COSTO U.S.$ / MES $ 78,883

B) PLANILLA SERVICIOS AUXILIARES


Nº L.Sociales TOTAL TOTAL GRAL
DESCRIPCION VIAJES X DIA LIBRE ALIMENTACION
CATEGORIA Ingresos M 66.52% S/. S/.
Pasaje Bus Pacroy
Bodeguero Obrero $ 6 1,600 1,064 2,664 15,986 -Huamachuco_parcoy 100% CMHSA
Pasaje Bus Pacroy
Mecanico de perforadoras Obrero $ 2 1,800 1,197 2,997 5,995 -Huamachuco_parcoy 100% CMHSA
Soldador Obrero $ 3 1,800 1,197 2,997 8,992
Auxiliar de servicios (1) Obrero $ - 1,365 908 2,273 0
Pasaje Bus Pacroy
Auxiliar logístico Obrero $ 4 1,800 1,197 2,997 11,989 -Huamachuco_parcoy 100% CMHSA
Pasaje Bus Pacroy
Electricistas Obrero $ 3 1,800 1,197 2,997 8,992 -Huamachuco_parcoy 100% CMHSA

COSTO S/. / MES $ 18 16,927 51,954


COSTO U.S.$ / MES $ 15,281

COSTO DE LA ALIMENTACION
LUGAR S/.X Dia
C) MOVILIDAD - ALOJAMIENTO - VIAJES Ñuñabamba 16.07

Ingresos
DESCRIPCION TOTAL GRAL S/.
Mensual S/.
Lucmas/Trapiche 18.67
Camioneta operaciones $ 2 21,735 43,471 Parcoy:Empleados 25.99
Camion $ 1 21,735 21,735 Parcoy: Tecnicos 23.36
Transporte logistico $ 3 6,000 18,000 S/. 6000 por viaje, 3 viajes al mes
SUB TOTAL S/.X Mes 83,206 83,206
SUB TOTAL U.S.$.x Mes $ 24,472

D) Implementos de Seguridad
EPP (U.S.$ x Mes) 52 83.91 4,363 $ 1,283

TOTAL COSTOS FIJOS U.S.$/Mes $ 119,919

OTROS GASTOS ADICIONALES (Control Recursos Humanos + Liquidaciones)


=(16.07-4)*30*66.7%=
Pago de Alimentacion según control
Alimentacion Obreros (Ñuñabamba) 0 S/.241.49
mensual
Pago x parte de LIQUIDACIONES
de Alimentacion según control
Alimentacion Empleados 21 ´=25.99x20dias= S/.518
´=23.36x30x.667dias= mensual
Pago x parte
vuelos de LIQUIDACIONES
según control mensual x
Alimentacion Tecnicos 13 S/.351.0
parte de LIQUIDACIONES
Pasajes obreros (Parcoy -
Pago pasajes según control mensual x
Huamachuco - Parcoy) S/.155 ida
parte de LIQUIDACIONES
+vuelta 0 ´=155 x 0.67= S/.103.85
Vuelo Funcionarios (Pias -Trujillo - ´=182.20 x 0.67x 2 viajes = Pago vuelos según control mensual x
Pias) = 182.20 X viaje 21 S/.244.15 parte de LIQUIDACIONES

H)CAMPAMENTOS, OFIICINAS, SERVICIOS PARCOY

Campamentos U.S.$/Mes(Ñuñabamba), Lucmas (70 Habitac. xs/.20.00 + 4 Habitac. X S/.20.00)/2.8 435


Hotel en el Pueblo ( 4 X S/.25.00X 30 dias)/2.8) 882
Oficinas (S/.40.00 X 30 dias= S/.1,200) 353
Talleres 294 $ 1,965

GASTOS DE RECURSOS HUMANOS Y ROTACION Se pagara en las liquidaciones previo sustento con facturas

TOTAL COSTOS FIJOS $ 121,884

GASTOS GENERALES $ 42,632

TOTAL COSTOS FIJOS + GASTOS GENERALES $ 164,516

UTILIDAD SOBRE COSTOS FIJOS + GASTOS GENERALES 7% $ 11,516

TOTAL COSTOS FIJOS + GASTOS GENERALES $ 176,032


GASTOS GENERALES MENSUALES ZONA SUR T.C. $ 3
ITEM CANT. DESCRIPCION PRECIO $ V.U. U.S.$
A) GASTOS EN UNIDAD MINERA Precio U.S.$
$ 5 Computadoras/Impresoras Multifuncionales/Servicio Internet Satelital/Telefono 3,200.00
$ 1 Útiles de Oficina 300.00
$ 1 Formularios para Seguridad, Almacen, Reportes diarios, Etc. 500.00
Se pagará una liquidacion
anual según las tarifas
0Exámenes de ingreso - ocupacionales anuales 53.57 $ 6 0.00 vigente
$ 1 Gastos de gestión en Trujillo $ 200 $ 1 200.00
0 Poliza de responsabilidad Civil 113.00 $ 1 113.00
$ 1 Materiales para limpieza de oficinas 500.00
$ 1 Herramientas para mina ( Band-it, grapas, flejes, etc.) $ 158 $ 1 157.50
$ 1 Válvulas, empalmes, pinturas, atacadores, etc. $ 100 $ 1 100.00
0 Licencia de manipuleo de explosivos para personal de mina (Discame $ 22 $ 24 0.00
$ 1 Motosierra y combustible para preparar madera $ 50 $ 1 50.00
$ 1 Herramientas para mina ( Band-it, grapas, flejes, etc.) $ 158 $ 1 157.50
$ 1 Válvulas, empalmes, pinturas, atacadores, etc. $ 100 $ 1 100.00
$ 7 Radios $ 388 $ 24 113.02
Medidor Gases y Detector Gases 2,620.10
8,111
B) TALLERES EN OBRA
$ 1 Equipamiento de taller de mantenimiento $ 100 $ 1 200.00
$ 1 Equipo de soldar eléctrico de 300 Amp. + Soldaduras $ 100 $ 1 200.00
$ 1 Equipo de oxicorte $ 50 $ 1 100.00
$ 1 Herramientas de taller ( llaves, dados, torquímetro, probadores inyector$ 100 $ 1 200.00
$ 1 Afiladora de Barrenos, brocas, esmeril ,etc. $ 150 $ 1 200.00
$ 1 Fierro corrugado para percheros, portaherramientas, etc. $ 50 $ 1 200.00
$ 1 Carbon de piedra para fragua $ 100 $ 1 100.00
1,200.00
C) GASTOS TRUJILLO
Descripcion Cantidad Precio Vida util Total S/.
Alquiler de oficina 1.00 $ 700 $ 1 700.00
Celular 1.00 78 $ 1 78.33
Internet y telefono 1.00 $ 100 $ 1 150.00
Luz y Agua 1.00 $ 60 $ 1 60.00
Mantto y limpieza de oficina 1.00 $ 50 $ 1 50.00
Computadora 1.00 $ 1,820 $ 36 50.56
Impresora 1.00 $ 620 $ 36 17.22
Escritorio 1.00 $ 380 $ 36 10.56
Sillas de plastico 5.00 $ 30 $ 12 12.50
Silla 2.00 $ 250 $ 12 41.67
Papeleria 1.00 $ 100 $ 1 100.00
Pasajes y movilizacion 1.00 $ 150 $ 1 150.00
Vigilancia 1.00 $ 30 $ 1 30.00
Muebles y otros 1.00 $ 500 $ 12 41.67
TOTAL GASTOS TRUJILLO 1,492.50

PERSONAL Cantidad Precio BB.SS. Total S/.


Logistico - Secretario 1.00 $ 1,800 67% 2,997.33

TOTAL GASTOS TRUJILLO US$ 4,489.83 1,320.54

D) GASTOS DE LA CEDE ADMINISTRATIVA DE LIMA - SEMIGLO 32,000.00

TOTAL DE GASTOS GENERALES ESTIMADOS US$. 42,632


COSTO DETECTOR GASES Y MEDIDOR DE GASES

ESTRUCTURA DE COSTOS DE DETECTOR Y MEDIDOR DE


DESCRIPCION CANTIDAD
GASES EN GASTOS GENERALES
Ing. Residente 1.00
Superintendente Recursos
Humanos 1.00 DETECTOR DE GASES
Ing. Asistente de Residente 1.00
Ing. Jefes de turno 6.00 Cant. Super Dias Libres Cant. Equipos
Ing. de Seguridad 1.00
Ing. Asistente de seguridad 1.00 20.00 0.67 13.33

Jefe de Productividad y Costos


1.00

Asistente de productividad y costos


1.00 Cantidad Precio U.S.$
Ing. Jefe de Mantenimiento 1.00 $ 14 $ 117

Ing. Asistente de Mantenimiento


1.00
Capataz 9.00 Costo U.S. $ 1,633
Inspector Seguridad 3.00
Jefe de Logística 1.00 MEDIDOR DE GASES (5 scoop+3 Volq. Bajo perfil)
Asistente de Logística 1.00 Cantidad U.S.$ Vida Economica U.S.$/Mes
Jefa de Bienestar Social 1.00 3.00 $ 5,423 36.00 $ 452
Asistenta Social 2.00
Administrador 1.00 SUB TOTAL $ 2,620
Asistente de administración 1.00
COSTO S/. / MES 34.00

DETECTOR GAS G460


10%
SUB TOTAL CANT EQUIPOS MARCA VIDA UTIL US$/UNID OTROS CONTIGENCIA TOTAL
Incluye : Estacion de carga dual para el equipo y bomba de muestreo US$ MES ACCESORIOS US$
Bomba de muestreo para espacios confinados con batería de NiMH recargable. $ 1,633 $ 14 DETECTOR DE GASES (monitoreo de ga ALIMAX $ 36 3,817.25 381.73 4,198.98
Tubo flexible para muestreo de 3 metros $ 452 $ 3 MEDIDOR DE GASES (analizador de ga DRAGER $ 36 4,930.00 493.00 5,423.00
Cánula con filtro, adaptador para calibracion, Manual de operación $ 132 $ 2 CORTADOR DE PERNOS HILTI $ 24 1,435.91 143.59 1,579.50
COSTO DE MANTENIMIENTO $ 235 $ 3 CORTADOR DE MADERA HILTI $ 24 1,707.30 170.73 1,878.03
DESCRIPCION CANT PRECIO INVERSION U AÑO1 AÑO2 AÑO3 $ 169 $ 2 TALADRO RETOPERCUTOR HILTI $ 24 1,842.23 184.22 2,026.45
Detector G460 con O2, CO, y NO2 $ 20 $ 1,825 $ 36,500 $ - $ - AUTORESCATADOR $ 24 1,244.64 124.46 1,369.11
DATALOGING $ 1 $ 240 $ 240 $ 2,620
Serv. Calibracion $ 4,600 $ 4,600
Sensores O2,CO y NO2 $ 17,800 EQUIPOS US$ VIDA UTIL US$/MES
Kit Filtros $ 520 $ 520 $ 1,040 DETECTOR DE GASES (Monitoreo de gases en labore$ 4,199 $ 36 $ 117
Gancho Sujecion $ 40 $ 80 $ 80 MEDIDOR DE GASES (Analizador de gases de combus$ 5,423 $ 36 $ 151
Carcasa Frontal $ 1,040 CORTADOR DE PERNOS $ 1,580 $ 24 $ 66
Bateria $ 2,500 CORTADOR DE MADERA $ 1,878 $ 24 $ 78
Docking Station $ 1 $ 3,045 $ 3,045 TALADRO RETOPERCUTOR $ 2,026 $ 24 $ 84
Reguladores $ 2 $ 548 $ 1,096 AUTORESCATADOR $ 1,369 $ 24 $ 57
Cilindro gas NO2,(10 ppm) 34 litros $ 1 $ 646 $ 646 $ 646 $ 646 $ - $ - $ -
Cilindro gas CO,(200 ppm) 103 litros $ 1 $ 353 $ 353 $ 353
TOTAL (U.S.$) $ 41,880 $ 560 $ 24,686 $ 9,219
TOTAL U.S.$ 76,345 EQUIPOS COMICIV CANCHANYA CRISTOBAL SEMIGLO SEPROCAL EXTRAMIN INCEMIN
Contingencia U.S.$ 10% 7,635 DETECTOR DE GASES (Monitoreo de gases en labore $ 12 $ 14 $ 10 $ 14 $ 5 $ 5 $ 3
TOTAL GENERAL U.S.$ 83,980 MEDIDOR DE GASES (Analizador de gases de combus$ 3 $ 3 $ 2 $ 3 $ 2
Vida Economica (meses9 36.00 2,333 CORTADOR DE PERNOS $ 2 $ 2 $ 2 $ 2 $ 2
Costo x Mes x Detector 117 CORTADOR DE MADERA $ 2 $ 3 $ 2 $ 3 $ 2 $ 2
TALADRO RETOPERCUTOR $ 2 $ 2 $ 2 $ 2 $ 2 $ 2
AUTORESCATADOR $ - $ - $ - $ - $ 20 $ -
MEDIDOR DE GASES $ - $ - $ - $ - $ -
Medidor de Gases Combustible GA-12 / O2, CO y Nox
Sensores integrados de Oxigeno, Monoxido carbono, Gases Ntrosos, Concentracion CO2, $ 4,200
Probeta 450 mm para analizadores combustion $ 370 EQUIPOS COMICIV CANCHANYA CRISTOBAL SEMIGLO SEPROCAL EXTRAMIN INCEMIN
Filtro Elemental 20 micras; 12 x 32 mm 4 filtrso x año $ 12 $ 30 $ 360 DETECTOR DE GASES (Monitoreo de gases en labore$ 1,400 $ 1,633 $ 1,166 $ 1,633 $ 583 $ 583 $ 350
TOTAL $ 4,930 MEDIDOR DE GASES (Analizador de gases de combus$ 452 $ 452 $ 301 $ 452 $ - $ 301 $ -
Contingencias 10% $ 493 CORTADOR DE PERNOS $ 132 $ 132 $ 132 $ 132 $ - $ 132 $ -
TOTAL GENERAL U.S.$ $ 5,423 CORTADOR DE MADERA $ 157 $ 235 $ 157 $ 235 $ - $ 157 $ 157
TALADRO RETOPERCUTOR $ 169 $ 169 $ 169 $ 169 $ - $ 169 $ 169
CANTIDAD MAQUINAS $ 3 $ 16,269 AUTORESCATADOR $ - $ - $ - $ - $ 1,141 $ - $ -

Vida Economica $ 36 COSTO TOTAL US$ $ 2,309 $ 2,620 $ 1,925 $ 2,620 $ 1,724 $ 1,341 $ 675
COSTO MENSUAL U.S.$/MES 452
TOTAL MENSUAL US$ $ 13,214
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO

03249 CONSORCIO MINER0 HORIZONTE S.A.


RAMPA 2.7 X 2.7 mts. Jack Leg - Scoop de 2.2 Yd3 Acarreo hasta 150 mts N° Taladros: 41 u
### N° Tal.carg.: 31 u
Log. Perfor.: 6 Pies
AVANCE: 1.50 ml

ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforista Tareas 1.00 36.44 $/Tarea 36.44
Ayudante Perforista Tareas 1.00 34.03 $/Tarea 34.03
Operador Scoop Tareas 0.50 46.37 $/Tarea 23.19
Bombero Tareas 34.03 $/Tarea 0.00
93.65 62.43
2.- IMPLEMENTOS
Implementos Tareas 2.00 1.59 3.18
Implementos Operador Scoop Tareas 0.50 2.98 1.49
$ 5 3.11
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 246.000 90.92 $/uni $ 12
Broca de 40 mm PP 246.000 23.08 $/uni $ 16
Aceite de Perforación Gln 0.400 7.86 $/uni $ 3
Petroleo Gln/Hr 6.000 3.28 $/uni $ 20
Herramientas de Mina-Barretillas Global $/uni 1.02
Alcayatas de 3/4" uni 1.000 7.27 $/uni 7.27
59.63 39.75
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 126.00 0.230 $/uni 28.98
EXSABLOCK 7/8" X 7" (276) Pza. 20.00 0.196 $/uni 3.93
EXADIT 45% 7/8" X 7" (328) Pza. 56.00 0.196 $/uni 11.00
EXSANEL 3.0m Pza. 31.00 2.241 $/uni 69.48
GUIA ENSAMBLADA 2.4 MTL - C Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Mts. 10.00 0.268 $/uni 2.68
IGNICION RAPIDA Mts. 0.10 1.313 $/pie 0.13
117.91 78.61
5.- EQUIPOS
Ventiladora 10 CFM Hrs. 0.00 0.89 $/hr 0.00
Scooptrams 2.2 Yd3 Hrs. 2.00 67.97 $/hr 135.94
Perforadora P.P. 246.00 0.100 $/pp 24.60
Manguera Aire 1¨ Mts. 30.00 3.17 $/hr 0.63
Manguera Agua 1/2¨ Mts. 30.00 1.57 $/hr 0.31
Bomba de 10 HP Hrs. 3.00 1.56 $/hr 4.69
166.18 110.79
294.69
6.- GASTOS INDIRECTOS
Contingencias 3% $ 8.84
Gastos Generales 0% $ 0.00
Utilidad 10% $ 29.47
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 333.00
Energía Eléctrica, Tuberias, accesorios proporciona Cía.
FORMATO DE PRECIOS UNITARIOS GALERIA DE EXPLORACION CON PALA

01327 CONSORCIO MINERO HORIZONTE N° Taladros Perf 36 u ###


GALERIA DE 2.4 X 2.4 CON PALA NEUMÁTICA N° Taladros Carg 33.00 u ###
Long.taladro 6 Piés
Rendimiento 1.50 ml

Sub Total Total


ITEM DESCRIPCION Unid. Cant. Precio Unitario $
$ (US$)/Und

1.00 MANO DE OBRA


Maestro perforista Tareas 1.00 36.44 36.44
Ayudante de perforista Tareas 1.00 34.03 34.03
Palero Tareas 0.00 36.44 0.00
Ayud. (cuneta, tuberias,alcayatas,Rieles) Tareas 0.50 34.03 17.01
87.48 58.318
2.00 IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.50 1.59 3.97
Tareas sin ropa de Agua Tareas 0.00 0.00 0.00
3.97 2.649
3.00 MATERIALES Y HERRAMIENTAS
Barras de 6' p.p 216.0 90.92 10.79
Broca de 40 mm PP 216.0 23.08 14.24
Aceite de perforacion Gln 0.250 7.86 1.96
Herramientas de mina Global 1.02
Durmientes 8"x4"x4' Pza. 1.0 0.00 0.00
Alcayatas de 3/4" Un 1.000 7.27 7.27
35.30 23.531
4.00 EXPLOSIVOS

EMULEX 45% x 1" x 7" (276) Pza. 139 0.230 31.97


EXSABLOCK 7/8" X 7" (276) Pza. 16 0.196 3.14
EXADIT 45% 7/8" X 7" (328) Pza. 16 0.196 3.14
EXSANEL 3.0 m Pza. 33.00 2.241 73.96
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.857 1.71
CORDON DETONANTE 5P Mts 10.00 0.268 2.68
IGNICION RAPIDA Mts 0.10 1.313 0.13
116.74 77.826
5.00 EQUIPOS
Ventilador 10 CFM Hrs. 0.000 0.891 0.00
Pala Neumatica 12B Hrs 3.000 6.107 18.32
Perforadora P.P. 216.000 0.120 25.92
Manguera Aire 1" Mts 30.000 3.173 0.63
Manguera agua 1/2" Mts 30.000 1.568 0.31
45.19 30.126
6.00 GASTOS DIRECTOS 192.45
Contingencias 3% 5.77
Gastos Generales 0% 0.00
Utilidad 10% 19.25
TOTAL COSTO LINEAL EN DOLARES (US$/M-L) 217.47
PRECIOS UNITARIOS DE RELLENO HIDRAULICO-DETRITICO - MECANIZADO

Producción Total Mineral en Tajeos (TMS/MES) 35,000 CONVENCIONAL $ 7,000


Rendmto Scoop Tons/Hr $ 20

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO Días Mes $ US$/UNID
2.- MANO DE OBRA S/.
Capataz Tareas - 93.67 30.00 0.00
Maestro Relleno M2/M3 Tareas - 60.50 30.00 0.00
Preparacion A1 Tareas - 56.50 30.00 0.00
SUB TOTAL 0.00 0.00
Leyes Sociales 0.00
SUB TOTAL 0.00 0.00

3.- IMPLEMENTOS
Implementos Ropa Agua Tareas 0.00 1.59 0.00
Implementos sin Ropa agua Tareas 0.00 1.59 0.00
SUB TOTAL 0.00 0.00
4.- MATERIALES Y HERRAMIENTAS RRHH
Poliyute M2 4,000.00 1.28 5,107.40
Clavos 3" Kgs 150.00 0.00 0.00
Tubo 4"X3m PVC Unid 400.00 3.13 1,253.63
Codos 4" x 90 Un 10.00 0.00 0.00
Herramientas de Mina-Barretillas Global 1.53
Floculante Kgs 0.00 0.00 0.00
Alambre No 8 Kgs 0.00 1.08 0.00
Madera Redondo Fts2 4,000.00 0.346 1,384.76
Madera Aserrada Fts2 2,000.00 0.396 791.29

8,538.62 0.00

RELLENO DETRITICO
EQUIPOS
Scooptram 4.1 Yds3 Hrs 350.00 92.97 32,538.84
Petroleo Glns 1,400.00 3.28 4,591.59
37,130.43 $ 1

TOTAL COSTOS POR TMS SEGÚN MEDICION TOPOGRAFICO DE TAJEOS U.S.$/TMS 1.06

* Los Pus de RRHH son ponderados con las TMS ROTAS MENSUALES de los TAJEOS y se pagará según
MEDICION TOPOGRAFICA DE ROTURA DE MINERAL.
El personal de tuberos para la linea TRONCAL y los BOMBEROS serán por Administración de CMHSA (6
personas), que no contempla este Precio Unitario
FORMATO DE PRECIOS UNITARIOS DE RELLENO HIDRAULICO CONVENCIONAL

Producción Total Mineral en Tajeos (TMS/MES) 7,000

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO


UNITARIO Días Mes
2.- MANO DE OBRA S/.
Capataz Tareas 1.00 93.67 30.00
Maestro Relleno M2/M3 Tareas 2.00 60.50 30.00
Preparacion A1 Tareas 3.00 56.50 30.00
SUB TOTAL 6.00
Leyes Sociales
SUB TOTAL

3.- IMPLEMENTOS
Implementos Ropa Agua Tareas 60.00 1.59
Implementos sin Ropa agua Tareas 120.00 1.59
SUB TOTAL
4.- MATERIALES Y HERRAMIENTAS RRHH
Poliyute M2 2,000.00 1.28
Clavos 3" Kgs 60.00 0.00
Tubo 4"X3m PVC Unid 150.00 3.13
Codos 4" x 90 Un 0.00 0.00
Herramientas de Mina-Barretillas Global
Floculante Kgs 0.00 0.00
Alambre No 8 Kgs 0.00 1.08
Madera Redondo Fts2 500.00 0.346
Madera Aserrada Fts2 1,000.00 0.396

TOTAL COSTOS POR TMS SEGÚN MEDICION TOPOGRAFICO DE TAJEOS

* Los Pus de RRHH son ponderados con las TMS ROTAS MENSUALES de los TAJEOS y se pagará según
MEDICION TOPOGRAFICA DE ROTURA DE MINERAL.
El personal de tuberos para la linea TRONCAL y los BOMBEROS serán por Administración de CMHSA (6
personas), que no contempla este Precio Unitario
ULICO CONVENCIONAL

SUBTOT. TOTAL
$ US$/UNID

826.50
1,067.65
1,495.59
3,389.74
3,551.32
6,941.06 0.99

95.38
190.76
286.13 0.04

2,553.70
0.00
470.11
0.00
1.53
0.00
0.00
173.10
395.65

3,594.08 0.51
FACTOR
U.S.$/TMS 0.00

S de los TAJEOS y se pagará según

án por Administración de CMHSA (6


PRECIOS UNITARIOS DE RELLENO HIDRAULICO-DETRITICO - MECANIZADO

Producción Total Mineral en Tajeos (TMS/MES) 35,000 CONVENCIONAL $ 7,000


Rendmto Scoop Tons/Hr $ 20

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO


UNITARIO Días Mes
2.- MANO DE OBRA S/.
Capataz Tareas - 93.67 30.00
Maestro Relleno M2/M3 Tareas - 60.50 30.00
Preparacion A1 Tareas - 56.50 30.00
SUB TOTAL 0.00
Leyes Sociales
SUB TOTAL

3.- IMPLEMENTOS
Implementos Ropa Agua Tareas 0.00 1.59
Implementos sin Ropa agua Tareas 0.00 1.59
SUB TOTAL
4.- MATERIALES Y HERRAMIENTAS RRHH
Poliyute M2 0.00 1.28
Clavos 3" Kgs 0.00 0.00
Tubo 4"X3m PVC Unid 0.00 3.13
Codos 4" x 90 Un 0.00 0.00
Herramientas de Mina-Barretillas Global 0.00
Floculante Kgs 0.00 0.00
Alambre No 8 Kgs 0.00 1.08
Madera Redondo Fts2 0.00 0.346
Madera Aserrada Fts2 0.00 0.396

RELLENO DETRITICO
EQUIPOS
Scooptram 4.1 Yds3 Hrs 350.00 92.97
Petroleo (4 glns/gdia) Glns 1,400.00 3.28

TOTAL COSTOS POR TMS SEGÚN MEDICION TOPOGRAFICO DE TAJEOS

* Los Pus de RRHH son ponderados con las TMS ROTAS MENSUALES de los TAJEOS y se pagará según
MEDICION TOPOGRAFICA DE ROTURA DE MINERAL.
El personal de tuberos para la linea TRONCAL y los BOMBEROS serán por Administración de CMHSA (6
personas), que no contempla este Precio Unitario
TICO - MECANIZADO

SUBTOT. TOTAL
$ US$/UNID

0.00
0.00
0.00
0.00
0.00
0.00 0.00

0.00
0.00
0.00 0.00

0.00
0.00
0.00
0.00
1.53
0.00
0.00
0.00
0.00

1.53 0.00

32,538.84
4,591.59
37,130.43 $ 1

U.S.$/TMS 1.06

S de los TAJEOS y se pagará según

án por Administración de CMHSA (6


PRECIOS UNITARIOS SHOTCRETE 1" VIA SECA (2disparos)

SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla...........: 3.00 M3 46.06 m2 15.35

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia


MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 36.44 0.38 13.66
Ayudantes Shotcrete Tarea 3.00 34.03 0.38 38.28
Operador Scoop Tarea 1.00 46.37 - -
1.50 51.94 1.13
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 1.50 1.59 2.38
2.38 0.05
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
Pesaje $/M3 - - -
Cemento Bolsas 30.00 8.18 245.51
Acelerante Kg 45.00 0.78 34.99
Dramix Kg - 1.76 -
Calibradores Pza 46.00 0.11 4.89
Petroleo D2 Gln/Hr - 3.28 -
286.90 6.23
EQUIPO DE PERFORACION
Scooptram de 2.2 Yd3. Hrs. - 67.97 -
Shotcretera y accesorios Hrs. 2.00 3.57 7.14
7.14 0.16
SUB-TOTAL COSTOS DIRECTOS 7.56
Contingencias 3% 0.23

Utilidad 10% 0.76


COSTO TOTAL U.S.$/M2. 8.55
Nota: La arena lo proporciona la Cía. en zona de trabajo

VARIACION DE PRECIOS SEGÚN GRADO DE MEZCLA DE DRAMIX


DRAMIX (0 KGS/M3) U.S.$/M2 8.55
DRAMIX (10 KGS/M3) U.S.$/M2 9.84
DRAMIX (20 KGS/M3) U.S.$/M2 11.14
DRAMIX (30 KGS/M3) U.S.$/M2 12.43
DRAMIX (40 KGS/M3) U.S.$/M2 13.72

SECCION 3 X 3 CON JUMBO


DESCRIPCION
M3 X DISP 3.00
COSTO X PESAJE (US$) $ 30
TIEMPO TRASLADO DE PLANTA - L 0.50
TIEMPO DE MEZCLA (HRAS) 0.50
TIEMPO DE LANZADO (HRAS) 2.00
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.50
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00

SECCION 3 X 3 CON JACK LEG


DESCRIPCION
M3 X DISP $ 2
COSTO DE PESAJE $ 15
TRASLADO DE PLANTA - LABOR 0.50
MEZCLA 0.50
LANZADO 1.50
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.00
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
PRECIOS UNITARIOS SHOTCRETE 2" VIA SECA (2disparos)

SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla...........: 3.00 M3 23.03 m2 7.68

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia


MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 36.44 0.38 13.66
Ayudantes Shotcrete Tarea 3.00 34.03 0.38 38.28
Operador Scoop Tarea 1.00 46.37 - -
1.50 51.94 2.26
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 1.50 1.59 2.38
2.38 0.10
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
Pesaje $/M3 - - -
Cemento Bolsas 30.00 8.18 245.51
Acelerante Kg 45.00 0.78 34.99
Dramix Kg - 1.76 -
Calibradores Pza 23.00 0.11 2.45
Petroleo D2 Gln/Hr - 3.28 -
284.45 12.35
EQUIPO DE PERFORACION
Scooptram de 2.2 Yd3. Hrs. - 67.97 -
Shotcretera y accesorios Hrs. 2.00 3.57 7.14
7.14 0.31
SUB-TOTAL COSTOS DIRECTOS 15.02
Contingencias 3% 0.45

Utilidad 10% 1.50


COSTO TOTAL U.S.$/M2. 16.97
Nota: La arena lo proporciona la Cía. en zona de trabajo

VARIACION DE PRECIOS SEGÚN GRADO DE MEZCLA DE DRAMIX


DRAMIX (0 KGS/M3) U.S.$/M2 16.97
DRAMIX (10 KGS/M3) U.S.$/M2 19.56
DRAMIX (20 KGS/M3) U.S.$/M2 22.15
DRAMIX (30 KGS/M3) U.S.$/M2 24.74
DRAMIX (40 KGS/M3) U.S.$/M2 27.33

SECCION 3 X 3 CON JUMBO


DESCRIPCION
M3 X DISP 3.00
COSTO X PESAJE (US$) $ 30
TIEMPO TRASLADO DE PLANTA - LA 0.50
TIEMPO DE MEZCLA (HRAS) 0.50
TIEMPO DE LANZADO (HRAS) 2.00
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.50
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00

SECCION 3 X 3 CON JACK LEG


DESCRIPCION
M3 X DISP $ 2
COSTO DE PESAJE $ 15
TRASLADO DE PLANTA - LABOR 0.50
MEZCLA 0.50
LANZADO 1.50
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.00
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
PRECIOS UNITARIOS SHOTCRETE 3" VIA SECA (2disparos)

SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla...........: 3.00 M3 15.35 m2 5.12

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia


MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 36.44 0.38 13.66
Ayudantes Shotcrete Tarea 3.00 34.03 0.38 38.28
Operador Scoop Tarea 1.00 46.37 - -
1.50 51.94 3.38
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 1.50 1.59 2.38
2.38 0.16
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
Pesaje $/M3 - - -
Cemento Bolsas 30.00 8.18 245.51
Acelerante Kg 45.00 0.78 34.99
Dramix Kg - 1.76 -
Calibradores Pza 15.00 0.11 1.60
Petroleo D2 Gln/Hr - 3.28 -
283.60 18.47
EQUIPO DE PERFORACION
Scooptram de 2.2 Yd3. Hrs. - 67.97 -
Shotcretera y accesorios Hrs. 2.00 3.57 7.14
7.14 0.47
SUB-TOTAL COSTOS DIRECTOS 22.47
Contingencias 3% 0.67

Utilidad 10% 2.25


COSTO TOTAL U.S.$/M2. 25.40
Nota: La arena lo proporciona la Cía. en zona de trabajo

VARIACION DE PRECIOS SEGÚN GRADO DE MEZCLA DE DRAMIX


DRAMIX (0 KGS/M3) U.S.$/M2 25.40
DRAMIX (10 KGS/M3) U.S.$/M2 29.28
DRAMIX (20 KGS/M3) U.S.$/M2 33.16
DRAMIX (30 KGS/M3) U.S.$/M2 37.05
DRAMIX (40 KGS/M3) U.S.$/M2 40.93

SECCION 3 X 3 CON JUMBO


DESCRIPCION
M3 X DISP 3.00
COSTO X PESAJE (US$) $ 30
TIEMPO TRASLADO DE PLANTA - 0.50
TIEMPO DE MEZCLA (HRAS) 0.50
TIEMPO DE LANZADO (HRAS) 2.00
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.50
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00

SECCION 3 X 3 CON JACK LEG


DESCRIPCION
M3 X DISP $ 2
COSTO DE PESAJE $ 15
TRASLADO DE PLANTA - LABOR 0.50
MEZCLA 0.50
LANZADO 1.50
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.00
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
PRECIOS UNITARIOS SHOTCRETE 2" VIA SECA CON FIBRA PLASTICA
(1 disparo)

SHOTCRETE TODO COSTO 2" (FIBRA: 3,50 Kgs/M3, 5 kgs/M3)


Avance Mts 2/Cuadrilla...........: 1.50 M3 10.04 m2

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia


MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.23 0.38 13.21
Ayudantes Shotcrete Tarea 3.00 34.03 0.38 38.28
Operador Scoop Tarea 1.00 46.37 - -
1.50 51.49 5.13
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 1.50 3.85 5.77
5.77 0.57
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
Pesaje $/M3 - - -
Cemento Bolsas 15.00 8.18 122.75
Acelerante Kg 22.50 0.78 17.49
Fibra Sintectica BRCHIP 54 Kg - 1.76 -
Calibradores Pza 10.00 0.11 1.06
Petroleo D2 Gln/Hr - 3.28 -
142.82 14.23
EQUIPO DE PERFORACION
Scooptram de 2.2 Yd3. Hrs. - 67.97 -
Shotcretera y accesorios Hrs. 2.00 3.57 7.14
7.14 0.71
SUB-TOTAL COSTOS DIRECTOS 20.64
Contingencias 3% 0.62

Utilidad 10% 2.06


COSTO TOTAL U.S.$/M2. 23.32
Nota: La arena lo proporciona la Cía. en zona de trabajo

VARIACION DE PRECIOS SEGÚN GRADO DE MEZCLA DE DRAMIX


FIBRA PLASTICA (3.5 KGS/M3) U.S.$/M2 $ 4 KG 24.02
FIBRA PLASTICA (5.0 KGS/M3) U.S.$/M2 $ 5 KG 24.31

SECCION 3 X 3 CON JUMBO


DESCRIPCION
M3 X DISP 3.00
COSTO X PESAJE (US$) $ 30
TIEMPO TRASLADO DE PLANTA - L 0.50
TIEMPO DE MEZCLA (HRAS) 0.50
TIEMPO DE LANZADO (HRAS) 2.00
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.50
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00

SECCION 3 X 3 CON JACK LEG


DESCRIPCION
M3 X DISP $ 2
COSTO DE PESAJE $ 15
TRASLADO DE PLANTA - LABOR 0.50
MEZCLA 0.50
LANZADO 1.50
OTROS TIEMPOS MUERTOS 0.50
TOTAL HRS 3.00
MAESTRO SHOTCRETE 1.00
AYTE DE SHOTCRETE 3.00
ANALISIS DE PRECIOS UNITARIOS

PARTIDA: LANZADO
SHOTCRETE VIA HUMEDA
MONEDA DÓLAR AMERICANO
RENDIMIENTO PLANTA M3/HORA
$ 20
RENDIMIENTO M3/DIA $ 20
RENDIMIENTO PLANTA M3/MES
$ 400
RENDIMIENTO PLANTA M3/MES$ 4,800
UNIDAD M3
DESCRIPCION UNIDAD CANTIDAD %INCIDENCIA P.U.(US$) PARCIAL

MANO DE OBRA
operador lanzado h/h $ 8 100% $ 5 $ 42
operador equipo h/h $ 8 100% $ 5 $ 42
ayudante de equipo lansador h/h $ 8 100% $ 5 $ 39
MANTENIMIENTO
electricista h/h $ 8 25% $ 5 $ 10
mecanico/equipo pesado h/h $ 8 50% $ 5 $ 21
ayudante mecanico h/h $ 8 50% $ 5 $ 19
SUPERVISION
ing supervisión h/h $ 8 25% $ 8 $ 16
tecnico/laboratorio h/h $ 8 50% $ 5 $ 21
capataz h/h $ 8 50% $ 6 $ 24

MATERIALES
Shotcretera mes $ 1 100% $19,000.00 $19,000.00
repuestos consumibles unidad $ 1 100% $4,800.00 $4,800.00
calibrador para aplicación unidad $ 4 100% $ 1 $ 4

IMPLEMENTOS Y HERRAMIENTAS
implementos de seguridad mes $ 8 100% $ 3 $ 22
implemento de seguridad p´lanzador
mes $ 1 100% $ 18 $ 18
seguros mes $ 1 100% $ 270 $ 270
herramientas varias mes $ 1 100% $ 2 $ 2
COSTO DIRECTO
GASTOS GENERALES 15% 15%
GASTOS OPERACIÓN LIMA 5%
UTILIDADES 10% 10%
COSTO TOTAL
DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 2
PULGADAS
SHOTCRTE 2" SHOTCRETE 3" SHOTCRETE 4"
PERDIDAS VIA
HUMEDA % % %
Perdida por
Manipuleo (%) 0.50% 0.70% 1%
Perdida por Rebote
(%) 10% 12% 15%
Superficie Irregular
(%) 10.00% 7.50% 5%

Rendimiento
(M3/Gdia) = 25.00 25.00 25.00

Espesor Perdidad/Manipu Perdida por Superficie Perdida


M3 Shotcrete Pulg leo Rebote irregular Total
$ 1 2" 0.50% 10% 10.00% 20.50%
$ 1 3" $ -
$ 1 4" $ -
DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 3
PULGADAS
Espesor Perdidad/Manipu Perdida por Superficie Perdida
M3 Shotcrete Pulg leo Rebote irregular Total
$ 1 2"
$ 1 3" 0.70% 12% 7.50% 20.20%
$ 1 4"
DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 4
PULGADAS

Espesor Perdidad/Manipu Perdida por Superficie Perdida


M3 Shotcrete Pulg leo Rebote irregular Total
$ 1 2"
$ 1 3"
$ 1 4" 1.00% 15% 5.00% 21.00%
SUB TOTAL TOTAL (US$)

2.08
2.08
1.93

0.52
1.04
0.96

0.80
1.04
1.20
11.65

31.67
8.00
4.00
39.67

1.12
0.90
0.45
0.11 2.58
53.89
8.08
2.69
5.39
70.06
DA 2

Rendimiento
(M2)
$ 12

DA 3

Rendimiento
(M2)

$ 9

DA 4

Rendimiento
(M2)

$ 7
FALTA APROBACION
PRECIOS UNITARIOS SHOTCRETE 2" VIA HUMEDA (Tajeo con Jumbo)

Shotcrete M3/Gdia 10.00 M3 110.83 M2/Gdia

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$


MANO DE OBRA
Operador Lanzado Tarea 1.00 36.44 1.00 36.44
Operador Equipo Tarea 1.00 36.44 1.00 36.44
Ayudante Equipo Lanzado Tarea 1.00 34.03 1.00 34.03
3.00 106.90
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 3.00 1.59 4.77
4.77
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
CEMENTO BOLSAS/M3 10.00 8.18 81.84
FIBRA KGS/M3 30.00 1.70 51.00
ADITIVO PLASTIFICANTE LITROS/M3 5.00 1.00 5.00
ADICITVO ACELERANTE LITROS/M3 $ 15 0.75 11.25
150.59

SUB-TOTAL COSTOS DIRECTOS


Contingencias $ 0

Utilidad $ 0
COSTO TOTAL U.S.$/M2.
Nota: La arena lo proporciona la Cía. en zona de trabajo

COSTO DE MATERIAL EXPRESADO U.S.$/M3


DESCRIPCION UNIDAD CANT PRECIO VALOR $
CEMENTO BOLSAS/M3 10.00 $ 9 $ 91
FIBRA KGS/M3 30.00 1.70 $ 51
AGREGADO KGS/M3 $ 1 7.00 $ 7
ADITIVO PLASTIFICANTE LITROS/M3 5.00 1.00 $ 5
ADICITVO ACELERANTE LITROS/M3 $ 15 $ 1 $ 11

PARAMETROS DE LABORES ACTUALIZADOS


PERDIDAS

Perdida por traslape 10.00%


Perdidad / Perdida x Perdida por Superficie
M3 Shotcrete Espesor Pulg Manipuleo traslape Rebote irregular
1.00 1" 0.50% 10% 18% 25%
1.00 2" 0.70% 10% 18% 15.0%

Rendimiento (M3/Gdia) = 10.00


Area de Sostenimiento =
SOSTENIMIENTO VIA SECA M2/M3 M2/GDIA
SHOTCRETE 1" M2 18.31 183.07
SHOTCRETE 2" M2 11.08 110.83
SHOTCRETE 3" M2 13.12 131.23
DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 2 PULGADAS
SHOTCRTE 2" SHOTCRETE 3" SHOTCRETE 4"
PERDIDAS VIA HUMEDA % % %
Perdida por Manipuleo (%) 0.50% 0.70% 1%
Perdida por Rebote (%) 10% 12% 15%
Superficie Irregular (%) 10.00% 7.50% 5%

Rendimiento (M3/Gdia) = 10.00 10.00 10.00

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2" 0.50% 10% 10.00% 20.50%
$ 1 3" $ -
$ 1 4" $ -

DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 3 PULGADAS

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2"
$ 1 3" 0.70% 12% 7.50% 20.20%
$ 1 4"

DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 4 PULGADAS

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2"
$ 1 3"
$ 1 4" 1.00% 15% 5.00% 21.00%
Jumbo)

U.S.$/Gdia

0.96

0.04

1.36

2.37
0.07

$ 0
$ 3

Perdida Total Rendimiento


(M2)
54% 18.31
44% 11.08
Rendimiento
(M2)
18.31

Rendimiento
(M2)

11.08

Rendimiento
(M2)

-
FALTA APROBACION
PRECIOS UNITARIOS SHOTCRETE 1" VIA HUMEDA (Tajeo con Jumbo-Robot)

Shotcrete M3/Gdia 10.00 M3 183.07 M2/Gdia

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$


MANO DE OBRA
Operador Lanzado Tarea 1.00 36.44 1.00 36.44
Operador Equipo Tarea 1.00 36.44 1.00 36.44
Ayudante Equipo Lanzado Tarea 1.00 34.03 1.00 34.03
3.00 106.90
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 3.00 1.59 4.77
4.77
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
CEMENTO BOLSAS/M3 10.00 8.18 81.84
FIBRA KGS/M3 30.00 1.70 51.00
ADITIVO PLASTIFICANTE LITROS/M3 5.00 1.00 5.00
ADICITVO ACELERANTE LITROS/M3 $ 15 0.75 11.25
150.59

SUB-TOTAL COSTOS DIRECTOS


Contingencias $ 0

Utilidad $ 0
COSTO TOTAL U.S.$/M2.
Nota: La arena lo proporciona la Cía. en zona de trabajo

COSTO DE MATERIAL EXPRESADO U.S.$/M3


DESCRIPCION UNIDAD CANT PRECIO VALOR $
CEMENTO BOLSAS/M3 10.00 $ 9 $ 91
FIBRA KGS/M3 30.00 1.70 $ 51
AGREGADO KGS/M3 $ 1 7.00 $ 7
ADITIVO PLASTIFICANTE LITROS/M3 5.00 1.00 $ 5
ADICITVO ACELERANTE LITROS/M3 $ 15 $ 1 $ 11

PARAMETROS DE LABORES ACTUALIZADOS


PERDIDAS

Perdida por traslape 10.00%


Perdidad / Perdida x Perdida por Superficie
M3 Shotcrete Espesor Pulg Manipuleo traslape Rebote irregular
1.00 1" 0.50% 10% 18% 25%
1.00 2" 0.70% 10% 18% 15.0%

Rendimiento (M3/Gdia) = 10.00


Area de Sostenimiento =
SOSTENIMIENTO VIA SECA M2/M3 M2/GDIA
SHOTCRETE 1" M2 18.31 183.07
SHOTCRETE 2" M2 11.08 110.83
SHOTCRETE 3" M2 13.12 131.23
DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 2 PULGADAS
SHOTCRTE 2" SHOTCRETE 3" SHOTCRETE 4"
PERDIDAS VIA HUMEDA % % %

Perdida por Manipuleo (%) 0.50% 0.70% 1%


Perdida por Rebote (%) 10% 12% 15%
Superficie Irregular (%) 10.00% 7.50% 5%

Rendimiento (M3/Gdia) = 10.00 10.00 10.00

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2" 0.50% 10% 10.00% 20.50%
$ 1 3" $ -
$ 1 4" $ -

DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 3 PULGADAS

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2"
$ 1 3" 0.70% 12% 7.50% 20.20%
$ 1 4"

DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 4 PULGADAS

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2"
$ 1 3"
$ 1 4" 1.00% 15% 5.00% 21.00%
mbo-Robot)

U.S.$/Gdia

0.58

0.03

0.82

1.43
0.04

$ 0
$ 2

Perdida Total Rendimiento


(M2)
54% 18.31
44% 11.08
Rendimiento
(M2)
18.31

Rendimiento
(M2)

11.08

Rendimiento
(M2)

-
FALTA APROBACION
PRECIOS UNITARIOS SHOTCRETE 1" VIA HUMEDA (Tajeo con Jumbo-TK)

Shotcrete M3/Gdia 10.00 M3 155.51 M2/Gdia

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$


MANO DE OBRA
Operador Lanzado Tarea 1.00 36.44 1.00 36.44
Operador Equipo Tarea 1.00 36.44 1.00 36.44
Ayudante Equipo Lanzado Tarea 1.00 34.03 1.00 34.03
3.00 106.90
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 3.00 1.59 4.77
4.77
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
CEMENTO BOLSAS/M3 10.00 8.18 81.84
FIBRA KGS/M3 30.00 1.70 51.00
ADITIVO PLASTIFICANTE LITROS/M3 5.00 1.00 5.00
ADICITVO ACELERANTE LITROS/M3 $ 15 0.75 11.25
150.59

SUB-TOTAL COSTOS DIRECTOS


Contingencias $ 0

Utilidad $ 0
COSTO TOTAL U.S.$/M2.
Nota: La arena lo proporciona la Cía. en zona de trabajo

COSTO DE MATERIAL EXPRESADO U.S.$/M3


DESCRIPCION UNIDAD CANT PRECIO VALOR $
CEMENTO BOLSAS/M3 10.00 $ 9 $ 91
FIBRA KGS/M3 30.00 1.70 $ 51
AGREGADO KGS/M3 $ 1 7.00 $ 7
ADITIVO PLASTIFICANTE LITROS/M3 5.00 1.00 $ 5
ADICITVO ACELERANTE LITROS/M3 $ 15 $ 1 $ 11

PARAMETROS DE LABORES ACTUALIZADOS


PERDIDAS

Perdida por traslape 10.00%


Perdidad / Perdida x Perdida por Superficie
M3 Shotcrete Espesor Pulg Manipuleo traslape Rebote irregular
1.00 1" 0.50% 10% 20% 30%
1.00 2" 0.70% 10% 20% 20.0%

Rendimiento (M3/Gdia) = 10.00


Area de Sostenimiento =
SOSTENIMIENTO VIA SECA M2/M3 M2/GDIA
SHOTCRETE 1" M2 15.55 155.51
SHOTCRETE 2" M2 9.70 97.05
SHOTCRETE 3" M2 13.12 131.23
DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 2 PULGADAS
SHOTCRTE 2" SHOTCRETE 3" SHOTCRETE 4"
PERDIDAS VIA HUMEDA % % %

Perdida por Manipuleo (%) 0.50% 0.70% 1%


Perdida por Rebote (%) 10% 12% 15%
Superficie Irregular (%) 10.00% 7.50% 5%

Rendimiento (M3/Gdia) = 10.00 10.00 10.00

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2" 0.50% 10% 10.00% 20.50%
$ 1 3" $ -
$ 1 4" $ -

DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 3 PULGADAS

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2"
$ 1 3" 0.70% 12% 7.50% 20.20%
$ 1 4"

DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 4 PULGADAS

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2"
$ 1 3"
$ 1 4" 1.00% 15% 5.00% 21.00%
umbo-TK)

U.S.$/Gdia

0.69

0.03

0.97

1.69
0.05

$ 0
$ 2

Perdida Total Rendimiento


(M2)
61% 15.55
51% 9.70
Rendimiento
(M2)
15.55

Rendimiento
(M2)

9.70

Rendimiento
(M2)

-
FALTA APROBACION
PRECIOS UNITARIOS SHOTCRETE 2" VIA HUMEDA (Tajeo con Jumbo-TK)

Shotcrete M3/Gdia 10.00 M3 110.83 M2/Gdia

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$


MANO DE OBRA
Operador Lanzado Tarea 1.00 36.44 1.00 36.44
Operador Equipo Tarea 1.00 36.44 1.00 36.44
Ayudante Equipo Lanzado Tarea 1.00 34.03 1.00 34.03
3.00 106.90
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 3.00 1.59 4.77
4.77
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
CEMENTO BOLSAS/M3 10.00 8.18 81.84
FIBRA KGS/M3 30.00 1.70 51.00
ADITIVO PLASTIFICANTE LITROS/M3 5.00 1.00 5.00
ADICITVO ACELERANTE LITROS/M3 $ 15 0.75 11.25
150.59

SUB-TOTAL COSTOS DIRECTOS


Contingencias $ 0

Utilidad $ 0
COSTO TOTAL U.S.$/M2.
Nota: La arena lo proporciona la Cía. en zona de trabajo

COSTO DE MATERIAL EXPRESADO U.S.$/M3


DESCRIPCION UNIDAD CANT PRECIO VALOR $
CEMENTO BOLSAS/M3 10.00 $ 9 $ 91
FIBRA KGS/M3 30.00 1.70 $ 51
AGREGADO KGS/M3 $ 1 7.00 $ 7
ADITIVO PLASTIFICANTE LITROS/M3 5.00 1.00 $ 5
ADICITVO ACELERANTE LITROS/M3 $ 15 $ 1 $ 11

PARAMETROS DE LABORES ACTUALIZADOS


PERDIDAS

Perdida por traslape 10.00%


Perdidad / Perdida x Perdida por Superficie
M3 Shotcrete Espesor Pulg Manipuleo traslape Rebote irregular
1.00 1" 0.50% 10% 18% 25%
1.00 2" 0.70% 10% 18% 15.0%

Rendimiento (M3/Gdia) = 10.00


Area de Sostenimiento =
SOSTENIMIENTO VIA SECA M2/M3 M2/GDIA
SHOTCRETE 1" M2 18.31 183.07
SHOTCRETE 2" M2 11.08 110.83
SHOTCRETE 3" M2 13.12 131.23
DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 2 PULGADAS
SHOTCRTE 2" SHOTCRETE 3" SHOTCRETE 4"
PERDIDAS VIA HUMEDA % % %

Perdida por Manipuleo (%) 0.50% 0.70% 1%


Perdida por Rebote (%) 10% 12% 15%
Superficie Irregular (%) 10.00% 7.50% 5%

Rendimiento (M3/Gdia) = 10.00 10.00 10.00

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2" 0.50% 10% 10.00% 20.50%
$ 1 3" $ -
$ 1 4" $ -

DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 3 PULGADAS

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2"
$ 1 3" 0.70% 12% 7.50% 20.20%
$ 1 4"

DETALLE PERDIDAS SHOTCRETE VIA HUMEDA 4 PULGADAS

Perdidad/Ma Perdida por Superficie Perdida


M3 Shotcrete Espesor Pulg nipuleo Rebote irregular Total
$ 1 2"
$ 1 3"
$ 1 4" 1.00% 15% 5.00% 21.00%
umbo-TK)

U.S.$/Gdia

0.96

0.04

1.36

2.37
0.07

$ 0
$ 3

Perdida Total Rendimiento


(M2)
54% 18.31
44% 11.08
Rendimiento
(M2)
18.31

Rendimiento
(M2)

11.08

Rendimiento
(M2)

-
INSTALACION PERNO HELICOIDAL DE 7' CEMBOL - JACKLEG
Solo instalación del perno
XXXXXXX
Longitud Taladro : 2.10 Mts. $ 7 FTS
Rendimiento : 20.00 Unid.

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas $ 1 Tarea 1.00 36.44 1.20 43.72
Ayud. Perforista $ 1 Tarea 1.00 34.03 1.20 40.83

2.00 84.56 4.23


2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.59 3.18
3.18 0.16
3. MATERIALES Y HERRAMIENTAS
Barra de 8 pies P.P. 140.00 96.90 1,820 7.45
Broca 40 mm Pza 140.00 23.08 350 9.23
Aceite Perforación Gln. 0.17 7.86 1.34
Perno Helicohidal de 7',tuerca,placa Pza. 20.00 - -
Resina Cart 40.00 0.64 25.72
Cembol Cart 200.00 0.20 39.29
Adaptador para inst perno Pza. 1.00 78.58 350 0.22
Herramientas de mina Global 1.02
84.27 4.21
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 140.00 0.12 16.80
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
17.75 0.89
COSTOS DIRECTOS 9.49
COSTOS FIJOS ( van en lista por separado )
IMPREVISTOS 3% 0.28
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 0.95
COSTO TOTAL (US$/Pza. 10.72
PU DE OPERACIONES
PEC
CUADRO COMPLETO MADERA 7' x 7'(Sub Nivel)

$ 12,129
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 100% 35.23
Ayud. Enmaderador Tarea 1.00 34.03 100% 34.03

2.00 69.26 34.63


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.59
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.75
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(7''X8') 3.12 25.25 78.85 9.96 31.11
Tirante (5"x10') $ 1 16.10 16.10 6.35 6.35
94.96 37.46
37.46
COSTOS DIRECTOS 74.43
COSTOS FIJOS ( van en lista por separado )
74.43

IMPREVISTOS 3% 2.23
GASTOS GENERALES 0% -
UTILIDAD 10% 7.44
COSTO TOTAL (US$/Pza.) 84.11

Costo de Transporte de Madera 94.96 0.043 4.04


COSTO TOTAL (US$/Pza.) sin CUNETA 88.15

Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
PEC
CUADRO COMPLETO SUB NIVEL 4' x 6'(Sub Nivel)

$ 12,149
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo FACTOR Costo x Costo/Pza.
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 100% 35.23
Ayud. Enmaderador Tarea 1.00 34.03 100% 34.03

2.00 69.26 34.63


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.59
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.75
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(6''X8') 3.12 18.55 57.93 7.32 22.86
Tirante (5"x10') $ 1 16.10 16.10 6.35 6.35
74.04 29.21
29.21
COSTOS DIRECTOS 66.19
COSTOS FIJOS ( van en lista por separado )
66.19

IMPREVISTOS 3% 1.99
GASTOS GENERALES 0% -
UTILIDAD 10% 6.62
COSTO TOTAL (US$/Pza.) 74.79

Costo de Transporte de Madera 74.04 0.043 3.15


COSTO TOTAL (US$/Pza.) 77.94

Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
LABOR >20 MTS SE PAGARA 2% + DEL PU
FACTOR 0.98

FORMULA PARA REDONDOS


TIPO DE CUADRO DIAM " LONG ' pies²
Redondo 6" x 15 cm 6.00 0.49 1.14
Redondo 7" x 15 cm 7.00 0.49 1.55
Redondo 8" x 15 cm 8.00 0.49 2.02
Redondo 8" x 8' 8.00 8.00 32.98
Redondo 5" x 10' 5.00 10.00 16.10
Redondo 8" x 10' 8.00 10.00 41.23
Redondo 6" x 10' 6.00 10.00 23.19
Redondo 7" x 8' 7.00 8.00 25.25
Redondo 6" x 8' 6.00 8.00 18.55
Redondo 7" x 10' 7.00 10.00 31.57
Redondo 4" x 8' 4.00 8.00 8.25
Redondo 5" x 8' 5.00 8.00 12.88
Redondo 8" x 4mts 8.00 13.12 54.11
Redondo 5" x 7' 5.00 7.00 11.27

FORMULA PARA CUARTONES Y TABLAS


TIPO DE MADERA ANCHO " ESPS" LONG ' PIES²
Tabla 8" x 2" x 10' 8.00 2.00 10.00 13.12
Tabla 8" x 4" x 10' 8.00 4.00 10.00 26.25
Tabla 1" x 5" x 8' 1.00 5.00 8.00 3.28
Tabla 8" x 2" x 4' 8.00 2.00 4.00 5.25
Tabla 8" x 2" x 2' 8.00 2.00 2.00 2.62
Durmiente 8"x4"x4' 8.00 4.00 4.00 10.50
Durmiente 8"x8"x5' 8.00 8.00 5.00 26.25
Descanso (listones 2"x2"x5') 2.00 2.00 5.00 1.64
ENTABLADO DE MADERA SIN MALLA PARA RELLENO
$ 12,176
Rendimiento / Gdia. 11.00 M2
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.23 35.23
Ayudante Tarea 1.00 34.03 34.03

2.00 69.26 6.30


2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.59 3.18

3.18 0.29
3. HERRAMIENTAS
Herramientas Global 1.50 0.14

4. MATERIALES CANTIDAD PIES2 TOT.PIES2 PRECIO MONTO


Redondos (5"x8´) Pza $ 5 12.88 64.42 5.08 25.40
Tabla (8"x2"x10´) Pza $ 12 13.12 157.48 6.38 76.59
Clavos 6 " Kgs $ 4 1.28 5.11
Malla Electrosoldad M2 0.00 221.90 2.69 -
107.10
9.74

COSTOS DIRECTOS 16.46

16.46

IMPREVISTOS 3% 0.49
GASTOS GENERALES 0% -
UTILIDAD 10% 1.65
COSTO TOTAL (US$/M2.) 18.60

COSTO DE TRANSPORTE DE MADERA 221.90 0.0426 0.86

COSTO TOTAL (US$/M2.) 19.46

Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata #DIV/0!
Malla Electrosoldada y todos los materiales es a costo del Contratista
LABOR >20 MTS SE PAGARA 2% + DEL PU
PIRCADO DE MEJORA DE LEY
08144
Rendimiento TMS/Gdia 2.80 M3
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 0.25 35.23 8.81
Ayud. Perforista Tarea 0.25 34.03 8.51

0.50 17.31 6.18


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 0.50 1.59 0.79

0.79 0.28
3. HERRAMIENTAS
Herramientas de mina Global 1.53

1.53 0.55
COSTOS DIRECTOS 7.01
COSTOS FIJOS ( van en lista por separado )
7.01

IMPREVISTOS 3% 0.21
GASTOS GENERALES 0% -
UTILIDAD 10% 0.70
COSTO TOTAL (US$/TMS) 7.93

OBSERVACION: Solo se paga siempre y cuando se respeten el Ancho de Minado establecido


INSTALACION DE LINEA DE CAUVILLE PRINCIPALES (45 Lbrs/Yd) Incluye Traslado

Rendimiento / Gdia. $ 36 Mts/Gdia


DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 3.00 35.23 105.70
Ayudante Tarea 5.00 34.03 170.14

8.00 275.83 7.66


2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 8.00 1.59 12.72

12.72 0.35
3. HERRAMIENTAS
Herramientas Global 1.50
1.50 0.04

4. -MATERIALES (Durmiente)
Und Pies²/Uni pies² $/Pza $
Durmiente (8"x8"x5') 27.07 26.25 710.53 22.62 612.26

710.53 612.26 17.01

COSTOS DIRECTOS 25.06

IMPREVISTOS 3% 0.75
GASTOS GENERALES 0% -
UTILIDAD 10% 2.51
COSTO TOTAL (US$/Pza.) 28.32

Costo de Tranbsporte de Madera 710.53 0.043 0.84


COSTO TOTAL (US$/Collera.) 29.16

Costo Incluye transporte de los materiales a sus labores a cuenta Contrata


INSTALACION DE LINEA DE CAUVILLE PRINCIPALES (60 Lbrs/Yd) Incluye Traslado

Rendimiento / Gdia. $ 30 Mts/Gdia


DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 3.00 35.23 105.70
Ayudante Tarea 5.00 34.03 170.14

8.00 275.83 9.19


2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 8.00 1.59 12.72

12.72 0.42
3. HERRAMIENTAS
Herramientas Global 1.50
1.50 0.05

4. -MATERIALES (Durmiente)
Und Pies²/Uni pies² $/Pza $
Durmiente (8"x8"x5') 22.56 26.25 592.11 22.62 510.22

592.11 510.22 17.01

COSTOS DIRECTOS 26.68

IMPREVISTOS 3% 0.80
GASTOS GENERALES 0% -
UTILIDAD 10% 2.67
COSTO TOTAL (US$/Pza.) 30.14

Costo de Tranbsporte de Madera 592.11 0.04 0.84


COSTO TOTAL (US$/Collera.) 30.98

Costo Incluye transporte de los materiales a sus labores a cuenta Contrata


ESTRUCTURA DE COSTOS DE BRAZO EMPERNADOR MODELO DS311

DATOS
DESCRIPCION UNID. 10 M3
PRECIO STOCK LIMA U.S.$ $ 640,000
VALOR RESCATE (20%) U.S.$ $ 128,000
VALOR NETO EQUIPO U.S.$ $ 512,000
VIDA ECONOMICA EN HORAS(8*25*72) HRS 14,400.00
HRS POR MES HRS 200.00
VIDA ECONOMICA EN AÑOS UNID 6.00

DEPRECIACION DE EQUIPOS

COSTO DE POSESION
DEPRECIACION U.S.$/HR 35.56
C.INTERESES,SEGUROS E IMPUESTOS U.S.$/HR 24.07

SUB-TOTAL COSTO POSECION U.S.$/HR 59.63

COSTO DE OPERACIÓN
Repuestos y Mantenimiento U.S.$/HR 35.78
Neumaticos U.S.$/HR 2.00
Petroleo (1.5 Gln x Hr) U.S.$/HR 4.92
Mecanico U.S.$/HR 7.64
SUB-TOTAL OPERACIONES U.S.$/HR 50.34

TOTAL (OPERACIÓN+DEPRECIACION) U.S.$/HR 109.97


ESTRUCTURA DE COSTOS DE BRAZO EMPERNADOR MODELO DS311

DATOS
DESCRIPCION UNID. 10 M3
PRECIO STOCK LIMA U.S.$ $ 640,000
VALOR RESCATE (20%) U.S.$ $ 128,000
VALOR NETO EQUIPO U.S.$ $ 512,000
VIDA ECONOMICA EN HORAS(8*25*72) HRS 14,400.00
HRS POR MES HRS 200.00
VIDA ECONOMICA EN AÑOS UNID 6.00

DEPRECIACION DE EQUIPOS

COSTO DE POSESION
DEPRECIACION U.S.$/HR 35.56
C.INTERESES,SEGUROS E IMPUESTOS U.S.$/HR 24.07

SUB-TOTAL COSTO POSECION U.S.$/HR 59.63

COSTO DE OPERACIÓN
Repuestos y Mantenimiento U.S.$/HR 41.74
Neumaticos U.S.$/HR 2.00
Petroleo (1.5 Gln x Hr) U.S.$/HR 4.92
Mecanico U.S.$/HR 11.64
SUB-TOTAL OPERACIONES U.S.$/HR 60.30

TOTAL (OPERACIÓN+DEPRECIACION) U.S.$/HR 119.93


IMPLEMENTOS DE SEGURIDAD EMPLEADOS
DESCRIPCION UNID. CANTIDAD PRECIO VIDA ECON. COSTO UNITARIO
US$/UNIDAD (Disparos) POR DISPARO
Botas de Jebe Punta Acero Par $ 1 13.74 183.00 0.08
Casco Tipo Sombrero Portalámpara Uni $ 1 11.32 1,095.00 0.01
Casco Tipo Sombrero Portalampara con orejera Pza $ - 0.00 1,095.00 0.00
Faja ergonomica de proteccion lumbar Pza $ - 0.00 0.00 0.00
Barbiquejo Elástico Gancho Metálico SEKUR Uni $ 1 0.48 90.00 0.01
Respirador Pza $ 1 17.64 365.00 0.05
Filtro Par $ 2 2.83 60.00 0.09
Cartucho para gases Par $ 1 3.66 365.00 0.01
Retenedor Par $ 2 1.94 365.00 0.01
Guante de cuero Par $ 1 2.58 15.00 0.17
Correa Portalámpara Faja Plana 1 1/2" Uni $ 1 2.55 365.00 0.01
Tapón de Oido Uni $ 1 0.47 45.00 0.01
Mameluco Jean Uni $ 1 27.49 183.00 0.15
Pantalón de Jebe Uni $ - 8.82 90.00 0.00
Casaca de Jebe Uni $ - 8.82 90.00 0.00
Lámpara Uni $ 1 15.05 30.00 0.50
Anteojos Uni $ 1 4.64 120.00 0.04
Cordón Sujetador de Anteojos Uni $ - 0.00 183.00 0.00
Tafilete de 4 Puntas (Suspensión ECO V) Uni $ 1 3.76 365.00 0.01
Zapato Seguridad Uni $ 1 30.57 365.00 0.08
SUB-TOTAL 1.23
$ 1
SIMULACION DE PLANILLA DE APRENDICES

JORNAL 22.92 22.92 22.92


CONCEPTOS % MES1 MES2 MES3 TOTAL
dias $ 31 $ 30 $ 31

REMUNERACION 710.52 687.60 710.52 2,108.64


GRATIFICACION 118.42 118.42 118.42 355.26
VACACIONES 0.00 0.00 0.00 0.00
CTS (Rem+Grati)/12 69.08 69.08 69.08 207.24
SUB TOTAL 898.02 875.10 898.02 2,671.14
Gravado(Afecto al Impuesto) 828.94 806.02 828.94 2,463.90
SEGUROS
ESSALUD 9.00% 74.60 72.54 74.60 221.75
JUBILACION 2.00% 16.58 16.12 16.58 49.28
SCT SALUD 0.97% 8.04 7.82 8.04 23.90
SCT PENSION 4.05% 33.57 32.64 33.57 99.79
SCT PENSION Prima 0.00% 0.00 0.00 0.00 0.00
VIDA LEY 0.36% 2.98 2.90 2.98 8.87
SUB TOTAL 135.78 132.03 135.78 403.59

TOTAL: 1,033.80 1,007.12 1,033.80 3,074.72

45.82%
LEYES SOCIALES DE CTTA POR PRECIO UNITARIO PAR
T Anual :
D.NORMALES
DOMINGOS
Basico $ 31 1,500.00 DESC.MEDICO
Asig. Fam. 1.367 75.00 FERIADOS
32.70 1,541.00 VACAC.
INGRESO: MENSUAL ANUAL
Obreros Empleados Obreros Empleados
Cálculo de Leyes Sociales

Mensual: 738.41 1,541.00 8,860.89 18,492.00

CTS 96.69 0.00 1,160.28 0.00


$ 1 VACACIONES 81.74 0.00 980.88 0.00
$ 2 GRATIFICACIONES 163.49 0.00 1,961.88 0.00
$ 3 DOMINGOS & FERIADOS-DESC.MED 174.38 0.00 2,092.56 0.00
DESCANSO MEDICO 10.90 0.00 130.80 0.00

ESSALUD 66.46 0.00 797.48 0.00


JUBILACION ANTICIPADA 14.77 0.00 177.22 0.00
SCTR-SALUD 7.16 0.00 85.95 0.00
SCTR-PENSIONES(interior Mina) 29.91 0.00 358.87 0.00
VIDA LEY 2.66 0.00 31.90 0.00
APORTES REM. PRINCIPAL

ESSALUD 7.36 0.00 88.28 0.00


JUBILACION ANTICIPADA 1.63 0.00 19.62 0.00
SCTR-SALUD 0.79 0.00 9.51 0.00
SCTR-PENSIONES 3.31 0.00 39.73 0.00
VIDA LEY 0.29 0.00 3.53 0.00
IMPUESTOS VACACIONES

ESSALUD 14.71 0.00 176.56 0.00


JUBILACION ANTICIPADA $ 3 $ - $ 39 $ -
SCTR-SALUD 1.59 0.00 19.03 0.00
SCTR-PENSIONES 6.62 0.00 79.45 0.00
VIDA LEY 0.59 0.00 7.06 0.00
APORTE AL TRABAJADOR SOBRE GRATIFICACIONES

ESSALUD 15.69 0.00 188.33 0.00


JUBILACION ANTICIPADA $ 3 $ - $ 42 $ -
SCTR-SALUD 1.69 0.00 20.30 0.00
SCTR-PENSIONES 7.06 0.00 84.75 0.00
VIDA LEY 0.63 0.00 7.53 0.00
IMPUESTO DOM Y FER.DES.MED.

TOTAL: 1,455.29 1,541.00 17,463.48 18,492.00

DIAS UTILES DOMINGOS FERIADOS DES.MEDIC


ENERO $ - $ 4 $ 1
FEBRERO $ 24 $ 4 $ -
MARZO $ 26 $ 5 $ -
ABRIL $ 24 $ 4 $ 2
MAYO $ 26 $ 4 $ 1
JUNIO $ 24 $ 5 $ 1
JULIO $ 25 $ 4 $ 2
AGOSTO $ 25 $ 5 $ 1
SEPTIEMBRE $ 26 $ 4 $ -
OCTUBRE $ 26 $ 4 $ 1
NOVIEMBRE $ 24 $ 5 $ 1
DICIEMBRE $ 21 $ 4 $ 2 $ 4
$ 271 $ 52 $ 12 $ 4
ACUMULADO $ 271 $ 323 $ 335 $ 339

ESTRUCTURA DE COSTOS MANO DE OBRA TODO COSTO


TIPO DE CAMBIO (Venta): 3.400
CATEG CATEGORIA UNIDAD JORNAL S/. JORNAL U.S.$ L.SOCIALES
CAPATAZ CAPATAZ S/.XJORNAL 79.00 23.24 15.53
MAESTRO
MAESTRO 2 PERFORIS./WINCHER/PALERO S/.XJORNAL 53.00 15.59 15.13
MAESTRO 3 SOSTENIMIENTO Y SERVICIOS S/.XJORNAL 51.00 15.00 14.56
AYUDANTE1 AYUDANTE1 S/.XJORNAL 49.00 14.41 13.99
OPERADOR 1-A OPERADOR JUMBO S/.XJORNAL 72.50 21.32 20.70

Escupero/Robot /Lanzador Concreto


OPERADOR 2-A S/.XJORNAL 67.50 19.85 19.27

UNIDAD BASE % CORRESP. COSTO TOTAL


ALIMENTACION OPERADOR S/.X DIA $ 12 65% $ 7
PASAJE OPERADOR DUMPER $ 80 100% $ 80

FACTOR TRABAJO $ 42 $ 14

COSTO COSTO COSTO


EQUIPOS UNIDAD PROPIEDAD OPERACIÓN TOTAL
U.S.$/HR U.S.$/HR U.S.$/HR
JUMBO ELECTROHIDR DE 1 B$/HR $ 45 $ 85 $ 130
SCOOP DIESEL 4 YD3 $/HR $ 30 $ 45 $ 75

CONTINGENCIAS % 3%
GASTOS GENERALES % 0%
UTILIDAD % 10%
FACTOR DE EFICIENCIA EN COLOCADO 100%

COSTO HORARIO DE EQUIPOS U.S.$/HR


WINCHES ELECTRICOS DE ARRASTRE JOY 3.53
PALA NEUMATICA 12B 6.11
BOMBA SUMERGIBLE GRINDEX MODELO M 1.56
VENTILADORES ELECT 6000CFM 15H 0.89
SHOTCRETERA ALIVA 3.57
LOCOMOTORA 3.5 TN A BATEU.S.$/Mes 1,400.00
LOCOMOTORA 5.5 TN A BATE U.S.$/Mes 2,200.00
LOCOMOTORA TROLLEY DE 5U.S.$/Mes 3,400.00
LOCOMOTORA TROLLEY DE 1U.S.$/Mes 8,000.00
CARROS MINEROS GRAMBY U.S.$/Mes 151.04 $ 14,500 $ 151
CARROS MINEROS GRAMBY 1 U.S.$/Mes 97.55 $ 9,365 $ 98
CARROS MINEROS GRAMBY U.S.$/Mes 91.20 $ 8,500 $ 91
CARROS MINEROS U35 U.S.$/Mes 47.03 $ 1,400 $ 47
MEZCLADORA U.S.$/Hr 4.44 Consumo Unidad
SCOOP 2.2 Yd3 $/Hr 55.00 3.00 Glns/Hr
SCOOP 1.5 Yd3 $/Hr 50.00 2.00 Glns/Hr
SCOOP 4.1 Yd3 $/Hr 75.00 4.00 Glns/Hr
JUMBO ROCKET BOOMER $/Hr 130.00 1.50 Glns/Hr
VOLQUETE BAJO PERFIL $/Hr 65.00 3.50 Glns/Hr
JUMBO EMPERNADOR ATLAS$/Hr 119.93
PERFORADORA JACK LEG (U.S
$/Hr 0.10

COSTO DE TRANSPORTE DE MADERA


RUBRO Und CONSUMO P.UNIT COSTO TOT

MADERA Pie2-Mina-me530,984.18 0.00 0.00


PERSONAL Glb 1.00 19,175.25 19,175.25
GASTOS ADMINISTRATIVOS % 0.07
MANTENIMIENTO CALESAS Und 39.00 23.00 897.00
COSTO LOCOMOTORA SERVIGlb 1.00 1,196.00 1,196.00
CAMION DYNA Und 1.00 0.00 0.00
TO TAL
NOTA: 2,236.62

Factor de correccion longitud m 0.98


LISTADO DE PRECIOS DE MATERIALES
PRECIO ABR PRECIO ABR 2013
TIPO DESCRIPCION UNIDAD VIDA UTIL
2013 S/. U.S.$
Aceite de Perforación Almo U.S.$/Gln 9.16
Oxigeno U.S.$/Botella 44.56
Floculante U.S.$/Kg 6.82
Acetileno U.S.$/Botella 110.93
Poliyute U.S.$/M2 1.45
Alambre # 16 U.S.$/Kg 1.22
Alcayata 1/2" U.S.$/Pza 3.36
Alcayata Electrica con triple espacio c U.S.$/Pza 4.16
Cadena 3/16" U.S.$/Mts 2.41
Calibradores U.S.$/Pza 0.15
Grampa de Fe corrugado 3/8" U.S.$/Pza 1.21
Cacho de toro (3/4" x 1.80m) U.S.$/Pza 5.88
Malla Electrosoldada de 4"x4" U.S.$/Mts2 3.18
Adaptador de perno U.S.$/Pza 88.00 350.00
Perno helicoidal de 6'+TUERCA+PLAC U.S.$/Pza 8.12
Perno helicoidal de 7'+TUERCA+PLAC U.S.$/Pza 8.82
Perno helicoidal de 8'+TUERCA+PLAC U.S.$/Pza 9.54
Perno Hydrabolt 5', tuerca, placa U.S.$/Pza 12.43
Perno Hydrabolt 6', tuerca, placa U.S.$/Pza 12.82
Perno Hydrabolt 7', tuerca, placa U.S.$/Pza 13.92
Perno Hydrabolt 8', tuerca, placa U.S.$/Pza 14.30
Perno Split Set 7 fts Pzas 4.93
Perno Split Set 7 fts Pzas 6.14
Adaptador Perno Split Set Pzas 165.00 100.00
Dramix U.S.$/Kg 1.95
MATERIALES 62090005 Fibra Sintectica BRCHIP 54 U.S.$/Kg 9.35
Acelerante U.S.$/Kg 0.82
Cartucho de cemento cembol ( 32mm U.S.$/Unid 0.22
Resina U.S.$/Unid 0.75
Cemento S./Bls 31.16 9.16
Clavo 3" U.S.$/Kg 1.28
Clavo 4" U.S.$/Kg 1.28
Clavo 5" U.S.$/Kg 1.44
Clavo 6" U.S.$/Kg 1.44
Tuberia de polietileno de 2" AGUA U.S.$/Pza 2.34
Tubo PVC (Recorte Voladura) U.S.$/Pza 0.41
Tubo PVC 4"x3m U.S.$/Mts 4.10
Codo PVC 4x90 U.S.$/Pza 0.79
Manguera de Aire 1" U.S.$/Mts 2.70 150.00
Manguera de Agua 1/2" U.S.$/Mts 1.33 150.00
Soldadura Cellocord 5/32 U.S.$/Kg 3.90
Soldadura Supercito 5/32 U.S.$/Kg 3.84
Soldadura Supercito 1/8 U.S.$/Kg 3.91
Tecle 2 tn. U.S.$/Unid 245.67 360.00
Descanso (listones 2"x2"x5m.) U.S.$/Pza 0.45
Sacos de polipropileno (50 Kgs/saco) U.S.$/Unid 0.38
Pintura Spry U.S.$/Pza 2.86
Cancamo (Fierro corrugado 3/4" x 8") U.S.$/Pza 5.67
Perno Exagonal U.S.$/Pza 1.16
Pintura Esmalte U.S.$/Pza 9.31
Escalera 3 m. U.S.$/Unid 12.64
COMBUSTIBLE Petroleo S./Gln 11.74 3.45 VIDA UTIL
Barra de extension porta broca conica U.S.$/Pza 68.20 1,820
Barra de extension porta broca conica U.S.$/Pza 94.60 1,820
Barra de extension porta broca conica U.S.$/Pza 103.40 1,820
Broca de 40 mm U.S.$/Pza 25.30 350
Broca de 38 mm U.S.$/Pza 24.75 350
Broca de 36 mm U.S.$/Pza 25.85 350
Barra MF T38 X H35 X R32 X 14´, 7324U.S.$/Pza 581.90 2,500
Barra MF T38 X H35 X R32 X 12 FTS U.S.$/Pza $ 548 $ 2,500
ACEROS DE
PERFORACION Broca boton R32 X 1-3/4", 7733-5245-S45
U.S.$/Pza 93.50 200
Shank adapter HLX5 X T38, 7304-7585-U.S.$/Pza 366.30 3,500
Aco Top Cen R38 55,7994-3655 (COP U.S.$/Pza 71.50 3,000
Broca escar. 4" GRADOS 12,7721-48 U.S.$/Pza 233.20 200
Adaptador PIL R32 40 12 GRADOS,7 U.S.$/Pza 271.70 200
Shank adapter hembra (BOLTER) U.S.$/Pza 341.00 3,500
Barra de extension R32 H25 (BOLTER) U.S.$/Pza 174.90 5,000
Broca boton R25 x 37 mm (BOLTER) U.S.$/Pza 80.30 500
Afiladora de Brocas U.S.$/Pza 1,600.00 100,000
Cordon detonante 5p (pentacord) U.S.$/Mts 0.23
Igneter cord U.S.$/Mts 0.41
Guia ensamblada 2.4 mts - carmex (30U.S.$/Pza 0.76
Exsanel 2.10 mts N 02 (300) U.S.$/Pza 1.15
Exsanel 3.0 mts N 288 (200) U.S.$/Pza 1.32
Exsanel 4.80 mts N 180 (200) U.S.$/Pza 1.58
Emulex 45% 1" x 7" (276) Cart U.S.$/Cart 0.23
Emulex 45% 1 1/8" x 12" (128) Cart U.S.$/Cart 0.52
Emulex 45% 1 1/8" x 12" (128) Kgs U.S.$/Kgs 2.66
Exadit 45% 7/8" x 7" (328) Cart U.S.$/Cart 0.17
Exadit 45% 7/8" x 7" (328) Kgs U.S.$/Kgs 2.23
Exsablock 7/8" x 7" (276) Cart U.S.$/Cart 0.16
ACCESORIOS Y
EXPLOSIVOS Exsablock 7/8" x 7" (276) Kgs U.S.$/Kgs 2.21
Mininel (2.10 mt) U.S.$/Pza 1.05
Mininel (3.00 mt) U.S.$/Pza 1.32
Fulminante electrico 4 mts U.S.$/Pza 4.54
Semexa 45% 1-1/8'' x 12'' (122) Cart U.S.$/Cart $ 1
Emulnor 500 1" x 7" (318) Cart U.S.$/Cart 0.14
Emulnor 500 1" x 7" (318) Kgs U.S.$/Kgs 1.78
Emulnor 1000 1" x 7" (264) Cart U.S.$/Cart 0.17
Emulnor 1000 1" x 7" (264) Kgs U.S.$/Kgs 1.79
Emulnor 3000 1 1/8" x 12" (114) Kgs U.S.$/Kgs 1.96
Emulnor 3000 1 1/8" x 12" (114) Cart U.S.$/Cart 0.43
Emulnor 3000 1" x 7" (260) Cart U.S.$/Cart 0.20
Emulnor 3000 1" x 7" (260) Kgs U.S.$/Kgs 2.08
Mad.Aserrada 2"x8"x2.5m S./Pies2 1.52 0.45
Mad.Redondo 6"X3m S./Pies2 1.33 0.39
Madera Cantonera S./Pza 11.00 3.24
Redondo 8" x 8' S./Pza 50.00 14.71
Redondo 5" x 10' S./Pza 24.41 7.18
Redondo 8" x 10' S./Pza 62.51 18.39
Redondo 6" x 10' S./Pza 35.16 10.34
Redondo 7" x 8' S./Pza 38.28 11.26
Redondo 6" x 8' S./Pza 28.13 8.27
Redondo 7" x 10' S./Pza 47.85 14.07
MADERA Redondo 4" x 8' S./Pza 12.49 3.67
Redondo 5" x 8' S./Pza 19.52 5.74
Redondo 8" x 4mts S./Pza 83.34 24.51
Redondo 5" x 7' S./Pza 17.09 5.03
Tabla 8" x 2" x 10' S./Pza 24.52 7.21
Tabla 8" x 4" x 10' S./Pza 45.30 13.32
Tabla 1" x 5" x 8' S./Pza 5.65 1.66
Tabla 8" x 2" x 4' S./Pza 9.07 2.67
Tabla 8" x 2" x 2' S./Pza 4.52 1.33
Durmiente 8"x4"x4' S./Pza 17.54 5.16
Durmiente 8"x8"x5' S./Pza 83.60 24.59
Botas U.S.$/Pza 19.57 183.00
Chaleco de malla con cinta reflectiva U.S.$/Pza 7.34 90.00
Casco Tipo Sombrero con orejera U.S.$/Pza 51.47 1,095.00
Faja ergonomica de proteccion lumbar U.S.$/Pza 7.11 183.00
Protector U.S.$/Pza 11.32 1,095.00
Barbiquejo U.S.$/Pza 0.68 90.00
Respirador U.S.$/Pza 23.13 365.00
Filtro U.S.$/Pza 3.18 60.00
Cartucho U.S.$/Pza 4.52 365.00
Retenedor U.S.$/Pza 2.63 365.00
IMPLEMENTO DE
Guantes de Cuero U.S.$/Pza 3.30 7.00
SEGURIDAD
Guantes de Neoprene U.S.$/Pza 7.94 7.00
Correa Portalampara U.S.$/Pza 3.63 365.00
Tapon de oido U.S.$/Pza 0.63 45.00
Mameluco U.S.$/Pza 18.67 183.00
Pantalon de Jebe U.S.$/Pza 12.56 90.00
Casaca de jebe U.S.$/Pza 12.56 90.00
Lampara U.S.$/Pza 17.00
Anteojo U.S.$/Pza 5.20 120.00
Cordon sujetador de anteojo U.S.$/Pza 2.28 183.00
Tafilete U.S.$/Pza 4.21 365.00
Corvina U.S.$/Pza 51.70 150.00
Palana (Lampa tipo cuchara) U.S.$/Pza 9.39 50.00
Pico U.S.$/Pza 10.90 50.00
Comba de 6 Lbs U.S.$/Pza 7.83 75.00
Llave Stilson de 8" U.S.$/Pza 4.79 150.00
HERRAMIENTAS
Llave Francesa de 8" U.S.$/Pza 5.90 150.00
Azuela de 3 Lbs U.S.$/Pza 9.24 150.00
Chotana U.S.$/Pza 11.18 100.00
Cable de Acero de 3/8" U.S.$/Mts 1.16 100.00
Llave stillson de 14" U.S.$/Pza 13.10
O UNITARIO PARA SUBSUELO
365.00
D.NORMALES 271.00 22.58
52.00
DESC.MEDICO 4.00
12.00
26.00

Obreros Conceptos
% Obreros

13.09% 14/12/12*365/271
11.07% (30/271)
22.14% (60/271)
23.62% (62/271)
1.48% (4/271)

9.00% A
2.00% B
0.97% C
4.05% D
0.36% E
16.38%

1.00% 1*A
0.22% 1*B
0.11% 1*C
0.45% 1*D
0.04% 1*E
1.81%

1.99% 2*A
0.44% 2*B
0.21% 2*C
0.90% 2*D
0.08% 2*E
3.63%

2.13% 3*A
0.47% 3*B
0.23% 3*C
0.96% 3*D
0.09% 3*E
3.87%

97.085%

VACACIONES
$ 26
$ 26
$ 365

TOTAL
38.77

30.72
29.56
28.40
42.03

39.13

COSTO TOTAL

60% $ 75
$ 0 $ 30
$ 1 $ 45

65% $ 130
$ 0 $ 46
$ 1 $ 85

PRODUCCION TAJEOS
MESES UNIDAD CANTIDAD

RELLENO HUIDRAUL TMS 7,000


RELLENO DETRITIC TMS 28,000

ANTES
50.00
40.00
60.00
110.00
50.00

COSTO UNOBSERVACION
$/pie
0.00
0.04
0.00
0.00 Entregada x CMHSA
0.00 Transporte Madera Boca a Interior Mina x
0.00 Rampa RNG
0.04
UNIDAD
VIDA UTIL

Pernos

Mts
Mts

Disp
Pies
Pies
Pies
Pies
Pies
Pies
mts
mts
mts
mts
mts
mts
mts
mts
Pies
Pies
mts
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp

Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
Disp
LEYES SOCIALES DE CTTA POR PRECIO UNITARI

Basico $ 31 1,500.00
Asig. Fam. 1.367 75.00
32.70 1,541.00
INGRESO: MENSUAL
Obreros Empleados
Cálculo de Leyes Sociales

Mensual: 738.41 1,541.00

CTS 96.69 0.00


$ 1 VACACIONES 81.74 0.00
$ 2 GRATIFICACIONES 163.49 0.00
$ 3 DOMINGOS & FERIADOS-DESC.MEDICO 174.38 0.00
DESCANSO MEDICO 10.90 0.00

ESSALUD 66.46 0.00


JUBILACION ANTICIPADA 0.00 0.00
SCTR-SALUD 7.16 0.00
SCTR-PENSIONES(interior Mina) 7.31 0.00
VIDA LEY 2.66 0.00
APORTES REM. PRINCIPAL

ESSALUD 7.36 0.00


JUBILACION ANTICIPADA 0.00 0.00
SCTR-SALUD 0.79 0.00
SCTR-PENSIONES 0.81 0.00
VIDA LEY 0.29 0.00
IMPUESTOS VACACIONES

ESSALUD 14.71 0.00


JUBILACION ANTICIPADA $ - $ -
SCTR-SALUD 1.59 0.00
SCTR-PENSIONES 1.62 0.00
VIDA LEY 0.59 0.00
APORTE AL TRABAJADOR SOBRE GRATIFICACIONES

ESSALUD 15.69 0.00


JUBILACION ANTICIPADA $ - $ -
SCTR-SALUD 1.69 0.00
SCTR-PENSIONES 1.73 0.00
VIDA LEY 0.63 0.00
IMPUESTO DOM Y FER.DES.MED.

TOTAL: 1,396.70 1,541.00

DIAS UTILES DOMINGOS


ENERO $ - $ 4
FEBRERO $ 24 $ 4
MARZO $ 26 $ 5
ABRIL $ 24 $ 4
MAYO $ 26 $ 4
JUNIO $ 24 $ 5
JULIO $ 25 $ 4
AGOSTO $ 25 $ 5
SEPTIEMBRE $ 26 $ 4
OCTUBRE $ 26 $ 4
NOVIEMBRE $ 24 $ 5
DICIEMBRE $ 21 $ 4
$ 271 $ 52
ACUMULADO $ 271 $ 323

ESTRUCTURA DE COSTOS MANO DE OBRA TODO COSTO


TIPO DE CAMBIO (Venta): 3.400
CATEG CATEGORIA UNIDAD JORNAL S/.
CAPATA CAPATAZ S/.XJORNAL 79.00
MAESTRMAESTRO PERFORIS./WINCHER/PALERO S/.XJORNAL 53.00
MAESTSOSTENIMIENTO Y SERVICIOS S/.XJORNAL 51.00
AYUDANAYUDANTE1 S/.XJORNAL 49.00
OPERADOPERADOR JUMBO S/.XJORNAL 72.50
OPERADEscupero/Robot /Lanzador Concreto S/.XJORNAL 67.50

UNIDAD BASE
ALIMENTACION OPERADOR DUMPER S/.X DIA $ 12
PASAJE OPERADOR DUMPER $ 80

FACTOR TRABAJO $ 42 $ 14

EQUIPOS UNIDAD COSTO PROPIEDAD


U.S.$/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) $/HR $ 45
SCOOP DIESEL 4 YD3 $/HR $ 30

CONTINGENCIAS % 3%
GASTOS GENERALES % 0%
UTILIDAD % 10%
FACTOR DE EFICIENCIA EN COLOCADO CUADROS MADERA 100%

COSTO HORARIO DE EQUIPOS U.S.$/HR


WINCHES ELECTRICOS DE ARRASTRE JOY DE 20 3.53
PALA NEUMATICA 12B 6.11
BOMBA SUMERGIBLE GRINDEX MODELO MAJOR H, 1.56
VENTILADORES ELECT 6000CFM 15H 0.89
SHOTCRETERA ALIVA 3.57
LOCOMOTORA 3.5 TN A BATERIA U.S.$/Mes 1,400.00
LOCOMOTORA 5.5 TN A BATERIA U.S.$/Mes 2,200.00
LOCOMOTORA TROLLEY DE 5.5 TN U.S.$/Mes 3,400.00
LOCOMOTORA TROLLEY DE 10 TN U.S.$/Mes 8,000.00
CARROS MINEROS GRAMBY 180 CFM U.S.$/Mes 151.04
CARROS MINEROS GRAMBY 110 CFM U.S.$/Mes 97.55
CARROS MINEROS GRAMBY 80 CFM U.S.$/Mes 91.20
CARROS MINEROS U35 U.S.$/Mes 47.03
MEZCLADORA U.S.$/Hr 4.44
SCOOP 2.2 Yd3 $/Hr 55.00
SCOOP 1.5 Yd3 $/Hr 50.00
SCOOP 4.1 Yd3 $/Hr 75.00
JUMBO ROCKET BOOMER $/Hr 130.00
VOLQUETE BAJO PERFIL $/Hr 65.00
JUMBO EMPERNADOR ATLAS COPCO $/Hr 119.93
PERFORADORA JACK LEG (U.S.$/Ft) $/Hr 0.10

COSTO DE TRANSPORTE DE MADERA


RUBRO Und CONSUMO

MADERA Pie2-Mina-mes 530,984.18


PERSONAL Glb 1.00
GASTOS ADMINISTRATIVOS %
MANTENIMIENTO CALESAS Und 39.00
COSTO LOCOMOTORA SERVICIOS Glb 1.00
CAMION DYNA Und 1.00
TO TAL
NOTA:

Factor de correccion longitud madera (pies a mts) 0.98


LISTADO DE PRECIOS DE MATERIALES
PRECIO ABR 2013
TIPO DESCRIPCION UNIDAD
S/.
Aceite de Perforación Almo U.S.$/Gln
Oxigeno U.S.$/Botella
Floculante U.S.$/Kg
Acetileno U.S.$/Botella
Poliyute U.S.$/M2
Alambre # 16 U.S.$/Kg
Alcayata 1/2" U.S.$/Pza
Alcayata Electrica con triple espacio c/manguera U.S.$/Pza
Cadena 3/16" U.S.$/Mts
Calibradores U.S.$/Pza
Grampa de Fe corrugado 3/8" U.S.$/Pza
Cacho de toro (3/4" x 1.80m) U.S.$/Pza
Malla Electrosoldada de 4"x4" U.S.$/Mts2
Adaptador de perno U.S.$/Pza
Perno helicoidal de 6'+TUERCA+PLACA U.S.$/Pza
Perno helicoidal de 7'+TUERCA+PLACA U.S.$/Pza
Perno helicoidal de 8'+TUERCA+PLACA U.S.$/Pza
Perno Hydrabolt 5', tuerca, placa U.S.$/Pza
Perno Hydrabolt 6', tuerca, placa U.S.$/Pza
Perno Hydrabolt 7', tuerca, placa U.S.$/Pza
Perno Hydrabolt 8', tuerca, placa U.S.$/Pza
Perno Split Set 7 fts Pzas
Perno Split Set 7 fts Pzas
Adaptador Perno Split Set Pzas
Dramix U.S.$/Kg
MATERI 62090005 Fibra Sintectica BRCHIP 54 U.S.$/Kg
ALES
Acelerante U.S.$/Kg
Cartucho de cemento cembol ( 32mm x 305mm) U.S.$/Unid
Resina U.S.$/Unid
Cemento S./Bls 31.16
Clavo 3" U.S.$/Kg
Clavo 4" U.S.$/Kg
Clavo 5" U.S.$/Kg
Clavo 6" U.S.$/Kg
Tuberia de polietileno de 2" AGUA U.S.$/Pza
Tubo PVC (Recorte Voladura) U.S.$/Pza
Tubo PVC 4"x3m U.S.$/Mts
Codo PVC 4x90 U.S.$/Pza
Manguera de Aire 1" U.S.$/Mts
Manguera de Agua 1/2" U.S.$/Mts
Soldadura Cellocord 5/32 U.S.$/Kg
Soldadura Supercito 5/32 U.S.$/Kg
Soldadura Supercito 1/8 U.S.$/Kg
Tecle 2 tn. U.S.$/Unid
Descanso (listones 2"x2"x5m.) U.S.$/Pza
Sacos de polipropileno (50 Kgs/saco) U.S.$/Unid
Pintura Spry U.S.$/Pza
Cancamo (Fierro corrugado 3/4" x 8") U.S.$/Pza
Perno Exagonal U.S.$/Pza
Pintura Esmalte U.S.$/Pza
Escalera 3 m. U.S.$/Unid
COMBUSTIBLE
Petroleo S./Gln 11.74
Barra de extension porta broca conica 4', 7876-6112-11 U.S.$/Pza
Barra de extension porta broca conica 6', 7876-6118-11 U.S.$/Pza
Barra de extension porta broca conica 8', 7876-1124-11 U.S.$/Pza
Broca de 40 mm U.S.$/Pza
Broca de 38 mm U.S.$/Pza
Broca de 36 mm U.S.$/Pza
Barra MF T38 X H35 X R32 X 14´, 7324-6543-20 U.S.$/Pza
ACERO Barra MF T38 X H35 X R32 X 12 FTS U.S.$/Pza
S DE
PERFO Broca boton R32 X 1-3/4", 7733-5245-S45 U.S.$/Pza
RACIO Shank adapter HLX5 X T38, 7304-7585-01 U.S.$/Pza
N Aco Top Cen R38 55,7994-3655 (COPLAS) U.S.$/Pza
Broca escar. 4" GRADOS 12,7721-4802-S45 (RIMADORA) U.S.$/Pza
Adaptador PIL R32 40 12 GRADOS,7821-3440 (ADAPTADOR RIM. U.S.$/Pza
Shank adapter hembra (BOLTER) U.S.$/Pza
Barra de extension R32 H25 (BOLTER) U.S.$/Pza
Broca boton R25 x 37 mm (BOLTER) U.S.$/Pza
Afiladora de Brocas U.S.$/Pza
Cordon detonante 5p (pentacord) U.S.$/Mts
Igneter cord U.S.$/Mts
Guia ensamblada 2.4 mts - carmex (300) U.S.$/Pza
Exsanel 2.10 mts N 02 (300) U.S.$/Pza
Exsanel 3.0 mts N 288 (200) U.S.$/Pza
Exsanel 4.80 mts N 180 (200) U.S.$/Pza
Emulex 45% 1" x 7" (276) Cart U.S.$/Cart
Emulex 45% 1 1/8" x 12" (128) Cart U.S.$/Cart
Emulex 45% 1 1/8" x 12" (128) Kgs U.S.$/Kgs
Exadit 45% 7/8" x 7" (328) Cart U.S.$/Cart
Exadit 45% 7/8" x 7" (328) Kgs U.S.$/Kgs
ACCES Exsablock 7/8" x 7" (276) Cart U.S.$/Cart
ORIOS
Y Exsablock 7/8" x 7" (276) Kgs U.S.$/Kgs
EXPLO Mininel (2.10 mt) U.S.$/Pza
SIVOS Mininel (3.00 mt) U.S.$/Pza
Fulminante electrico 4 mts U.S.$/Pza
Semexa 45% 1-1/8'' x 12'' (122) Cart U.S.$/Cart
Emulnor 500 1" x 7" (318) Cart U.S.$/Cart
Emulnor 500 1" x 7" (318) Kgs U.S.$/Kgs
Emulnor 1000 1" x 7" (264) Cart U.S.$/Cart
Emulnor 1000 1" x 7" (264) Kgs U.S.$/Kgs
Emulnor 3000 1 1/8" x 12" (114) Kgs U.S.$/Kgs
Emulnor 3000 1 1/8" x 12" (114) Cart U.S.$/Cart
Emulnor 3000 1" x 7" (260) Cart U.S.$/Cart
Emulnor 3000 1" x 7" (260) Kgs U.S.$/Kgs
Mad.Aserrada 2"x8"x2.5m S./Pies2 1.52
Mad.Redondo 6"X3m S./Pies2 1.33
Madera Cantonera S./Pza 11.00
Redondo 8" x 8' S./Pza 50.00
Redondo 5" x 10' S./Pza 24.41
Redondo 8" x 10' S./Pza 62.51
Redondo 6" x 10' S./Pza 35.16
Redondo 7" x 8' S./Pza 38.28
Redondo 6" x 8' S./Pza 28.13
Redondo 7" x 10' S./Pza 47.85
MADER Redondo 4" x 8' S./Pza 12.49
A Redondo 5" x 8' S./Pza 19.52
Redondo 8" x 4mts S./Pza 83.34
Redondo 5" x 7' S./Pza 17.09
Tabla 8" x 2" x 10' S./Pza 24.52
A

Tabla 8" x 4" x 10' S./Pza 45.30


Tabla 1" x 5" x 8' S./Pza 5.65
Tabla 8" x 2" x 4' S./Pza 9.07
Tabla 8" x 2" x 2' S./Pza 4.52
Durmiente 8"x4"x4' S./Pza 17.54
Durmiente 8"x8"x5' S./Pza 83.60
Botas U.S.$/Pza
Chaleco de malla con cinta reflectiva U.S.$/Pza
Casco Tipo Sombrero con orejera U.S.$/Pza
Faja ergonomica de proteccion lumbar U.S.$/Pza
Protector U.S.$/Pza
Barbiquejo U.S.$/Pza
Respirador U.S.$/Pza
Filtro U.S.$/Pza
Cartucho U.S.$/Pza
IMPLE Retenedor U.S.$/Pza
MENTO
Guantes de Cuero U.S.$/Pza
DE
SEGUR Guantes de Neoprene U.S.$/Pza
IDAD Correa Portalampara U.S.$/Pza
Tapon de oido U.S.$/Pza
Mameluco U.S.$/Pza
Pantalon de Jebe U.S.$/Pza
Casaca de jebe U.S.$/Pza
Lampara U.S.$/Pza
Anteojo U.S.$/Pza
Cordon sujetador de anteojo U.S.$/Pza
Tafilete U.S.$/Pza
Corvina U.S.$/Pza
Palana (Lampa tipo cuchara) U.S.$/Pza
Pico U.S.$/Pza
Comba de 6 Lbs U.S.$/Pza
HERRA Llave Stilson de 8" U.S.$/Pza
MIENTA Llave Francesa de 8" U.S.$/Pza
S
Azuela de 3 Lbs U.S.$/Pza
Chotana U.S.$/Pza
Cable de Acero de 3/8" U.S.$/Mts
Llave stillson de 14" U.S.$/Pza
OR PRECIO UNITARIO OOCC SUPERFICIE
T Anual : 365.00
D.NORMALES 271.00 22.58
DOMINGOS 52.00
DESC.MEDICO 4.00
FERIADOS 12.00
VACAC. 26.00
ANUAL
Obreros Empleados Obreros Conceptos
% Obreros
8,860.89 18,492.00

1,160.28 0.00 13.09% 14/12/12*365/271


980.88 0.00 11.07% (30/271)
1,961.88 0.00 22.14% (60/271)
2,092.56 0.00 23.62% (62/271)
130.80 0.00 1.48% (4/271)

797.48 0.00 9.00% A


0.00 0.00 0.00% B
85.95 0.00 0.97% C
87.72 0.00 0.99% D
31.90 0.00 0.36% E
11.32%

88.28 0.00 1.00% 1*A


0.00 0.00 0.00% 1*B
9.51 0.00 0.11% 1*C
9.71 0.00 0.11% 1*D
3.53 0.00 0.04% 1*E
1.25%

176.56 0.00 1.99% 2*A


$ - $ - 0.00% 2*B
19.03 0.00 0.21% 2*C
19.42 0.00 0.22% 2*D
7.06 0.00 0.08% 2*E
2.51%

188.33 0.00 2.13% 3*A


$ - $ - 0.00% 3*B
20.30 0.00 0.23% 3*C
20.72 0.00 0.23% 3*D
7.53 0.00 0.09% 3*E
2.67%

16,760.32 18,492.00 89.150%

FERIADOS DES.MEDICOVACACIONES
$ 1 $ 26
$ -
$ -
$ 2
$ 1
$ 1
$ 2
$ 1
$ -
$ 1
$ 1
$ 2 $ 4
$ 12 $ 4 $ 26
$ 335 $ 339 $ 365

JORNAL U.S.$ L.SOCIALES TOTAL


23.24 15.53 38.77
15.59 13.90 29.49
15.00 13.37 28.37
14.41 12.85 27.26
21.32 19.01 40.33
19.85 17.70 37.55

% CORRESP. COSTO TOTAL


65% $ 7
100% $ 80

60% $ 75
$ 0 $ 30
$ 1 $ 45
COSTO
OPERACIÓN COSTO TOTAL
U.S.$/HR U.S.$/HR
$ 85 $ 130 65% $ 130
$ 45 $ 75 $ 0 $ 46
$ 1 $ 85

PRODUCCION TAJEOS
MESES UNIDAD CANTIDAD

RELLENO HUIDRAULTMS ###


RELLENO DETRITIC TMS ###

$ 14,500 $ 151
$ 9,365 $ 98
$ 8,500 $ 91
$ 1,400 $ 47
Consumo Unidad ANTES
3.00 Glns/Hr 50.00
2.00 Glns/Hr 40.00
4.00 Glns/Hr 60.00
1.50 Glns/Hr 110.00
3.50 Glns/Hr 50.00

P.UNIT COSTO TOTACOSTO UNIT OBSERVACION


$/pie
0.00 0.00 0.00
19,175.25 19,175.25 0.04
0.07 0.00
23.00 897.00 0.00 Entregada x CMHSA
1,196.00 1,196.00 0.00 Transporte Madera Boca a Interior Mina x
0.00 0.00 0.00 Rampa RNG
0.04
2,236.62
S
PRECIO ABR 2013 UNIDAD VIDA
VIDA UTIL
U.S.$ UTIL
9.16
44.56
6.82
110.93
1.45
1.22
3.36
4.16
2.41
0.15
1.21
5.88
3.18
88.00 350.00 Pernos
8.12
8.82
9.54
12.43
12.82
13.92
14.30
4.93
6.14
165.00 100.00
1.95
9.35
0.82
0.22
0.75
9.16
1.28
1.28
1.44
1.44
2.34
0.41
4.10
0.79
2.70 150.00 Mts
1.33 150.00 Mts
3.90
3.84
3.91
245.67 360.00 Disp
0.45
0.38
2.86
5.67
1.16
9.31
12.64
3.45 VIDA UTIL
68.20 1,820 Pies
94.60 1,820 Pies
103.40 1,820 Pies
25.30 350 Pies
24.75 350 Pies
25.85 350 Pies
581.90 2,500 mts
$ 548 $ 2,500 mts
93.50 200 mts
366.30 3,500 mts
71.50 3,000 mts
233.20 200 mts
271.70 200 mts
341.00 3,500 mts
174.90 5,000 Pies
80.30 500 Pies
1,600.00 100,000 mts
0.23
0.41
0.76
1.15
1.32
1.58
0.23
0.52
2.66
0.17
2.23
0.16
2.21
1.05
1.32
4.54
$ 1
0.14
1.78
0.17
1.79
1.96
0.43
0.20
2.08
0.45
0.39
3.24
14.71
7.18
18.39
10.34
11.26
8.27
14.07
3.67
5.74
24.51
5.03
7.21
13.32
1.66
2.67
1.33
5.16
24.59
19.57 183.00 Disp
7.34 90.00 Disp
51.47 1,095.00 Disp
7.11 183.00 Disp
11.32 1,095.00 Disp
0.68 90.00 Disp
23.13 365.00 Disp
3.18 60.00 Disp
4.52 365.00 Disp
2.63 365.00 Disp
3.30 7.00 Disp
7.94 7.00 Disp
3.63 365.00 Disp
0.63 45.00 Disp
18.67 183.00 Disp
12.56 90.00 Disp
12.56 90.00 Disp
17.00
5.20 120.00 Disp
2.28 183.00 Disp
4.21 365.00 Disp
51.70 150.00 Disp
9.39 50.00 Disp
10.90 50.00 Disp
7.83 75.00 Disp
4.79 150.00 Disp
5.90 150.00 Disp
9.24 150.00 Disp
11.18 100.00 Disp
1.16 100.00 Disp
13.10
Ing. Daniel Briones Álvarez Ing. Ivan Vega Ruiz Superintendencia
Gerente Central de Operaciones Gerente de Ingeniería

Elaborado por: Ing. Félix Avila García


Analista de Control de Operaciones Mina
Superintendencia
COSTO HORARIO VOLQUETE BAJO PERFIL DUMPERS

DESCRIPCION UNIDAD DATOS U.S.$


Alquiler Dumpers U.S.$/Hr $ 95
Petroleo Glns/Hr 3.50
Petroleo U.S.$/Galon 3.28
Petroleo U.S.$/Hr 11.48
Operador U.S.$/Hr 5.80 5.80
Alimentacion U.S.$/Hr 0.61 0.61
EPPS U.S.$/Hr 0.37 0.37
Pasaje U.S.$/Hr 0.14 0.14

SUB TOTAL U.S.$/Hr $ 113


UTILIDAD U.S.$/Hr 10% $ 11
COSTO TOTAL U.S.$/Hr $ 125
LEYES SOCIALES
OBREROS EMPLEADOS
ESSALUD 9.00% 9.00%
JUBILACION ANTICIPADA 2.00% 2.00%
SCTR-SALUD 0.90% 0.90%
SCTR-PENSIONES(interior M 9.50% 9.50%
SCTR Pension Prima 0.00% 0.00%
VIDA LEY 0.36% 0.30% $ 1
TOTAL 21.76% 21.70%
PLANILLA DE OBREROS SUBSUELO Y OOCC INTERIOR MINA

JORNAL 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
CONCEPTOS % ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC TOTAL
dias $ 31 $ 28 $ 31 $ 30 $ 31 $ 30 $ 31 $ 31 $ 30 $ 31 $ 30 $ 31 $ 365
VAC GRAT GRAT
REMUNERACION 1,085.00 980.00 1,085.00 1,085.00 1,050.00 1,085.00 1,085.00 1,050.00 1,085.00 1,050.00 1,085.00 11,725.00
VACACIONES 1,050.00 1,050.00
GRATIFICACIONES Factor 1,050.00 1,050.00 2,100.00
ASIG.FAMILIAR $ 75 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Descanso Medico $ 12 4.00 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 140.00
Hrs Extras $ 1 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CTS 9.72% 105.49 95.28 105.49 102.08 105.49 102.08 105.49 105.49 102.08 105.49 102.08 105.49 1,242.01
SUB TOTAL 40.00 333.33% 1,202.15 1,086.94 1,202.15 1,163.75 1,202.15 1,163.75 2,252.15 1,202.15 1,163.75 1,202.15 1,163.75 2,252.15 16,257.01
Gravado(Afecto al Impuesto) 1,096.67 991.67 1,096.67 1,061.67 1,096.67 1,061.67 2,146.67 1,096.67 1,061.67 1,096.67 1,061.67 2,146.67 15,015.00

APOR REM.PRINC 21.76% 238.63 215.79 238.63 0.00 238.63 231.02 467.11 238.63 231.02 238.63 231.02 467.11 3,036.25
APOR GRAT. 21.76% 0.00 0.00
APOR VAC. 21.76% 231.02 231.02
TOTAL: 1,440.79 1,302.73 1,440.79 1,394.77 1,440.79 1,394.77 2,719.27 1,440.79 1,394.77 1,440.79 1,394.77 2,719.27 19,524.28

66.52%

PLANILLA DE EMPLEADOS SUBSUELO A TODO COSTO

JORNAL 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00
CONCEPTOS % ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC TOTAL
dias $ 31 $ 28 $ 31 $ 30 $ 31 $ 30 $ 31 $ 31 $ 30 $ 31 $ 30 $ 31 $ 365
VAC GRAT GRAT
REMUNERACION 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 16,500.00
VACACIONES 1,500.00 1,500.00
GRATIFICACIONES Factor 1,500.00 1,500.00 3,000.00
ASIG.FAMILIAR $ 75 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Descanso Medico $ 360 4.00 16.67 16.67 16.67 0.00 16.67 16.67 16.67 16.67 16.67 16.67 16.67 16.67 183.33
CTS 9.72% 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 1,750.00
SUB TOTAL 1,662.50 1,662.50 1,662.50 1,645.83 1,662.50 1,662.50 3,162.50 1,662.50 1,662.50 1,662.50 1,662.50 3,162.50 22,933.33
Gravado(Afecto al Impuesto) 1,516.67 1,516.67 1,516.67 1,500.00 1,516.67 1,516.67 3,016.67 1,516.67 1,516.67 1,516.67 1,516.67 3,016.67 21,183.33

APOR REM.PRINC 21.70% 329.12 329.12 329.12 0.00 329.12 329.12 654.62 329.12 329.12 329.12 329.12 654.62 4,271.28
APOR GRAT. 21.70% 0.00 0.00
APOR VAC. 21.70% 325.50 325.50
TOTAL: 1,991.62 1,991.62 1,991.62 1,971.33 1,991.62 1,991.62 3,817.12 1,991.62 1,991.62 1,991.62 1,991.62 3,817.12 27,530.12

66.85%
82 de 347

LISTA DE PRECIOS UNI


(Tipo de cam
APLICA A LA CONTRATA: EXTRAMIN, CANCHANYA, COMICIP, CRISTOBAL, INCEMIN.

Tipo PU Tipo Labor Codigo

EXTRACCION 07151
07152
07150
07155
AVANCE CRUCERO 02453
02449
02448
02454
02446
02447
02455
02444
02443
02442
02450
02459
02439
02451
02425
02452
02456
02445
02441
RAMPA 03310
03312
03314
02457
03313
03311
03317
03309
03318
02458
03308
03307
03316
03315
CHIMENEA 04262
04261
04260
SUBNIVEL 05521
05520
ROTURA TAJO 06544
06543
06542
06540
06537
06545
06539
06538
SOSTENIMIENTO 12806
12807
12808
12809
12810
12871
12811
12888
12812
12813
12814
83 de 347

LISTA DE PRECIOS UNI


(Tipo de cam
APLICA A LA CONTRATA: EXTRAMIN, CANCHANYA, COMICIP, CRISTOBAL, INCEMIN.

Tipo PU Tipo Labor Codigo

12872
12816
12817
12815
12820
12818
12821
12819
12822
12823
12824
12825
12868
12869
12870
12830
12831
12832
12829
12828
12827
12826
12835
12834
12833
12837
12836
12838
12839
84 de 347

LISTA DE PRECIOS UNI


(Tipo de cam
APLICA A LA CONTRATA: EXTRAMIN, CANCHANYA, COMICIP, CRISTOBAL, INCEMIN.

Tipo PU Tipo Labor Codigo

12842
12843
12844
12840
12841
12845
12846
12848
12847
12849
12851
12850
12852
12853
12854
12855
12856
12857
12858
12859
12860
12861
12862
12863
12864
12865
12866
12867
SERVICIOS 08146
08435
08436
08451
08380
08139
08381
08209
08215
08437
08438
08439
08440
08448
08442
08441
08449
08445
08444
08443
08446
08447
08430
08431
08432
08433
08434

APLICA A LA CONTRATA: SEPROCAL

Tipo PU Tipo Labor Codigo

AVANCE ALIMAK 04238


85 de 347

LISTA DE PRECIOS UNI


(Tipo de cam
APLICA A LA CONTRATA: EXTRAMIN, CANCHANYA, COMICIP, CRISTOBAL, INCEMIN.

Tipo PU Tipo Labor Codigo

04239
04240
SERVICIOS ALIMAK 08450
SOSTENIMIENTO ALIMAK 12873
12874
12875
12876
12877
12878
12879
12880
12881
12889
12890
12891
86 de 347

LISTA DE PRECIOS UNITARIOS - NOVIEMBRE 2015


(Tipo de cambio de 3.15 a 3.30)
XTRAMIN, CANCHANYA, COMICIP, CRISTOBAL, INCEMIN.
Unidad
Descripcion Medida
EXTRACCION CON LOCOMOTORA A BATERIA LM 15(5.5 Tons) - G TMH
EXTRACCION CON LOCOMOTORA A BATERIA LM 10(3.5 Tons) - G TMH
EXTRACCION CON LOCOMOTORA LT-01 TROLLEY (5.5 Tons) - G TMH
EXTRACCION CON LOCOMOTORA LT-05 TROLLEY (10 Tons) - G TMH
CRUCERO 2.0 M X 2.0 M CON JUMBO Y LIMPIEZA SCOOP (REFUGIO) - G MTS
CRUCERO 2.00 X 2.00 MTs. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G MTS
CRUCERO 2.40 X 2.40 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. - G MTS
CRUCERO 2.70 X 2.70 MTs. Jack Leg-Scoop de 2.5 Yds3 Acarreo hasta 150 mts - G MTS
CRUCERO 3.00 X 3.00 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. - G MTS
PRECORTE CRUCERO 3.0 X 3.0 mts. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G MTS
CRUCERO 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP - G MTS
CRUCERO 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. - G MTS
CRUCERO 3.5M X 3.5 M CON JUMBO - G MTS
CRUCERO 3.5M X 3.5 M CON JUMBO ALTA DIFICULTAD - G MTS
CRUCERO 4.0 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP - G MTS
CRUCERO 4 X 4 CON JUMBO Y LIMPIEZA SCOOP - G MTS
CRUCERO 4.5M X 4.2 M CON JUMBO - G MTS
CRUCERO 4.5 M X 4.2 M JUMBO Y LIMPIEZA SCOOP ALTA DIFICULTAD - G MTS
PRECORTE CRUCERO 4.5M X 4.2 M CON JUMBO - G MTS
CRUCERO 5.0 M X 4.0 M JUMBO Y LIMPIEZA SCOOP - G MTS
GALERIA 2.4 X 2.4 M JACK LEG 6' Y LIMPIEZA SCOOP - G MTS
GAL/CRUCERO 3.0 M X 3.0 M CON JUMBO - G MTS
PRECORTE GAL/CRUCERO 3.5M X 3.5 M CON JUMBO - G MTS
PRECORTE RP/XC 4.0M X 3.5 M CON JUMBO - G MTS
RAMPA 3.0 X 3.0 mts. Jack Leg - Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G MTS
PRECORTE RAMPA 3.0 x 3.0 mts con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. - G MTS
RAMPA 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP - G MTS
RAMPA 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. - G MTS
RAMPA 3.5M X 3.5 M CON JUMBO - G MTS
PRECORTE RAMPA 3.5M X 3.5 M CON JUMBO - G MTS
RAMPA 4.0M X 3.5 M CON JUMBO - G MTS
RAMPA 4 X 4 CON JUMBO - G MTS
RAMPA 4.20 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP - G MTS
RAMPA 4.5M X 4.2 M con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. - G MTS
RAMPA 4.5M X 4.2 M CON JUMBO - G MTS
RAMPA 4.5M X 4.2 M CON JUMBO - ALTA DIFICULTAD - G MTS
PRECORTE - RAMPA 4.5M X 4.2 M CON JUMBO - G MTS
CHIMENEA 1.50 x 1.50 Mts. Limpieza sin Scoop, defrente a Chute - G MTS
CHIMENEA 2.40 x 1.20 Mts.Limpieza Sin Scooptram directo a la Tolva hasta 30 mts altura - G MTS
CHIMENEA 3.20 x 1.50 Mts.Limpieza Sin Scoop directo a la Tolva, hasta 30 mts altura - G MTS
SUB NIVEL 4' x 6' CON WINCHE - G MTS
SUB NIVEL 4' x 6' CON WINCHE Y LIMPIEZA SCOOP - G MTS
ROTURA DE TAJEO MECANIZADO ANCHO VENTA 9MX4.5M (CON EQUIPOS) - G TMS
ROTURA DE TAJEO MECANIZADO ANCHO VENTA 6MX4.5M (CON EQUIPOS) - G TMS
ROTURA DE TAJEO MECANIZADO ANCHO VETA 3.5MX4.5M(CON EQUIPOS) - G TMS
ROTURA DE TAJEO CORTE Y RELLENO EN BREASTING - G TMS
ROTURA EN TAJEOS CON 1 WINCHE - G TMS
ROTURA DE TAJEOS SEMI MECANIZADO VETA ANGOSTA 2.4MX2.2M 1 SCOOPTRAM - G TMS
ROTURA DE TAJEO RECUPERACION PILARES CON 1 WINCHE - G TMS
ROTURA DE TAJEO VETAS ANGOSTAS < 1.20 MTS CON 1 WINCHE ALTA DIFICULTAS - G TMS
SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3) - G MT2
SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3) - G MT2
SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3) - G MT2
SHOTCRETE 1" TK-40 - G MT2
SHOTCRETE 2" TK-40 - G MT2
INSTALACION PERNO HELICOIDAL DE 6' CEMBOL CON JACKLEG - G UNI
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JACKLEG - G UNI
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JUMBO - G UNI
INSTALACION PERNO HYDRABOLT DE 5' (BOMBA MANUAL) - G UNI
INSTALACION PERNO HYDRABOLT DE 6' (BOMBA MANUAL) - G UNI
INSTALACION PERNO HYDRABOLT DE 7' (BOMBA MANUAL) - G UNI
87 de 347

LISTA DE PRECIOS UNITARIOS - NOVIEMBRE 2015


(Tipo de cambio de 3.15 a 3.30)
XTRAMIN, CANCHANYA, COMICIP, CRISTOBAL, INCEMIN.
Unidad
Descripcion Medida
INSTALACION PERNO HYDRABOLT DE 8' (BOMBA MANUAL) CON JACKLEG - G UNI
PERNO HIDRABOLT 5FTS CON JUMBO EMPERNADOR - G UNI
PERNO HIDRABOLT 7FTS CON JUMBO EMPERNADOR - G UNI
PERNO HIDRABOLT 8FTS CON JUMBO EMPERNADOR - G UNI
INSTALACION DE CIMBRAS DE 10'X10' ( No incluye las tablas) - G PZA
INSTALACION DE CIMBRAS DE 4.5mX4.2m (Incluye Plancha Acanalada+Bolsacrete) - G PZA
INSTALACION DE CIMBRAS DE 10'X10' Y 8'X8' (Rehabilitacion+25 Marchavante) - G PZA
INSTALACION DE CIMBRAS DE 3.5mX3.5m ( Que incluye las tablas) - G PZA
TABLAS EN CIMBRAS DE 10'X10' Y 8'X8' - G PZA
INSTALACION DE MALLA ELECTROSOLDADA - G MT2
PARRILLERO - BOMBERO - G UNI
INSTALACION PERNO SPLIT SET DE 5' (JACKLEG) - G PZA
INSTALACION PERNO SPLIT SET DE 7' (JACKLEG) - G PZA
INSTALACION PERNO SPLIT SET DE 5' (BOLTER) - G PZA
INSTALACION PERNO SPLIT SET DE 7' (BOLTER) - G PZA
CUADRO COMPLETO TAJEO DE MADERA 6' x 6' - G PZA
CUADRO COMPLETO TAJEO DE MADERA 7' x 7' - G PZA
CUADRO COMPLETO TAJEO DE MADERA 8' x 8' - G PZA
CUADRO COMPLETO DE MADERA 6' x 6' (subnivel) - G PZA
CUADRO COMPLETO DE MADERA 8' x 8' - G PZA
CUADRO COMPLETO DE MADERA 8' x 9' - G PZA
CUADRO COMPLETO DE MADERA 10' x 10' - G PZA
CUADRO INTERMEDIO DE MADERA 8'x8' - G PZA
CUADRO INTERMEDIO DE MADERA 8' x9' - G PZA
CUADRO INTERMEDIO DE MADERA 8' x10' - G PZA
CUADRO EN CHIMENEA 5'X5' - SIN ENCOSTILLADO - G PZA
CUADRO EN CHIMENEA 5'X5' - CON ENCOSTILLADO - G PZA
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 8'X4' CON ENTABLADO - G PZA
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 3.20mX1.50m CON ENTABLADO - G PZA
88 de 347

LISTA DE PRECIOS UNITARIOS - NOVIEMBRE 2015


(Tipo de cambio de 3.15 a 3.30)
XTRAMIN, CANCHANYA, COMICIP, CRISTOBAL, INCEMIN.
Unidad
Descripcion Medida
CUADRO COJO 6'X6' (En avances y Tajeos) - G PZA
CUADRO COJO 7'X7' (En avances y Tajeos) - G PZA
CUADRO COJO TAJEO DE MADERA 8' x 8' - G PZA
CUADRO COJO 8"X9' (En avances y Tajeos) - G PZA
CUADRO COJO 8"X10' (En avances y Tajeos) - G PZA
CUADRO DE CAMBIO 10'X10' - G PZA
SOBRECUADRO DE MADERA 7' x 7' - G PZA
GUARDACABEZA 4"X 2.40Mts (MARCHAVANTES) - G PZA
GUARDACABEZA 5"X 3Mts (MARCHAVANTES) - G PZA
ENCRIBADO DE CUADRO 5"X6 PIES - G PZA
ENCRIBADO DE CUADRO 5"X8 PIES - G PZA
ENCRIBADO DE CUADRO 6"X8 PIES - G PZA
SOLERA 6"X8' - G PZA
SOLERA 7"X8' - G PZA
SOLERA 8"X8' - G PZA
SOLERA 8"X10' - G PZA
PUNTAL DE SEGURIDAD 5"X8' - G PZA
PUNTAL DE SEGURIDAD 6"X8' - G PZA
PUNTAL DE SEGURIDAD 7"X8' - G PZA
PUNTAL DE SEGURIDAD 8"X8' - G PZA
CACHO DE TORO (En avances y Tajeos) - G PZA
ENTABLADO DE MADERA CON MALLA PARA RELLENO - G MT2
INSTALACION DE WOOD PACK CON MAD. REDONDA Ø7 y Ø8" - G PZA
INSTALACION DE WOOD PACK CON MADERA ASERRADA - G PZA
COLOCADO ENTABLADO (FORRADO CUADROS EN VEZ CANTONERA) - G PZA
COLOCADO CANTONERAS - G PZA
COLOCADO DE RAJADO - G PZA
ELABORACION + INSTALACION BOLSACRETE (Arena+Cemento) - G MT3
ACARREO CON WINCHE - G TMH
INSTALACION DE PLATAFORMA DESCANSO CON ESCALERA - G UNI
INSTALACION DE ESCALERA - G UNI
RELLENO HIDRAULICO CONVENCIONAL - G MT3
LIMPIEZA CON PALA DE LINEA MT3
LIMPIEZA A PULSO MT3
RECUPERACION DE CUADRO DE MADERA 7X7, 8'x8', 10X10 PZA
INSTALACION TUBERIA POLIETILENO 4" EN LINEA RECTA (Incluye Traslado) MTS
LIMPIEZA DE VIA CON MINICARGADOR MTS
ENTABLADO - G MT2
INSTALACION DE TOLVA SIMPLE - G UNI
NICHO PARA TABLERO ELECTRICO 0.60m x 0.60m - G UNI
RELLENO DETRITICO CON WINCHE - G MT3
INSTALACION ALCAYATAS ELECTRICAS DE TRES ESPACIOS - G UNI
INSTALACION ALCAYATAS PARA MANGA DE VENTILACION - G UNI
INSTALACION ALCAYATAS - G UNI
DESQUINCHE CON JUMBO Y LIMPIEZA CON SCOOP - G MT3
DESQUINCHE LIMPIEZA CON WINCHE - G MT3
DESQUINCHE CON JACK LEG Y LIMPIEZA CON SCOOPTRAM - G MT3
DESQUINCHE EN REBATIDO DE RAMPA - G MT3
INSTALACION TUBERIA POLIETILENO 2" EN LINEA RECTA (Incluye Traslado) - G MTS
LABORES DE APOYO - G UNI
ACARREO CON SCOOP 50 M - G TMS
ACARREO CON DUMPER MINERAL (12TON) 50 M - G TMS
ACARREO CON DUMPER DESMONTE (12TON) 50 M - G TMS
ACARREO CON DUMPER MINERAL (16TON) 50 M - G TMS
ACARREO CON DUMPER DESMONTE (16TON) 50 M - G TMS

Unidad
Descripcion Medida
CHIMENEA SECCION 2M X 2M ALIMAK - SE MTS
89 de 347

LISTA DE PRECIOS UNITARIOS - NOVIEMBRE 2015


(Tipo de cambio de 3.15 a 3.30)
XTRAMIN, CANCHANYA, COMICIP, CRISTOBAL, INCEMIN.
Unidad
Descripcion Medida
CHIMENEA SECCION : 2.5 x 2.5 m ALIMAK - SE MTS
CHIMENEA SECCION : 2.5 x 2.5 m. (ALTA DIFICULTAD) ALIMAK - SE MTS
INSTALACION BOLSAS CRET EN CH. ALIMAK (Toda Sección) - SE MT3
CUADRO METALICO TIPO L + PERNOS DE ANCLAJE ALIMAK (SECC.2.5mX2.5m) DE 0 A 50 MTS - SE UNI
CUADRO METALICO TIPO L + PERNOS DE ANCLAJE ALIMAK (SECC.3mX3m) DE 0 A 50 MTS - SE UNI
INSTALACION DE PERNO HELICOIDAL DE 6' CON ALIMAK - SE UNI
INSTALACION DE PERNO HELICOIDAL DE 8' CON ALIMAK - SE UNI
INSTALACION DE PERNO HIDRABOLT DE 5' CON ALIMAK - SE UNI
INSTALACION DE PERNO HIDRABOLT DE 7' CON ALIMAK - SE UNI
SHOTCRETE TODO COSTO 1" DRAMIX (0 KGS/M3) ALIMAK - SE MT2
SHOTCRETE TODO COSTO 2" DRAMIX (0 KGS/M3) ALIMAK - SE MT2
SHOTCRETE TODO COSTO 3" DRAMIX (0 KGS/M3) ALIMAK - SE MT2
INSTALACION DE PERMNO SPLIT SET 5' CON ALIMAK - SE UNI
INSTALACION DE PERMNO SPLIT SET 7' CON ALIMAK - SE UNI
INST MALLA ELECTROSOLDADA CON ALIMAK - SE M2
90 de 347

RIOS - NOVIEMBRE 2015


de 3.15 a 3.30)

US$ NOV US$ OCT DIF


'15 '15
$ 1.66 $ 1.69 $ -0.03
$ 1.47 $ 1.50 $ -0.03
$ 1.01 $ 1.02 $ -0.02
$ 0.93 $ 0.93 $ -0.01
$ 335.47 $ 337.94 $ -2.47
$ 267.68 $ 270.32 $ -2.64
$ 315.42 $ 318.13 $ -2.71
$ 357.21 $ 360.67 $ -3.45
$ 394.41 $ 398.78 $ -4.36
$ 400.81 $ 405.17 $ -4.36
$ 412.87 $ 416.38 $ -3.51
$ 428.21 $ 431.32 $ -3.10
$ 507.96 $ 511.94 $ -3.98
$ 539.18 $ 543.15 $ -3.98
$ 519.55 $ 523.35 $ -3.79
$ 542.80 $ 546.62 $ -3.82
$ 625.36 $ 629.73 $ -4.37
$ 626.89 $ 631.79 $ -4.90
$ 653.78 $ 657.79 $ -4.00
$ 645.49 $ 649.91 $ -4.42
$ 323.93 $ 326.59 $ -2.65
$ 434.94 $ 438.04 $ -3.10
$ 524.40 $ 528.38 $ -3.98
$ 589.68 $ 594.04 $ -4.35
$ 413.72 $ 418.51 $ -4.78
$ 414.40 $ 418.76 $ -4.35
$ 427.25 $ 430.81 $ -3.57
$ 437.79 $ 441.90 $ -4.11
$ 542.80 $ 546.36 $ -3.55
$ 571.20 $ 576.09 $ -4.89
$ 545.14 $ 549.09 $ -3.95
$ 564.54 $ 568.50 $ -3.96
$ 578.29 $ 582.53 $ -4.24
$ 575.46 $ 582.63 $ -7.17
$ 642.56 $ 647.35 $ -4.79
$ 688.44 $ 693.98 $ -5.54
$ 690.90 $ 696.15 $ -5.25
$ 146.68 $ 149.07 $ -2.39
$ 168.44 $ 170.81 $ -2.37
$ 386.14 $ 391.84 $ -5.70
$ 182.91 $ 135.75 $ 47.15
$ 251.57 $ 204.19 $ 47.39
$ 8.91 $ 8.96 $ -0.05
$ 12.24 $ 12.30 $ -0.06
$ 13.28 $ 13.37 $ -0.09
$ 12.40 $ 12.56 $ -0.16
$ 12.38 $ 12.62 $ -0.24
$ 13.78 $ 13.97 $ -0.19
$ 13.65 $ 13.95 $ -0.30
$ 14.19 $ 14.46 $ -0.28
$ 12.80 $ 13.14 $ -0.34
$ 25.47 $ 26.15 $ -0.68
$ 38.14 $ 39.16 $ -1.02
$ 1.60 $ 1.64 $ -0.05
$ 3.19 $ 3.29 $ -0.09
$ 19.35 $ 19.56 $ -0.22
$ 22.63 $ 22.86 $ -0.23
$ 30.10 $ 30.18 $ -0.08
$ 16.12 $ 16.19 $ -0.06
$ 16.65 $ 16.73 $ -0.08
$ 18.65 $ 18.75 $ -0.10
91 de 347

RIOS - NOVIEMBRE 2015


de 3.15 a 3.30)

US$ NOV US$ OCT DIF


'15 '15
$ 20.43 $ 20.54 $ -0.11
$ 26.53 $ 26.59 $ -0.06
$ 28.85 $ 28.92 $ -0.07
$ 31.54 $ 31.62 $ -0.08
$ 159.29 $ 130.17 $ 29.11
$ 272.27 $ 283.61 $ -11.34
$ 307.85 $ 282.95 $ 24.90
$ 346.01 $ 322.21 $ 23.80
$ 9.45 $ 9.72 $ -0.27
$ 6.57 $ 6.64 $ -0.08
#N/A $ 42.61 #N/A
$ 10.26 $ 10.35 $ -0.08
$ 13.95 $ 14.10 $ -0.15
$ 16.88 $ 16.93 $ -0.05
$ 21.63 $ 21.70 $ -0.07
$ 69.23 $ 71.21 $ -1.97
$ 79.45 $ 81.70 $ -2.25
$ 107.31 $ 110.36 $ -3.05
$ 85.77 $ 88.23 $ -2.46
$ 111.69 $ 114.87 $ -3.19
$ 127.69 $ 131.33 $ -3.64
$ 172.94 $ 177.89 $ -4.96
$ 157.38 $ 161.90 $ -4.52
$ 169.47 $ 174.33 $ -4.86
$ 172.94 $ 177.89 $ -4.96
$ 94.74 $ 97.42 $ -2.68
$ 111.28 $ 114.44 $ -3.16
$ 297.77 $ 306.16 $ -8.39
$ 405.83 $ 417.25 $ -11.43
92 de 347

RIOS - NOVIEMBRE 2015


de 3.15 a 3.30)

US$ NOV US$ OCT DIF


'15 '15
$ 58.04 $ 59.70 $ -1.66
$ 64.78 $ 66.63 $ -1.85
$ 72.34 $ 74.39 $ -2.06
$ 80.75 $ 83.04 $ -2.29
$ 85.42 $ 87.85 $ -2.43
$ 216.39 $ 222.64 $ -6.24
$ 98.22 $ 101.02 $ -2.80
$ 11.11 $ 11.43 $ -0.32
$ 14.95 $ 15.37 $ -0.43
$ 30.36 $ 31.22 $ -0.86
$ 30.36 $ 31.22 $ -0.86
$ 35.91 $ 36.92 $ -1.01
$ 28.91 $ 29.74 $ -0.83
$ 32.18 $ 33.10 $ -0.92
$ 35.95 $ 36.98 $ -1.03
$ 39.98 $ 41.12 $ -1.14
$ 17.65 $ 18.16 $ -0.51
$ 22.91 $ 23.56 $ -0.66
$ 30.31 $ 31.18 $ -0.87
$ 42.35 $ 43.57 $ -1.21
$ 8.72 $ 8.75 $ -0.03
$ 23.92 $ 24.50 $ -0.58
$ 393.99 $ 404.93 $ -10.93
$ 495.15 $ 509.53 $ -14.38
$ 3.45 $ 3.55 $ -0.10
$ 5.10 $ 5.25 $ -0.15
$ 3.67 $ 3.77 $ -0.10
$ 53.90 $ 54.83 $ -0.92
$ 2.23 $ 2.28 $ -0.05
$ 42.54 $ 43.34 $ -0.80
$ 19.89 $ 20.04 $ -0.15
$ 2.64 $ 2.70 $ -0.06
$ 3.46 $ 3.54 $ -0.09
$ 8.30 $ 8.55 $ -0.24
$ 27.85 $ 28.67 $ -0.81
$ 0.62 $ 0.63 $ -0.02
$ 0.22 $ 0.22 $ -0.01
$ 21.82 $ 22.43 $ -0.61
$ 894.86 $ 920.62 $ -25.76
$ 70.37 $ 71.86 $ -1.49
$ 4.58 $ 4.70 $ -0.12
$ 7.69 $ 7.77 $ -0.08
$ 10.18 $ 10.23 $ -0.05
$ 12.63 $ 12.73 $ -0.10
$ 17.49 $ 17.60 $ -0.10
$ 20.00 $ 20.25 $ -0.26
$ 31.10 $ 31.41 $ -0.31
$ 32.39 $ 32.70 $ -0.31
$ 0.33 $ 0.34 $ -0.01
$ 38.94 $ 40.06 $ -1.12
$ 0.93 $ 0.94 $ -0.01
$ 1.36 $ 1.37 $ -0.01
$ 1.64 $ 1.64 $ -0.01
$ 1.31 $ 1.32 $ -0.01
$ 1.57 $ 1.58 $ -0.01

US$ NOV US$ OCT DIF


'15 '15
$ 613.57 $ 613.57 $ -
93 de 347

RIOS - NOVIEMBRE 2015


de 3.15 a 3.30)

US$ NOV US$ OCT DIF


'15 '15
$ 658.46 $ 658.46 $ -
$ 982.91 $ 982.91 $ -
$ 220.42 $ 220.42 $ -
$ 786.24 $ 786.24 $ -
$ 859.19 $ 859.19 $ -
$ 50.47 $ 50.47 $ -
$ 56.08 $ 56.08 $ -
$ 38.77 $ 38.77 $ -
$ 43.14 $ 43.14 $ -
$ 22.61 $ 22.61 $ -
$ 45.09 $ 45.09 $ -
$ 67.57 $ 67.57 $ -
$ 25.36 $ 25.36 $ -
$ 32.87 $ 32.87 $ -
$ 16.59 $ 16.59 $ -
94 de 347

LISTA DE PRECIOS U
(Actualización de precio de mater
APLICA A LA CONTRATA: CANCHANYA, COMICIP, CRISTOBAL E INCEMIN.

Tipo PU Tipo Labor Codigo

EXTRACCION 07151
07152
07150
07155
AVANCE CRUCERO 02453
02449
02448
02454
02446
02447
02455
02444
02443
02442
02450
02459
02439
02451
02425
02452
02456
02445
02441
RAMPA 03310
03312
03314
02457
03313
03311
03317
03309
03318
02458
03308
03307
03316
03315
CHIMENEA 04262
04261
04260
SUBNIVEL 05521
05520
ROTURA TAJO 06544
06543
06542
06540
06537
06546
06545
06539
06538
SOSTENIMIENTO 12806
12807
12808
12809
12810
12871
12811
12888
12812
12813
12814
95 de 347

LISTA DE PRECIOS U
(Actualización de precio de mater
APLICA A LA CONTRATA: CANCHANYA, COMICIP, CRISTOBAL E INCEMIN.

Tipo PU Tipo Labor Codigo

12872
12816
12817
12815
12892
12820
12818
12821
12819
12822
12823
12825
12868
12869
12870
12830
12831
12832
12829
12828
12827
12893
12826
12835
12834
12833
12837
12836
12838
12839
96 de 347

LISTA DE PRECIOS U
(Actualización de precio de mater
APLICA A LA CONTRATA: CANCHANYA, COMICIP, CRISTOBAL E INCEMIN.

Tipo PU Tipo Labor Codigo

12842
12843
12844
12840
12841
12845
12846
12848
12847
12849
12851
12850
12852
12853
12854
12855
12856
12857
12858
12859
12860
12861
12862
12863
12864
12865
12866
12867
SERVICIOS 08146
08435
08436
08452
08453
08454
08451
08380
08139
08381
08209
08215
08437
08438
08439
08440
08448
08442
08441
08449
08445
08444
08443
08446
08447
08430
08431
08432
08433
08434

APLICA A LA CONTRATA: SEPROCAL


97 de 347

LISTA DE PRECIOS U
(Actualización de precio de mater
APLICA A LA CONTRATA: CANCHANYA, COMICIP, CRISTOBAL E INCEMIN.

Tipo PU Tipo Labor Codigo

Tipo PU Tipo Labor Codigo

AVANCE ALIMAK 04238


04239
04240
SERVICIOS ALIMAK 08450
SOSTENIMIENTO ALIMAK 12873
12874
12875
12876
12877
12878
12879
12880
12881
12889
12890
12891
98 de 347

LISTA DE PRECIOS UNITARIOS - ABRIL 2015


(Actualización de precio de materiales y tipo de cambio de 3.30 a 3.254)
ANCHANYA, COMICIP, CRISTOBAL E INCEMIN.
Unidad
Descripcion Medida
EXTRACCION CON LOCOMOTORA A BATERIA LM 15(5.5 Tons) - G TMH
EXTRACCION CON LOCOMOTORA A BATERIA LM 10(3.5 Tons) - G TMH
EXTRACCION CON LOCOMOTORA LT-01 TROLLEY (5.5 Tons) - G TMH
EXTRACCION CON LOCOMOTORA LT-05 TROLLEY (10 Tons) - G TMH
CRUCERO 2.0 M X 2.0 M CON JUMBO Y LIMPIEZA SCOOP (REFUGIO) - G MTS
CRUCERO 2.00 X 2.00 MTs. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G MTS
CRUCERO 2.40 X 2.40 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. - G MTS
CRUCERO 2.70 X 2.70 MTs. Jack Leg-Scoop de 2.5 Yds3 Acarreo hasta 150 mts - G MTS
CRUCERO 3.00 X 3.00 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. - G MTS
PRECORTE CRUCERO 3.0 X 3.0 mts. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G MTS
CRUCERO 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP - G MTS
CRUCERO 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. - G MTS
CRUCERO 3.5M X 3.5 M CON JUMBO - G MTS
CRUCERO 3.5M X 3.5 M CON JUMBO ALTA DIFICULTAD - G MTS
CRUCERO 4.0 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP - G MTS
CRUCERO 4 X 4 CON JUMBO Y LIMPIEZA SCOOP - G MTS
CRUCERO 4.5M X 4.2 M CON JUMBO - G MTS
CRUCERO 4.5 M X 4.2 M JUMBO Y LIMPIEZA SCOOP ALTA DIFICULTAD - G MTS
PRECORTE CRUCERO 4.5M X 4.2 M CON JUMBO - G MTS
CRUCERO 5.0 M X 4.0 M JUMBO Y LIMPIEZA SCOOP - G MTS
GALERIA 2.4 X 2.4 M JACK LEG 6' Y LIMPIEZA SCOOP - G MTS
GAL/CRUCERO 3.0 M X 3.0 M CON JUMBO - G MTS
PRECORTE GAL/CRUCERO 3.5M X 3.5 M CON JUMBO - G MTS
PRECORTE RP/XC 4.0M X 3.5 M CON JUMBO - G MTS
RAMPA 3.0 X 3.0 mts. Jack Leg - Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G MTS
PRECORTE RAMPA 3.0 x 3.0 mts con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. - G MTS
RAMPA 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP - G MTS
RAMPA 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. - G MTS
RAMPA 3.5M X 3.5 M CON JUMBO - G MTS
PRECORTE RAMPA 3.5M X 3.5 M CON JUMBO - G MTS
RAMPA 4.0M X 3.5 M CON JUMBO - G MTS
RAMPA 4 X 4 CON JUMBO - G MTS
RAMPA 4.20 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP - G MTS
RAMPA 4.5M X 4.2 M con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. - G MTS
RAMPA 4.5M X 4.2 M CON JUMBO - G MTS
RAMPA 4.5M X 4.2 M CON JUMBO - ALTA DIFICULTAD - G MTS
PRECORTE - RAMPA 4.5M X 4.2 M CON JUMBO - G MTS
CHIMENEA 1.50 x 1.50 Mts. Limpieza sin Scoop, defrente a Chute - G MTS
CHIMENEA 2.40 x 1.20 Mts.Limpieza Sin Scooptram directo a la Tolva hasta 30 mts altura - G MTS
CHIMENEA 3.20 x 1.50 Mts.Limpieza Sin Scoop directo a la Tolva, hasta 30 mts altura - G MTS
SUB NIVEL 4' x 6' CON WINCHE - G MTS
SUB NIVEL 4' x 6' CON WINCHE Y LIMPIEZA SCOOP - G MTS
ROTURA DE TAJEO MECANIZADO ANCHO VENTA 9MX4.5M (CON EQUIPOS) - G TMS
ROTURA DE TAJEO MECANIZADO ANCHO VENTA 6MX4.5M (CON EQUIPOS) - G TMS
ROTURA DE TAJEO MECANIZADO ANCHO VETA 3.5MX4.5M(CON EQUIPOS) - G TMS
ROTURA DE TAJEO CORTE Y RELLENO EN BREASTING - G TMS
ROTURA EN TAJEOS CON 1 WINCHE - G TMS
ROTURA DE TAJEO CON MICRO SCOOP (CON EQUIPOS) - G TMS
ROTURA DE TAJEOS SEMI MECANIZADO VETA ANGOSTA 2.4MX2.2M 1 SCOOPTRAM - G TMS
ROTURA DE TAJEO RECUPERACION PILARES CON 1 WINCHE - G TMS
ROTURA DE TAJEO VETAS ANGOSTAS < 1.20 MTS CON 1 WINCHE ALTA DIFICULTAS - G TMS
SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3) - G MT2
SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3) - G MT2
SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3) - G MT2
SHOTCRETE 1" TK-40 - G MT2
SHOTCRETE 2" TK-40 - G MT2
INSTALACION PERNO HELICOIDAL DE 6' CEMBOL CON JACKLEG - G UNI
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JACKLEG - G UNI
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JUMBO - G UNI
INSTALACION PERNO HYDRABOLT DE 5' (BOMBA MANUAL) - G UNI
INSTALACION PERNO HYDRABOLT DE 6' (BOMBA MANUAL) - G UNI
INSTALACION PERNO HYDRABOLT DE 7' (BOMBA MANUAL) - G UNI
99 de 347

LISTA DE PRECIOS UNITARIOS - ABRIL 2015


(Actualización de precio de materiales y tipo de cambio de 3.30 a 3.254)
ANCHANYA, COMICIP, CRISTOBAL E INCEMIN.
Unidad
Descripcion Medida
INSTALACION PERNO HYDRABOLT DE 8' (BOMBA MANUAL) CON JACKLEG - G UNI
PERNO HIDRABOLT 5FTS CON JUMBO EMPERNADOR - G UNI
PERNO HIDRABOLT 7FTS CON JUMBO EMPERNADOR - G UNI
PERNO HIDRABOLT 8FTS CON JUMBO EMPERNADOR - G UNI
PERNO SWELEX 7 FTS CON JUMBO EMPERNADOR - G UNI
INSTALACION DE CIMBRAS DE 10'X10' ( No incluye las tablas) - G PZA
INSTALACION DE CIMBRAS DE 4.5mX4.2m (Incluye Plancha Acanalada+Bolsacrete) - G PZA
INSTALACION DE CIMBRAS DE 10'X10' Y 8'X8' (Rehabilitacion+25 Marchavante) - G PZA
INSTALACION DE CIMBRAS DE 3.5mX3.5m ( Que incluye las tablas) - G PZA
TABLAS EN CIMBRAS DE 10'X10' Y 8'X8' - G PZA
INSTALACION DE MALLA ELECTROSOLDADA - G MT2
INSTALACION PERNO SPLIT SET DE 5' (JACKLEG) - G PZA
INSTALACION PERNO SPLIT SET DE 7' (JACKLEG) - G PZA
INSTALACION PERNO SPLIT SET DE 5' (BOLTER) - G PZA
INSTALACION PERNO SPLIT SET DE 7' (BOLTER) - G PZA
CUADRO COMPLETO TAJEO DE MADERA 6' x 6' - G PZA
CUADRO COMPLETO TAJEO DE MADERA 7' x 7' - G PZA
CUADRO COMPLETO TAJEO DE MADERA 8' x 8' - G PZA
CUADRO COMPLETO DE MADERA 6' x 6' (subnivel) - G PZA
CUADRO COMPLETO DE MADERA 8' x 8' - G PZA
CUADRO COMPLETO DE MADERA 8' x 9' - G PZA
CUADRO COMPLETO DE MADERA 8' x 4m (sombrero) - G PZA
CUADRO COMPLETO DE MADERA 10' x 10' - G PZA
CUADRO INTERMEDIO DE MADERA 8'x8' - G PZA
CUADRO INTERMEDIO DE MADERA 8' x9' - G PZA
CUADRO INTERMEDIO DE MADERA 8' x10' - G PZA
CUADRO EN CHIMENEA 5'X5' - SIN ENCOSTILLADO - G PZA
CUADRO EN CHIMENEA 5'X5' - CON ENCOSTILLADO - G PZA
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 8'X4' CON ENTABLADO - G PZA
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 3.20mX1.50m CON ENTABLADO - G PZA
100 de 347

LISTA DE PRECIOS UNITARIOS - ABRIL 2015


(Actualización de precio de materiales y tipo de cambio de 3.30 a 3.254)
ANCHANYA, COMICIP, CRISTOBAL E INCEMIN.
Unidad
Descripcion Medida
CUADRO COJO 6'X6' (En avances y Tajeos) - G PZA
CUADRO COJO 7'X7' (En avances y Tajeos) - G PZA
CUADRO COJO TAJEO DE MADERA 8' x 8' - G PZA
CUADRO COJO 8"X9' (En avances y Tajeos) - G PZA
CUADRO COJO 8"X10' (En avances y Tajeos) - G PZA
CUADRO DE CAMBIO 10'X10' - G PZA
SOBRECUADRO DE MADERA 7' x 7' - G PZA
GUARDACABEZA 4"X 2.40Mts (MARCHAVANTES) - G PZA
GUARDACABEZA 5"X 3Mts (MARCHAVANTES) - G PZA
ENCRIBADO DE CUADRO 5"X6 PIES - G PZA
ENCRIBADO DE CUADRO 5"X8 PIES - G PZA
ENCRIBADO DE CUADRO 6"X8 PIES - G PZA
SOLERA 6"X8' - G PZA
SOLERA 7"X8' - G PZA
SOLERA 8"X8' - G PZA
SOLERA 8"X10' - G PZA
PUNTAL DE SEGURIDAD 5"X8' - G PZA
PUNTAL DE SEGURIDAD 6"X8' - G PZA
PUNTAL DE SEGURIDAD 7"X8' - G PZA
PUNTAL DE SEGURIDAD 8"X8' - G PZA
CACHO DE TORO (En avances y Tajeos) - G PZA
ENTABLADO DE MADERA CON MALLA PARA RELLENO - G MT2
INSTALACION DE WOOD PACK CON MAD. REDONDA Ø7 y Ø8" - G PZA
INSTALACION DE WOOD PACK CON MADERA ASERRADA - G PZA
COLOCADO ENTABLADO (FORRADO CUADROS EN VEZ CANTONERA) - G PZA
COLOCADO CANTONERAS - G PZA
COLOCADO DE RAJADO - G PZA
ELABORACION + INSTALACION BOLSACRETE (Arena+Cemento) - G MT3
ACARREO CON WINCHE - G TMH
INSTALACION DE PLATAFORMA DESCANSO CON ESCALERA - G UNI
INSTALACION DE ESCALERA - G UNI
PARRILLERO - BOMBERO - G UNI
DESATADOR SCALER - G US$/HR
TALADRO DE CONSOLIDACION CON JUMBO US$/HR
RELLENO HIDRAULICO CONVENCIONAL - G MT3
LIMPIEZA CON PALA DE LINEA MT3
LIMPIEZA A PULSO MT3
RECUPERACION DE CUADRO DE MADERA 7X7, 8'x8', 10X10 PZA
INSTALACION TUBERIA POLIETILENO 4" EN LINEA RECTA (Incluye Traslado) MTS
LIMPIEZA DE VIA CON MINICARGADOR MTS
ENTABLADO - G MT2
INSTALACION DE TOLVA SIMPLE - G UNI
NICHO PARA TABLERO ELECTRICO 0.60m x 0.60m - G UNI
RELLENO DETRITICO CON WINCHE - G MT3
INSTALACION ALCAYATAS ELECTRICAS DE TRES ESPACIOS - G UNI
INSTALACION ALCAYATAS PARA MANGA DE VENTILACION - G UNI
INSTALACION ALCAYATAS - G UNI
DESQUINCHE CON JUMBO Y LIMPIEZA CON SCOOP - G MT3
DESQUINCHE LIMPIEZA CON WINCHE - G MT3
DESQUINCHE CON JACK LEG Y LIMPIEZA CON SCOOPTRAM - G MT3
DESQUINCHE EN REBATIDO DE RAMPA - G MT3
INSTALACION TUBERIA POLIETILENO 2" EN LINEA RECTA (Incluye Traslado) - G MTS
LABORES DE APOYO - G UNI
ACARREO CON SCOOP 50 M - G TMS
ACARREO CON DUMPER MINERAL (12TON) 50 M - G TMS
ACARREO CON DUMPER DESMONTE (12TON) 50 M - G TMS
ACARREO CON DUMPER MINERAL (16TON) 50 M - G TMS
ACARREO CON DUMPER DESMONTE (16TON) 50 M - G TMS
101 de 347

LISTA DE PRECIOS UNITARIOS - ABRIL 2015


(Actualización de precio de materiales y tipo de cambio de 3.30 a 3.254)
ANCHANYA, COMICIP, CRISTOBAL E INCEMIN.
Unidad
Descripcion Medida
Unidad
Descripcion Medida
CHIMENEA SECCION 2M X 2M ALIMAK - SE MTS
CHIMENEA SECCION : 2.5 x 2.5 m ALIMAK - SE MTS
CHIMENEA SECCION : 2.5 x 2.5 m. (ALTA DIFICULTAD) ALIMAK - SE MTS
INSTALACION BOLSAS CRET EN CH. ALIMAK (Toda Sección) - SE MT3
CUADRO METALICO TIPO L + PERNOS DE ANCLAJE ALIMAK (SECC.2.5mX2.5m) DE 0 A 50 MTS - SE UNI
CUADRO METALICO TIPO L + PERNOS DE ANCLAJE ALIMAK (SECC.3mX3m) DE 0 A 50 MTS - SE UNI
INSTALACION DE PERNO HELICOIDAL DE 6' CON ALIMAK - SE UNI
INSTALACION DE PERNO HELICOIDAL DE 8' CON ALIMAK - SE UNI
INSTALACION DE PERNO HIDRABOLT DE 5' CON ALIMAK - SE UNI
INSTALACION DE PERNO HIDRABOLT DE 7' CON ALIMAK - SE UNI
SHOTCRETE TODO COSTO 1" DRAMIX (0 KGS/M3) ALIMAK - SE MT2
SHOTCRETE TODO COSTO 2" DRAMIX (0 KGS/M3) ALIMAK - SE MT2
SHOTCRETE TODO COSTO 3" DRAMIX (0 KGS/M3) ALIMAK - SE MT2
INSTALACION DE PERMNO SPLIT SET 5' CON ALIMAK - SE UNI
INSTALACION DE PERMNO SPLIT SET 7' CON ALIMAK - SE UNI
INST MALLA ELECTROSOLDADA CON ALIMAK - SE M2
102 de 347

TARIOS - ABRIL 2015


es y tipo de cambio de 3.30 a 3.254)

US$ ABR US$ NOV DIF


'16 '15
$ 1.66 $ 1.69 $ -0.03
$ 1.47 $ 1.50 $ -0.03
$ 1.01 $ 1.02 $ -0.02
$ 0.93 $ 0.93 $ -0.01
$ 335.47 $ 337.94 $ -2.47
$ 267.68 $ 270.32 $ -2.64
$ 315.42 $ 318.13 $ -2.71
$ 357.21 $ 360.67 $ -3.45
$ 394.41 $ 398.78 $ -4.36
$ 400.81 $ 405.17 $ -4.36
$ 412.87 $ 416.38 $ -3.51
$ 428.21 $ 431.32 $ -3.10
$ 507.96 $ 511.94 $ -3.98
$ 539.18 $ 543.15 $ -3.98
$ 519.55 $ 523.35 $ -3.79
$ 542.80 $ 546.62 $ -3.82
$ 625.36 $ 629.73 $ -4.37
$ 626.89 $ 631.79 $ -4.90
$ 653.78 $ 657.79 $ -4.00
$ 645.49 $ 649.91 $ -4.42
$ 323.93 $ 326.59 $ -2.65
$ 434.94 $ 438.04 $ -3.10
$ 524.40 $ 528.38 $ -3.98
$ 589.68 $ 594.04 $ -4.35
$ 413.72 $ 418.51 $ -4.78
$ 414.40 $ 418.76 $ -4.35
$ 427.25 $ 430.81 $ -3.57
$ 437.79 $ 441.90 $ -4.11
$ 542.80 $ 546.36 $ -3.55
$ 571.20 $ 576.09 $ -4.89
$ 545.14 $ 549.09 $ -3.95
$ 564.54 $ 568.50 $ -3.96
$ 578.29 $ 582.53 $ -4.24
$ 575.46 $ 582.63 $ -7.17
$ 642.56 $ 647.35 $ -4.79
$ 688.44 $ 693.98 $ -5.54
$ 690.90 $ 696.15 $ -5.25
$ 146.68 $ 149.07 $ -2.39
$ 168.44 $ 170.81 $ -2.37
$ 386.14 $ 391.84 $ -5.70
$ 182.91 $ 185.87 $ -2.96
$ 251.57 $ 254.30 $ -2.73
$ 8.91 $ 8.96 $ -0.05
$ 12.24 $ 12.30 $ -0.06
$ 13.28 $ 13.37 $ -0.09
$ 12.40 $ 12.56 $ -0.16
$ 12.38 $ 12.62 $ -0.24
$ 14.63 $ 14.77 $ -0.14
$ 13.78 $ 13.97 $ -0.19
$ 13.65 $ 13.95 $ -0.30
$ 14.19 $ 14.46 $ -0.28
$ 12.80 $ 13.14 $ -0.34
$ 25.47 $ 26.15 $ -0.68
$ 38.14 $ 39.16 $ -1.02
$ 1.60 $ 1.64 $ -0.05
$ 3.19 $ 3.29 $ -0.09
$ 19.35 $ 19.56 $ -0.22
$ 22.63 $ 22.86 $ -0.23
$ 30.10 $ 30.18 $ -0.08
$ 16.12 $ 16.19 $ -0.06
$ 16.65 $ 16.73 $ -0.08
$ 18.65 $ 18.75 $ -0.10
103 de 347

TARIOS - ABRIL 2015


es y tipo de cambio de 3.30 a 3.254)

US$ ABR US$ NOV DIF


'16 '15
$ 20.43 $ 20.54 $ -0.11
$ 26.53 $ 26.59 $ -0.06
$ 28.85 $ 28.92 $ -0.07
$ 31.54 $ 31.62 $ -0.08
$ 24.98 $ 25.05 $ -0.07
$ 159.29 $ 163.02 $ -3.73
$ 272.27 $ 278.85 $ -6.58
$ 307.85 $ 315.79 $ -7.95
$ 346.01 $ 355.05 $ -9.04
$ 9.45 $ 9.72 $ -0.27
$ 6.57 $ 6.64 $ -0.08
$ 10.26 $ 10.35 $ -0.08
$ 13.95 $ 14.10 $ -0.15
$ 16.88 $ 16.93 $ -0.05
$ 21.63 $ 21.70 $ -0.07
$ 69.23 $ 71.21 $ -1.97
$ 79.45 $ 81.70 $ -2.25
$ 107.31 $ 110.36 $ -3.05
$ 85.77 $ 88.23 $ -2.46
$ 111.69 $ 114.87 $ -3.19
$ 127.69 $ 131.33 $ -3.64
$ 182.72 $ 182.72 $ -
$ 172.94 $ 177.89 $ -4.96
$ 157.38 $ 161.90 $ -4.52
$ 169.47 $ 174.33 $ -4.86
$ 172.94 $ 177.89 $ -4.96
$ 94.74 $ 97.42 $ -2.68
$ 111.28 $ 114.44 $ -3.16
$ 297.77 $ 306.16 $ -8.39
$ 405.83 $ 417.25 $ -11.43
104 de 347

TARIOS - ABRIL 2015


es y tipo de cambio de 3.30 a 3.254)

US$ ABR US$ NOV DIF


'16 '15
$ 58.04 $ 59.70 $ -1.66
$ 64.78 $ 66.63 $ -1.85
$ 72.34 $ 74.39 $ -2.06
$ 80.75 $ 83.04 $ -2.29
$ 85.42 $ 87.85 $ -2.43
$ 216.39 $ 222.64 $ -6.24
$ 98.22 $ 101.02 $ -2.80
$ 11.11 $ 11.43 $ -0.32
$ 14.95 $ 15.37 $ -0.43
$ 30.36 $ 31.22 $ -0.86
$ 30.36 $ 31.22 $ -0.86
$ 35.91 $ 36.92 $ -1.01
$ 28.91 $ 29.74 $ -0.83
$ 32.18 $ 33.10 $ -0.92
$ 35.95 $ 36.98 $ -1.03
$ 39.98 $ 41.12 $ -1.14
$ 17.65 $ 18.16 $ -0.51
$ 22.91 $ 23.56 $ -0.66
$ 30.31 $ 31.18 $ -0.87
$ 42.35 $ 43.57 $ -1.21
$ 8.72 $ 8.75 $ -0.03
$ 23.92 $ 24.50 $ -0.58
$ 393.99 $ 404.93 $ -10.93
$ 495.15 $ 509.53 $ -14.38
$ 3.45 $ 3.55 $ -0.10
$ 5.10 $ 5.25 $ -0.15
$ 3.67 $ 3.77 $ -0.10
$ 53.90 $ 54.83 $ -0.92
$ 2.23 $ 2.28 $ -0.05
$ 42.54 $ 43.34 $ -0.80
$ 19.89 $ 20.04 $ -0.15
$ 41.41 $ 42.61 $ -1.20
$ 113.19 $ 113.69 $ -0.50
$ 186.04 $ 186.83 $ -0.79
$ 2.64 $ 2.70 $ -0.06
$ 3.46 $ 3.54 $ -0.09
$ 8.30 $ 8.55 $ -0.24
$ 27.85 $ 28.67 $ -0.81
$ 0.62 $ 0.63 $ -0.02
$ 0.22 $ 0.22 $ -0.01
$ 21.82 $ 22.43 $ -0.61
$ 894.86 $ 920.62 $ -25.76
$ 70.37 $ 71.86 $ -1.49
$ 4.58 $ 4.70 $ -0.12
$ 7.69 $ 7.77 $ -0.08
$ 10.18 $ 10.23 $ -0.05
$ 12.63 $ 12.73 $ -0.10
$ 17.49 $ 17.60 $ -0.10
$ 20.00 $ 20.25 $ -0.26
$ 31.10 $ 31.41 $ -0.31
$ 32.39 $ 32.70 $ -0.31
$ 0.33 $ 0.34 $ -0.01
$ 38.94 $ 40.06 $ -1.12
$ 0.93 $ 0.94 $ -0.01
$ 1.36 $ 1.37 $ -0.01
$ 1.64 $ 1.64 $ -0.01
$ 1.31 $ 1.32 $ -0.01
$ 1.57 $ 1.58 $ -0.01
105 de 347

TARIOS - ABRIL 2015


es y tipo de cambio de 3.30 a 3.254)

US$ ABR US$ NOV DIF


'16 '15
US$ ABR US$ NOV DIF
'16 '15
$ 613.57 $ 613.57 $ -
$ 658.46 $ 658.46 $ -
$ 982.91 $ 982.91 $ -
$ 220.42 $ 220.42 $ -
$ 786.24 $ 786.24 $ -
$ 859.19 $ 859.19 $ -
$ 50.47 $ 50.47 $ -
$ 56.08 $ 56.08 $ -
$ 38.77 $ 38.77 $ -
$ 43.14 $ 43.14 $ -
$ 22.61 $ 22.61 $ -
$ 45.09 $ 45.09 $ -
$ 67.57 $ 67.57 $ -
$ 25.36 $ 25.36 $ -
$ 32.87 $ 32.87 $ -
$ 16.59 $ 16.59 $ -
Tipo PU Tipo Labor Codigo
AVANCE ALIMAK 04238
AVANCE ALIMAK 04239
AVANCE ALIMAK 04240
AVANCE CHIMENEA 04001
AVANCE CHIMENEA 04002
AVANCE CHIMENEA 04003
AVANCE CHIMENEA 04260
AVANCE CHIMENEA 04261
AVANCE CHIMENEA 04262
AVANCE CRUCERO 02001
AVANCE CRUCERO 02002
AVANCE CRUCERO 02003
AVANCE CRUCERO 02004
AVANCE CRUCERO 02005
AVANCE CRUCERO 02006
AVANCE CRUCERO 02007
AVANCE CRUCERO 02008
AVANCE CRUCERO 02009
AVANCE CRUCERO 02010
AVANCE CRUCERO 02011
AVANCE CRUCERO 02012
AVANCE CRUCERO 02013
AVANCE CRUCERO 02014
AVANCE CRUCERO 02015
AVANCE CRUCERO 02016
AVANCE CRUCERO 02017
AVANCE CRUCERO 02018
AVANCE CRUCERO 02425
AVANCE CRUCERO 02439
AVANCE CRUCERO 02441
AVANCE CRUCERO 02442
AVANCE CRUCERO 02443
AVANCE CRUCERO 02444
AVANCE CRUCERO 02445
AVANCE CRUCERO 02446
AVANCE CRUCERO 02447
AVANCE CRUCERO 02448
AVANCE CRUCERO 02449
AVANCE CRUCERO 02450
AVANCE CRUCERO 02451
AVANCE CRUCERO 02452
AVANCE CRUCERO 02453
AVANCE CRUCERO 02454
AVANCE CRUCERO 02455
AVANCE CRUCERO 02459
AVANCE GALERIA 01001
AVANCE GALERIA 02456
AVANCE RAMPA 02457
AVANCE RAMPA 02458
AVANCE RAMPA 03001
AVANCE RAMPA 03002
AVANCE RAMPA 03003
AVANCE RAMPA 03004
AVANCE RAMPA 03005
AVANCE RAMPA 03006
AVANCE RAMPA 03007
AVANCE RAMPA 03008
AVANCE RAMPA 03009
AVANCE RAMPA 03010
AVANCE RAMPA 03011
AVANCE RAMPA 03012
AVANCE RAMPA 03013
AVANCE RAMPA 03014
AVANCE RAMPA 03307
AVANCE RAMPA 03308
AVANCE RAMPA 03309
AVANCE RAMPA 03310
AVANCE RAMPA 03311
AVANCE RAMPA 03312
AVANCE RAMPA 03313
AVANCE RAMPA 03314
AVANCE RAMPA 03315
AVANCE RAMPA 03316
AVANCE RAMPA 03317
AVANCE RAMPA 03318
AVANCE SUBNIVEL 05001
AVANCE SUBNIVEL 05002
AVANCE SUBNIVEL 05520
AVANCE SUBNIVEL 05521
EXTRACCION 07001
EXTRACCION 07002
EXTRACCION 07003
EXTRACCION 07004
EXTRACCION 07150
EXTRACCION 07151
EXTRACCION 07152
EXTRACCION 07155
ROTURA TAJO 06001
ROTURA TAJO 06002
ROTURA TAJO 06003
ROTURA TAJO 06004
ROTURA TAJO 06005
ROTURA TAJO 06006
ROTURA TAJO 06007
ROTURA TAJO 06008
ROTURA TAJO 06537
ROTURA TAJO 06538
ROTURA TAJO 06539
ROTURA TAJO 06540
ROTURA TAJO 06542
ROTURA TAJO 06543
ROTURA TAJO 06544
ROTURA TAJO 06545
ROTURA TAJO 06546
SERVICIOS 08001
SERVICIOS 08002
SERVICIOS 08003
SERVICIOS 08004
SERVICIOS 08005
SERVICIOS 08006
SERVICIOS 08007
SERVICIOS 08008
SERVICIOS 08009
SERVICIOS 08010
SERVICIOS 08011
SERVICIOS 08012
SERVICIOS 08013
SERVICIOS 08014
SERVICIOS 08015
SERVICIOS 08016
SERVICIOS 08017
SERVICIOS 08018
SERVICIOS 08019
SERVICIOS 08020
SERVICIOS 08021
SERVICIOS 08022
SERVICIOS 08023
SERVICIOS 08024
SERVICIOS 08025
SERVICIOS 08026
SERVICIOS 08027
SERVICIOS 08139
SERVICIOS 08146
SERVICIOS 08209
SERVICIOS 08215
SERVICIOS 08380
SERVICIOS 08381
SERVICIOS 08430
SERVICIOS 08431
SERVICIOS 08432
SERVICIOS 08433
SERVICIOS 08434
SERVICIOS 08435
SERVICIOS 08436
SERVICIOS 08437
SERVICIOS 08438
SERVICIOS 08439
SERVICIOS 08440
SERVICIOS 08441
SERVICIOS 08442
SERVICIOS 08443
SERVICIOS 08444
SERVICIOS 08445
SERVICIOS 08446
SERVICIOS 08447
SERVICIOS 08448
SERVICIOS 08449
SERVICIOS 08451
SERVICIOS 08452
SERVICIOS 08453
SERVICIOS 08454
SERVICIOS ALIMAK 08450
SOSTENIMIENTO 12001
SOSTENIMIENTO 12002
SOSTENIMIENTO 12003
SOSTENIMIENTO 12004
SOSTENIMIENTO 12005
SOSTENIMIENTO 12011
SOSTENIMIENTO 12012
SOSTENIMIENTO 12013
SOSTENIMIENTO 12014
SOSTENIMIENTO 12015
SOSTENIMIENTO 12016
SOSTENIMIENTO 12017
SOSTENIMIENTO 12018
SOSTENIMIENTO 12019
SOSTENIMIENTO 12020
SOSTENIMIENTO 12025
SOSTENIMIENTO 12026
SOSTENIMIENTO 12027
SOSTENIMIENTO 12028
SOSTENIMIENTO 12051
SOSTENIMIENTO 12052
SOSTENIMIENTO 12053
SOSTENIMIENTO 12054
SOSTENIMIENTO 12055
SOSTENIMIENTO 12056
SOSTENIMIENTO 12057
SOSTENIMIENTO 12060
SOSTENIMIENTO 12061
SOSTENIMIENTO 12062
SOSTENIMIENTO 12063
SOSTENIMIENTO 12064
SOSTENIMIENTO 12065
SOSTENIMIENTO 12066
SOSTENIMIENTO 12067
SOSTENIMIENTO 12068
SOSTENIMIENTO 12069
SOSTENIMIENTO 12070
SOSTENIMIENTO 12071
SOSTENIMIENTO 12076
SOSTENIMIENTO 12077
SOSTENIMIENTO 12078
SOSTENIMIENTO 12080
SOSTENIMIENTO 12081
SOSTENIMIENTO 12082
SOSTENIMIENTO 12083
SOSTENIMIENTO 12086
SOSTENIMIENTO 12087
SOSTENIMIENTO 12088
SOSTENIMIENTO 12089
SOSTENIMIENTO 12090
SOSTENIMIENTO 12091
SOSTENIMIENTO 12092
SOSTENIMIENTO 12093
SOSTENIMIENTO 12094
SOSTENIMIENTO 12095
SOSTENIMIENTO 12096
SOSTENIMIENTO 12101
SOSTENIMIENTO 12102
SOSTENIMIENTO 12103
SOSTENIMIENTO 12104
SOSTENIMIENTO 12105
SOSTENIMIENTO 12106
SOSTENIMIENTO 12107
SOSTENIMIENTO 12108
SOSTENIMIENTO 12109
SOSTENIMIENTO 12301
SOSTENIMIENTO 12302
SOSTENIMIENTO 12627
SOSTENIMIENTO 12645
SOSTENIMIENTO 12673
SOSTENIMIENTO 12806
SOSTENIMIENTO 12807
SOSTENIMIENTO 12808
SOSTENIMIENTO 12809
SOSTENIMIENTO 12810
SOSTENIMIENTO 12811
SOSTENIMIENTO 12812
SOSTENIMIENTO 12813
SOSTENIMIENTO 12814
SOSTENIMIENTO 12815
SOSTENIMIENTO 12816
SOSTENIMIENTO 12817
SOSTENIMIENTO 12818
SOSTENIMIENTO 12819
SOSTENIMIENTO 12820
SOSTENIMIENTO 12821
SOSTENIMIENTO 12822
SOSTENIMIENTO 12823
SOSTENIMIENTO 12825
SOSTENIMIENTO 12826
SOSTENIMIENTO 12827
SOSTENIMIENTO 12828
SOSTENIMIENTO 12829
SOSTENIMIENTO 12830
SOSTENIMIENTO 12831
SOSTENIMIENTO 12832
SOSTENIMIENTO 12833
SOSTENIMIENTO 12834
SOSTENIMIENTO 12835
SOSTENIMIENTO 12836
SOSTENIMIENTO 12837
SOSTENIMIENTO 12838
SOSTENIMIENTO 12839
SOSTENIMIENTO 12840
SOSTENIMIENTO 12841
SOSTENIMIENTO 12842
SOSTENIMIENTO 12843
SOSTENIMIENTO 12844
SOSTENIMIENTO 12845
SOSTENIMIENTO 12846
SOSTENIMIENTO 12847
SOSTENIMIENTO 12848
SOSTENIMIENTO 12849
SOSTENIMIENTO 12850
SOSTENIMIENTO 12851
SOSTENIMIENTO 12852
SOSTENIMIENTO 12853
SOSTENIMIENTO 12854
SOSTENIMIENTO 12855
SOSTENIMIENTO 12856
SOSTENIMIENTO 12857
SOSTENIMIENTO 12858
SOSTENIMIENTO 12859
SOSTENIMIENTO 12860
SOSTENIMIENTO 12861
SOSTENIMIENTO 12862
SOSTENIMIENTO 12863
SOSTENIMIENTO 12864
SOSTENIMIENTO 12865
SOSTENIMIENTO 12866
SOSTENIMIENTO 12867
SOSTENIMIENTO 12868
SOSTENIMIENTO 12869
SOSTENIMIENTO 12870
SOSTENIMIENTO 12871
SOSTENIMIENTO 12872
SOSTENIMIENTO 12888
SOSTENIMIENTO 12892
SOSTENIMIENTO 12893
SOSTENIMIENTO ALIMAK 12873
SOSTENIMIENTO ALIMAK 12874
SOSTENIMIENTO ALIMAK 12875
SOSTENIMIENTO ALIMAK 12876
SOSTENIMIENTO ALIMAK 12877
SOSTENIMIENTO ALIMAK 12878
SOSTENIMIENTO ALIMAK 12879
SOSTENIMIENTO ALIMAK 12880
SOSTENIMIENTO ALIMAK 12881
SOSTENIMIENTO ALIMAK 12889
SOSTENIMIENTO ALIMAK 12890
SOSTENIMIENTO ALIMAK 12891
Descripcion Moneda Unidad Medida
CHIMENEA SECCION 2M X 2M ALIMAK - SE USD MTS
CHIMENEA SECCION : 2.5 x 2.5 m ALIMAK - SE USD MTS
CHIMENEA SECCION : 2.5 x 2.5 m. (ALTA DIFICULTAD) ALIMAK - SE USD MTS
CHIMENEA 1.50 x 1.50 Mts. Limpieza sin Scoop, defrente a Chute - C USD MTS
CHIMENEA 2.40 x 1.20 Mts.Limpieza Sin Scooptram directo a la Tolva hasta 30 mts altura - C USD MTS
CHIMENEA 3.20 x 1.50 Mts.Limpieza Sin Scoop directo a la Tolva, hasta 30 mts altura - C USD MTS
CHIMENEA 3.20 x 1.50 Mts.Limpieza Sin Scoop directo a la Tolva, hasta 30 mts altura - G USD MTS
CHIMENEA 2.40 x 1.20 Mts.Limpieza Sin Scooptram directo a la Tolva hasta 30 mts altura - G USD MTS
CHIMENEA 1.50 x 1.50 Mts. Limpieza sin Scoop, defrente a Chute - G USD MTS
CRUCERO 2.0 M X 2.0 M CON JUMBO Y LIMPIEZA SCOOP (REFUGIO) - C USD MTS
CRUCERO 2.00 X 2.00 MTs. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - C USD MTS
CRUCERO 2.40 X 2.40 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. - C USD MTS
CRUCERO 2.70 X 2.70 MTs. Jack Leg-Scoop de 2.5 Yds3 Acarreo hasta 150 mts - C USD MTS
CRUCERO 3.00 X 3.00 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. - C USD MTS
PRECORTE CRUCERO 3.0 X 3.0 mts. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - C USD MTS
CRUCERO 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP - C USD MTS
CRUCERO 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. - C USD MTS
CRUCERO 3.5M X 3.5 M CON JUMBO - C USD MTS
CRUCERO 3.5M X 3.5 M CON JUMBO ALTA DIFICULTAD - C USD MTS
CRUCERO 4.0 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP - C USD MTS
CRUCERO 4 X 4 CON JUMBO Y LIMPIEZA SCOOP - C USD MTS
CRUCERO 4.5M X 4.2 M CON JUMBO - C USD MTS
CRUCERO 4.5 M X 4.2 M JUMBO Y LIMPIEZA SCOOP ALTA DIFICULTAD - C USD MTS
PRECORTE CRUCERO 4.5M X 4.2 M CON JUMBO - C USD MTS
CRUCERO 5.0 M X 4.0 M JUMBO Y LIMPIEZA SCOOP - C USD MTS
GAL/CRUCERO 3.0 M X 3.0 M CON JUMBO - C USD MTS
PRECORTE GAL/CRUCERO 3.5M X 3.5 M CON JUMBO - C USD MTS
PRECORTE CRUCERO 4.5M X 4.2 M CON JUMBO - G USD MTS
CRUCERO 4.5M X 4.2 M CON JUMBO - G USD MTS
PRECORTE GAL/CRUCERO 3.5M X 3.5 M CON JUMBO - G USD MTS
CRUCERO 3.5M X 3.5 M CON JUMBO ALTA DIFICULTAD - G USD MTS
CRUCERO 3.5M X 3.5 M CON JUMBO - G USD MTS
CRUCERO 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. - G USD MTS
GAL/CRUCERO 3.0 M X 3.0 M CON JUMBO - G USD MTS
CRUCERO 3.00 X 3.00 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. - G USD MTS
PRECORTE CRUCERO 3.0 X 3.0 mts. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G USD MTS
CRUCERO 2.40 X 2.40 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. - G USD MTS
CRUCERO 2.00 X 2.00 MTs. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G USD MTS
CRUCERO 4.0 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP - G USD MTS
CRUCERO 4.5 M X 4.2 M JUMBO Y LIMPIEZA SCOOP ALTA DIFICULTAD - G USD MTS
CRUCERO 5.0 M X 4.0 M JUMBO Y LIMPIEZA SCOOP - G USD MTS
CRUCERO 2.0 M X 2.0 M CON JUMBO Y LIMPIEZA SCOOP (REFUGIO) - G USD MTS
CRUCERO 2.70 X 2.70 MTs. Jack Leg-Scoop de 2.5 Yds3 Acarreo hasta 150 mts - G USD MTS
CRUCERO 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP - G USD MTS
CRUCERO 4 X 4 CON JUMBO Y LIMPIEZA SCOOP - G USD MTS
GALERIA 2.4 X 2.4 M JACK LEG 6' Y LIMPIEZA SCOOP - C USD MTS
GALERIA 2.4 X 2.4 M JACK LEG 6' Y LIMPIEZA SCOOP - G USD MTS
RAMPA 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP - G USD MTS
RAMPA 4.20 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP - G USD MTS
PRECORTE RP/XC 4.0M X 3.5 M CON JUMBO - C USD MTS
RAMPA 3.0 X 3.0 mts. Jack Leg - Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - C USD MTS
PRECORTE RAMPA 3.0 x 3.0 mts con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. - C USD MTS
RAMPA 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP - C USD MTS
RAMPA 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. - C USD MTS
RAMPA 3.5M X 3.5 M CON JUMBO - C USD MTS
PRECORTE RAMPA 3.5M X 3.5 M CON JUMBO - C USD MTS
RAMPA 4.0M X 3.5 M CON JUMBO - C USD MTS
RAMPA 4 X 4 CON JUMBO - C USD MTS
RAMPA 4.20 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP - C USD MTS
RAMPA 4.5M X 4.2 M con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. - C USD MTS
RAMPA 4.5M X 4.2 M CON JUMBO - C USD MTS
RAMPA 4.5M X 4.2 M CON JUMBO - ALTA DIFICULTAD - C USD MTS
PRECORTE - RAMPA 4.5M X 4.2 M CON JUMBO - C USD MTS
RAMPA 4.5M X 4.2 M CON JUMBO - G USD MTS
RAMPA 4.5M X 4.2 M con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. - G USD MTS
RAMPA 4.0M X 3.5 M CON JUMBO - G USD MTS
PRECORTE RP/XC 4.0M X 3.5 M CON JUMBO - G USD MTS
RAMPA 3.5M X 3.5 M CON JUMBO - G USD MTS
RAMPA 3.0 X 3.0 mts. Jack Leg - Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G USD MTS
RAMPA 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. - G USD MTS
PRECORTE RAMPA 3.0 x 3.0 mts con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. - G USD MTS
PRECORTE - RAMPA 4.5M X 4.2 M CON JUMBO - G USD MTS
RAMPA 4.5M X 4.2 M CON JUMBO - ALTA DIFICULTAD - G USD MTS
PRECORTE RAMPA 3.5M X 3.5 M CON JUMBO - G USD MTS
RAMPA 4 X 4 CON JUMBO - G USD MTS
SUB NIVEL 4' x 6' CON WINCHE - C USD MTS
SUB NIVEL 4' x 6' CON WINCHE Y LIMPIEZA SCOOP - C USD MTS
SUB NIVEL 4' x 6' CON WINCHE Y LIMPIEZA SCOOP - G USD MTS
SUB NIVEL 4' x 6' CON WINCHE - G USD MTS
EXTRACCION CON LOCOMOTORA A BATERIA LM 15(5.5 Tons) - C USD TMH
EXTRACCION CON LOCOMOTORA A BATERIA LM 10(3.5 Tons) - C USD TMH
EXTRACCION CON LOCOMOTORA LT-01 TROLLEY (5.5 Tons) - C USD TMH
EXTRACCION CON LOCOMOTORA LT-05 TROLLEY (10 Tons) - C USD TMH
EXTRACCION CON LOCOMOTORA LT-01 TROLLEY (5.5 Tons) - G USD TMH
EXTRACCION CON LOCOMOTORA A BATERIA LM 15(5.5 Tons) - G USD TMH
EXTRACCION CON LOCOMOTORA A BATERIA LM 10(3.5 Tons) - G USD TMH
EXTRACCION CON LOCOMOTORA LT-05 TROLLEY (10 Tons) - G USD TMH
ROTURA DE TAJEO MECANIZADO ANCHO VENTA 9MX4.5M (CON EQUIPOS) - C USD TMS
ROTURA DE TAJEO MECANIZADO ANCHO VENTA 6MX4.5M (CON EQUIPOS) - C USD TMS
ROTURA DE TAJEO MECANIZADO ANCHO VETA 3.5MX4.5M(CON EQUIPOS) - C USD TMS
ROTURA DE TAJEO CORTE Y RELLENO EN BREASTING - C USD TMS
ROTURA EN TAJEOS CON 1 WINCHE - C USD TMS
ROTURA DE TAJEOS SEMI MECANIZADO VETA ANGOSTA 2.4MX2.2M 1 SCOOPTRAM - C USD TMS
ROTURA DE TAJEO RECUPERACION PILARES CON 1 WINCHE - C USD TMS
ROTURA DE TAJEO VETAS ANGOSTAS < 1.20 MTS CON 1 WINCHE ALTA DIFICULTAS - C USD TMS
ROTURA EN TAJEOS CON 1 WINCHE - G USD TMS
ROTURA DE TAJEO VETAS ANGOSTAS < 1.20 MTS CON 1 WINCHE ALTA DIFICULTAS - G USD TMS
ROTURA DE TAJEO RECUPERACION PILARES CON 1 WINCHE - G USD TMS
ROTURA DE TAJEO CORTE Y RELLENO EN BREASTING - G USD TMS
ROTURA DE TAJEO MECANIZADO ANCHO VETA 3.5MX4.5M(CON EQUIPOS) - G USD TMS
ROTURA DE TAJEO MECANIZADO ANCHO VENTA 6MX4.5M (CON EQUIPOS) - G USD TMS
ROTURA DE TAJEO MECANIZADO ANCHO VENTA 9MX4.5M (CON EQUIPOS) - G USD TMS
ROTURA DE TAJEOS SEMI MECANIZADO VETA ANGOSTA 2.4MX2.2M 1 SCOOPTRAM - G USD TMS
ROTURA DE TAJEO CON MICRO SCOOP (CON EQUIPOS) - G USD TMS
ACARREO CON WINCHE - C USD TMH
INSTALACION DE PLATAFORMA DESCANSO CON ESCALERA - C USD UNI
INSTALACION DE ESCALERA - C USD UNI
RELLENO HIDRAULICO CONVENCIONAL - C USD MT3
LIMPIEZA CON PALA DE LINEA - C USD MT3
LIMPIEZA A PULSO - C USD MT3
INSTALACION TUBERIA POLIETILENO 4" EN LINEA RECTA (Incluye Traslado) - C USD MTS
LIMPIEZA DE CUNETA O VIA CON MINICARGADOR - C USD MTS
ENTABLADO - C USD MT2
INSTALACION DE TOLVA SIMPLE - C USD UNI
NICHO PARA TABLERO ELECTRICO 0.60m x 0.60m - C USD UNI
RELLENO DETRITICO CON WINCHE - C USD MT3
INSTALACION ALCAYATAS ELECTRICAS DE TRES ESPACIOS - C USD UNI
INSTALACION ALCAYATAS PARA MANGA DE VENTILACION - C USD UNI
INSTALACION ALCAYATAS - C USD UNI
DESQUINCHE CON JUMBO Y LIMPIEZA CON SCOOP - C USD MT3
DESQUINCHE LIMPIEZA CON WINCHE - C USD MT3
DESQUINCHE CON JACK LEG Y LIMPIEZA CON SCOOPTRAM - C USD MT3
DESQUINCHE EN REBATIDO DE RAMPA - C USD MT3
INSTALACION TUBERIA POLIETILENO 2" EN LINEA RECTA (Incluye Traslado) - C USD MTS
LABORES DE APOYO - C USD UNI
ACARREO CON SCOOP 50 M - C USD TMS
ACARREO CON DUMPER MINERAL (12TON) 50 M - C USD TMS
ACARREO CON DUMPER DESMONTE (12TON) 50 M - C USD TMS
ACARREO CON DUMPER MINERAL (16TON) 50 M - C USD TMS
ACARREO CON DUMPER DESMONTE (16TON) 50 M - C USD TMS
PARRILLERO - BOMBERO - C USD UNI
LIMPIEZA A PULSO - G USD MT3
ACARREO CON WINCHE - G USD TMH
INSTALACION TUBERIA POLIETILENO 4" EN LINEA RECTA - G USD MTS
LIMPIEZA DE CUNETA O VIA CON MINICARGADOR - G USD MTS
LIMPIEZA CON PALA DE LINEA - G USD MT3
RECUPERACION DE CUADRO DE MADERA 7 X7 , 8 X 8 10 X 10 - G USD PZA
ACARREO CON SCOOP 50 M - G USD TMS
ACARREO CON DUMPER MINERAL (12TON) 50 M - G USD TMS
ACARREO CON DUMPER DESMONTE (12TON) 50 M - G USD TMS
ACARREO CON DUMPER MINERAL (16TON) 50 M - G USD TMS
ACARREO CON DUMPER DESMONTE (16TON) 50 M - G USD TMS
INSTALACION DE PLATAFORMA DESCANSO CON ESCALERA - G USD UNI
INSTALACION DE ESCALERA - G USD UNI
ENTABLADO - G USD MT2
INSTALACION DE TOLVA SIMPLE - G USD UNI
NICHO PARA TABLERO ELECTRICO 0.60m x 0.60m - G USD UNI
RELLENO DETRITICO CON WINCHE - G USD MT3
INSTALACION ALCAYATAS - G USD UNI
INSTALACION ALCAYATAS PARA MANGA DE VENTILACION - G USD UNI
DESQUINCHE EN REBATIDO DE RAMPA - G USD MT3
DESQUINCHE CON JACK LEG Y LIMPIEZA CON SCOOPTRAM - G USD MT3
DESQUINCHE LIMPIEZA CON WINCHE - G USD MT3
INSTALACION TUBERIA POLIETILENO 2" EN LINEA RECTA (Incluye Traslado) - G USD MTS
LABORES DE APOYO - G USD UNI
INSTALACION ALCAYATAS ELECTRICAS DE TRES ESPACIOS - G USD UNI
DESQUINCHE CON JUMBO Y LIMPIEZA CON SCOOP - G USD MT3
RELLENO HIDRAULICO CONVENCIONAL - G USD MT3
PARRILLERO - BOMBERO - G USD UNI
DESATADOR SCALER - G USD U.S.$/HR
TALADRO DE CONSOLIDACION CON JUMBO USD MT3
INSTALACION BOLSAS CRET EN CH. ALIMAK (Toda Sección) - SE USD MT3
SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3) - C USD MT2
SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3) - C USD MT2
SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3) - C USD MT2
SHOTCRETE 1" TK-40 - C USD MT2
SHOTCRETE 2" TK-40 - C USD MT2
INSTALACION PERNO HELICOIDAL DE 6' CEMBOL CON JACKLEG - C USD UNI
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JACKLEG - C USD UNI
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JUMBO - C USD UNI
INSTALACION PERNO HYDRABOLT DE 5' (BOMBA MANUAL) - C USD UNI
INSTALACION PERNO HYDRABOLT DE 6' (BOMBA MANUAL) - C USD UNI
INSTALACION PERNO HYDRABOLT DE 7' (BOMBA MANUAL) - C USD UNI
INSTALACION PERNO HYDRABOLT DE 8' (BOMBA MANUAL) CON JACKLEG - C USD UNI
PERNO HIDRABOLT 5FTS CON JUMBO EMPERNADOR - C USD UNI
PERNO HIDRABOLT 7FTS CON JUMBO EMPERNADOR - C USD UNI
PERNO HIDRABOLT 8FTS CON JUMBO EMPERNADOR - C USD UNI
INSTALACION PERNO SPLIT SET DE 5' (JACKLEG) - C USD PZA
INSTALACION PERNO SPLIT SET DE 7' (JACKLEG) - C USD PZA
INSTALACION PERNO SPLIT SET DE 5' (BOLTER) - C USD PZA
INSTALACION PERNO SPLIT SET DE 7' (BOLTER) - C USD PZA
INSTALACION DE CIMBRAS DE 10'X10' ( No incluye las tablas) - C USD PZA
INSTALACION DE CIMBRAS DE 4.5mX4.2m (Incluye Plancha Acanalada+Bolsacrete) - C USD PZA
INSTALACION DE CIMBRAS DE 10'X10' Y 8'X8' (Rehabilitacion+25 Marchavante) - C USD PZA
INSTALACION DE CIMBRAS DE 3.5mX3.5m ( Que incluye las tablas) - C USD PZA
TABLAS EN CIMBRAS DE 10'X10' Y 8'X8' - C USD PZA
INSTALACION DE MALLA ELECTROSOLDADA - C USD MT2
ELABORACION + INSTALACION BOLSACRETE (Arena+Cemento) - C USD MT3
CUADRO EN CHIMENEA 5'X5' - CON ENCOSTILLADO - C USD PZA
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 8'X4' CON ENTABLADO - C USD PZA
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 3.20mX1.50m CON ENTABLADO - C USD PZA
CUADRO COJO 6'X6' (En avances y Tajeos) - C USD PZA
CUADRO COJO 7'X7' (En avances y Tajeos) - C USD PZA
CUADRO COJO TAJEO DE MADERA 8' x 8' - C USD PZA
CUADRO COJO 8"X9' (En avances y Tajeos) - C USD PZA
CUADRO COJO 8"X10' (En avances y Tajeos) - C USD PZA
CUADRO DE CAMBIO 10'X10' - C USD PZA
SOBRECUADRO DE MADERA 7' x 7' - C USD PZA
GUARDACABEZA 4"X 2.40Mts (MARCHAVANTES) - C USD PZA
GUARDACABEZA 5"X 3Mts (MARCHAVANTES) - C USD PZA
ENCRIBADO DE CUADRO 5"X6 PIES - C USD PZA
ENCRIBADO DE CUADRO 5"X8 PIES - C USD PZA
ENCRIBADO DE CUADRO 6"X8 PIES - C USD PZA
SOLERA 6"X8' - C USD PZA
SOLERA 7"X8' - C USD PZA
SOLERA 8"X8' - C USD PZA
SOLERA 8"X10' - C USD PZA
PUNTAL DE SEGURIDAD 5"X8' - C USD PZA
PUNTAL DE SEGURIDAD 6"X8' - C USD PZA
PUNTAL DE SEGURIDAD 7"X8' - C USD PZA
PUNTAL DE SEGURIDAD 8"X8' - C USD PZA
CACHO DE TORO (En avances y Tajeos) - C USD PZA
ENTABLADO DE MADERA CON MALLA PARA RELLENO - C USD MT2
INSTALACION DE WOOD PACK CON MAD. REDONDA Ø7 y Ø8" - C USD PZA
INSTALACION DE WOOD PACK CON MADERA ASERRADA - C USD PZA
COLOCADO ENTABLADO (FORRADO CUADROS EN VEZ CANTONERA) - C USD PZA
COLOCADO CANTONERAS - C USD PZA
COLOCADO DE RAJADO - C USD PZA
CUADRO COMPLETO TAJEO DE MADERA 6' x 6' - C USD PZA
CUADRO COMPLETO TAJEO DE MADERA 7' x 7' - C USD PZA
CUADRO COMPLETO TAJEO DE MADERA 8' x 8' - C USD PZA
CUADRO COMPLETO DE MADERA 6' x 6' (subnivel) - C USD PZA
CUADRO COMPLETO DE MADERA 8' x 8' - C USD PZA
CUADRO COMPLETO DE MADERA 8' x 9' - C USD PZA
CUADRO COMPLETO DE MADERA 10' x 10' - C USD PZA
CUADRO INTERMEDIO DE MADERA 8'x8' - C USD PZA
CUADRO INTERMEDIO DE MADERA 8' x9' - C USD PZA
CUADRO INTERMEDIO DE MADERA 8' x10' - C USD PZA
CUADRO EN CHIMENEA 5'X5' - SIN ENCOSTILLADO - C USD PZA
SHOTCRETE VIA HUMEDA DOSIFICACION PLANTA - C/I PEN UNI
SHOTCRETE VIA HUMEDA CON ROBOT - C/I PEN UNI
SHOTCRETE VIA HUMEDA TRASPORTE - C/I PEN UNI
SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3) - G USD MT2
SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3) - G USD MT2
SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3) - G USD MT2
SHOTCRETE 1" TK-40 - G USD MT2
SHOTCRETE 2" TK-40 - G USD MT2
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JACKLEG - G USD UNI
INSTALACION PERNO HYDRABOLT DE 5' (BOMBA MANUAL) - G USD UNI
INSTALACION PERNO HYDRABOLT DE 6' (BOMBA MANUAL) - G USD UNI
INSTALACION PERNO HYDRABOLT DE 7' (BOMBA MANUAL) - G USD UNI
PERNO HIDRABOLT 8FTS CON JUMBO EMPERNADOR - G USD UNI
PERNO HIDRABOLT 5FTS CON JUMBO EMPERNADOR - G USD UNI
PERNO HIDRABOLT 7FTS CON JUMBO EMPERNADOR - G USD UNI
INSTALACION DE CIMBRAS DE 4.5mX4.2m (Incluye Plancha Acanalada+Bolsacrete) - G USD PZA
INSTALACION DE CIMBRAS DE 3.5mX3.5m ( Que incluye las tablas) - G USD PZA
INSTALACION DE CIMBRAS DE 10'X10' ( No incluye las tablas) - G USD PZA
INSTALACION DE CIMBRAS DE 10'X10' Y 8'X8' (Rehabilitacion+25 Marchavante) - G USD PZA
TABLAS EN CIMBRAS DE 10'X10' Y 8'X8' - G USD PZA
INSTALACION DE MALLA ELECTROSOLDADA - G USD MT2
INSTALACION PERNO SPLIT SET DE 5' (JACKLEG) - G USD PZA
CUADRO COMPLETO DE MADERA 10' x 10' - G USD PZA
CUADRO COMPLETO DE MADERA 8' x 9' - G USD PZA
CUADRO COMPLETO DE MADERA 8' x 8' - G USD PZA
CUADRO COMPLETO DE MADERA 6' x 6' (subnivel) - G USD PZA
CUADRO COMPLETO TAJEO DE MADERA 6' x 6' - G USD PZA
CUADRO COMPLETO TAJEO DE MADERA 7' x 7' - G USD PZA
CUADRO COMPLETO TAJEO DE MADERA 8' x 8' - G USD PZA
CUADRO INTERMEDIO DE MADERA 8' x10' - G USD PZA
CUADRO INTERMEDIO DE MADERA 8' x9' - G USD PZA
CUADRO INTERMEDIO DE MADERA 8'x8' - G USD PZA
CUADRO EN CHIMENEA 5'X5' - CON ENCOSTILLADO - G USD PZA
CUADRO EN CHIMENEA 5'X5' - SIN ENCOSTILLADO - G USD PZA
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 8'X4' CON ENTABLADO - G USD PZA
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 3.20mX1.50m CON ENTABLADO - G USD PZA
CUADRO COJO 8"X9' (En avances y Tajeos) - G USD PZA
CUADRO COJO 8"X10' (En avances y Tajeos) - G USD PZA
CUADRO COJO 6'X6' (En avances y Tajeos) - G USD PZA
CUADRO COJO 7'X7' (En avances y Tajeos) - G USD PZA
CUADRO COJO TAJEO DE MADERA 8' x 8' - G USD PZA
CUADRO DE CAMBIO 10'X10' - G USD PZA
SOBRECUADRO DE MADERA 7' x 7' - G USD PZA
GUARDACABEZA 5"X 3Mts (MARCHAVANTES) - G USD PZA
GUARDACABEZA 4"X 2.40Mts (MARCHAVANTES) - G USD PZA
ENCRIBADO DE CUADRO 5"X6 PIES - G USD PZA
ENCRIBADO DE CUADRO 6"X8 PIES - G USD PZA
ENCRIBADO DE CUADRO 5"X8 PIES - G USD PZA
SOLERA 6"X8' - G USD PZA
SOLERA 7"X8' - G USD PZA
SOLERA 8"X8' - G USD PZA
SOLERA 8"X10' - G USD PZA
PUNTAL DE SEGURIDAD 5"X8' - G USD PZA
PUNTAL DE SEGURIDAD 6"X8' - G USD PZA
PUNTAL DE SEGURIDAD 7"X8' - G USD PZA
PUNTAL DE SEGURIDAD 8"X8' - G USD PZA
CACHO DE TORO (En avances y Tajeos) - G USD PZA
ENTABLADO DE MADERA CON MALLA PARA RELLENO - G USD MT2
INSTALACION DE WOOD PACK CON MAD. REDONDA Ø7 y Ø8" - G USD PZA
INSTALACION DE WOOD PACK CON MADERA ASERRADA - G USD PZA
COLOCADO ENTABLADO (FORRADO CUADROS EN VEZ CANTONERA) - G USD PZA
COLOCADO CANTONERAS - G USD PZA
COLOCADO DE RAJADO - G USD PZA
ELABORACION + INSTALACION BOLSACRETE (Arena+Cemento) - G USD MT3
INSTALACION PERNO SPLIT SET DE 7' (JACKLEG) - G USD PZA
INSTALACION PERNO SPLIT SET DE 5' (BOLTER) - G USD PZA
INSTALACION PERNO SPLIT SET DE 7' (BOLTER) - G USD PZA
INSTALACION PERNO HELICOIDAL DE 6' CEMBOL CON JACKLEG - G USD UNI
INSTALACION PERNO HYDRABOLT DE 8' (BOMBA MANUAL) CON JACKLEG - G USD UNI
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JUMBO - G USD UNI
PERNO SWELEX 7 FTS CON JUMBO EMPERNADOR - G USD UNI
CUADRO COMPLETO DE MADERA 8' x 4m (sombrero) - G USD PZA
CUADRO METALICO TIPO L + PERNOS DE ANCLAJE ALIMAK (SECC.2.5mX2.5m) DE 0 A 50 MTS - SE USD UNI
CUADRO METALICO TIPO L + PERNOS DE ANCLAJE ALIMAK (SECC.3mX3m) DE 0 A 50 MTS - SE USD UNI
INSTALACION DE PERNO HELICOIDAL DE 6'/SPLIT SET CON ALIMAK - SE USD UNI
INSTALACION DE PERNO HELICOIDAL DE 8' CON ALIMAK - SE USD UNI
INSTALACION DE PERNO HIDRABOLT DE 5' CON ALIMAK - SE USD UNI
INSTALACION DE PERNO HIDRABOLT DE 7' CON ALIMAK - SE USD UNI
SHOTCRETE TODO COSTO 1" DRAMIX (0 KGS/M3) ALIMAK - SE USD MT2
SHOTCRETE TODO COSTO 2" DRAMIX (0 KGS/M3) ALIMAK - SE USD MT2
SHOTCRETE TODO COSTO 3" DRAMIX (0 KGS/M3) ALIMAK - SE USD MT2
INSTALACION DE PERMNO SPLIT SET 5' CON ALIMAK - SE USD UNI
INSTALACION DE PERMNO SPLIT SET 5' CON ALIMAK - SE USD UNI
INST MALLA ELECTROSOLDADA CON ALIMAK - SE USD UNI
$ 614
$ 658
$ 983
$ 133
$ 171
$ 359
$ 392
$ 171
$ 149
$ 317
$ 248
$ 293
$ 335
$ 370
$ 376
$ 388
$ 407
$ 481
$ 509
$ 493
$ 516
$ 586
$ 586
$ 615
$ 608
$ 408
$ 496
$ 658
$ 630
$ 528
$ 543
$ 512
$ 431
$ 438
$ 399
$ 405
$ 318
$ 270
$ 523
$ 632
$ 650
$ 338
$ 361
$ 416
$ 547
$ 307
$ 327
$ 431
$ 583
$ 557
$ 390
$ 391
$ 414
$ 410
$ 513
$ 539
$ 517
$ 536
$ 550
$ 546
$ 596
$ 636
$ 642
$ 647
$ 583
$ 549
$ 594
$ 546
$ 419
$ 442
$ 419
$ 696
$ 694
$ 576
$ 569
$ 168
$ 241
$ 254
$ 186
$ 2
$ 2
$ 1
$ 1
$ 1
$ 2
$ 2
$ 1
$ 8
$ 11
$ 12
$ 11
$ 11
$ 13
$ 12
$ 13
$ 13
$ 14
$ 14
$ 13
$ 13
$ 12
$ 9
$ 14
$ 15
$ 2
$ 40
$ 19
$ 3
$ 3
$ 9
$ 1
$ 0
$ 21
$ 855
$ 59
$ 5
$ 8
$ 10
$ 12
$ 17
$ 20
$ 29
$ 30
$ 0
$ 40
$ 1
$ 1
$ 2
$ 1
$ 2
$ 43
$ 9
$ 2
$ 1
$ 0
$ 4
$ 29
$ 1
$ 1
$ 2
$ 1
$ 2
$ 43
$ 20
$ 22
$ 921
$ 72
$ 5
$ 13
$ 10
$ 33
$ 31
$ 20
$ 0
$ 40
$ 8
$ 18
$ 3
$ 43
$ 114
$ 187
$ 220
$ 12
$ 25
$ 37
$ 2
$ 3
$ 19
$ 22
$ 28
$ 16
$ 16
$ 18
$ 20
$ 25
$ 27
$ 30
$ 10
$ 14
$ 15
$ 20
$ 118
$ 248
$ 258
$ 298
$ 9
$ 6
$ 53
$ 106
$ 290
$ 384
$ 54
$ 61
$ 69
$ 78
$ 80
$ 207
$ 91
$ 10
$ 14
$ 29
$ 30
$ 35
$ 27
$ 30
$ 34
$ 38
$ 17
$ 22
$ 28
$ 40
$ 9
$ 23
$ 397
$ 503
$ 3
$ 5
$ 4
$ 66
$ 76
$ 102
$ 80
$ 103
$ 123
$ 162
$ 146
$ 158
$ 162
$ 92
$ 37
$ 23
$ 18
$ 13
$ 26
$ 39
$ 2
$ 3
$ 23
$ 16
$ 17
$ 19
$ 32
$ 27
$ 29
$ 284
$ 322
$ 130
$ 283
$ 10
$ 7
$ 10
$ 178
$ 131
$ 115
$ 88
$ 71
$ 82
$ 110
$ 178
$ 174
$ 162
$ 114
$ 97
$ 306
$ 417
$ 83
$ 88
$ 60
$ 67
$ 74
$ 223
$ 101
$ 15
$ 11
$ 31
$ 37
$ 31
$ 30
$ 33
$ 37
$ 41
$ 18
$ 24
$ 31
$ 44
$ 9
$ 25
$ 405
$ 510
$ 4
$ 5
$ 4
$ 55
$ 14
$ 17
$ 22
$ 20
$ 21
$ 30
$ 25
$ 183
$ 786
$ 859
$ 50
$ 56
$ 39
$ 43
$ 23
$ 45
$ 68
$ 25
$ 33
$ 17
124 de 347

LISTA DE PRECIOS U
(Actualización de precio de mater
APLICA A LA CONTRATA: CANCHANYA, COMICIP, CRISTOBAL E INCEMIN.

Tipo PU Tipo Labor Codigo

EXTRACCION 07151
07152
07150
07155
AVANCE CRUCERO 02453
02449
02448
02454
02446
02447
02455
02444
02443
02442
02450
02459
02439
02451
02425
02452
02456
02445
02441
RAMPA 03310
03312
03314
02457
03313
03311
03317
03309
03318
02458
03308
03307
03316
03315
CHIMENEA 04262
04261
04260
SUBNIVEL 05521
05520
ROTURA TAJO 06544
06543
06542
06540
06537
06546
06545
06539
06538
SOSTENIMIENTO 12806
12807
12808
12809
12810
12871
12811
12888
12812
12813
12814
125 de 347

LISTA DE PRECIOS U
(Actualización de precio de mater
APLICA A LA CONTRATA: CANCHANYA, COMICIP, CRISTOBAL E INCEMIN.

Tipo PU Tipo Labor Codigo

12872
12816
12817
12815
12892
12820
12818-INSTALACI 12818
12821
12819
12822
12823
12825
12868
12869
12870
12830
12831
12832
12829
12828
12827
12893
12826
12835
12834-CUADRO IN12834
12833
12837
12836
12838-ENMADER 12838
12839-ENMADER 12839
126 de 347

LISTA DE PRECIOS U
(Actualización de precio de mater
APLICA A LA CONTRATA: CANCHANYA, COMICIP, CRISTOBAL E INCEMIN.

Tipo PU Tipo Labor Codigo

12842
12843
12844
12840
12841
12845
12846
12848
12847
12849
12851
12850
12852
12853
12854
12855
12856
12857
12858
12859
12860
12861
12862
12863
12864
12865
12866
12867
SERVICIOS 08146
08435
08436
08452
08453
08454
08451
08380
08139
08381
08209
08215
08437
08438
08439
08440
08448
08442
08441
08449
08445
08444
08443
08446
08447
08430
08431
08432
08433
08434

APLICA A LA CONTRATA: SEPROCAL


127 de 347

LISTA DE PRECIOS U
(Actualización de precio de mater
APLICA A LA CONTRATA: CANCHANYA, COMICIP, CRISTOBAL E INCEMIN.

Tipo PU Tipo Labor Codigo

Tipo PU Tipo Labor Codigo

AVANCE ALIMAK 04238


04239
04240
SERVICIOS ALIMAK 08450
SOSTENIMIENTO ALIMAK 12873
12874
12875
12876
12877
12878
12879
12880
12881
12889
12890
12891
128 de 347

LISTA DE PRECIOS UNITARIOS - ABRIL 2015


(Actualización de precio de materiales y tipo de cambio de 3.30 a 3.254)
ANCHANYA, COMICIP, CRISTOBAL E INCEMIN.
Unidad
Descripcion Medida
EXTRACCION CON LOCOMOTORA A BATERIA LM 15(5.5 Tons) - G TMH
EXTRACCION CON LOCOMOTORA A BATERIA LM 10(3.5 Tons) - G TMH
EXTRACCION CON LOCOMOTORA LT-01 TROLLEY (5.5 Tons) - G TMH
EXTRACCION CON LOCOMOTORA LT-05 TROLLEY (10 Tons) - G TMH
CRUCERO 2.0 M X 2.0 M CON JUMBO Y LIMPIEZA SCOOP (REFUGIO) - G MTS
CRUCERO 2.00 X 2.00 MTs. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G MTS
CRUCERO 2.40 X 2.40 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. - G MTS
CRUCERO 2.70 X 2.70 MTs. Jack Leg-Scoop de 2.5 Yds3 Acarreo hasta 150 mts - G MTS
CRUCERO 3.00 X 3.00 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. - G MTS
PRECORTE CRUCERO 3.0 X 3.0 mts. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G MTS
CRUCERO 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP - G MTS
CRUCERO 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. - G MTS
CRUCERO 3.5M X 3.5 M CON JUMBO - G MTS
CRUCERO 3.5M X 3.5 M CON JUMBO ALTA DIFICULTAD - G MTS
CRUCERO 4.0 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP - G MTS
CRUCERO 4 X 4 CON JUMBO Y LIMPIEZA SCOOP - G MTS
CRUCERO 4.5M X 4.2 M CON JUMBO - G MTS
CRUCERO 4.5 M X 4.2 M JUMBO Y LIMPIEZA SCOOP ALTA DIFICULTAD - G MTS
PRECORTE CRUCERO 4.5M X 4.2 M CON JUMBO - G MTS
CRUCERO 5.0 M X 4.0 M JUMBO Y LIMPIEZA SCOOP - G MTS
GALERIA 2.4 X 2.4 M JACK LEG 6' Y LIMPIEZA SCOOP - G MTS
GAL/CRUCERO 3.0 M X 3.0 M CON JUMBO - G MTS
PRECORTE GAL/CRUCERO 3.5M X 3.5 M CON JUMBO - G MTS
PRECORTE RP/XC 4.0M X 3.5 M CON JUMBO - G MTS
RAMPA 3.0 X 3.0 mts. Jack Leg - Scoop de 2.5 Yd3. Acarreo hasta 150 mts. - G MTS
PRECORTE RAMPA 3.0 x 3.0 mts con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. - G MTS
RAMPA 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP - G MTS
RAMPA 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. - G MTS
RAMPA 3.5M X 3.5 M CON JUMBO - G MTS
PRECORTE RAMPA 3.5M X 3.5 M CON JUMBO - G MTS
RAMPA 4.0M X 3.5 M CON JUMBO - G MTS
RAMPA 4 X 4 CON JUMBO - G MTS
RAMPA 4.20 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP - G MTS
RAMPA 4.5M X 4.2 M con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. - G MTS
RAMPA 4.5M X 4.2 M CON JUMBO - G MTS
RAMPA 4.5M X 4.2 M CON JUMBO - ALTA DIFICULTAD - G MTS
PRECORTE - RAMPA 4.5M X 4.2 M CON JUMBO - G MTS
CHIMENEA 1.50 x 1.50 Mts. Limpieza sin Scoop, defrente a Chute - G MTS
CHIMENEA 2.40 x 1.20 Mts.Limpieza Sin Scooptram directo a la Tolva hasta 30 mts altura - G MTS
CHIMENEA 3.20 x 1.50 Mts.Limpieza Sin Scoop directo a la Tolva, hasta 30 mts altura - G MTS
SUB NIVEL 4' x 6' CON WINCHE - G MTS
SUB NIVEL 4' x 6' CON WINCHE Y LIMPIEZA SCOOP - G MTS
ROTURA DE TAJEO MECANIZADO ANCHO VENTA 9MX4.5M (CON EQUIPOS) - G TMS
ROTURA DE TAJEO MECANIZADO ANCHO VENTA 6MX4.5M (CON EQUIPOS) - G TMS
ROTURA DE TAJEO MECANIZADO ANCHO VETA 3.5MX4.5M(CON EQUIPOS) - G TMS
ROTURA DE TAJEO CORTE Y RELLENO EN BREASTING - G TMS
ROTURA EN TAJEOS CON 1 WINCHE - G TMS
ROTURA DE TAJEO CON MICRO SCOOP (CON EQUIPOS) - G TMS
ROTURA DE TAJEOS SEMI MECANIZADO VETA ANGOSTA 2.4MX2.2M 1 SCOOPTRAM - G TMS
ROTURA DE TAJEO RECUPERACION PILARES CON 1 WINCHE - G TMS
ROTURA DE TAJEO VETAS ANGOSTAS < 1.20 MTS CON 1 WINCHE ALTA DIFICULTAS - G TMS
SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3) - G MT2
SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3) - G MT2
SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3) - G MT2
SHOTCRETE 1" TK-40 - G MT2
SHOTCRETE 2" TK-40 - G MT2
INSTALACION PERNO HELICOIDAL DE 6' CEMBOL CON JACKLEG - G UNI
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JACKLEG - G UNI
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JUMBO - G UNI
INSTALACION PERNO HYDRABOLT DE 5' (BOMBA MANUAL) - G UNI
INSTALACION PERNO HYDRABOLT DE 6' (BOMBA MANUAL) - G UNI
INSTALACION PERNO HYDRABOLT DE 7' (BOMBA MANUAL) - G UNI
129 de 347

LISTA DE PRECIOS UNITARIOS - ABRIL 2015


(Actualización de precio de materiales y tipo de cambio de 3.30 a 3.254)
ANCHANYA, COMICIP, CRISTOBAL E INCEMIN.
Unidad
Descripcion Medida
INSTALACION PERNO HYDRABOLT DE 8' (BOMBA MANUAL) CON JACKLEG - G UNI
PERNO HIDRABOLT 5FTS CON JUMBO EMPERNADOR - G UNI
PERNO HIDRABOLT 7FTS CON JUMBO EMPERNADOR - G UNI
PERNO HIDRABOLT 8FTS CON JUMBO EMPERNADOR - G UNI
PERNO SWELEX 7 FTS CON JUMBO EMPERNADOR - G UNI
INSTALACION DE CIMBRAS DE 10'X10' ( No incluye las tablas) - G PZA
INSTALACION DE CIMBRAS DE 4.5mX4.2m (Incluye Plancha Acanalada+Bolsacrete) - G PZA
INSTALACION DE CIMBRAS DE 10'X10' Y 8'X8' (Rehabilitacion+25 Marchavante) - G PZA
INSTALACION DE CIMBRAS DE 3.5mX3.5m ( Que incluye las tablas) - G PZA
TABLAS EN CIMBRAS DE 10'X10' Y 8'X8' - G PZA
INSTALACION DE MALLA ELECTROSOLDADA - G MT2
INSTALACION PERNO SPLIT SET DE 5' (JACKLEG) - G PZA
INSTALACION PERNO SPLIT SET DE 7' (JACKLEG) - G PZA
INSTALACION PERNO SPLIT SET DE 5' (BOLTER) - G PZA
INSTALACION PERNO SPLIT SET DE 7' (BOLTER) - G PZA
CUADRO COMPLETO TAJEO DE MADERA 6' x 6' - G PZA
CUADRO COMPLETO TAJEO DE MADERA 7' x 7' - G PZA
CUADRO COMPLETO TAJEO DE MADERA 8' x 8' - G PZA
CUADRO COMPLETO DE MADERA 6' x 6' (subnivel) - G PZA
CUADRO COMPLETO DE MADERA 8' x 8' - G PZA
CUADRO COMPLETO DE MADERA 8' x 9' - G PZA
CUADRO COMPLETO DE MADERA 8' x 4m (sombrero) - G PZA
CUADRO COMPLETO DE MADERA 10' x 10' - G PZA
CUADRO INTERMEDIO DE MADERA 8'x8' - G PZA
CUADRO INTERMEDIO DE MADERA 8' x9' - G PZA
CUADRO INTERMEDIO DE MADERA 8' x10' - G PZA
CUADRO EN CHIMENEA 5'X5' - SIN ENCOSTILLADO - G PZA
CUADRO EN CHIMENEA 5'X5' - CON ENCOSTILLADO - G PZA
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 8'X4' CON ENTABLADO - G PZA
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 3.20mX1.50m CON ENTABLADO - G PZA
130 de 347

LISTA DE PRECIOS UNITARIOS - ABRIL 2015


(Actualización de precio de materiales y tipo de cambio de 3.30 a 3.254)
ANCHANYA, COMICIP, CRISTOBAL E INCEMIN.
Unidad
Descripcion Medida
CUADRO COJO 6'X6' (En avances y Tajeos) - G PZA
CUADRO COJO 7'X7' (En avances y Tajeos) - G PZA
CUADRO COJO TAJEO DE MADERA 8' x 8' - G PZA
CUADRO COJO 8"X9' (En avances y Tajeos) - G PZA
CUADRO COJO 8"X10' (En avances y Tajeos) - G PZA
CUADRO DE CAMBIO 10'X10' - G PZA
SOBRECUADRO DE MADERA 7' x 7' - G PZA
GUARDACABEZA 4"X 2.40Mts (MARCHAVANTES) - G PZA
GUARDACABEZA 5"X 3Mts (MARCHAVANTES) - G PZA
ENCRIBADO DE CUADRO 5"X6 PIES - G PZA
ENCRIBADO DE CUADRO 5"X8 PIES - G PZA
ENCRIBADO DE CUADRO 6"X8 PIES - G PZA
SOLERA 6"X8' - G PZA
SOLERA 7"X8' - G PZA
SOLERA 8"X8' - G PZA
SOLERA 8"X10' - G PZA
PUNTAL DE SEGURIDAD 5"X8' - G PZA
PUNTAL DE SEGURIDAD 6"X8' - G PZA
PUNTAL DE SEGURIDAD 7"X8' - G PZA
PUNTAL DE SEGURIDAD 8"X8' - G PZA
CACHO DE TORO (En avances y Tajeos) - G PZA
ENTABLADO DE MADERA CON MALLA PARA RELLENO - G MT2
INSTALACION DE WOOD PACK CON MAD. REDONDA Ø7 y Ø8" - G PZA
INSTALACION DE WOOD PACK CON MADERA ASERRADA - G PZA
COLOCADO ENTABLADO (FORRADO CUADROS EN VEZ CANTONERA) - G PZA
COLOCADO CANTONERAS - G PZA
COLOCADO DE RAJADO - G PZA
ELABORACION + INSTALACION BOLSACRETE (Arena+Cemento) - G MT3
ACARREO CON WINCHE - G TMH
INSTALACION DE PLATAFORMA DESCANSO CON ESCALERA - G UNI
INSTALACION DE ESCALERA - G UNI
PARRILLERO - BOMBERO - G UNI
DESATADOR SCALER - G US$/HR
TALADRO DE CONSOLIDACION CON JUMBO US$/HR
RELLENO HIDRAULICO CONVENCIONAL - G MT3
LIMPIEZA CON PALA DE LINEA MT3
LIMPIEZA A PULSO MT3
RECUPERACION DE CUADRO DE MADERA 7X7, 8'x8', 10X10 PZA
INSTALACION TUBERIA POLIETILENO 4" EN LINEA RECTA (Incluye Traslado) MTS
LIMPIEZA DE VIA CON MINICARGADOR MTS
ENTABLADO - G MT2
INSTALACION DE TOLVA SIMPLE - G UNI
NICHO PARA TABLERO ELECTRICO 0.60m x 0.60m - G UNI
RELLENO DETRITICO CON WINCHE - G MT3
INSTALACION ALCAYATAS ELECTRICAS DE TRES ESPACIOS - G UNI
INSTALACION ALCAYATAS PARA MANGA DE VENTILACION - G UNI
INSTALACION ALCAYATAS - G UNI
DESQUINCHE CON JUMBO Y LIMPIEZA CON SCOOP - G MT3
DESQUINCHE LIMPIEZA CON WINCHE - G MT3
DESQUINCHE CON JACK LEG Y LIMPIEZA CON SCOOPTRAM - G MT3
DESQUINCHE EN REBATIDO DE RAMPA - G MT3
INSTALACION TUBERIA POLIETILENO 2" EN LINEA RECTA (Incluye Traslado) - G MTS
LABORES DE APOYO - G UNI
ACARREO CON SCOOP 50 M - G TMS
ACARREO CON DUMPER MINERAL (12TON) 50 M - G TMS
ACARREO CON DUMPER DESMONTE (12TON) 50 M - G TMS
ACARREO CON DUMPER MINERAL (16TON) 50 M - G TMS
ACARREO CON DUMPER DESMONTE (16TON) 50 M - G TMS
131 de 347

LISTA DE PRECIOS UNITARIOS - ABRIL 2015


(Actualización de precio de materiales y tipo de cambio de 3.30 a 3.254)
ANCHANYA, COMICIP, CRISTOBAL E INCEMIN.
Unidad
Descripcion Medida
Unidad
Descripcion Medida
CHIMENEA SECCION 2M X 2M ALIMAK - SE MTS
CHIMENEA SECCION : 2.5 x 2.5 m ALIMAK - SE MTS
CHIMENEA SECCION : 2.5 x 2.5 m. (ALTA DIFICULTAD) ALIMAK - SE MTS
INSTALACION BOLSAS CRET EN CH. ALIMAK (Toda Sección) - SE MT3
CUADRO METALICO TIPO L + PERNOS DE ANCLAJE ALIMAK (SECC.2.5mX2.5m) DE 0 A 50 MTS - SE UNI
CUADRO METALICO TIPO L + PERNOS DE ANCLAJE ALIMAK (SECC.3mX3m) DE 0 A 50 MTS - SE UNI
INSTALACION DE PERNO HELICOIDAL DE 6' CON ALIMAK - SE UNI
INSTALACION DE PERNO HELICOIDAL DE 8' CON ALIMAK - SE UNI
INSTALACION DE PERNO HIDRABOLT DE 5' CON ALIMAK - SE UNI
INSTALACION DE PERNO HIDRABOLT DE 7' CON ALIMAK - SE UNI
SHOTCRETE TODO COSTO 1" DRAMIX (0 KGS/M3) ALIMAK - SE MT2
SHOTCRETE TODO COSTO 2" DRAMIX (0 KGS/M3) ALIMAK - SE MT2
SHOTCRETE TODO COSTO 3" DRAMIX (0 KGS/M3) ALIMAK - SE MT2
INSTALACION DE PERMNO SPLIT SET 5' CON ALIMAK - SE UNI
INSTALACION DE PERMNO SPLIT SET 7' CON ALIMAK - SE UNI
INST MALLA ELECTROSOLDADA CON ALIMAK - SE M2
132 de 347

TARIOS - ABRIL 2015


es y tipo de cambio de 3.30 a 3.254)

US$ ABR US$ NOV DIF


'16 '15
$ 1.66 $ 1.69 $ -0.03
$ 1.47 $ 1.50 $ -0.03
$ 1.01 $ 1.02 $ -0.02
$ 0.93 $ 0.93 $ -0.01
$ 335.47 $ 337.94 $ -2.47
$ 267.68 $ 270.32 $ -2.64
$ 315.42 $ 318.13 $ -2.71
$ 357.21 $ 360.67 $ -3.45
$ 394.41 $ 398.78 $ -4.36
$ 400.81 $ 405.17 $ -4.36
$ 412.87 $ 416.38 $ -3.51
$ 428.21 $ 431.32 $ -3.10
$ 507.96 $ 511.94 $ -3.98
$ 539.18 $ 543.15 $ -3.98
$ 519.55 $ 523.35 $ -3.79
$ 542.80 $ 546.62 $ -3.82
$ 625.36 $ 629.73 $ -4.37
$ 626.89 $ 631.79 $ -4.90
$ 653.78 $ 657.79 $ -4.00
$ 645.49 $ 649.91 $ -4.42
$ 323.93 $ 326.59 $ -2.65
$ 434.94 $ 438.04 $ -3.10
$ 524.40 $ 528.38 $ -3.98
$ 589.68 $ 594.04 $ -4.35
$ 413.72 $ 418.51 $ -4.78
$ 414.40 $ 418.76 $ -4.35
$ 427.25 $ 430.81 $ -3.57
$ 437.79 $ 441.90 $ -4.11
$ 542.80 $ 546.36 $ -3.55
$ 571.20 $ 576.09 $ -4.89
$ 545.14 $ 549.09 $ -3.95
$ 564.54 $ 568.50 $ -3.96
$ 578.29 $ 582.53 $ -4.24
$ 575.46 $ 582.63 $ -7.17
$ 642.56 $ 647.35 $ -4.79
$ 688.44 $ 693.98 $ -5.54
$ 690.90 $ 696.15 $ -5.25
$ 146.68 $ 149.07 $ -2.39
$ 168.44 $ 170.81 $ -2.37
$ 386.14 $ 391.84 $ -5.70
$ 182.91 $ 185.87 $ -2.96
$ 251.57 $ 254.30 $ -2.73
$ 8.91 $ 8.96 $ -0.05
$ 12.24 $ 12.30 $ -0.06
$ 13.28 $ 13.37 $ -0.09
$ 12.40 $ 12.56 $ -0.16
$ 12.38 $ 12.62 $ -0.24
$ 14.63 $ 14.77 $ -0.14
$ 13.78 $ 13.97 $ -0.19
$ 13.65 $ 13.95 $ -0.30
$ 14.19 $ 14.46 $ -0.28
$ 12.80 $ 13.14 $ -0.34
$ 25.47 $ 26.15 $ -0.68
$ 38.14 $ 39.16 $ -1.02
$ 1.60 $ 1.64 $ -0.05
$ 3.19 $ 3.29 $ -0.09
$ 19.35 $ 19.56 $ -0.22
$ 22.63 $ 22.86 $ -0.23
$ 30.10 $ 30.18 $ -0.08
$ 16.12 $ 16.19 $ -0.06
$ 16.65 $ 16.73 $ -0.08
$ 18.65 $ 18.75 $ -0.10
133 de 347

TARIOS - ABRIL 2015


es y tipo de cambio de 3.30 a 3.254)

US$ ABR US$ NOV DIF


'16 '15
$ 20.43 $ 20.54 $ -0.11
$ 26.53 $ 26.59 $ -0.06
$ 28.85 $ 28.92 $ -0.07
$ 31.54 $ 31.62 $ -0.08
$ 24.98 $ 25.05 $ -0.07
$ 159.29 $ 130.17 $ 29.12
$ 272.27 $ 283.61 $ -11.34
$ 307.85 $ 282.95 $ 24.90
$ 346.01 $ 322.21 $ 23.80
$ 9.45 $ 9.72 $ -0.27
$ 6.57 $ 6.64 $ -0.08
$ 10.26 $ 10.35 $ -0.08
$ 13.95 $ 14.10 $ -0.15
$ 16.88 $ 16.93 $ -0.05
$ 21.63 $ 21.70 $ -0.07
$ 69.23 $ 71.21 $ -1.97
$ 79.45 $ 81.70 $ -2.25
$ 107.31 $ 110.36 $ -3.05
$ 85.77 $ 88.23 $ -2.46
$ 111.69 $ 114.87 $ -3.19
$ 127.69 $ 131.33 $ -3.64
$ 182.72 $ 182.72 $ -
$ 172.94 $ 177.89 $ -4.96
$ 157.38 $ 161.90 $ -4.52
$ 169.47 $ 174.33 $ -4.86
$ 172.94 $ 177.89 $ -4.96
$ 94.74 $ 97.42 $ -2.68
$ 111.28 $ 114.44 $ -3.16
$ 297.77 $ 306.16 $ -8.39
$ 405.83 $ 417.25 $ -11.43
134 de 347

TARIOS - ABRIL 2015


es y tipo de cambio de 3.30 a 3.254)

US$ ABR US$ NOV DIF


'16 '15
$ 58.04 $ 59.70 $ -1.66
$ 64.78 $ 66.63 $ -1.85
$ 72.34 $ 74.39 $ -2.06
$ 80.75 $ 83.04 $ -2.29
$ 85.42 $ 87.85 $ -2.43
$ 216.39 $ 222.64 $ -6.24
$ 98.22 $ 101.02 $ -2.80
$ 11.11 $ 11.43 $ -0.32
$ 14.95 $ 15.37 $ -0.43
$ 30.36 $ 31.22 $ -0.86
$ 30.36 $ 31.22 $ -0.86
$ 35.91 $ 36.92 $ -1.01
$ 28.91 $ 29.74 $ -0.83
$ 32.18 $ 33.10 $ -0.92
$ 35.95 $ 36.98 $ -1.03
$ 39.98 $ 41.12 $ -1.14
$ 17.65 $ 18.16 $ -0.51
$ 22.91 $ 23.56 $ -0.66
$ 30.31 $ 31.18 $ -0.87
$ 42.35 $ 43.57 $ -1.21
$ 8.72 $ 8.75 $ -0.03
$ 23.92 $ 24.50 $ -0.58
$ 393.99 $ 404.93 $ -10.93
$ 495.15 $ 509.53 $ -14.38
$ 3.45 $ 3.55 $ -0.10
$ 5.10 $ 5.25 $ -0.15
$ 3.67 $ 3.77 $ -0.10
$ 53.90 $ 54.83 $ -0.92
$ 2.23 $ 2.28 $ -0.05
$ 42.54 $ 43.34 $ -0.80
$ 19.89 $ 20.04 $ -0.15
$ 41.41 $ 42.61 $ -1.20
$ 113.19 $ 113.69 $ -0.50
$ 186.04 $ 186.83 $ -0.79
$ 2.64 $ 2.70 $ -0.06
$ 3.46 $ 3.54 $ -0.09
$ 8.30 $ 8.55 $ -0.24
$ 27.85 $ 28.67 $ -0.81
$ 0.62 $ 0.63 $ -0.02
$ 0.22 $ 0.22 $ -0.01
$ 21.82 $ 22.43 $ -0.61
$ 894.86 $ 920.62 $ -25.76
$ 70.37 $ 71.86 $ -1.49
$ 4.58 $ 4.70 $ -0.12
$ 7.69 $ 7.77 $ -0.08
$ 10.18 $ 10.23 $ -0.05
$ 12.63 $ 12.73 $ -0.10
$ 17.49 $ 17.60 $ -0.10
$ 20.00 $ 20.25 $ -0.26
$ 31.10 $ 31.41 $ -0.31
$ 32.39 $ 32.70 $ -0.31
$ 0.33 $ 0.34 $ -0.01
$ 38.94 $ 40.06 $ -1.12
$ 0.93 $ 0.94 $ -0.01
$ 1.36 $ 1.37 $ -0.01
$ 1.64 $ 1.64 $ -0.01
$ 1.31 $ 1.32 $ -0.01
$ 1.57 $ 1.58 $ -0.01
135 de 347

TARIOS - ABRIL 2015


es y tipo de cambio de 3.30 a 3.254)

US$ ABR US$ NOV DIF


'16 '15
US$ ABR US$ NOV DIF
'16 '15
$ 613.57 $ 613.57 $ -
$ 658.46 $ 658.46 $ -
$ 982.91 $ 982.91 $ -
$ 220.42 $ 220.42 $ -
$ 786.24 $ 786.24 $ -
$ 859.19 $ 859.19 $ -
$ 50.47 $ 50.47 $ -
$ 56.08 $ 56.08 $ -
$ 38.77 $ 38.77 $ -
$ 43.14 $ 43.14 $ -
$ 22.61 $ 22.61 $ -
$ 45.09 $ 45.09 $ -
$ 67.57 $ 67.57 $ -
$ 25.36 $ 25.36 $ -
$ 32.87 $ 32.87 $ -
$ 16.59 $ 16.59 $ -
Pagina: 136 de 347
LEYES SOCIALES DE CTTA A TODO C

Basico 31 1,500.00
Asig. Fam. 1.367 75.00
32.70 1,541.00
INGRESO: MENSUAL ANUAL
Obreros Empleados Obreros
Cálculo de Leyes Sociales

Mensual: 741.13 1,541.00 8,893.58

CTS 96.69 0.00 1,160.28


VACACIONES 81.74 0.00 980.88
GRATIFICACIONES 163.49 0.00 1,961.88
DOMINGOS & FERIADOS 171.66 0.00 2,059.92

DESCANSO MEDICO 10.90 0.00 130.80

ESSALUD 66.70 0.00 800.42


JUBILACION ANTICIPADA 14.82 0.00 177.87
SCTR-SALUD 6.67 14.95 80.04
SCTR-PENSIONES(interior Mina) 70.41 62.41 844.89
VIDA LEY 2.67 0.00 32.02
APORTES REM. PRINCIPAL

ESSALUD 7.36 0.00% 8828.00%


JUBILACION ANTICIPADA 1.63 0.00 19.62
SCTR-SALUD 0.74 0.00 8.83
SCTR-PENSIONES 7.77 0.00 93.19
VIDA LEY 0.29 0.00 3.53
IMPUESTOS VACACIONES

ESSALUD 14.71 0.00 176.56


JUBILACION ANTICIPADA 3.27 0.00 39.24
SCTR-SALUD 1.47 0.00 17.66
SCTR-PENSIONES 15.53 0.00 186.37
VIDA LEY 0.59 0.00 7.06
APORTE AL TRABAJADOR SOBRE GRATIFICACIONES

ESSALUD 15.45 0.00 185.39


JUBILACION ANTICIPADA 3.43 0.00 41.20
SCTR-SALUD 1.54 0.00 18.54
SCTR-PENSIONES 16.31 0.00 195.69
VIDA LEY 0.62 0.00 7.42
IMPUESTO DOM Y FERIADOS
Pagina: 137 de 347

TOTAL: 1,517.59 1,618.36 18,211.16

MES DIAS UTILESDOMINGOS FERIADOS


ENERO 0 4 1
FEBRERO 24 4 0
MARZO 26 5 0
ABRIL 24 4 2
MAYO 26 4 1
JUNIO 25 5 0
JULIO 25 4 2
AGOSTO 25 5 1
SEPTIEMBRE 26 4 0
OCTUBRE 26 4 1
NOVIEMBRE 24 5 1
DICIEMBRE 21 4 2
272 52 11
ACUMULADO 272 324 335
Pagina: 138 de 347
E CTTA A TODO COSTO

T Anual : 365.00
D.NORMALES 272.00 22.67
DOMINGOS 52.00
DESC.MEDICO 4.00
FERIADOS 11.00
VACAC. 26.00
ANUAL
Empleados Obreros Conceptos
% Obreros
18,492.00

14/12/12*365/27
0.00 13.05% 1
0.00 11.03% (30/271)
0.00 22.06% (60/271)
0.00 23.16% (64/271)

0.00 1.47% (4/271)

0.00 9.00% A
0.00 2.00% B
179.37 0.90% 0.97% C
748.93 9.50% 4.05% D
0.00 0.36% E
21.76%

0.00% 0.99% 1*A


0.00 0.22% 1*B
0.00 0.10% 1*C
0.00 1.05% 1*D
0.00 0.04% 1*E
2.40%

0.00 1.99% 2*A


0.00 0.44% 2*B
0.00 0.20% 2*C
0.00 2.10% 2*D
0.00 0.08% 2*E
4.80%

0.00 2.08% 3*A


0.00 0.46% 3*B
0.00 0.21% 3*C
0.00 2.20% 3*D
0.00 0.08% 3*E
5.04%
Pagina: 139 de 347

19,420.30 104.767%

DES.MEDICO VACACIONES
26 31
28
31
30
31
30
31
31
30
31
30
4 31
4 26
339 365
Pagina: 140 de 347
ESTRUCTURA DE COSTOS MANO DE OBRA TODO COSTO
TIPO DE CAMBIO (Venta): 3.400
CATEG CATEGORIA UNIDAD JORNAL S/.
CAPATAZ CAPATAZ S/.XJORNAL 93.67
MAESTRO 2 MAESTRO PERFORIS./WINCHER/PALERO S/.XJORNAL 60.50
MAESTRO 3 SOSTENIMIENTO Y SERVICIOS S/.XJORNAL 58.50
AYUDANTE1 AYUDANTE1 S/.XJORNAL 56.50
OPERADOR 1OPERADOR JUMBO S/.XJORNAL 87.00
OPERADOR 2Escupero/Robot /Lanzador Concreto S/.XJORNAL 77.00

UNIDAD BASE
ALIMENTACION OPERADOR DUMPER S/.X DIA 17
PASAJE OPERADOR DUMPER 155

FACTOR TRABAJO 28 14

COSTO
EQUIPOS UNIDAD PROPIEDAD
U.S.$/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) $/HR 45
SCOOP DIESEL 4.1 YD3 $/HR 30
SCOOP DIESEL 2.5 YD3 $/HR
SCOOP DIESEL 1.5 YD3 $/HR

CONTINGENCIAS % 3%
GASTOS GENERALES % 0%
UTILIDAD % 10%
FACTOR DE EFICIENCIA EN COLOCADO CUADROS MADERA 100%

COSTO HORARIO DE EQUIPOS U.S.$/HR


WINCHES ELECTRICOS DE ARRASTRE JOY DE 20 3.53
PALA NEUMATICA 12B 6.11
BOMBA SUMERGIBLE GRINDEX MODELO MAJOR H, 1.56
VENTILADORES ELECT 6000CFM 15H 0.89
SHOTCRETERA ALIVA 3.57
LOCOMOTORA 3.5 TN A BATERIA U.S.$/Mes 1,400.00
LOCOMOTORA 5.5 TN A BATERIA U.S.$/Mes 2,200.00
LOCOMOTORA TROLLEY DE 5.5 TN U.S.$/Mes 3,400.00
LOCOMOTORA TROLLEY DE 10 TN U.S.$/Mes 8,000.00
CARROS MINEROS GRAMBY 180 CFM U.S.$/Mes 151.04
CARROS MINEROS GRAMBY 110 CFM U.S.$/Mes 97.55
CARROS MINEROS GRAMBY 80 CFM U.S.$/Mes 91.20
CARROS MINEROS U35 U.S.$/Mes 47.03
MEZCLADORA U.S.$/Hr 4.44
SCOOP 2.5 Yd3 $/Hr 67.97
SCOOP 1.5 Yd3 $/Hr 62.97
Pagina: 141 de 347
SCOOP 4.1 Yd3 $/Hr 92.97
SCOOP 0.75 Yd3 $/Hr 55.37
SCOOP 0.5 Yd3 $/Hr 49.97
JUMBO ROCKET BOOMER $/Hr 138.00
VOLQUETE BAJO PERFIL (pendiente a definir) $/Hr 95.00
JUMBO EMPERNADOR ATLAS COPCO $/Hr 119.93
PERFORADORA JACK LEG (U.S.$/Ft) $/Hr 0.12
BOMBA INYECTORA DIDRABOLT $/Hr 0.96
COSTO DE TRANSPORTE DE MADERA
RUBRO Und CONSUMO

MADERA Pie2-Mina-mes 530,984.18


PERSONAL Glb 1.00
GASTOS ADMINISTRATIVOS %
MANTENIMIENTO CALESAS Und 39.00
COSTO LOCOMOTORA SERVICIOS Glb 1.00
CAMION DYNA Und 1.00
TOTAL
NOTA:
Pagina: 142 de 347

JORNAL U.S.$ L.SOCIALES TOTAL JORNAL S/.


27.55 18.42 45.97 CAPATAZ
17.79 18.64 36.44 M2
17.21 18.03 35.23 M3
16.62 17.41 34.03 Ayudante
25.59 26.81 52.40 Operador 1 -A
22.65 23.73 46.37 Operador 2 -A

% CORRESP. COSTO TOTAL 58.50


100% 17 66.52%
100% 155 97.41

28.65
68% $ 75
$ 0 $ 30
$ 1 $ 45
COSTO COSTO
OPERACIÓN TOTAL
U.S.$/HR U.S.$/HR
93 138 68% $ 130
63 93 $ 0 $ 46
68
63
$ 1 $ 85

PRODUCCION TAJEOS
MESES UNIDADCANTIDAD

RELLENO HUIDRAULITMS 7,000.00


$ 1 RELLENO DETRITICOTMS 28,000.00

$ 14,500 $ 151
$ 9,365 $ 98
$ 8,500 $ 91
$ 1,400 $ 47
Consumo Unidad
3.00 Glns/Hr
2.00 Glns/Hr
Pagina: 143 de 347
4.00 Glns/Hr
1.10 Glns/Hr
0.88 Glns/Hr
1.50 Glns/Hr
3.50 Glns/Hr 75.00
1.50 Glns/Hr

P.UNIT COSTO TOTAL COSTO UNIT OBSERVACION


$/pie
0.00 0.00 0.00
19,175.25 19,175.25 0.04
0.07 0.00
23.00 897.00 0.00 Entregada x CMHSA
1,196.00 1,196.00 0.00
0.00 0.00 0.00 Transporte Madera Boca a Interior Mina x Rampa RN
0.04
2,236.62
Pagina: 144 de 347
LISTADO DE PRECIOS DE MAT

CODIGO DESCRIPCION

ACCESORIOS Y EXPLOSIVOS (TIPO CAMBIO 2.80)


1022516 Cordon detonante 5p (pentacord)
1022715 Igneter cord
1022714 Guia ensamblada 2.4 mts - carmex (300)
1022519 Exsanel 2.1 mts N 288 (200)
1022566 Exsanel 3.0 mts N 288 (200)
1022617 Exsanel 4.80 mts N 180 (200)
1022510 Emulex 45% 1" x 7" (276) Cart
1022509 Emulex 45% 1 1/8" x 12" (128) Cart
1022717 Exadit 45% 7/8" x 7" (328) Cart
1022717Kgs Exadit 45% 7/8" x 7" (328) Kgs
1022719 Exsablock 7/8" x 7" (276) Cart
1022719Kgs Exsablock 7/8" x 7" (276) Kgs
FANEL BLANCO Fanel blanco 1 al 10 (caja x 150)
1022713 Fulminante electrico 4 mts
1022721 Semexa 45% 1-1/8'' x 12'' (122) Cart
1022512 Emulnor 1000 1" x 7" (264) Cart
1022514 Emulnor 3000 1" x 7" (260) Cart
COMBUSTIBLE (TIPO CAMBIO 3.15)
1000002 Petroleo
ACEROS DE PERFORACION (TIPO CAMBIO 2.80)
1022795 Barra de extension porta broca conica 4', 7876-6112-11
1022796 Barra de extension porta broca conica 6', 7876-6118-11
1022797 Barra de extension porta broca conica 8', 7876-1124-11
1022827 Broca de 40 mm
1022826 Broca de 38 mm
1009386 Barra MF T38 X H35 X R32 X 14´, 7324-6543-20
1022788 Barra MF T38 X H35 X R32 X 12 FTS
1022820 Broca boton R32 X 1-3/4", 7733-5245-S45 (45 MM)
1022780 Shank adapter HLX5 X T38, 7304-7585-01
ACO TOP Aco Top Cen R38 55,7994-3655 (COPLAS)
1022832 Broca escar. 4" GRADOS 12,7721-4802-S45 (RIMADORA)
1009384 Adaptador PIL R32 40 12 GRADOS,7821-3440 (ADAPTADOR RIM.
1022782 Shank adapter hembra (BOLTER)
1022785 Barra de extension R32 H25 (BOLTER)
1022814 BROCA B R28 X 37MM
BROCA_R25X37MM Broca boton R25 x 37 mm (BOLTER)
-
MADERA (TIPO CAMBIO 3.15)
MAD ASERRADA Mad.Aserrada 2"x8"x2.5m
MAD REDONDA Mad.Redondo 6"X3m
1024956 Madera Cantonera
1024916 Redondo 8" x 8'
1024903 Redondo 5" x 10'
1024917 Redondo 8" x 10'
1024913 Redondo 6" x 10'
Pagina: 145 de 347

CODIGO DESCRIPCION

1024914 Redondo 7" x 8'


1024912 Redondo 6" x 8'
1024915 Redondo 7" x 10'
1024896 Redondo 4" x 8'
1024901 Redondo 5" x 8'
1024903 MARCHAVANTE Ø 5" X 300 CM
1024918 Redondo 8" x 4mts
Redondo 5" x 7' Redondo 5" x 7'
1024954 Tabla 8" x 2" x 10'
1024975 Tabla 8" x 4" x 10'
Tabla 1" x 5" x 8' Tabla 1" x 5" x 8'
Tabla 8" x 2" x 4' Tabla 8" x 2" x 4'
Tabla 8" x 2" x 2' Tabla 8" x 2" x 2'
1024918 Madera Redonda O 8'' X 4m
1024961 Durmiente 8"x8"x5'
Pagina: 146 de 347

CODIGO DESCRIPCION

IMPLEMENTO DE SEGURIDAD (TIPO CAMBIO 3.15)


1021760 Botas
1021990 Chaleco de malla con cinta reflectiva
1043263 CHALECO MALLA C/AMARILLO LIMON C/CINTA REFLECT. - TALLA M
1021887 CASCO JOCKEY CON PORTALAMPARA AZUL
1021876 Barbiquejo
1022282 Respirador
1022271 Filtro
1022268 Cartucho
1022291 Retenedor
1021849 Guantes de Cuero
1021846 Guantes de Neoprene
1022244 Correa Portalampara
1022243 Tapon de oido
CAMISACO + PANTALON CAMISACO + PANTALON
1027988 PANTALON DE DRILL C/VERDE LIMON FOSFORESCENTE - T/M
1028065 CAMISACO DE DRILL C/VERDE LIMON FOSFORESCENTE S/LOGO - T/M
1021967 Pantalon de Jebe
1021965 Casaca de jebe
1026618 Lampara
1022221 Anteojo
1021884 Tafilete
HERRAMIENTAS (TIPO CAMBIO 2.80)
1023291 Corvina
1023058 Palana (Lampa tipo cuchara)
1023637 Pico
1023154 Comba de 6 Lbs
1023412 Llave Stilson de 8"
1044087 Llave Francesa de 8"
1023049 Azuela de 3 Lbs
Cable de Acero Cable de Acero
1023039 Cable de Acero de 3/8"
1023408 Llave stillson de 14"
-
MATERIALES (TIPO CAMBIO 2.8)
1000069 Aceite de Perforación Almo
1018561 Poliyute
1014497 Alambre # 16
1014771 Alcayata 1/2"
1014767 Alcayata Electrica con triple espacio c/manguera
CALIBRADOR Calibradores
CACHO_TORO Cacho de toro (3/4" x 1.80m)
1022900 Malla Electrosoldada de 4"x4"
1022967 Adaptador de perno
1022909 Perno helicoidal de 6'+TUERCA+PLACA
1022911 Perno helicoidal de 8'+TUERCA+PLACA
Pagina: 147 de 347

CODIGO DESCRIPCION

1004975 Perno Hydrabolt 5', tuerca, placa


1004976 Perno Hydrabolt 6', tuerca, placa
1004977 Perno Hydrabolt 7', tuerca, placa
1004978 Perno Hydrabolt 8', tuerca, placa
1022932 Perno Split Set 5 fts
1022933 Perno Split Set 7 fts
1022931 Adaptador Perno Split Set
1022894 Dramix
1022892 FIBRA DE ACERO DRAMIX P/REFUERZO CONCR.
1022874 Acelerante
1046821 PERNO DE ANCLAJE EXPANSIVO BULTECK 28MM X 7'
1022934 Cartucho de cemento cembol ( 32mm x 305mm)
1016190 Resina
1014533 Cemento
1014782 Clavo 6"
1022771 Tuberia de polietileno de 2" AGUA
1015441 Tubo PVC (Recorte Voladura)
1015428 Tubo PVC 4"x3m
1026999 Manguera de Aire 1"
1027001 Manguera de Agua 1/2"
1015174 Soldadura Supercito 1/8
1015666 Sacos de polipropileno (50 Kgs/saco)
1003464 Cancamo (Fierro corrugado 3/4" x 8")
1024962 Escalera 3 m.
1022794 BARRA EXTENSION PORTA BROCA CONICA 2'
1018997 CINTA AISLANTE SCOTCH23 3/4X 19MMX 9.1MT
Grapas y Accesorios Grapas y Accesorios - COSTO ANTIGUO
1024098 CLINOMETRO
1023264 CIZALLA PARA Fe TIPO TIJERA CAPAC. 1/2"
1023399 LLAVE FRANCESA DE 14"
1022318 ARNES T/PARACAIDISTA FP700 EN C/NYL 2"
1022773 TUBO DE POLIETILENO DE 4"
1022328 LINEA DE VIDA DOBLE 1.8MT C/AMORTIGUADOR
Pagina: 148 de 347
DO DE PRECIOS DE MATERIALES - NOVIEMBRE

PRECIO SEP PRECIO SEP UNIDAD VIDA


UNIDAD VIDA UTIL
2015 S/. 2015 U.S.$ UTIL

U.S.$/Mts 0.75 0.27


U.S.$/Mts 3.68 1.31
U.S.$/Pza 2.40 0.86
U.S.$/Pza 2.88 1.03
U.S.$/Pza 6.28 2.24
U.S.$/Pza 4.50 1.61
U.S.$/Cart 0.64 0.23
U.S.$/Cart 1.85 0.66
U.S.$/Cart 0.55 0.20
U.S.$/Kgs 7.20 2.57
U.S.$/Cart 0.55 0.20
U.S.$/Kgs 7.58 2.71
U.S.$/Pza 3.27 1.17
U.S.$/Pza 11.48 4.10
U.S.$/Cart 1.65 0.59
U.S.$/Cart 0.60 0.21
U.S.$/Cart 0.68 0.24
- -
S./Gln 11.15 3.28 VIDA UTIL
- -
U.S.$/Pza 178.83 63.87 1,820.00 Pies
U.S.$/Pza 254.56 90.92 1,820.00
U.S.$/Pza 271.31 96.90 1,820.00 Pies
U.S.$/Pza 64.63 23.08 350.00
U.S.$/Pza 63.25 22.59 350.00 Pies
U.S.$/Pza 1351.44 482.66 2,500.00 Pies
U.S.$/Pza 1440.80 514.57 2,500.00 Pies
U.S.$/Pza 242.86 86.74 200.00 Pies
U.S.$/Pza 668.48 238.74 3,500.00 Pies
U.S.$/Pza 223.02 79.65 3,000.00 mts
U.S.$/Pza 574.78 205.28 200.00 Mts
U.S.$/Pza 372.87 133.17 200.00 Mts
U.S.$/Pza 852.54 304.48 3,500.00 Mts
U.S.$/Pza 437.27 156.17 5,000.00 Mts
U.S.$/Pza 193.66 69.16 500.00 Pies
U.S.$/Pza 200.76 71.70 500.00 Pies
0.00 0.00
- -
S./Pies2 1.35 0.40
S./Pies2 1.18 0.35
S./Pza 9.74 2.86
S./Pza 44.25 13.01
S./Pza 21.59 6.35
S./Pza 55.32 16.27
S./Pza 31.12 9.15
Pagina: 149 de 347

PRECIO SEP PRECIO SEP UNIDAD VIDA


UNIDAD VIDA UTIL
2015 S/. 2015 U.S.$ UTIL

S./Pza 33.88 9.96


S./Pza 24.90 7.32
S./Pza 42.35 12.46
S./Pza 11.05 3.25
S./Pza 17.28 5.08
S./Pza 21.59 6.35
S./Pza 73.76 21.69
S./Pza 15.12 4.45
S./Pza 21.70 6.38
S./Pza 38.80 11.41
S./Pza 5.00 1.47
S./Pza 8.03 2.36
S./Pza 4.00 1.18
S./Pza 73.75 21.69
S./Pza 76.91 22.62
Pagina: 150 de 347

PRECIO SEP PRECIO SEP UNIDAD VIDA


UNIDAD VIDA UTIL
2015 S/. 2015 U.S.$ UTIL

- -
U.S.$/Pza 46.73 13.74 183.00 Disp
U.S.$/Pza 17.52 5.15 90.00 Disp
U.S.$/Pza 17.52 5.15 90.00 Disp
U.S.$/Pza 31.70 11.32 1,095.00 Disp
U.S.$/Pza 1.64 0.48 90.00 Disp
U.S.$/Pza 59.99 17.64 365.00 Disp
U.S.$/Pza 9.62 2.83 60.00 Disp
U.S.$/Pza 12.46 3.66 365.00 Disp
U.S.$/Pza 6.61 1.94 365.00 Disp
U.S.$/Pza 8.76 2.58 7.00 Disp
U.S.$/Pza 20.44 6.01 7.00 Disp
U.S.$/Pza 8.66 2.55 365.00 Disp
U.S.$/Pza 1.32 0.47 45.00 Disp
U.S.$/Pza 93.46 27.49 183.00 Disp
U.S.$/Pza 40.89 12.03
U.S.$/Pza 52.57 15.46
U.S.$/Pza 29.98 8.82 90.00 Disp
U.S.$/Pza 29.98 8.82 90.00 Disp
U.S.$/Pza 42.13 15.05 30.00
U.S.$/Pza 13.00 4.64 120.00 Disp
U.S.$/Pza 10.53 3.76 365.00 Disp
- -
U.S.$/Pza 215.34 76.91 150.00 Disp
U.S.$/Pza 18.75 6.70 50.00 Disp
U.S.$/Pza 24.48 8.74 50.00 Disp
U.S.$/Pza 24.63 8.80 75.00 Disp
U.S.$/Pza 11.98 4.28 150.00 Disp
U.S.$/Pza 15.88 5.67 150.00 Disp
U.S.$/Pza 13.58 4.85 150.00 Disp
U.S.$/Mts 3.54 1.26 100.00 Disp
U.S.$/Mts 2.90 1.04 100.00 Disp
U.S.$/Pza 36.45 13.02
0.00 0.00
- -
U.S.$/Gln 22.00 7.86
U.S.$/M2 3.58 1.28
U.S.$/Kg 3.03 1.08
U.S.$/Pza 20.36 7.27
U.S.$/Pza 9.43 3.37
U.S.$/Pza 0.30 0.11
U.S.$/Pza 16.46 5.88
U.S.$/Mts2 7.53 2.69
U.S.$/Pza 220.01 78.58 350.00 Pernos
U.S.$/Pza 20.30 7.25
U.S.$/Pza 21.95 7.84
Pagina: 151 de 347

PRECIO SEP PRECIO SEP UNIDAD VIDA


UNIDAD VIDA UTIL
2015 S/. 2015 U.S.$ UTIL

U.S.$/Pza 31.08 11.10


U.S.$/Pza 30.33 10.83
U.S.$/Pza 32.45 11.59
U.S.$/Pza 35.75 12.77
Pzas 12.33 4.40
Pzas 15.35 5.48
Pzas 412.52 147.33 100.00
U.S.$/Kg 4.93 1.76
U.S.$/Kg 4.93 1.76
U.S.$/Kg 2.18 0.78
U.S.$/Pza 22.87 8.17
U.S.$/Unid 0.55 0.20
U.S.$/Unid 1.80 0.64
S./Bls 27.82 8.18
U.S.$/Kg 3.58 1.28
U.S.$/Pza 5.83 2.08
U.S.$/Pza 5.28 1.88
U.S.$/Mts 8.78 3.13
U.S.$/Mts 8.89 3.17 150.00 Mts
U.S.$/Mts 4.39 1.57 150.00 Mts
U.S.$/Kg 9.33 3.33
U.S.$/Unid 0.95 0.34
U.S.$/Pza 20.35 7.27
U.S.$/Unid 36.99 13.21
UND 151.26 54.02
UND 24.78 8.85
GENERAL COSTO COGIDO
0.00 DEL COSTO
0.00 ANTIGUO DE LOS PU'S - VERIFICAR SI REALMENTE T
UND 409.77 146.35 Solamente usa Geología CMH y llega por pedido
UND 167.13 59.69 Para cortar malla y alambre
UND 51.91 18.54
UND 135.93 48.55
MTS 17.78 6.35 sale a consumo propio y actualmente recuperan.
UND 205.90 73.53
LISTADO DE LOS PRECIOS UNITARIOS UNIFICADO SEPTIEMBRE 2015

EXTRACCION - LOCOCOMOTORA ANALISIS

COD DESCRIPCION UND PRECIO SEP '15

U.S.$/TON
07151 TRANSPORTE EXTRACCION CON LOCOMOTORA A BATERIA LM 15(5.5 Tons) 1.66

U.S.$/TON
07152 TRANSPORTE EXTRACCION CON LOCOMOTORA A BATERIA LM 10(3.5 Tons) 1.47

U.S.$/TON
07150 TRANSPORTE EXTRACCION CON LOCOMOTORA LT-01 TROLLEY (5.5 Tons) 1.01

U.S.$/TON
07155 TRANSPORTE EXTRACCION CON LOCOMOTORA LT-05 TROLLEY (10 Tons) 0.93

AVANCES
COD DESCRIPCION UND PRECIO SEP '15

02453 CRUCERO 2.0 M X 2.0 M CON JUMBO Y LIMPIEZA SCOOP (REFUGIO) U.S.$/MTS 335.47

02449 CRUCERO 2.00 X 2.00 MTs. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 267.68

02448 CRUCERO 2.40 X 2.40 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 315.42

02454 CRUCERO 2.70 X 2.70 MTs. Jack Leg-Scoop de 2.5 Yds3 Acarreo hasta 150 mts U.S.$/MTS 357.21

02446 CRUCERO 3.00 X 3.00 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 394.41

02447 PRECORTE CRUCERO 3.0 X 3.0 mts. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 400.81

02455 CRUCERO 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP U.S.$/MTS 412.87

02444 CRUCERO 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. U.S.$/MTS 428.21

02443 CRUCERO 3.5M X 3.5 M CON JUMBO U.S.$/MTS 507.96

02442 CRUCERO 3.5M X 3.5 M CON JUMBO ALTA DIFICULTAD U.S.$/MTS 539.18

02450 CRUCERO 4.0 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP U.S.$/MTS 519.55

02459 CRUCERO 4.0 M X 4.0 M CON JUMBO Y LIMPIEZA SCOOP U.S.$/MTS 542.80

02439 CRUCERO 4.5M X 4.2 M CON JUMBO U.S.$/MTS 625.36

02451 CRUCERO 4.5 M X 4.2 M JUMBO Y LIMPIEZA SCOOP ALTA DIFICULTAD U.S.$/MTS 626.89

02425 PRECORTE CRUCERO 4.5M X 4.2 M CON JUMBO U.S.$/MTS 653.78

02452 CRUCERO 5.0 M X 4.0 M JUMBO Y LIMPIEZA SCOOP U.S.$/MTS 645.49

02456 GALERIA 2.4 X 2.4 M JACK LEG 6' Y LIMPIEZA SCOOP U.S.$/MTS 323.93

02445 GAL/CRUCERO 3.0 M X 3.0 M CON JUMBO U.S.$/MTS 434.94

02441 PRECORTE GAL/CRUCERO 3.5M X 3.5 M CON JUMBO U.S.$/MTS 524.40

03310 PRECORTE RP/XC 4.0M X 3.5 M CON JUMBO U.S.$/MTS 589.68

03312 RAMPA 3.0 X 3.0 mts. Jack Leg - Scoop de 2.5 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 413.72

03314 PRECORTE RAMPA 3.0 x 3.0 mts con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 414.40

02457 RAMPA 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP U.S.$/MTS 427.25

03313 RAMPA 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. U.S.$/MTS 437.79

03311 RAMPA 3.5M X 3.5 M CON JUMBO U.S.$/MTS 542.80

03317 PRECORTE RAMPA 3.5M X 3.5 M CON JUMBO U.S.$/MTS 571.20

03309 RAMPA 4.0M X 3.5 M CON JUMBO U.S.$/MTS 545.14

03318 RAMPA 4.0M X 4 M CON JUMBO U.S.$/MTS 564.54

02458 RAMPA 4.20 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP U.S.$/MTS 578.29

03308 RAMPA 4.5M X 4.2 M con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts. U.S.$/MTS 575.46

03307 RAMPA 4.5M X 4.2 M CON JUMBO U.S.$/MTS 642.56

03316 RAMPA 4.5M X 4.2 M CON JUMBO - ALTA DIFICULTAD U.S.$/MTS 688.44
------------------------------------- -------------------------------------- -----------------------------------------
03315 PRECORTE - RAMPA 4.5M X 4.2 M CON JUMBO U.S.$/MTS 690.90

04262 CH. 1.50 x 1.50 Mts. Limpieza sin Scoop, defrente a Chute U.S.$/MTS 146.68

04261 CH. 2.40 x 1.20 Mts.Limpieza Sin Scooptram directo a la Tolva hasta 30 mts altura U.S.$/MTS 168.44

04260 CH. 3.20 x 1.50 Mts.Limpieza Sin Scoop directo a la Tolva, hasta 30 mts altura U.S.$/MTS 386.14

05521 SUB NIVEL 4' x 6' CON WINCHE U.S.$/MTS 182.91

05520 SUB NIVEL 4' x 6' CON WINCHE Y LIMPIEZA SCOOP U.S.$/MTS 251.57

ROTURA
COD DESCRIPCION UND PRECIO SEP '15

06544 EXPLOTACION_TAJEO_MECANIZADO ANCHO VENTA 9MX4.5M (CON EQUIPOS) U.S.$/TMS 8.91

06543 EXPLOTACION_TAJEO_MECANIZADO ANCHO VENTA 6MX4.5M (CON EQUIPOS) U.S.$/TMS 12.24

06542 EXPLOTACION TAJEO MECANIZADO ANCHO VETA 3.5MX4.5M(CON EQUIPOS) U.S.$/TMS 13.28

06540 EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTING U.S.$/TMS 12.40

06537 EXPLOTACION DE ROTURA EN TAJEOS CON 1 WINCHE U.S.$/TMS 12.38

06545 TAJEOS SEMI MECANIZADO VETA ANGOSTA 2.4MX2.2M 1 SCOOPTRAM U.S.$/TMS 13.78

06539 EXPLOTACION DE TAJEOS RECUPERACION PILARES CON 1 WINCHE U.S.$/TMS 13.65

06538 EXPLOT. TAJEOS VETAS ANGOSTAS < 1.20 MTS CON 1 WINCHE ALTA DIFICULTAS U.S.$/TMS 14.19

------------------------------------- -------------------------------------- -----------------------------------------


SOSTENIMIENTO MECANIZADO
COD DESCRIPCION UND PRECIO SEP '15
12806 SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3) U.S.$/M2 12.80
12807 SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3) U.S.$/M2 25.47
12808 SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3) U.S.$/M2 38.14
12809 SHOTCRETE 1" TK-40 U.S.$/M2 1.60
12810 SHOTCRETE 2" TK-40 U.S.$/M2 3.19
12871 INSTALACION PERNO HELICOIDAL DE 6' CEMBOL CON JACKLEG U.S.$/PZA 19.35
12811 INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JACKLEG U.S.$/PZA 22.63
12888 INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JUMBO U.S.$/PZA 30.10
12812 INSTALACION PERNO HYDRABOLT DE 5' (BOMBA MANUAL) U.S.$/PZA 16.12
12813 INSTALACION PERNO HYDRABOLT DE 6' (BOMBA MANUAL) U.S.$/PZA 16.65
12814 INSTALACION PERNO HYDRABOLT DE 7' (BOMBA MANUAL) U.S.$/PZA 18.65
12872 INSTALACION PERNO HYDRABOLT DE 8' (BOMBA MANUAL) CON JACKLEG U.S.$/PZA 20.43
12816 PERNO HIDRABOLT 5FTS CON JUMBO EMPERNADOR U.S.$/PZA 26.53
12817 PERNO HIDRABOLT 7FTS CON JUMBO EMPERNADOR U.S.$/PZA 28.85
12815 PERNO HIDRABOLT 8FTS CON JUMBO EMPERNADOR U.S.$/PZA 31.54
12820 INSTALACION DE CIMBRAS DE 10'X10' ( No incluye las tablas) U.S.$/PZA 159.29
12818 INSTALACION DE CIMBRAS DE 4.5mX4.2m (Incluye Plancha Acanalada+Bolsacrete) U.S.$/PZA 272.27
12821 INSTALACION DE CIMBRAS DE 10'X10' Y 8'X8' (Rehabilitacion+25 Marchavante) U.S.$/PZA 307.85
12819 INSTALACION DE CIMBRAS DE 3.5mX3.5m ( Que incluye las tablas) U.S.$/PZA 346.01
12822 TABLAS EN CIMBRAS DE 10'X10' Y 8'X8' U.S.$/PZA 9.45
12823 INSTALACION DE MALLA ELECTROSOLDADA U.S.$/M2 6.57
08452 PARRILLERO - BOMBERO 41.41
12825 INSTALACION PERNO SPLIT SET DE 5' (JACKLEG) U.S.$/PZA 10.26
12868 INSTALACION PERNO SPLIT SET DE 7' (JACKLEG) U.S.$/PZA 13.95
12869 INSTALACION PERNO SPLIT SET DE 5' (BOLTER) U.S.$/PZA 16.88
12870 INSTALACION PERNO SPLIT SET DE 7' (BOLTER) U.S.$/PZA 21.63
SHOTCRETE VIA SECA (1 DISPARO)

SOSTENIMIENTO CONVENCIONAL

COD DESCRIPCION UND PRECIO SEP '15

12830 CUADRO COMPLETO TAJEO DE MADERA 6' x 6' U.S.$/PZA 69.23


12831 CUADRO COMPLETO TAJEO DE MADERA 7' x 7' U.S.$/PZA 79.45
12832 CUADRO COMPLETO TAJEO DE MADERA 8' x 8' U.S.$/PZA 107.31
12829 CUADRO COMPLETO DE MADERA 6' x 6' (subnivel) U.S.$/PZA 85.77
12828 CUADRO COMPLETO DE MADERA 8' x 8' U.S.$/PZA 111.69
12827 CUADRO COMPLETO DE MADERA 8' x 9' U.S.$/PZA 127.69
12826 CUADRO COMPLETO DE MADERA 10' x 10' U.S.$/PZA 172.94
12835 CUADRO INTERMEDIO DE MADERA 8'x8' U.S.$/PZA 157.38
12834 CUADRO INTERMEDIO DE MADERA 8' x9' U.S.$/PZA 169.47
12833 CUADRO INTERMEDIO DE MADERA 8' x10' U.S.$/PZA 172.94
12837 CUADRO EN CHIMENEA 5'X5' - SIN ENCOSTILLADO U.S.$/PZA 94.74
12836 CUADRO EN CHIMENEA 5'X5' - CON ENCOSTILLADO U.S.$/PZA 111.28
12838 ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 8'X4' CON ENTABLADO U.S.$/PZA 297.77
12839 ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 3.20mX1.50m CON ENTABLADO U.S.$/PZA 405.83
12842 CUADRO COJO 6'X6' (En avances y Tajeos) U.S.$/PZA 58.04
12843 CUADRO COJO 7'X7' (En avances y Tajeos) U.S.$/PZA 64.78
12844 CUADRO COJO TAJEO DE MADERA 8' x 8' U.S.$/PZA 72.34
12840 CUADRO COJO 8"X9' (En avances y Tajeos) U.S.$/PZA 80.75
12841 CUADRO COJO 8"X10' (En avances y Tajeos) U.S.$/PZA 85.42
12845 CUADRO DE CAMBIO 10'X10' U.S.$/PZA 216.39
12846 SOBRECUADRO DE MADERA 7' x 7' U.S.$/PZA 98.22
12848 GUARDACABEZA 4"X 2.40Mts (MARCHAVANTES) U.S.$/PZA 11.11
12847 GUARDACABEZA 5"X 3Mts (MARCHAVANTES) U.S.$/PZA 14.95
12849 ENCRIBADO DE CUADRO 5"X6 PIES U.S.$/PZA 30.36
12851 ENCRIBADO DE CUADRO 5"X8 PIES U.S.$/PZA 30.36
12850 ENCRIBADO DE CUADRO 6"X8 PIES U.S.$/PZA 35.91
12852 SOLERA 6"X8' U.S.$/PZA 28.91
12853 SOLERA 7"X8' U.S.$/PZA 32.18
12854 SOLERA 8"X8' U.S.$/PZA 35.95
12855 SOLERA 8"X10' U.S.$/PZA 39.98
12856 PUNTAL DE SEGURIDAD 5"X8' U.S.$/PZA 17.65
12857 PUNTAL DE SEGURIDAD 6"X8' U.S.$/PZA 22.91
12858 PUNTAL DE SEGURIDAD 7"X8' U.S.$/PZA 30.31
12859 PUNTAL DE SEGURIDAD 8"X8' U.S.$/PZA 42.35
12860 CACHO DE TORO (En avances y Tajeos) U.S.$/PZA 8.72
12861 ENTABLADO DE MADERA CON MALLA PARA RELLENO (LOZA) U.S.$/M2 23.92
12862 INSTALACION DE WOOD PACK CON MAD. REDONDA Ø7 y Ø8" U.S.$/PZA 393.99
12863 INSTALACION DE WOOD PACK CON MADERA ASERRADA U.S.$/PZA 495.15
12864 COLOCADO ENTABLADO (FORRADO CUADROS EN VEZ CANTONERA) U.S.$/PZA 3.45
12865 COLOCADO CANTONERAS U.S.$/PZA 5.10
12866 COLOCADO DE RAJADO U.S.$/PZA 3.67
12867 ELABORACION + INSTALACION BOLSACRETE (Arena+Cemento) U.S.$/M3 53.90

SERVICIOS
COD DESCRIPCION UND PRECIO SEP '15

08146 ACARREO CON WINCHE U.S.$/TMS 2.23


08435 PLATAFORMA DESCANSO CON ESCALERA U.S.$/PZA 42.54
08436 INSTALACION DE ESCALERA U.S.$/PZA 19.89
08451 RELLENO HIDRAULICO CONVENCIONAL - G U.S.$/M3 2.64
08380 LIMPIEZA CON PALA DE LINEA U.S.$/M3 3.46
08139 LIMPIEZA A PULSO U.S.$/M3 8.30
------------------------------------- -------------------------------------- -----------------------------------------
08381 RECUPERACION DE CUADRO DE MADERA 7X7, 8'x8', 10X10 U.S.$/PZA 27.85
08209 INSTALACION TUBERIA POLIETILENO 4" EN LINEA RECTA (Incluye Traslado) U.S.$/MTS 0.62
08215 LIMPIEZA DE VIA CON MINICARGADOR U.S.$/MTS 0.22
08437 ENTABLADO U.S.$/M2 21.82
08438 INSTALACION DE TOLVA SIMPLE U.S.$/PZA 894.86
08439 NICHO PARA TABLERO ELECTRICO 0.60m x 0.60m U.S.$/PZA 70.37
08440 RELLENO DETRITICO CON WINCHE U.S.$/M3 4.58
08448 INSTALACION ALCAYATAS ELECTRICAS DE 3 ESPACIOS U.S.$/PZA 7.69
08442 INSTALACION ALCAYATAS PARA MANGA DE VENTILACION U.S.$/PZA 10.18
08441 INSTALACION ALCAYATAS U.S.$/PZA 12.63
08449 DESQUINCHE CON JUMBO Y LIMPIEZA CON SCOOP U.S.$/M3 17.49
08445 PRECIOS UNITARIOS DESQUINCHE LIMPIEZA CON WINCHE U.S.$/M3 20.00
08444 PRECIOS UNITARIOS DESQUINCHE CON JACK LEG Y LIMPIEZA CON SCOOPTRAM U.S.$/M3 31.10
08443 PRECIOS UNITARIOS DESQUINCHE EN REBATIDO DE RAMPA U.S.$/M3 32.39
08446 INSTALACION TUBERIA POLIETILENO 2" EN LINEA RECTA (Incluye Traslado) U.S.$/MTS 0.33
08447 LABORES DE APOYO U.S.$/MTS 38.94

SOBRE DISTANCIA PRECIO SEP '15

08430 ACARREO CON SCOOP 50 M - ZZ U.S.$/Ton 0.93


08431 ACARREO CON DUMPER MINERAL (12TON) 50 M - ZZ U.S.$/Ton 1.36
08432 ACARREO CON DUMPER DESMONTE (12TON) 50 M - ZZ U.S.$/Ton 1.64
08433 ACARREO CON DUMPER MINERAL (16TON) 50 M - ZZ U.S.$/Ton 1.31
08434 ACARREO CON DUMPER DESMONTE (16TON) 50 M - ZZ U.S.$/Ton 1.57

------------------------------------- -------------------------------------- -----------------------------------------


PRECIOS UNITARIOS
EXTRACCION
LOCOMOTORA
Pagina: 157 de 347
TRANSPORTE CON LOCOMOTORA A BATERIA 5.5 Tons

07151 CONSORCIO MINER0 HORIZONTE S.A.


TRANSPORTE EXTRACCION CON LOCOMOTORA A BATERIA LM
15(5.5 Tons) Producción Tons/Mes 5,000.00 Tons
No CARROS MINEROS Cant 8.00 Días Mes 30.00 Turnos 2.00

ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL


UNITARIO U.S.$ $ US$/UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 36.44 $/Mes 2,186.19
Ayudante Locomotorista Tareas 1.00 34.03 $/Mes 2,041.65
4,227.84 0.85
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.59 190.76
190.76 0.038
3.- CARROS MINEROS GRAMBY
Carros Mineros Gramby 80 CFM Cant 8.000 91.20 $/Mes 729.60
729.60 0.15

5.- EQUIPOS
Locomotora LM-15 Cant 1.00 2,200.00 $/Mes 2,200.00
2,200.00 0.44
1.47
6.- GASTOS INDIRECTOS
Contingencia 3% $ 0.04
Gastos Generales 0% $ 0.00
Utilidad 10% $ 0.15
TOTAL COSTO TONELADAS EN DOLARES (US$/TON) 1.66
TOTAL COSTO TONELADAS EN DOLARES (US$/TON) - SIN UTILIDAD NI CONTINGENCIA 1.64
Pagina: 158 de 347
TRANSPORTE CON LOCOMOTORA A BATERIA 3.5 Tons

07152 CONSORCIO MINER0 HORIZONTE S.A.


Tons/Mes
TRANSPORTE EXTRACCION CON LOCOMOTORA A BATERIA LM 10(3.5 TProducción 5,000.00 Tons
No CARROS MINEROS Cant 15.00 Días Mes 30.00 Turnos 2.00

ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL


UNITARIO U.S.$ $ US$/UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 36.44 $/Mes 2,186.19
Ayudante Locomotorista Tareas 1.00 34.03 $/Mes 2,041.65
4,227.84 0.85
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.59 190.76
190.76 0.038
3.- CARROS MINEROS GRAMBY
Carros Mineros U35 Cant 15.000 47.03 $/Mes 705.45
705.45 0.14

5.- EQUIPOS
Locomotora LM-10 Cant 1.00 1,400.00 $/Mes 1,400.00
1,400.00 0.28
1.30
6.- GASTOS INDIRECTOS
Contingencia 3% $ 0.04
Gastos Generales 0% $ 0.00
Utilidad 10% $ 0.13
TOTAL COSTO TONELADAS EN DOLARES (US$/TON) 1.47
TOTAL COSTO TONELADAS EN DOLARES (US$/TON) - SIN UTILIDAD NI CONTINGENCIA 1.45
Pagina: 159 de 347
TRANSPORTE CON LOCOMOTORA TROLLEY 5.5 Tons

07150 CONSORCIO MINER0 HORIZONTE S.A.


TRANSPORTE EXTRACCION CON LOCOMOTORA LT-01 TROLLEY (5.5
Tons) Producción Tons/Mes 9,600.00 Tons
No CARROS MINEROS Cant 8.00 Días Mes 30.00 Turnos 2.00

ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL


UNITARIO U.S.$ $ US$/UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 36.44 $/Mes 2,186.19
Ayudante Locomotorista Tareas 1.00 34.03 $/Mes 2,041.65
4,227.84 0.44
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.59 190.76
190.76 0.020
3.- CARROS MINEROS GRAMBY
Carros Mineros Gramby 80 CFM Cant 8.000 91.20 $/Mes 729.60
729.60 0.08

5.- EQUIPOS
Locomotora LT-01 Cant 1.00 3,400.00 $/Mes 3,400.00
3,400.00 0.35
0.89
6.- GASTOS INDIRECTOS
Contingencia 3% $ 0.03
Gastos Generales 0% $ 0.00
Utilidad 10% $ 0.09
TOTAL COSTO TONELADAS EN DOLARES (US$/TON) 1.01
TOTAL COSTO TONELADAS EN DOLARES (US$/TON) - SIN UTILIDAD NI CONTINGENCIA 0.99
Pagina: 160 de 347
TRANSPORTE CON LOCOMOTORA TROLLEY 10 Tons

07155 CONSORCIO MINER0 HORIZONTE S.A.


TRANSPORTE EXTRACCION CON LOCOMOTORA LT-05 TROLLEY (10
Tons) Producción Tons/Mes 17,000.00 Tons
No CARROS MINEROS Cant 10.00 Días Mes 30.00 Ddias 2.00

ITEM DESCRIPCION UNI. CANTID. PRECIO MES SUBTOT. TOTAL


UNITARIO U.S.$ $ US$/UNID
1.- MANO DE OBRA
Maestro Locomotorista Tareas 1.00 36.44 $/Mes 2,186.19
Ayudante Locomotorista Tareas 1.00 34.03 $/Mes 2,041.65
4,227.84 0.25
2.- IMPLEMENTOS
Implementos Seguridad Tareas 2.00 1.59 190.76
190.76 0.011
3.- CARROS MINEROS GRAMBY
Carros Mineros Gramby 180 Cant 10.000 151.04 $/Mes 1,510.40
1,510.40 0.09

5.- EQUIPOS
Locomotora LT-05 Cant 1.00 8,000.00 $/Mes 8,000.00
8,000.00 0.47
0.82
6.- GASTOS INDIRECTOS
Contingencia 3% 0.02
Gastos Generales 0% 0.00
Utilidad 10% $ 0.08
TOTAL COSTO TONELADAS EN DOLARES (US$/TON) 0.93
TOTAL COSTO TONELADAS EN DOLARES (US$/TON) - SIN UTILIDAD NI CONTINGENCIA 0.91
PRECIOS UNITARIOS
AVANCE
Pagina: 162 de 347

CRUCERO 2.0 M X 2.0 M CON JUMBO Y LIMPIEZA SCOOP (REFUGIO)


02453
N° de Taladro 28 Avance/Disp. 3.00 MT

MANO DE OBRA UNIDAD CANTIDAD FACTOR FACT MO PU SUB TOTAL U.S.$/MT


OPERADOR DE JUMBO Hom/Disp 1.00 1.00 1.00 52.40 52.40 0.00
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 1.00 36.44 36.44 0.00
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 46.37 46.37 0.00
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 1.00 1.00 0.00 0.00
CARGADOR/DISPARADOR 2.00 Hom/Disp 1.00 1.00 1.00 36.44 36.44 0.00
BOMBERO Hom/Disp 0.00 1.00 1.00 0.00 0.00
SERVICIOS AUXILIARES Hom/Disp 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL 171.64 57.29

MATERIALES
VIDA
ESTANDAR PRECIO U.S.
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP $/PZA
MTS
BARRAS DE PERFORACION MT/DISP 92.87 2,500 0.04 482.66 5.98
BROCAS DE 45 MM MT/DISP 83.89 200 0.42 86.74 12.14
SHANK ADAPTER MT/DISP 92.87 3,500 0.03 238.74 2.11
AFILADOR BROCAS MT/DISP 83.89 100,000 0.00 0.00 0.00
COPLAS MT/DISP 0.00 3,000 0.00 79.65 0.00
RIMADORA DE 89 MM MT/DISP 8.99 200 0.04 205.28 3.08
ADAPTADOR DE RIMADORA MT/DISP 8.99 200 0.04 133.17 2.00
TUBO PVC (Voladura recorte) PZAS/DISP 5.00 1.88 3.14
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.08 0.00
TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00
HERRAMIENTAS 1.02 0.34
MANGA VENTILACION 30" MT/DISP 0.00 $ 1 0.00
ALCAYATAS DE 1/2" 4.00 PZAS/DISP 4.00 7.27 9.71
PETROLEO(Para Jumbo ) Glns/Hr 1.50 3.28 1.64
PETROLEO(Para Scooptram ) 10.00 3.28 10.95
SUB-TOTAL 51.10

IMPLEMENTOS SEGURIDAD
COSTO UNIT COSTO
DESCRIPCION UNIDAD MTS/DISP U.S.$/MT
U.S.$/Pers U.S.$
Implementos Seguridad Unidad 4.00 1.59 6.36 2.12

VOLADURA

CANTIDAD COSTO
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA UNIDAD KGS U.S.$/MT
PZA U.S.$/Kgs
LADRO
EMULEX 45% 1 1/8" X 12" (128) TALADROS 17.00 7.41 126.00 24.61 0.66 27.79
EXADIT 45% 7/8" X 7" (328) TALADROS 8.00 5.00 40.00 3.05 0.20 2.62
CORDON DETONANTE 5P MTS 35.00 0.27 3.13
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.86 0.57
EXSANEL 4.80 MTL PZAS 25.00 1.61 13.41
SUB-TOTAL 47.52

EQUIPOS
COSTO COSTO COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. TOTAL U.S. U.S.$/MT
U.S.$/HR U.S.$/HR $/HR $
JUMBO ELECTROHIDR DE 1 BRAZO 1.50 HORAS 1.33 138.00 183.51
SCOOP DIESEL 4.1 YD3 (Incluye el carguio de mate HORAS 2.50 92.97 232.42
CAMION DE BAJO PERFIL (2 CAMIONES X 1.8HrsxDi HORAS 0.00 0.00
VENTILADOR DE 20,000 CFM HORAS 0.00 0.00
B OMBA DE 10 HP 0.00 HORAS 0.00 0.00
PERFORADORA PIES 12.00 0.00
SUB-TOTAL 415.9 138.83

TOTAL COSTOS DIRECTOS 296.87

CONTINGENCIA 3% 8.91
UTILIDAD 10% 29.69
SUB TOTAL COSTOS INDIRECTOS 38.59

TOTAL COSTOS U.S.$/Mt (Con Jumbo) 335.47


TOTAL COSTOS U.S.$/Mt (Con Jumbo) - SIN UTILIDAD NI CONTINGENCIA 322.37

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
CARGUIO DE MATERIAL CON ESCOOPTRA HACIA LOS VOLQUETES INCLUIDO EL LOS PRECIOS UNITARIOS
FORMATO DE PRECIOS UNITARIOS DE AVANCES
ACUMULACION PARCOY
02449 CONSORCIO MINER0 HORIZONTE S.A.
CRUCERO 2.00 X 2.00 MTs. Jack Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. N° Taladros: 24
N° Tal.carg.: 20 u
AVANCE: 1.50 ml

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforistas Tareas 1.00 36.44 $/Tarea 36.44
Ayudante Perforista Tareas 1.00 34.03 $/Tarea 34.03
Operador Scoop Tareas 0.50 46.37 $/Tarea 23.19
Bombero Tareas 34.03 $/Tarea 0.00
93.65 62.43
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.00 1.59 3.18
Tareas sin ropa de agua Tareas 0.50 2.98 1.49
4.67 3.11
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 144.000 90.92 $/uni 7.19
Broca de 40 mm PP 144.000 23.08 $/uni 9.50
Aceite de Perforación Gln. 0.250 7.86 $/uni 1.96
Petroleo D2 Gln/Hr 5.130 3.28 $/uni 16.82
Herramientas de Mina Global $/uni 1.02
Alcayatas de 3/4" uni 1.000 7.27 $/uni 7.27
43.78 29.18
4.- EXPLOSIVOS 8.81 m3
EMULEX 45% x 1" x 7" (276) uni 81.00 0.230 $/uni 18.63
EXSABLOCK 7/8" X 7" (276) Pza. 18.00 0.196 $/uni 3.54
EXADIT 45% 7/8" X 7" (328) Pza. 37.00 0.196 $/uni 7.27
EXSANEL 3.0m Pza. 20.00 2.241 $/uni 44.82
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Mts. 10.00 0.268 $/uni 2.68
IGNICION RAPIDA Mts. 0.10 1.313 $/pie 0.13
78.78 52.52
5.- EQUIPOS
Ventiladora 10000 CFM Hrs. 0.00 0.00 $/hr 0.00
Scooptrams de 2.5 Yd3 $ 2 Hrs. 1.71 67.97 $/hr 116.23
Perforadora P.P. 144.00 0.120 $/pp 17.28
Manguera de Aire 1¨ Mts. 30.00 3.17 $/hr 0.63
Manguera de Agua 1/2¨ Mts. 30.00 1.57 $/hr 0.31
134.45 89.64
236.89
6.- GASTOS INDIRECTOS
Contingencias 3% $ 7.11
Gastos Generales 0% $ 0.00
Utilidad 10% $ 23.69
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 267.68
FORMATO DE PRECIOS UNITARIOS DE AVANCES

ACUMULACION PARCOY
02448 CONSORCIO MINER0 HORIZONTE S.A. 31-Aug
CRUCERO 2.40 X 2.40 MTs. Jack Leg-Scoop de 2.2 Yd3. Acarreo hasta 150 mts. N° Taladros: 32
N° Tal.carg.: 28 u
AVANCE: 1.50 ml

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforistas Tareas 1.00 36.44 $/Tarea 36.44
Ayudante Perforista Tareas 1.00 34.03 $/Tarea 34.03
Operador Scoop Tareas 0.50 46.37 $/Tarea 23.19
Bombero Tareas 34.03 $/Tarea 0.00
93.65 62.43
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.00 1.59 3.18
Tareas sin ropa de agua Tareas 0.50 2.98 1.49
4.67 3.11
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 192.000 90.92 $/uni 9.59
Broca de 40 mm PP 192.000 23.08 $/uni 12.66
Aceite de Perforación Gln. 0.250 7.86 $/uni 1.96
Petroleo D2 Gln/Hr 6.000 3.28 $/uni 19.68
Herramientas de Mina Global $/uni 1.02
Alcayatas de 3/4" uni 1.000 7.27 $/uni 7.27
52.19 34.80
4.- EXPLOSIVOS 8.81 m3
EMULEX 45% x 1" x 7" (276) uni 115.00 0.230 $/uni 26.45
EXSABLOCK 7/8" X 7" (276) Pza. 25.00 0.196 $/uni 4.91
EXADIT 45% 7/8" X 7" (328) Pza. 49.00 0.196 $/uni 9.63
EXSANEL 3.0 m Pza. 28.00 2.241 $/uni 62.75
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Mts. 10.00 0.268 $/uni 2.68
IGNICION RAPIDA Mts. 0.10 1.313 $/pie 0.13
108.26 72.18
5.- EQUIPOS
Ventiladora 10000 CFM Hrs. 0.00 0.89 $/hr 0.00
Scooptrams de 2.5 Yd3 Hrs. 2.00 67.97 $/hr 135.94
Perforadora P.P. 192.00 0.120 $/pp 23.04
Manguera de Aire 1¨ Mts. 30.00 3.17 $/hr 0.63
Manguera de Agua 1/2¨ Mts. 30.00 1.57 $/hr 0.31
159.92 106.62
279.14
6.- GASTOS INDIRECTOS
Contingencias 3% $ 8.37
Gastos Generales 0% $ 0.00
Utilidad 10% $ 27.91
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 315.42
02454 CONSORCIO MINER0 HORIZONTE S.A. 31-Aug
CRUCERO 2.70 X 2.70 MTs. Jack Leg-Scoop de 2.5 Yds3 Acarreo hasta 150 mts N° Taladros: 41
N° Tal.carg.: 31 u
AVANCE: 1.50 ml

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforistas 1.000 Tareas 2.00 36.44 $/Tarea 72.87
Ayudante Perforista Tareas 1.00 34.03 $/Tarea 34.03
Operador Scoop 0.50 Tareas 0.40 46.37 $/Tarea 18.55

125.45 83.63
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 3.00 1.59 4.77
Tareas sin ropa de agua Tareas 0.40 2.98 1.19
5.96 3.97
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 246.000 90.92 $/uni 12.29
Broca de 40 mm PP 246.000 23.08 $/uni 16.22
Aceite de Perforación Gln. 0.250 7.86 $/uni 1.96
Petroleo D2 Gln/Hr 6.000 3.28 $/uni 19.68
Herramientas de Mina Global $/uni 1.02
Alcayatas de 3/4" uni 1.000 7.27 $/uni 7.27
58.45 38.97
4.- EXPLOSIVOS 8.81 m3
EMULEX 45% x 1" x 7" (276) Pza. 126.00 0.230 $/uni 28.98
EXSABLOCK 7/8" X 7" (276) Pza. 20.00 0.196 $/uni 3.93
EXADIT 45% 7/8" X 7" (328) Pza. 56.00 0.196 $/uni 11.00
EXSANEL 3.0m Pza. 31.00 2.241 $/uni 69.48
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Mts. 10.00 0.268 $/uni 2.68
IGNICION RAPIDA Mts. 0.10 1.313 $/pie 0.13
0.00 117.91 78.61
5.- EQUIPOS
Ventiladora 10000 CFM Hrs. 0.00 0.89 $/hr 0.00
Scooptrams de 2.5 Yd3 Hrs. 2.00 67.97 $/hr 135.94
Perforadora P.P. 246.00 0.120 $/pp 29.52
Manguera de Aire 1¨ Mts. 30.00 3.17 $/hr 0.63
Manguera de Agua 1/2¨ Mts. 30.00 1.57 $/hr 0.31
166.40 110.94
316.12
6.- GASTOS INDIRECTOS
Contingencias 3% $ 9.48
Gastos Generales 0% $ 0.00
Utilidad 10% $ 31.61
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 357.21
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO

02446 CONSORCIO MINER0 HORIZONTE S.A.


CRUCERO 3.0 X 3.0 mts. Jacl Leg-Scoop de 2.5 Yd3. Acarreo hasta 150 mts. N° Taladros: 38 u
N° Tal.carg.: 35 u
AVANCE: 1.50 ml

ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL

UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforista $1 Tareas 2.00 36.44 $/Tarea 72.87
Ayudante Perforista Tareas 1.00 34.03 $/Tarea 34.03
Operador Scoop Tareas 0.50 46.37 $/Tarea 23.19
Servicio Tareas 1.00 34.03 $/Tarea 34.03
164.11 109.41
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 4.00 1.59 6.36
Implementos Operador Scoop Tareas 0.50 2.98 1.49
7.85 5.23
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 228.000 90.92 $/uni 11.39
Broca de 40 mm PP 228.000 23.08 $/uni 15.04
Aceite de Perforación Gln 0.400 7.86 $/uni 3.14
Petroleo D2 Gln/Hr 6.000 3.28 $/uni 19.68
Herramientas de Mina-Barretillas Global $/uni 1.02
Alcayatas de 3/4" uni 1.000 7.27 $/uni 7.27
57.54 38.36
4.- EXPLOSIVOS

EMULEX 45% x 1" x 7" (276) Pza. 151.00 0.230 $/uni 34.73
EXSABLOCK 7/8" X 7" (276) Pza. 48.00 0.196 $/uni 9.43
EXSANEL 3.0 m Pza. 35.00 2.241 $/uni 78.44
GUIA ENSAMBLADA 2.4 MTL - CA Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Pza. 20.00 0.268 $/uni 5.36
IGNICION RAPIDA Mts. 0.10 1.313 $/uni 0.13
129.80 86.54
5.- EQUIPOS
Scooptrams 2.5 Yd3 Hrs. 2.00 67.97 $/hr 135.94
Perforadora P.P. 228.00 0.12 $/pp 27.36
Manguera Aire 1¨ Mts. 30.00 3.17 $/hr 0.63
Manguera Agua 1/2¨ Mts. 30.00 1.57 $/hr 0.31

164.24 109.50
349.04
6.- GASTOS INDIRECTOS
Contingencias 3% $ 10.47
Gastos Generales 0% $ 0.00
Utilidad 10% $ 34.90
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 394.41
Energía Eléctrica, Tuberias, accesorios proporciona Cía.
Pagina: 167 de 347

FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO


02447
PRECORTE CRUCERO 3.0 X 3.0 mts. Jack Leg-Scoop de 2.5 Yd3. Acarreo hastN° Taladros: 44 u
N° Tal.carg.: 35 u
AVANCE: 1.50 ml

ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL

UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforista $1 Tareas 2.00 36.44 $/Tarea 72.87
Ayudante Perforista Tareas 1.00 34.03 $/Tarea 34.03
Operador Scoop Tareas 0.50 46.37 $/Tarea 23.19
Servicio Tareas 1.00 34.03 $/Tarea 34.03
164.11 109.41
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 4.00 1.59 6.36
Tareas con Operaadores Tareas 0.500 2.98 1.49
7.85 5.23
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 264.000 90.92 $/uni 13.19
Broca de 40 mm PP 264.000 23.08 $/uni 17.41
Aceite de Perforación Gln 0.400 7.86 $/uni 3.14
Petroleo D2 Gln/Hr 6.000 3.28 $/uni 19.68
Herramientas de Mina-Barretillas Global $/uni 1.02
Alcayatas de 3/4" uni 1.000 7.27 $/uni 7.27
61.72 41.14
4.- EXPLOSIVOS

EMULEX 45% x 1" x 7" (276) Pza. 151.00 0.230 $/uni 34.73
EXSABLOCK 7/8" X 7" (276) Pza. 48.00 0.196 $/uni 9.43
EXSANEL 3.0 m Pza. 35.00 2.241 $/uni 78.44
GUIA ENSAMBLADA 2.4 MTL - CA Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Pza. 20.00 0.268 $/uni 5.36
IGNICION RAPIDA Mts. 0.10 1.313 $/uni 0.13
129.80 86.54
5.- EQUIPOS
Scooptrams 2.5 Yd3 Hrs. 2.00 67.97 $/hr 135.94
Perforadora P.P. 264.00 0.12 $/pp 31.68
Manguera Aire 1¨ Mts. 30.00 3.17 $/hr 0.63
Manguera Agua 1/2¨ Mts. 30.00 1.57 $/hr 0.31

168.56 112.38
354.70
6.- GASTOS INDIRECTOS
Contingencias 3% $ 10.64
Gastos Generales 0% $ 0.00
Utilidad 10% $ 35.47
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 400.81
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) - SIN UTILIDAD NI CONTINGENCIA 383.53
Energía Eléctrica, Tuberias, accesorios proporciona Cía.
Pagina: 168 de 347

CRUCERO 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP


02455
GRADIENTE: 5/1000 N° Tal Cargados: 44.00 Avance/Disp. 1.50 MT
N° Tal Perforados: 47.00
MANO DE OBRA
FACTOR COSTO COSTO
DESCRIPCION UNIDAD CANT U.S.$/MT
INCIDENCIA U.S.$/Tar U.S.$/DISP

PERFORISTA Hom 2.00 1.00 36.44 72.87 48.65


AYUD. PERFORISTA Hom 1.00 1.00 34.03 34.03 22.72
OPERADOR SCOOPTRAM Hom 0.50 1.00 46.37 23.19 15.48

SUB-TOTAL 86.85

MATERIALES
ESTANDAR PRECIO COSTO
DESCRIPCION UNIDAD PIES/DISP VIDA UTIL U.S.$/MT
PIES/DISP U.S.$/PZA U.S.$/DISP

BARRAS DE PERFORACION 6' P.P. 253.80 1,820 0.14 90.92 12.68 8.46
BROCAS DE 40 MM P.P. 253.80 350 0.73 23.08 16.74 11.17
ACEITE DE PERFORACIÓN GLN 0.40 7.86 3.14 2.10
HERRAMIENTAS GLB 1.00 1.02 1.02 0.68
ALCAYATAS DE 3/4" PZAS 2.00 7.27 14.55 9.71
TUBERIA DE POLIETILENO DE 2" AGUA PZAS 0.75 2.08 1.56 1.04
TUBERIA DE POLIETILENO DE 4" AIRE PZAS 0.75 6.35 4.76 3.17
TUBO PVC (Voladura recorte) PZAS 5.00 1.88 9.42 6.29
MANGUERA DE AIRE 1" MTS 30.00 150 0.20 3.17 0.63 0.42
MANGUERA DE AGUA 1/2" MTS 30.00 150 0.20 1.57 0.31 0.21
Petroleo para scooptram Glns/Hr 5.46 3.28 11.96
SUB-TOTAL 55.23

IMPLEMENTOS SEGURIDAD
COSTO
COSTO
DESCRIPCION UNIDAD TAR/DISP UNIT U.S. U.S.$/MT
U.S.$
$/Per
IMPLEMENTOS SEGURIDAD GLB 3.50 1.59 5.56 3.71

VOLADURA
UNIDAD COSTO U.S. COSTO
DESCRIPCION UNIDAD CART U.S.$/MT
KG $/Pza U.S.$/DISP
EMULNOR 3000 1" X 7" PZAS 105.00 10.10 0.24 25.31 16.90
EMULNOR 1000 1" X 7" PZAS 184.00 17.42 0.21 39.43 26.33
EXADIT 45% 7/8" X 7" PZAS 20.00 1.52 0.20 3.93 2.62
FANEL PZAS 44.00 1.17 51.40 34.32
CORDON DETONANTE 5P $ 15 MTS 25.00 0.27 6.70 4.47
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.86 1.71 1.14
IGNITED CORD $ 0 PZAS 0.20 1.31 0.26 0.18
SUB-TOTAL 85.96

EQUIPOS
COSTO COSTO COSTO
COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDA OPERACIÓ TOTAL U.S. U.S.$/MT
TOTAL U.S.$
D U.S.$/HR N U.S.$/HR $/HR
SCOOP DIESEL 4.1 YD3 HORAS 1.82 92.97 169.20 112.97
CAMION DE BAJO PERFIL HORAS 0.00 0.00 0.00
BOMBA DE 50 HP HORAS 0.00 0.00 0.00
BOMBA DE 10 HP HORAS 0.00 0.00
SCALER HORAS 0.50 0.00 0.00 0.00
PERFORADORA PIES 257.80 0.12 30.94 20.65
SUB-TOTAL 133.62

TOTAL COSTOS DIRECTOS 365.38

GASTOS GENERALES 0% 0.00


CONTINGENCIA 3% 10.96
UTILIDAD 10% 36.54
SUB TOTAL COSTOS INDIRECTOS 47.50

TOTAL COSTOS U.S.$/Mt (Con equipos) 412.87


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA 394.04
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO

02444 CONSORCIO MINER0 HORIZONTE S.A.


CRUCERO 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. N° Taladros: 53 u
N° Tal.carg.: 50 u
AVANCE: 1.50 ml

ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforista Tareas 2.00 36.44 $/Tarea 72.87
Ayudante Perforista Tareas 0.50 34.03 $/Tarea 17.01
Operador Scoop Tareas 0.40 46.37 $/Tarea 18.55

108.44 72.29
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.50 1.59 3.97
Implementos Operador Scoop Tareas 0.40 2.98 1.19
5.17 3.44
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 318.000 90.92 $/uni 15.89
Broca de 40 mm PP 318.000 23.08 $/uni 20.97
Aceite de Perforación Gln 0.400 7.86 $/uni 3.14

Petroleo Gln/Hr 6.600 3.28 $/uni 21.65


Herramientas de Mina-Barretillas Global $/uni 1.02
Alcayatas de 3/4" uni 1.000 7.27 $/uni 7.27
69.94 46.63
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza 285.00 0.230 $/uni 65.55
EXSABLOCK 7/8" X 7" (276) Pza 65.00 0.196 $/uni 12.77
EXSANEL 3.0m Pza. 50.00 2.241 $/uni 112.06
GUIA ENSAMBLADA 2.4 MTL - C Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Mts. 15.00 0.268 $/uni 4.02
IGNICION RAPIDA Mts. 0.10 1.313 $/pie 0.13
196.24 130.83
5.- EQUIPOS
Scooptrams 2.5 Yd3 Hrs. 2.20 67.97 $/hr 149.53
SCALER Hrs. 0.50 0.00 $/hr 0.00
Perforadora P.P. 318.00 0.120 $/pp 38.16
Manguera Aire 1¨ Mts. 30.00 3.17 $/hr 0.63
Manguera Agua 1/2¨ Mts. 30.00 1.57 $/hr 0.31
188.64 125.76
378.95
6.- GASTOS INDIRECTOS
Contingencias 3% $ 11.37
Gastos Generales 0% $ 0.00
Utilidad 10% $ 37.90
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 428.21
Energía Eléctrica, Tuberias, accesorios proporciona Cía.
Pagina: 170 de 347

CRUCERO 3.5M X 3.5 M CON JUMBO


02443 N° de Taladros: 42 Avance/Disp. 2.90

MANO DE OBRA UNIDAD PU SUB TOTAL


CANTIDAD FACTOR
OPERADOR DE JUMBO Hom/Disp 1 1 52.40 52.40
AYUDANTE OP. JUMBO Hom/Disp 1 1 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1 1 46.37 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0 1 46.37 0.00
CARGADOR/DISPARADOR Hom/Disp 2 1 36.44 72.87
BOMBERO Hom/Disp 0 0 0.00
SERVICIOS AUXILIARES Hom/Disp 2 1 36.44 72.87
SUB-TOTAL 280.95

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMIC
PZAS/DISP U.S.$/PZA
A MTS
BARRAS DE PERFORACION 12 FTS MT/DISP 144.84 2,500 0.06 514.57
BROCAS DE 45 MM MT/DISP 135.18 200 0.68 86.74
SHANK ADAPTER MT/DISP 144.84 3,500 0.04 238.74
AFILADOR BROCAS MT/DISP 135.18 100,000 0.00 0.00
COPLAS MT/DISP 0.00 3,000 0.00 79.65
RIMADORA DE 89 MM MT/DISP 9.66 200 0.05 205.28
ADAPTADOR DE RIMADORA MT/DISP 9.66 200 0.05 133.17
TUBO PVC (Voladura recorte) PZAS/DISP 10.00 1.88
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.08
PETROLEO (JUMBO) GLN/HR 1.50 3.28
PETROLEO (SCOOP) GLN/HR 12.00 3.28
HERRAMIENTAS 1.02
ALCAYATAS DE 3/4" PZAS/DISP 4.00 7.27

SUB-TOTAL

IMPLEMENTOS SEGURIDAD
COSTO
DESCRIPCION UNIDAD MTS/DISP UNIT U.S.
$/Pers
Implementos Seguridad Unidad 6.00 1.59
Implementos Operador Scoop Unidad 1.00 2.98

VOLADURA
CANTIDAD UNIDAD
DESCRIPCION UNIDAD TALADROS CANTIDAD/T
PZA KGS
ALADRO
EMULEX 45% 1 1/8" X 12" (128) TALADROS 26.00 8.81 229.00 44.73
EXADIT 45% 7/8" X 7" (328) TALADROS 13.00 6.00 78.00 5.95
CORDON DETONANTE 5P MTS 40.00
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00
EXSANEL 4.80 MTL PZAS 39.00
SUB-TOTAL

EQUIPOS
COSTO COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S.
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO 2 HORAS 2.02 138.00
Pagina: 171 de 347
SCOOP DIESEL 4.1 YD3 HORAS 3.00 30 63 92.97
SCALER HORAS 0.50 0.00
B OMBA DE 10 HP HORAS 0.00 1.56
PERFORADORA PIES 12.00 0.12
SUB-TOTAL

TOTAL COSTOS DIRECTOS


CONTINGENCIAS 3%
GASTOS GENERALES 0%
UTILIDAD 10%

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)


LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE
Pagina: 172 de 347

X 3.5 M CON JUMBO


Metro

U.S.$/MT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
96.99

U.S.$/MT

10.29
20.24
3.41
0.00
0.00
3.42
2.22
6.50
0.00
1.70
13.59
0.35
10.04
$ -
71.77

COSTO
U.S.$/MT
U.S.$
9.54 3.29
2.98 1.03
4.32

COSTO
U.S.$/MT
U.S.$/Kgs
0.66 52.23
2.57 5.28
0.27 3.70
0.86 0.59
1.61 21.64
83.44

COSTO
TOTAL U.S. U.S.$/MT
$
278.76
Pagina: 173 de 347
278.90
0.00
0.00
1.44
559.10 193.01

449.52
13.49
0.00
44.95

507.96
VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 174 de 347

CRUCERO 3.5M X 3.5 M CON JUMBO ALTA DIFICULTAD


02442 N° de Taladros: 50 Avance/Disp. 2.58

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40


AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 46.37 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 0.50 46.37 0.00
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 36.44 72.87
BOMBERO Hom/Disp 0.00 0.38 0.00
SERVICIOS AUXILIARES Hom/Disp 1.00 1.00 36.44 36.44
SUB-TOTAL 244.52

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMIC
PZAS/DISP U.S.$/PZA
A MTS
BARRAS DE PERFORACION 12 FTS MT/DISP 168.65 $ 2,500 0.07 514.57
BROCAS DE 45 MM MT/DISP 159.11 $ 200 0.80 86.74
SHANK ADAPTER MT/DISP 168.65 $ 3,500 0.05 238.74
AFILADOR BROCAS MT/DISP 159.11 $ 100,000 0.00 -
COPLAS MT/DISP $ - $ 3,000 - 79.65
RIMADORA DE 89 MM MT/DISP 9.55 $ 200 0.05 205.28
ADAPTADOR DE RIMADORA MT/DISP 9.55 $ 200 0.05 133.17
TUBO PVC (Voladura recorte) PZAS/DISP 10.00 1.88
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP $ - 2.08
PETROLEO (JUMBO) GLN/HR 1.50 3.28
PETROLEO (SCOOP) GLN/HR 12.00 3.28
HERRAMIENTAS 1.02
ALCAYATAS DE 3/4" PZAS/DISP 4.00 7.27

SUB-TOTAL

IMPLEMENTOS SEGURIDAD
COSTO
DESCRIPCION UNIDAD MTS/DISP UNIT U.S.
$/Pers
Implementos Seguridad Unidad 5.00 1.59
Implementos Operador Scoop Unidad 1.00 2.98

VOLADURA
CANTIDAD UNIDAD
DESCRIPCION UNIDAD TALADROS CANTIDAD/T
PZA KGS
ALADRO
SEMEXSA 45% 1 1/8" X 12" (122) TALADROS 25.00 7.48 187.00 38.32
EXABLOCK 7/8" X 7" (276) TALADROS 11.00 6.00 66.00 4.78
CORDON DETONANTE 5P MTS 40.00
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00
EXSANEL 4.80 MTL PZAS 36.00
SUB-TOTAL

EQUIPOS
COSTO COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S.
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.00 138.00
Pagina: 175 de 347
SCOOP DIESEL 4.1 YD3 $ 3 HORAS 3.00 $ 30 $ 63 92.97
SCALER HORAS 0.50 0.00
B OMBA DE 10 HP HORAS 0.00 1.56
PERFORADORA PIES 12.00 0.12
SUB-TOTAL

TOTAL COSTOS DIRECTOS

CONTINGENCIAS 3%
GASTOS GENERALES 0%
UTILIDAD 10%

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)


TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) - SIN UTILIDAD NI CONTINGENCIA
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE
Pagina: 176 de 347

ON JUMBO ALTA DIFICULTAD


Metro

U.S.$/MT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
94.87

U.S.$/MT

13.47
26.77
4.46
-
-
3.80
2.47
7.31
-
1.91
15.27
0.40
11.29
-
87.14

COSTO
U.S.$/MT
U.S.$
7.95 3.08
2.98 1.16
4.24

COSTO
U.S.$/MT
U.S.$/Kgs
0.59 42.76
0.20 5.03
0.27 4.16
0.86 0.67
1.61 22.45
75.06

COSTO
TOTAL U.S. U.S.$/MT
$
276.00
Pagina: 177 de 347
278.90
0.00
0.00
1.44
556.34 215.85

477.15

14.31
0.00
47.71

539.18
517.54
OLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 178 de 347

CRUCERO 4.0 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP


02450
GRADIENTE: 5/1000 N° de Taladros: 43.00 Avance/Disp. 3.00 MT

FACTOR
MANO DE OBRA UNIDAD CANTIDAD FACT MO PU SUB TOTAL U.S.$/MT
INCIDENCIA
OPERADOR DE JUMBO Hom/Disp 1.00 1.00 1.00 52.40 52.40 0.00
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 46.37 46.37 0.00
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 1.00 36.44 72.87 0.00
BOMBERO Hom/Disp 0.00
SERVICIOS AUXILIARES Hom/Disp 2.00 1.00 1.00 34.03 68.05 0.00
SUB-TOTAL 276.13 92.17

MATERIALES
VIDA UTIL ESTANDAR PRECIO U.S.
DESCRIPCION UNIDAD MTS/DISP U.S.$/MT
MTS PZAS/DISP $/PZA
BARRAS DE PERFORACION MT/DISP 170.77 2,500 0.07 482.66 11.00
BROCAS DE 45 MM MT/DISP 159.64 200 0.80 86.74 23.11
SHANK ADAPTER MT/DISP 170.77 3,500 0.05 238.74 3.89
AFILADOR BROCAS MT/DISP 159.64 100,000 0.00 0.00 0.00
COPLAS MT/DISP 0.00
RIMADORA DE 89 MM MT/DISP 11.14 200 0.06 205.28 3.82
ADAPTADOR DE RIMADORA MT/DISP 11.14 200 0.06 133.17 2.48
TUBO PVC (Voaldura recorte) PZAS/DISP 10.00 1.88 6.29
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00
TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00
HERRAMIENTAS 1.02 0.34
MANGA VENTILACION 30" MT/DISP $ 1 0.00
ALCAYATAS DE 1/2" 4.00 PZAS/DISP 4.00 7.27 9.71
PETROLEO(Para Jumbo ) Glns/Hr 1.50 3.28 1.64
PETROLEO(Para Scooptram ) 12.32 3.28 13.49
SUB-TOTAL 75.76

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT
U.S.$/Pers
IMPLEMENTOS SEGURIDAD Unidad 7.00 1.59 11.13 3.71

VOLADURA
CANTIDAD/ CANTIDAD COSTO U.S.
DESCRIPCION UNIDAD MTS/DISP UNIDAD KG U.S.$/MT
TALADRO PZAS $/Kg
EMULEX 45% 1 1/8" X 12" Cebos TALADROS 16.00 11.00 176.00 34.38 0.66 38.82
EMULEX 45% 1 1/8" X 12" Arrastres TALADROS 10.00 12.00 120.00 23.44 0.66 26.47
EXADIT 45% 7/8" X 7" Corona TALADROS 14.00 5.29 74.00 5.64 0.20 4.85
CORDON DETONANTE 5P MTS 41.00 0.27 3.67
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.86 0.57
EXANEL 4.8 Mts PZAS 40.00 1.61 21.46
SUB-TOTAL 95.83

EQUIPOS
COSTO COSTO COSTO
COSTO TOTAL
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO HORAS 2.10 138.00 289.80
SCOOP DIESEL 4.1 YD3 (Incluye el carguio de materiHORAS 3.08 92.97 286.34
SCALER HORAS 0.80 0.00 0.00
SUB-TOTAL 576.14 192.31

TOTAL COSTOS DIRECTOS 459.78

CONTINGENCIA 3% 13.79
UTILIDAD 10% 45.98
SUB TOTAL COSTOS INDIRECTOS 59.77

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 519.55


TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) - SIN UTILIDAD NI CONTINGENCIA 496.76

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
CARGUIO DE MATERIAL CON ESCOOPTRA HACIA LOS VOLQUETES INCLUIDO EL LOS PRECIOS UNITARIOS
Pagina: 179 de 347

CRUCERO 4.0 M X 4.0 M CON JUMBO Y LIMPIEZA SCOOP


02459
GRADIENTE: 5/1000 N° de Taladros: 48.00 Avance/Disp. 3.00 MT

FACTOR
MANO DE OBRA UNIDAD CANTIDAD FACT MO PU SUB TOTAL U.S.$/MT
INCIDENCIA
OPERADOR DE JUMBO Hom/Disp 1.00 1.00 1.00 52.40 52.40
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 46.37 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 1.00 36.44 72.87
BOMBERO Hom/Disp
SERVICIOS AUXILIARES Hom/Disp 2.00 1.00 1.00 34.03 68.05
SUB-TOTAL 276.13 92.17

MATERIALES
VIDA UTIL ESTANDAR PRECIO U.S.
DESCRIPCION UNIDAD MTS/DISP U.S.$/MT
MTS PZAS/DISP $/PZA
BARRAS DE PERFORACION MT/DISP 189.34 2,500 0.08 482.66 12.20
BROCAS DE 45 MM MT/DISP 178.20 200 0.89 86.74 25.80
SHANK ADAPTER MT/DISP 189.34 3,500 0.05 238.74 4.31
RIMADORA DE 89 MM MT/DISP 11.14 200 0.06 205.28 3.82
ADAPTADOR DE RIMADORA MT/DISP 11.14 200 0.06 133.17 2.48
TUBO PVC (Voaldura recorte) PZAS/DISP 10.00 1.88 6.29
HERRAMIENTAS 1.02 0.34
ALCAYATAS DE 3/4" 4.00 PZAS/DISP 4.00 7.27 9.71
PETROLEO(Para Jumbo ) Glns/Hr 1.50 3.28 1.64
PETROLEO(Para Scooptram ) 12.60 3.28 13.79
SUB-TOTAL 80.37

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT
U.S.$/Pers
Implementos Seguridad Unidad 6.00 1.59 9.54 3.18
Implementos Operador Scoop Unidad 1.00 2.98 2.98 1.00
7.00 4.18

VOLADURA
CANTIDAD/ CANTIDAD COSTO U.S.
DESCRIPCION UNIDAD MTS/DISP UNIDAD KG U.S.$/MT
TALADRO PZAS $/Kg
EMULEX 45% 1 1/8" X 12" Cebos TALADROS 17.00 10.59 180.00 35.16 0.66 39.70
EMULEX 45% 1 1/8" X 12" Arrastres TALADROS 12.00 11.75 141.00 27.54 0.66 31.10
EXADIT 45% 7/8" X 7" Corona TALADROS 16.00 5.13 82.00 6.25 0.20 5.38
CORDON DETONANTE 5P MTS 41.00 0.27 3.67
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.86 0.57
EXANEL 4.8 Mts PZAS 45.00 1.61 24.14
SUB-TOTAL 104.55

EQUIPOS
COSTO COSTO COSTO
COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
TOTAL U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO HORAS 2.20 138.00 303.60
SCOOP DIESEL 4.1 YD3 (Incluye el carguio de materiHORAS 3.15 92.97 292.85
SCALER HORAS 0.90 0.00 0.00
SUB-TOTAL 596.45 199.08

TOTAL COSTOS DIRECTOS 480.36

CONTINGENCIA 3% 14.41
UTILIDAD 10% 48.04
SUB TOTAL COSTOS INDIRECTOS 62.45

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 542.80

LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
CARGUIO DE MATERIAL CON ESCOOPTRA HACIA LOS VOLQUETES INCLUIDO EL LOS PRECIOS UNITARIOS
Pagina: 180 de 347

CRUCERO 4.5M X 4.2 M CON JUMBO


02439 N° de Taladros: 50.00 Avance/Disp 3.00 Metros

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40


AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM 1 Hom/Disp 1.00 1.00 46.37 46.37
CARGADOR/DISPARADOR 1 Hom/Disp 3.00 1.00 36.44 109.31
AUXILIAR Hom/Disp 2.00 1.00 34.03 68.05
SUB-TOTAL 312.57 104.06

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION MT/DISP 192.83 2,500 0.08 482.66 12.39
BROCAS DE 45 MM MT/DISP 185.41 200 0.93 86.74 26.77
SHANK ADAPTER MT/DISP 192.83 3,500 0.06 238.74 4.38
AFILADOR BROCAS MT/DISP 185.41 100,000 0.00 0.00 0.00
COPLAS MT/DISP 0.00 3,000 0.00 79.65 0.00
RIMADORA DE 89 MM MT/DISP 7.42 200 0.04 205.28 2.53
ADAPTADOR DE RIMADORA MT/DISP 7.42 200 0.04 133.17 1.64
TUBO PVC (Voladura recorte) 5 PZAS/DISP 12.00 1.88 7.53
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.08 0.00
PETROLEO (JUMBO) GLN/HR 1.50 3.28 1.64
PETROLEO (SCOOP) GLN/HR 16.00 3.28 17.47
HERRAMIENTAS 1.02 0.34
ALCAYATAS DE 1/2" PZAS/DISP 4.00 7.27 9.69
SUB-TOTAL 84.38

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT
U.S.$/Pers
Implementos Seguridad Unidad 7.00 1.59 11.13 3.70
Implementos Operador Scoop Unidad 1.00 2.98 2.98 0.99
4.70
VOLADURA
CANTIDAD UNIDAD COSTO U.S.
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA U.S.$/MT
PZA KGS $/Kgs
LADRO
EMULEX 45% 1 1/8" X 12" (128) TALADROS 35.00 10.60 371.00 72.46 0.66 81.61
EXADIT 45% 7/8" X 7" (328) TALADROS 13.00 6.00 78.00 5.95 2.57 5.09
CORDON DETONANTE 5P MTS 40.00 0.27 3.57
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.86 0.57
EXSANEL 4.80 MTL PZAS 48.00 1.61 25.68
SUB-TOTAL 116.53

EQUIPOS
COSTO COSTO COSTO
COSTO TOTAL
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) 3 HORAS 2.60 138.00 358.80
SCOOP DIESEL 4.1 YD3 3 HORAS 4.00 29.97 63 92.97 371.87
SCALER HORAS 1.00 0.00 0.00
BOMBA DE 10 HP HORAS 0.00 1.56 0.00
PERFORADORA PIES 12.00 0.12 1.44
SUB-TOTAL 732.11 243.74

TOTAL COSTOS DIRECTOS 553.41

CONTINGENCIAS 3% 16.60
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 55.34

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 625.36


LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 181 de 347
CRUCERO 4.5 M X 4.2 M JUMBO Y LIMPIEZA SCOOP ALTA DIFICULTAD
02451
GRADIENTE: 5/1000 N° de Taladros: 48.00 Avance/Disp.
Factor Incidencia 12%
FACTOR
MANO DE OBRA UNIDAD CANTIDAD FACT MO PU
INCIDENCIA
OPERADOR DE JUMBO Hom/Disp 1.00 1.00 1.00 52.40
AYUDANTE OPER.JUMBO Hom/Disp 1.00 1.00 1.00 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp
CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 1.00 36.44
BOMBERO Hom/Disp
SERVICIOS AUXILIARES Hom/Disp 2.00 1.00 1.00 34.03
SUB-TOTAL

MATERIALES
VIDA UTIL ESTANDAR
DESCRIPCION UNIDAD MTS/DISP
MTS PZAS/DISP
BARRAS DE PERFORACION MT/DISP 159.11 2,500 0.06
BROCAS DE 45 MM MT/DISP 152.74 200 0.76
SHANK ADAPTER MT/DISP 159.11 3,500 0.05
AFILADOR BROCAS MT/DISP 152.74 100,000 0.00
COPLAS MT/DISP 0.00 3,000 0.00
RIMADORA DE 89 MM MT/DISP 6.36 200 0.03
ADAPTADOR DE RIMADORA MT/DISP 6.36 200 0.03
TUBO PVC (Voladura recorte) PZAS/DISP 10.00
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00
TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00
HERRAMIENTAS GLB
MANGA VENTILACION 30" MT/DISP 0.00 $ 1
ALCAYATAS DE 1/2" 4.00 PZAS/DISP 4.00
PETROLEO(Para Jumbo ) Glns/Hr 1.50
PETROLEO(Para Scooptram ) 14.80
SUB-TOTAL

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP
U.S.$/Pers
IMPLEMENTOS SEGURIDAD Unidad 8.00 1.59

VOLADURA
CANTIDAD/ CANTIDAD
DESCRIPCION UNIDAD MTS/DISP
TALADRO PZAS
EMULEX 45% 1 1/8" X 12" Cebos TALADROS 20.00 9.00 180.00
EMULEX 45% 1 1/8" X 12" Arrastres TALADROS 9.00 9.56 86.00
EXADIT 45% 7/8" X 7" Corona TALADROS 17.00 4.00 68.00
CORDON DETONANTE 5P MTS 45.00
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00
EXANEL 4.8 Mts PZAS 46.00
SUB-TOTAL

EQUIPOS
COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN
U.S.$/HR U.S.$/HR
JUMBO ELECTROHIDR DE 1 BRAZO HORAS 2.15
SCOOP DIESEL 4.1 YD3 (Incluye el carguio de mate HORAS 3.70
SCALER HORAS 1.00
Pagina: 182 de 347
VENTILADOR DE 60,000 CFM HORAS 0.00
VENTILADOR DE 20,000 CFM HORAS 0.00
BOMBA DE 50 HP HORAS 0.00
BOMBA DE 10 HP HORAS 0.00
PERFORADORA HORAS 12.00
SUB-TOTAL

TOTAL COSTOS DIRECTOS

CONTINGENCIA 3%
UTILIDAD 10%
SUB TOTAL COSTOS INDIRECTOS

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)


TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) - SIN UTILIDAD NI CONTINGENCIA
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE EST
CARGUIO DE MATERIAL CON ESCOOPTRA HACIA LOS VOLQUETES INCLUIDO EL LOS PRECIOS UNITARIOS
Pagina: 183 de 347
Y LIMPIEZA SCOOP ALTA DIFICULTAD

2.64 MT

SUB TOTAL U.S.$/MT

52.40
36.44
46.37
0.00
109.31
0.00
68.05
312.57 118.35

PRECIO U.S.
U.S.$/MT
$/PZA
482.66 11.63
86.74 25.08
238.74 4.11
0.00 0.00
79.65 0.00
205.28 2.47
133.17 1.60
1.88 7.13
2.08 0.00
0.00
1.02 0.39
0.00
7.27 11.01
3.28 1.86
3.28 18.38
83.67

COSTO
U.S.$/MT
U.S.$
12.72 4.81

COSTO
UNIDAD KG U.S.$/MT
U.S.$/Kg
35.16 0.66 45.03
16.80 0.66 21.51
5.18 0.20 5.06
0.27 4.56
0.86 0.65
1.61 27.99
104.81

COSTO COSTO
TOTAL U.S. TOTAL U.S.$/MT
$/HR U.S.$
138.00 296.70
92.97 343.98
0.00 0.00
Pagina: 184 de 347
0.00
0.00
0.00
0.00
0.12 1.44
642.12 243.12

554.77

16.64
55.48
72.12

626.89
601.76
UETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 185 de 347

PRECORTE CRUCERO 4.5M X 4.2 M CON JUMBO


02425 N° de Taladros: 57.00 Avance/Disp 2.64 Metros

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT


OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 46.37 46.37
CARGADOR/DISPARADOR Hom/Disp 1.00 1.00 36.44 36.44
AUXILIAR Hom/Disp $ 2 1.00 34.03 68.05
SUB-TOTAL 239.70 90.70

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION MT/DISP 183.43 2,500.00 0.07 482.66 13.40
BROCAS DE 45 MM MT/DISP 177.21 200.00 0.89 86.74 29.08
SHANK ADAPTER MT/DISP 183.43 3,500.00 0.05 238.74 4.73
AFILADOR BROCAS MT/DISP 177.21 100,000.00 0.00 0.00 0.00
COPLAS MT/DISP - 3,000.00 - 79.65 0.00
RIMADORA DE 89 MM MT/DISP 6.22 200.00 0.03 205.28 2.42
ADAPTADOR DE RIMADORA MT/DISP 6.22 200.00 0.03 133.17 1.57
TUBO PVC (Voladura recorte) $ 5 PZAS/DISP 12.00 1.88 8.56
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP - 2.08 0.00
PETROLEO (JUMBO) GLN/HR 1.50 3.28 1.86
PETROLEO (SCOOP) GLN/HR 16.00 3.28 19.86
HERRAMIENTAS 1.02 0.39
ALCAYATAS DE 3/4" PZAS/DISP 4.00 7.27 11.01
SUB-TOTAL 92.87

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT
U.S.$/Pers
Implementos Seguridad Unidad 5.00 1.59 7.95 3.01
Implementos Operador Scoop Unidad 1.00 2.98 2.98 1.13
4.14
VOLADURA
CANTIDAD UNIDAD COSTO U.S.
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA U.S.$/MT
PZA KGS $/Pza
LADRO
SEMEXSA 45% 1 1/8" X 12" (122) TALADROS 30.00 9.03 271.00 55.53 0.59 60.43
EXABLOCK 7/8" X 7" (276) TALADROS 15.00 6.00 90.00 6.52 0.20 6.69
CORDON DETONANTE 5P MTS 40.00 0.27 4.05
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.86 0.65
EXSANEL 4.80 MTL PZAS 45.00 1.61 27.37
SUB-TOTAL 99.20

EQUIPOS
COSTO COSTO COSTO
COSTO TOTAL
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) $ 3 HORAS 2.88 138.00 397.44
SCOOP DIESEL 4.1 YD3 HORAS 4.00 29.97 $ 63 92.97 371.87
SCALER HORAS 1.00 0.00 0.00
BOMBA DE 10 HP HORAS 0.00 1.56 0.00
PERFORADORA PIES 12.00 0.12 1.44
SUB-TOTAL 770.75 291.66

TOTAL COSTOS DIRECTOS 578.57

CONTINGENCIAS 3% 17.36
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 57.86

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 653.78


TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) - SIN UTILIDAD NI CONTINGENCIA 628.28
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 186 de 347
CRUCERO 5.0 M X 4.0 M JUMBO Y LIMPIEZA SCOOP
02452
GRADIENTE: 5/1000 N° de Taladros: 53.00 Avance/Disp. 3.00 MT
Factor Incidencia 12%
FACTOR
MANO DE OBRA UNIDAD CANTIDAD FACT MO PU SUB TOTAL U.S.$/MT
INCIDENCIA
OPERADOR DE JUMBO Hom/Disp 1.00 1.00 1.00 52.40 52.40
AYUDANTE OPER.JUMBO Hom/Disp 1.00 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 46.37 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 1.00 1.00 0.00
CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 1.00 36.44 109.31
BOMBERO Hom/Disp 0.00 1.00 1.00 0.00
SERVICIOS AUXILIARES Hom/Disp 2.00 1.00 1.00 34.03 68.05
SUB-TOTAL 312.57 104.33

MATERIALES
VIDA UTIL ESTANDAR PRECIO U.S.
DESCRIPCION UNIDAD MTS/DISP U.S.$/MT
MTS PZAS/DISP $/PZA
BARRAS DE PERFORACION MT/DISP 204.19 2,500 0.08 482.66 13.16
BROCAS DE 45 MM MT/DISP 196.76 200 0.98 86.74 28.48
SHANK ADAPTER MT/DISP 204.19 3,500 0.06 238.74 4.65
AFILADOR BROCAS MT/DISP 196.76 100,000 0.00 0.00 0.00
COPLAS MT/DISP 0.00 3,000 0.00
RIMADORA DE 89 MM MT/DISP 7.42 200 0.04 205.28 2.54
ADAPTADOR DE RIMADORA MT/DISP 7.42 200 0.04 133.17 1.65
TUBO PVC (Voladura recorte) PZAS/DISP 10.00 1.88 6.29
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 0.00
TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00 0.00
HERRAMIENTAS GLB 1.02 0.34
MANGA VENTILACION 30" MT/DISP 0.00 $ 1 0.00
ALCAYATAS DE 1/2" 4.00 PZAS/DISP 4.00 7.27 9.71
PETROLEO(Para Jumbo ) Glns/Hr 1.50 3.28 1.64
PETROLEO(Para Scooptram ) 17.20 3.28 18.83
SUB-TOTAL 87.29

IMPLEMENTOS SEGURIDAD
COSTO UNIT COSTO
DESCRIPCION UNIDAD MTS/DISP U.S.$/MT
U.S.$/Pers U.S.$
IMPLEMENTOS SEGURIDAD Unidad 8.00 1.59 12.72 4.24

VOLADURA
CANTIDAD/ CANTIDAD COSTO
DESCRIPCION UNIDAD MTS/DISP UNIDAD KG U.S.$/MT
TALADRO PZAS U.S.$/Kg
EMULEX 45% 1 1/8" X 12" Cebos TALADROS 22.00 11.27 248.00 48.44 0.66 54.70
EMULEX 45% 1 1/8" X 12" Arrastres TALADROS 11.00 12.09 133.00 25.98 0.66 29.33
EXADIT 45% 7/8" X 7" Corona TALADROS 18.00 6.00 108.00 8.23 0.20 7.08
CORDON DETONANTE 5P MTS 45.00 0.27 4.02
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.86 0.57
EXANEL 4.8 Mts PZAS 51.00 1.61 27.36
SUB-TOTAL 123.06

EQUIPOS
COSTO COSTO COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. TOTAL U.S.$/MT
U.S.$/HR U.S.$/HR $/HR U.S.$
JUMBO ELECTROHIDR DE 1 BRAZO HORAS 2.57 138.00 354.66
SCOOP DIESEL 4.1 YD3 (Incluye el carguio de mate HORAS 4.30 92.97 399.76
SCALER HORAS 1.00 0.00 0.00
PERFORADORA HORAS 12.00 0.12 1.44
SUB-TOTAL 755.86 252.29

TOTAL COSTOS DIRECTOS 571.23

CONTINGENCIA 3% 17.14
UTILIDAD 10% 57.12
SUB TOTAL COSTOS INDIRECTOS 74.26

TOTAL COSTOS U.S.$/Mt (Con equipos) 645.49


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA 617.59
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
CARGUIO DE MATERIAL CON ESCOOPTRA HACIA LOS VOLQUETES INCLUIDO EL LOS PRECIOS UNITARIOS
Pagina: 187 de 347

GALERIA 2.4 X 2.4 M JACK LEG 6' Y LIMPIEZA SCOOP


(1 FRENTE)
GRADIENTE: 5/1000 N° Taladros Carg: 35.00 Avance/Disp.
02456 N° Taladros Perf: 38.00
MANO DE OBRA
FACTOR COSTO
DESCRIPCION UNIDAD CANT
INCIDENCIA U.S.$/Tar

PERFORISTA Hom 1.00 1.00 36.44


AYUD. PERFORISTA Hom 1.00 1.00 34.03
OPERADOR SCOOPTRAM Hom 0.50 1.00 46.37
SERVICIOS AUXILIARES $ 1 Hom 0.00 1.00 34.03
SUB-TOTAL

MATERIALES
ESTANDAR PRECIO
DESCRIPCION UNIDAD PIES/DISP VIDA UTIL
PIES/DISP U.S.$/PZA

BARRAS DE PERFORACION 6' P.P. 205.20 1,820 0.11 90.92


BROCAS DE 40 MM P.P. 205.20 350 0.59 23.08
ACEITE DE PERFORACIÓN GLN 0.25 7.86
HERRAMIENTAS GLB 1.00 1.02
ALCAYATAS DE 3/4" PZAS 0.00
TUBERIA DE POLIETILENO DE 2" AGUA PZAS 0.00
TUBERIA DE POLIETILENO DE 4" AIRE PZAS 0.00
TUBO PVC (Voladura recorte) PZAS 0.00
MANGUERA DE AIRE 1" MTS 30.00 150 0.20 3.17
MANGUERA DE AGUA 1/2" MTS 30.00 150 0.20 1.57
Petroleo para scooptram Glns/Hr 5.49
SUB-TOTAL

IMPLEMENTOS SEGURIDAD
COSTO
DESCRIPCION UNIDAD TAR/DISP UNIT U.S.
$/Per
IMPLEMENTOS SEGURIDAD GLB 2.50 1.59

VOLADURA
UNIDAD COSTO U.S.
DESCRIPCION UNIDAD CART
KG $/Pza
EMULNOR 3000 1" X 7" PZAS 56.00 5.38 0.24
EMULNOR 1000 1" X 7" PZAS 132.00 12.50 0.21
EXADIT 45% 7/8" X 7" PZAS 20.00 1.52 0.20
FANEL PZAS 35.00 1.17
CORDON DETONANTE 5P $ 10 MTS 10.00 0.27
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.86
IGNITED CORD $ 0 PZAS 0.20 1.31
SUB-TOTAL

EQUIPOS
COSTO COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDA OPERACIÓ TOTAL U.S.
D U.S.$/HR N U.S.$/HR $/HR
SCOOP DIESEL 4.1 YD3 2.00 HORAS 1.83 92.97
CAMION DE BAJO PERFIL HORAS 0.00 0.00
VENTILADOR DE 30,000 CFM HORAS 0.00 0.00
Pagina: 188 de 347
VENTILADOR DE 20,000 CFM HORAS 0.00 0.00
BOMBA DE 50 HP HORAS 0.00 0.00
BOMBA DE 10 HP HORAS 0.00 0.00
SCISSOR LIFT HORAS 0.00
PERFORADORA PIES 205.20 0.12
SUB-TOTAL

TOTAL COSTOS DIRECTOS

GASTOS GENERALES 0%
CONTINGENCIA 3%
UTILIDAD 10%
SUB TOTAL COSTOS INDIRECTOS

TOTAL COSTOS U.S.$/Mt (Con equipos)


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE
Pagina: 189 de 347

ACK LEG 6' Y LIMPIEZA SCOOP


1 FRENTE)
1.50 MT

COSTO
U.S.$/MT
U.S.$/DISP

36.44 24.33
34.03 22.72
23.19 15.48
0.00 0.00
62.53

COSTO
U.S.$/MT
U.S.$/DISP

10.25 6.84
13.53 9.03
1.96 1.31
1.02 0.68
0.00
0.00
0.00
0.00
0.63 0.42
0.31 0.21
3.28 12.02
30.53

COSTO
U.S.$/MT
U.S.$

3.97 2.65

COSTO
U.S.$/MT
U.S.$/DISP
13.50 9.01
28.29 18.89
3.93 2.62
40.89 27.30
2.68 1.79
1.71 1.14
0.26 0.18
60.93

COSTO
U.S.$/MT
TOTAL U.S.$

170.13 113.59
0.00
0.00
Pagina: 190 de 347
0.00
0.00
0.00
0.00
24.62 16.44
130.03

286.67

0.00
8.60
28.67
37.27

323.93
311.70
IO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 191 de 347
GAL/CRUCERO 3.0 M X 3.0 M CON JUMBO
02445 N° de Taladros: 38 Avance/Disp. 2.90 MT
$ 31

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40


AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 46.37 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 1.00 0.00 0.00
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 36.44 72.87
BOMBERO Hom/Disp 0.00 1.00 0.00
SERVICIOS AUXILIARES Hom/Disp 1.00 0.00
SUB-TOTAL 208.08 71.86

MATERIALES
VIDA
ESTANDAR PRECIO U.S.
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP $/PZA
MTS
BARRAS DE PERFORACION MT/DISP 118.72 2,500 0.05 482.66 7.92
BROCAS DE 45 MM MT/DISP 110.03 200 0.55 86.74 16.48
SHANK ADAPTER MT/DISP 118.72 3,500 0.03 238.74 2.80
AFILADOR BROCAS MT/DISP 110.03 100,000 0.00 0.00 0.00
COPLAS MT/DISP 0.00 3,000 0.00 79.65 0.00
RIMADORA DE 89 MM MT/DISP 8.69 200 0.04 205.28 3.08
ADAPTADOR DE RIMADORA MT/DISP 8.69 200 0.04 133.17 2.00
TUBO PVC (Voaldura recorte) PZAS/DISP 8.00 1.88 5.21
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.08 0.00
PETROLEO (JUMBO) GLN/HR 1.50 3.28 1.70
PETROLEO (SCOOP) GLN/HR 12.00 3.28 13.59
HERRAMIENTAS 1.02 0.35
ALCAYATAS DE 3/4" PZAS/DISP 3.00 7.27 7.54

SUB-TOTAL 60.65

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT
U.S.$/Pers
Implementos Seguridad Unidad 4.00 1.59 6.36 2.20
Implementos Operador Scoop Unidad 1.00 2.98 2.98 1.03
3.23

VOLADURA
CANTIDAD UNIDAD COSTO U.S.
DESCRIPCION UNIDAD TALADROS CANTIDAD/TAL U.S.$/MT
PZA KGS $/Kgs
ADRO
EMULEX 45% 1 1/8" X 12" (128) TALADROS 24.00 7.25 174.00 33.98 0.66 39.71
EXADIT 45% 7/8" X 7" (328) TALADROS 11.00 5.00 55.00 4.19 2.57 3.72
CORDON DETONANTE 5P MTS 35.00 0.27 3.24
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.86 0.59
EXSANEL 4.80 MTL PZAS 35.00 1.61 19.43
SUB-TOTAL 66.68

EQUIPOS
COSTO COSTO COSTO
COSTO TOTAL
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO $
( 2 HORAS 1.80 138.00 248.40
SCOOP DIESEL 4.1 YD3 $ 2 HORAS 3.00 29.97 62.99 92.97 278.90
PERFORADORA PIES 9.00 0.12 1.08
SUB-TOTAL 528.38 182.48

TOTAL COSTOS DIRECTOS 384.90

CONTINGENCIAS 3% 11.55
GASTOS GENERALES 0% 0.00
UTILIDAD 10.00% 38.49

TOTAL COSTOS U.S.$/Mt (Con equipos) 434.94


LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 192 de 347

PRECORTE GAL/CRUCERO 3.5M X 3.5 M CON JUMBO


02441 N° de Taladros: 52 Avance/Disp.

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40


AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 0.50 46.37
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 36.44
BOMBERO Hom/Disp 0.00 0.38
SERVICIOS AUXILIARES Hom/Disp 2.00 1.00 36.44
SUB-TOTAL

MATERIALES
VIDA
ESTANDAR
DESCRIPCION UNIDAD MTS/DISP ECONOMICA
PZAS/DISP
MTS
BARRAS DE PERFORACION 12 FTS MT/DISP 180.25 2,500.00 0.07
BROCAS DE 45 MM MT/DISP 167.37 200.00 0.84
SHANK ADAPTER MT/DISP 180.25 3,500.00 0.05
AFILADOR BROCAS MT/DISP 167.37 100,000.00 0.00
COPLAS MT/DISP - $ 3,000 -
RIMADORA DE 89 MM MT/DISP 12.87 200.00 0.06
ADAPTADOR DE RIMADORA MT/DISP 12.87 200.00 0.06
TUBO PVC (Voladura recorte) PZAS/DISP 10.00
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP -
PETROLEO (JUMBO) GLN/HR 1.50
PETROLEO (SCOOP) GLN/HR 12.00
HERRAMIENTAS
ALCAYATAS DE 3/4" PZAS/DISP 4.00

SUB-TOTAL

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP
U.S.$/Pers
Implementos Seguridad Unidad 6.00 1.59
Implementos Operador Scoop Unidad 1.00 2.98

VOLADURA
CANTIDAD
DESCRIPCION UNIDAD TALADROS CANTIDAD/TAL
PZA
ADRO
SEMEXSA 45% 1 1/8" X 12" (122) TALADROS 25.00 8.64 216.00
EXABLOCK 7/8" X 7" (276) TALADROS 13.00 6.00 78.00
CORDON DETONANTE 5P MTS 40.00
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00
EXSANEL 4.80 MTL PZAS 38.00
SUB-TOTAL

EQUIPOS
COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN
U.S.$/HR U.S.$/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.30
Pagina: 193 de 347
SCOOP DIESEL 4.1 YD3 HORAS 3.00 29.97 62.99
SCALER HORAS 0.50
B OMBA DE 10 HP HORAS -
PERFORADORA PIES 12.00
SUB-TOTAL

TOTAL COSTOS DIRECTOS

CONTINGENCIAS 3%
GASTOS GENERALES 0%
UTILIDAD 10%

TOTAL COSTOS U.S.$/Mt (Con equipos)


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE EST
Pagina: 194 de 347

RO 3.5M X 3.5 M CON JUMBO


2.90 Metro

SUB TOTAL U.S.$/MT

52.40 0.00
36.44 0.00
46.37 0.00
0.00 0.00
72.87 0.00
0.00 0.00
72.87 0.00
280.95 96.99

PRECIO U.S.
U.S.$/MT
$/PZA
514.57 12.81
86.74 25.06
238.74 4.24
- -
79.65 -
205.28 4.56
133.17 2.96
1.88 6.50
2.08 -
3.28 1.70
3.28 13.59
1.02 0.35
7.27 10.04
-
81.81

COSTO
U.S.$/MT
U.S.$
9.54 3.29
2.98 1.03
4.32

COSTO
UNIDAD KGS U.S.$/MT
U.S.$/Kgs
44.26 0.59 43.94
5.65 0.20 5.29
0.27 3.70
0.86 0.59
1.61 21.08
74.61

COSTO
COSTO TOTAL
TOTAL U.S. U.S.$/MT
U.S.$/HR
$
138.00 317.40
Pagina: 195 de 347
92.97 278.90
- -
1.56 -
0.12 1.44
597.74 206.35

464.07

13.92
0.00
46.41

524.40
503.51
ETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 196 de 347

PRECORTE RP/XC 4.0M X 3.5 M CON JUMBO


03310 N° de Taladros: 50.00 Avance/Disp 2.64 Metros

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT


OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 46.37 46.37
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 36.44 72.87
AUXILIAR Hom/Disp 2.00 1.00 34.03 68.05
SUB-TOTAL 276.13 104.49

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION MT/DISP 164.77 2,500.00 0.07 482.66 12.04
BROCAS DE 45 MM MT/DISP 155.45 200.00 0.78 86.74 25.51
SHANK ADAPTER MT/DISP 164.77 3,500.00 0.05 238.74 4.25
AFILADOR BROCAS MT/DISP 155.45 100,000.00 0.00 0.00 0.00
COPLAS MT/DISP - 3,000.00 - 79.65 0.00
RIMADORA DE 89 MM MT/DISP 9.33 200.00 0.05 205.28 3.62
ADAPTADOR DE RIMADORA MT/DISP 9.33 200.00 0.05 133.17 2.35
TUBO PVC (Voladura recorte) PZAS/DISP 12.00 1.88 8.56
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP - 2.08 0.00
PETROLEO (JUMBO) GLN/HR 1.50 3.28 1.86
PETROLEO (SCOOP) GLN/HR 12.80 3.28 15.89
HERRAMIENTAS 1.02 0.39
ALCAYATAS DE 3/4" PZAS/DISP 4.00 7.27 11.01
SUB-TOTAL 85.47

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT
U.S.$/Pers
Implementos Seguridad Unidad 6.00 1.59 9.54 3.61
Implementos Operador Scoop Unidad 1.00 2.98 2.98 1.13
4.74
VOLADURA
CANTIDAD UNIDAD COSTO U.S.
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA U.S.$/MT
PZA KGS $/Pza
LADRO
SEMEXSA 45% 1 1/8" X 12" (122) TALADROS 25.00 8.60 215.00 44.06 0.59 47.95
EXABLOCK 7/8" X 7" (276) TALADROS 12.00 6.00 72.00 5.22 0.20 5.35
CORDON DETONANTE 5P MTS 40.00 0.27 4.05
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.86 0.65
EXSANEL 4.80 MTL PZAS 37.00 1.61 22.50
SUB-TOTAL 80.50

EQUIPOS
COSTO COSTO COSTO
COSTO TOTAL
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.50 138.00 345.00
SCOOP DIESEL 4.1 YD3 HORAS 3.20 29.97 $ 63 92.97 297.50
SCALER HORAS 0.80 0.00 0.00
BOMBA DE 10 HP 4 HORAS 5.00 1.56 7.82
PERFORADORA PIES 12.00 0.12 1.44
SUB-TOTAL 651.76 246.64

TOTAL COSTOS DIRECTOS 521.84

CONTINGENCIAS 3% 15.66
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 52.18

TOTAL COSTOS U.S.$/Mt (Con equipos) 589.68


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA 567.49
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 197 de 347
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO

03312 CONSORCIO MINER0 HORIZONTE S.A.


RAMPA 3.0 X 3.0 mts. Jack Leg - Scoop de 2.5 Yd3. Acarreo hasta 150 mts. N° Taladros: 38 u
N° Tal.carg.: 35 u
AVANCE: 1.50 ml

ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL

UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforista Tareas 2.00 36.44 $/Tarea 72.87
Ayudante Perforista $1 Tareas 1.00 34.03 $/Tarea 34.03
Operador Scoop Tareas 0.50 46.37 $/Tarea 23.19
Personal de servicios auxiliares Tareas 1.00 34.03 $/Tarea 34.03
Bombero $0 Tareas 0.50 34.03 $/Tarea 17.01
181.13 120.75
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 4.50 1.59 7.15
Implementos Operador Scoop Tareas 0.50 2.98 1.49
8.64 5.76
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 228.000 90.92 $/uni 11.39
Broca de 40 mm P.P. 228.000 23.08 $/uni 15.04
Aceite de Perforación Gln 0.400 7.86 $/uni 3.14
Petroleo Gln/Hr 6.000 3.28 $/uni 19.68
Herramientas de Mina-Barretillas Global $/uni 1.02
Alcayatas de 3/4" uni 1.000 7.27 $/uni 7.27
57.54 38.36
4.- EXPLOSIVOS

EMULEX 45% x 1" x 7" (276) Pza. 151.00 0.230 $/uni 34.73
EXSABLOCK 7/8" X 7" (276) Pza. 48.00 0.196 $/uni 9.43
EXSANEL 3.0 m Pza. 35.00 2.241 $/uni 78.44
GUIA ENSAMBLADA 2.4 MTL - CA Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Pza. 20.00 0.268 $/uni 5.36
IGNICION RAPIDA Mts. 0.10 1.313 $/uni 0.13
129.80 86.54
5.- EQUIPOS
Scooptrams 2.5 Yd3 Hrs. 2.00 67.97 $/hr 135.94
Perforadora P.P. 228.00 0.120 $/pp 27.36
Manguera Aire 1¨ Mts. 30.00 3.17 $/hr 0.63
Manguera Agua 1/2¨ Mts. 30.00 1.57 $/hr 0.31
Bomba de 10 HP $4 Hrs. 5.00 1.56 $/hr 7.82
172.07 114.71
366.13
6.- GASTOS INDIRECTOS
Contingencias 3% $ 10.98
Gastos Generales 0% $ 0.00
Utilidad 10% $ 36.61
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 413.72
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) - SIN UTILIDAD NI CONTINGENCIA 396.74
Energía Eléctrica, Tuberias, accesorios proporciona Cía.
Pagina: 198 de 347

PRECORTE RAMPA 3.0 x 3.0 mts con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts.
03314 N° de Taladros: 44.00 Avance/Disp. 1.50 MT

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT

MAESTRO PERFORISTA Hom/Disp 2.00 1.00 36.44 72.87 0.00


AYUDANTE PERFORISTA Hom/Disp 1.00 1.00 34.03 34.03 0.00
OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 46.37 23.19 0.00
SERVICIO Hom/Disp 1.00 1.00 34.03 34.03
SUB-TOTAL 164.11 109.20

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION 6' Pies/DISP 264.00 1,820 0.15 90.92 8.78
BROCAS DE 40 MM Pies/DISP 264.00 350 0.75 23.08 11.58
ACEITE DE PERFORACION Gkns 0.40 7.86 2.09
PETROLEO Gkns/Hr 6.00 3.28 13.09
HERRAMIENTAS 1.02 0.68
ALCAYATAS DE 3/4" PZAS/DISP 1.00 7.27 4.84
$ -
SUB-TOTAL 41.07

IMPLEMENTOS SEGURIDAD
COSTO
COSTO
DESCRIPCION UNIDAD MTS/DISP UNIT U.S. U.S.$/MT
U.S.$
$/Pers
Implementos Seguridad Unidad 3.00 1.59 4.77
Implementos Seguridad Operador Unidad 0.50 2.98 1.49 4.17

VOLADURA
CANTIDAD UNIDAD COSTO
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA U.S.$/MT
PZA KGS U.S.$/Uni
LADRO
EMULEX 45% 1" X 7" (276) TALADROS 23.00 6.74 155.00 14.04 0.23 23.72
EXSABLOCK 7/8" X 7" (276) TALADROS 12.00 4.00 48.00 3.48 0.20 6.27
CORDON DETONANTE 5P MTS 65.00 0.27 11.59
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.86 1.14
EXSANEL 3.0 MTL PZAS 35.00 2.24 52.20
SUB-TOTAL 94.92

EQUIPOS
COSTO COSTO COSTO
COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
TOTAL U.S.$
U.S.$/HR U.S.$/HR $/HR
SCOOP DIESEL 2.5 YD3 HORAS 2.00 67.97 135.94
MANGUERA AIRE 1¨ MTS 30.00 150.00 $ 0 3.17 0.63
MANGUERA AGUA 1/2¨ MTS 30.00 150.00 $ 0 1.57 0.31
BOMBA DE 10 HP HORAS 5.00 1.56 7.82
PERFORADORA HORAS 264.00 0.12 31.68
SUB-TOTAL 176.39 117.37

TOTAL COSTOS DIRECTOS 366.73

CONTINGENCIAS 3% 11.00
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 36.67

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 414.40


TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) - SIN UTILIDAD NI CONTINGENCIA 396.18
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 199 de 347

RAMPA 3.00 M X 3.50 M JACK LEG 6' Y LIMPIEZA SCOOP

GRADIENTE: 5/1000 N° Tal Cargados: 44.00 Avance/Disp.


02457 N° Tal Perforados: 47.00
MANO DE OBRA
FACTOR COSTO
DESCRIPCION UNIDAD CANT
INCIDENCIA U.S.$/Tar

PERFORISTA Hom 2.00 1.00 36.44


AYUD. PERFORISTA $ 1 Hom 1.00 1.00 34.03
OPERADOR SCOOPTRAM Hom 1.00 0.40 46.37
BOMBERO $ 0 Hom 1.00 0.15 34.03

SUB-TOTAL

MATERIALES
ESTANDAR PRECIO
DESCRIPCION UNIDAD PIES/DISP VIDA UTIL
PIES/DISP U.S.$/PZA

BARRAS DE PERFORACION 6' P.P. 253.80 1,820 0.14 90.92


BROCAS DE 40 MM P.P. 253.80 350 0.73 23.08
ACEITE DE PERFORACIÓN GLN 0.40 7.86
HERRAMIENTAS GLB 1.00 1.02
ALCAYATAS DE 3/4" 1.00 PZAS 2.00 7.27
TUBERIA DE POLIETILENO DE 2" AGUA PZAS 0.75 2.08
TUBERIA DE POLIETILENO DE 4" AIRE PZAS 0.75 6.35
TUBO PVC (Voladura recorte) PZAS 5.00 1.88
MANGUERA DE AIRE 1" MTS 30.00 150 0.20 3.17
MANGUERA DE AGUA 1/2" MTS 30.00 150 0.20 1.57
Petroleo para scooptram Glns/Hr 6.00
SUB-TOTAL

IMPLEMENTOS SEGURIDAD
COSTO
DESCRIPCION UNIDAD TAR/DISP UNIT U.S.
$/Per
IMPLEMENTOS SEGURIDAD GLB 3.55 1.59

VOLADURA
UNIDAD COSTO U.S.
DESCRIPCION UNIDAD CART
KG $/Pza
EMULNOR 3000 1" X 7" PZAS 105.00 10.10 0.24
EMULNOR 1000 1" X 7" PZAS 184.00 17.42 0.21
EXADIT 45% 7/8" X 7" PZAS 20.00 1.52 0.20
FANEL PZAS 44.00 1.17
CORDON DETONANTE 5P $ 15 MTS 25.00 0.27
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.86
IGNITED CORD $ 0 PZAS 0.20 1.31
SUB-TOTAL

EQUIPOS
COSTO COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDA OPERACIÓ TOTAL U.S.
D U.S.$/HR N U.S.$/HR $/HR
SCOOP DIESEL 4.1 YD3 2.50 HORAS 2.00 92.97
CAMION DE BAJO PERFIL HORAS 0.00
Pagina: 200 de 347
BOMBA DE 50 HP HORAS 0.00
BOMBA DE 10 HP HORAS 0.00
SCISSOR LIFT HORAS 0.00
PERFORADORA PIES 257.80 0.12
SUB-TOTAL

TOTAL COSTOS DIRECTOS

GASTOS GENERALES 0%
CONTINGENCIA 3%
UTILIDAD 10%
SUB TOTAL COSTOS INDIRECTOS

TOTAL COSTOS U.S.$/Mt (Con equipos)


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE
Pagina: 201 de 347

JACK LEG 6' Y LIMPIEZA SCOOP

1.50 MT

COSTO
U.S.$/MT
U.S.$/DISP

72.87 48.65
34.03 22.72
18.55 12.38
5.10 3.41

87.16

COSTO
U.S.$/MT
U.S.$/DISP

12.68 8.46
16.74 11.17
3.14 2.10
1.02 0.68
14.55 9.71
1.56 1.04
4.76 3.17
9.42 6.29
0.63 0.42
0.31 0.21
3.28 13.14
56.41

COSTO
U.S.$/MT
U.S.$

5.64 3.77

COSTO
U.S.$/MT
U.S.$/DISP
25.31 16.90
39.43 26.33
3.93 2.62
51.40 34.32
6.70 4.47
1.71 1.14
0.26 0.18
85.96

COSTO
U.S.$/MT
TOTAL U.S.$

185.94 124.14
0.00 0.00
Pagina: 202 de 347
0.00 0.00
0.00 0.00
0.00 0.00
30.94 20.65
144.80

378.09

0.00
11.34
37.81
49.15

427.25
408.25
IO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 203 de 347
FORMATO DE PRECIOS UNITARIOS DE AVANCES - MECANIZADO
03313 CONSORCIO MINER0 HORIZONTE S.A.
RAMPA 3.5 X 3.5 mts. Jack Leg - Scoop de 2.5 Yd3 Acarreo hasta 150 mts. N° Taladros: 43 u
N° Tal.carg.: 39 u
AVANCE: 1.50 ml

ITEM DESCRIPCION UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforista Tareas 2.00 36.44 $/Tarea 72.87
Ayudante Perforista Tareas 1.00 34.03 $/Tarea 34.03
Operador Scoop Tareas 0.85 46.37 $/Tarea 39.42
146.32 97.55
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 3.00 1.59 4.77
Implementos Operador Scoop Tareas 0.85 2.98 2.53
7.30 4.87
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 258.000 90.92 $/uni 12.89
Broca de 40 mm PP 258.000 23.08 $/uni 17.01
Aceite de Perforación Gln 0.400 7.86 $/uni 3.14
Petroleo Gln/Hr 7.500 3.28 $/uni 24.60
Herramientas de Mina-Barretillas Global $/uni 1.02
Alcayatas de 3/4" uni 1.000 7.27 $/uni 7.27
65.94 43.96
4.- EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza 168.00 0.230 $/uni 38.64
EXSABLOCK 7/8" X 7" (276) Pza 24.00 0.196 $/uni 4.71
EXADIT 45% 7/8" X 7" (328) Pza 54.00 0.196 $/uni 10.61
EXSANEL 3.0m Pza. 39.00 2.241 $/uni 87.41
GUIA ENSAMBLADA 2.4 MTL - C Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Mts. 15.00 0.268 $/uni 4.02
IGNICION RAPIDA Mts. 0.10 1.313 $/pie 0.13
147.23 98.15
5.- EQUIPOS
SCALER Hrs. 0.50 0.00 $/hr 0.00
Scooptrams 2.5 Yd3 $2 Hrs. 2.50 67.97 $/hr 169.92
Perforadora P.P. 258.00 0.120 $/pp 30.96
Manguera Aire 1¨ Mts. 30.00 3.17 $/hr 0.63
Manguera Agua 1/2¨ Mts. 30.00 1.57 $/hr 0.31
Bomba de 10 HP $5 Hrs. 8.00 1.56 $/hr 12.52
214.35 142.90
387.43
6.- GASTOS INDIRECTOS
Contingencias 3% $ 11.62
Gastos Generales 0% $ 0.00
Utilidad 10% $ 38.74
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 437.79
Energía Eléctrica, Tuberias, accesorios proporciona Cía.
Pagina: 204 de 347

RAMPA 3.5M X 3.5 M CON JUMBO

03311 N° de Taladros: 44 Avance/Disp 2.90 Metros

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40


AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM 1 Hom/Disp 1.00 1.00 46.37 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 0.50 46.37 0.00
CARGADOR/DISPARADOR 1 Hom/Disp 2.00 1.00 36.44 72.87
BOMBERO 0 Hom/Disp 1.00 0.38 0.00
SERVICIOS AUXILIARES 1 Hom/Disp 2.00 0.50 36.44 36.44
SUB-TOTAL 244.52 84.41

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION 12 FTS MT/DISP 136.15 2,500 0.05 514.57 9.67
BROCAS DE 45 MM MT/DISP 127.46 200 0.64 86.74 19.08
SHANK ADAPTER MT/DISP 136.15 3,500 0.04 238.74 3.21
AFILADOR BROCAS MT/DISP 127.46 100,000 0.00 0.00 0.00
COPLAS MT/DISP 0.00 3,000 0.00 79.65 0.00
RIMADORA DE 89 MM MT/DISP 8.69 200 0.04 205.28 3.08
ADAPTADOR DE RIMADORA MT/DISP 8.69 200 0.04 133.17 2.00
TUBO PVC (Voladura recorte) PZAS/DISP 5.00 1.88 3.25
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.08 0.00
PETROLEO (JUMBO) GLN/HR 1.50 3.28 1.70
PETROLEO (SCOOP) GLN/HR 12.00 3.28 13.59
HERRAMIENTAS 1.02 0.35
ALCAYATAS DE 3/4" PZAS/DISP 4.00 7.27 10.04
$ -
SUB-TOTAL 65.97

IMPLEMENTOS SEGURIDAD
COSTO UNIT COSTO U.S.
DESCRIPCION UNIDAD MTS/DISP U.S.$/MT
U.S.$/Pers $
Implementos Seguridad Unidad 5.38 1.59 8.54 2.95
Implementos Operador Scoop Unidad 1.00 2.98 2.98 1.03
3.98

VOLADURA
CANTIDAD UNIDAD COSTO U.S.
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA U.S.$/MT
PZA KGS $/Pza
LADRO
EMULEX 45% 1 1/8" X 12" (128) TALADROS 27.00 11.74 317.00 61.91 0.66 72.31
EXADIT 45% 7/8" X 7" (328) TALADROS 14.00 6.00 84.00 6.40 0.20 5.70
CORDON DETONANTE 5P MTS 40.00 0.27 3.70
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.86 0.59
EXSANEL 4.80 MTL PZAS 41.00 1.61 22.75
SUB-TOTAL 105.04

EQUIPOS
COSTO COSTO COSTO
COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
TOTAL U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) 2 HORAS 2.55 138.00 351.90
SCOOP DIESEL 4.1 YD3 3 HORAS 3.00 29.97 63 92.97 278.90
SCALER HORAS 0.50 0.00 0.00
BOMBA DE 10 HP 4 HORAS 5.00 1.56 7.82
PERFORADORA PIES 12.00 0.12 1.44
SUB-TOTAL 640.07 220.96

TOTAL COSTOS DIRECTOS 480.35

CONTINGENCIAS 3% 14.41
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 48.04

TOTAL COSTOS U.S.$/Mt (Con equipos) 542.80


LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 205 de 347

PRECORTE RAMPA 3.5M X 3.5 M CON JUMBO


03317 N° de Taladros: $ 52 Avance/Disp 2.90 Metros

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT


OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 46.37 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00 0.50 46.37 0.00
CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 36.44 109.31
BOMBERO Hom/Disp 1.00 1.00 0.00
SERVICIOS AUXILIARES $ 2 Hom/Disp 3.00 1.00 36.44 109.31
SUB-TOTAL 353.83 122.14

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION 12 FTS MT/DISP 180.25 $ 2,500 0.07 514.57 12.81
BROCAS DE 45 MM MT/DISP 167.37 $ 200 0.84 86.74 25.06
SHANK ADAPTER MT/DISP 180.25 $ 3,500 0.05 238.74 4.24
AFILADOR BROCAS MT/DISP 167.37 $ 100,000 0.00 0.00 0.00
COPLAS MT/DISP 0.00 $ 3,000 0.00 79.65 0.00
RIMADORA DE 89 MM MT/DISP 12.87 $ 200 0.06 205.28 4.56
ADAPTADOR DE RIMADORA MT/DISP 12.87 $ 200 0.06 133.17 2.96
TUBO PVC (Voladura recorte) PZAS/DISP 10.00 1.88 6.50
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.08 0.00
PETROLEO (JUMBO) GLN/HR 1.50 3.28 1.70
PETROLEO (SCOOP) GLN/HR 12.00 3.28 13.59
HERRAMIENTAS 1.02 0.35
ALCAYATAS DE 3/4" PZAS/DISP 4.00 7.27 10.04
$ -
SUB-TOTAL 81.81

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT
U.S.$/Pers
Implementos Seguridad Unidad 9.00 1.59 14.31 4.94
Implementos Operador Scoop Unidad 1.00 2.98 2.98 1.03
5.97

VOLADURA
CANTIDAD UNIDAD COSTO U.S.
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA U.S.$/MT
PZA KGS $/Pza
LADRO
SEMEXSA 45% 1 1/8" X 12" (122) TALADROS 25.00 8.64 216.00 44.26 0.59 43.94
EXABLOCK 7/8" X 7" (276) TALADROS 13.00 6.00 78.00 5.65 0.20 5.29
CORDON DETONANTE 5P MTS 40.00 0.27 3.70
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.86 0.59
EXSANEL 4.80 MTL PZAS 38.00 1.61 21.08
SUB-TOTAL 74.61

EQUIPOS
COSTO COSTO COSTO
COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
TOTAL U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) $ 2 HORAS 2.55 138.00 351.90
SCOOP DIESEL 4.1 YD3 $ 3 HORAS 3.00 29.97 $ 63 92.97 278.90
SCALER HORAS 0.50 0.00 0.00
BOMBA DE 10 HP $ 5 HORAS 5.00 1.56 7.82
PERFORADORA PIES 12.00 0.12 1.44
SUB-TOTAL 640.07 220.96

TOTAL COSTOS DIRECTOS 505.49

CONTINGENCIAS 3% 15.16
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 50.55

TOTAL COSTOS U.S.$/Mt (Con equipos) 571.20


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA 550.09
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 206 de 347

RAMPA 4.0M X 3.5 M CON JUMBO

03309 N° de Taladros: 47.00 Avance/Disp 2.90

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40


AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 46.37 46.37
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 36.44 72.87
AUXILIAR Hom/Disp 2.00 1.00 34.03 68.05
SUB-TOTAL 276.13

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION 14 FTS MT/DISP 160.93 2500.00 0.06 482.66
BROCAS DE 45 MM MT/DISP 151.28 200.00 0.76 86.74
SHANK ADAPTER MT/DISP 160.93 3500.00 0.05 238.74
AFILADOR BROCAS MT/DISP 151.28 100000.00 0.00 0.00
COPLAS MT/DISP 0.00 3000.00 0.00 79.65
RIMADORA DE 89 MM MT/DISP 9.66 200.00 0.05 205.28
ADAPTADOR DE RIMADORA MT/DISP 9.66 200.00 0.05 133.17
TUBO PVC (Voladura recorte) 5 PZAS/DISP 12.00 1.88
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00 2.08
PETROLEO (JUMBO) GLN/HR 1.50 3.28
PETROLEO (SCOOP) GLN/HR 12.40 3.28
HERRAMIENTAS 1.02
ALCAYATAS DE 1/2" PZAS/DISP 4.00 7.27
SUB-TOTAL

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP
U.S.$/Pers
Implementos Seguridad Unidad 6.00 1.59
Implementos Operador Scoop Unidad 1.00 2.98

VOLADURA
CANTIDAD UNIDAD
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA
PZA KGS
LADRO
EMULEX 45% 1 1/8" X 12" (128) TALADROS 31.00 9.13 283.00 55.27
EXADIT 45% 7/8" X 7" (328) TALADROS 13.00 6.00 78.00 5.95
CORDON DETONANTE 5P MTS 40.00
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00
EXSANEL 4.80 MTL PZAS 44.00
SUB-TOTAL

EQUIPOS
COSTO COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S.
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.20 138.00
SCOOP DIESEL 4.1 YD3 HORAS 3.10 29.97 62.99 92.97
SCALER HORAS 0.80 0.00
BOMBA DE 10 HP 4.00 HORAS 5.00 1.56
PERFORADORA PIES 12.00 0.12
Pagina: 207 de 347
SUB-TOTAL

TOTAL COSTOS DIRECTOS

CONTINGENCIAS 3%
GASTOS GENERALES 0%
UTILIDAD 10%

TOTAL COSTOS U.S.$/Mt (Con equipos)


LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE
Pagina: 208 de 347

.5 M CON JUMBO

Metros

U.S.$/MT

95.32

U.S.$/MT

10.73
22.65
3.79
0.00
0.00
3.42
2.22
7.80
0.00
1.70
14.04
0.35
10.04
76.74

COSTO U.S.$ U.S.$/MT


9.54 3.29
2.98 1.03
4.32

COSTO U.S.
U.S.$/MT
$/Kgs
0.66 64.55
0.20 5.29
0.27 3.70
0.86 0.59
1.61 24.41
98.54

COSTO TOTAL
U.S.$/MT
U.S.$
303.60
288.20
0.00
7.82
1.44
Pagina: 209 de 347
601.07 207.49

482.42

14.47
0.00
48.24

545.14
QUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 210 de 347
RAMPA 4.0M X 4 M CON JUMBO
03318 N° de Taladros: 49.00 Avance/Disp 2.90 Metros

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT


OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 46.37 46.37
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 36.44 72.87
AUXILIAR Hom/Disp 2.00 1.00 34.03 68.05
SUB-TOTAL 276.13 95.32

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION 14 FTS MT/DISP 167.37 2,500 0.07 482.66 11.15
BROCAS DE 45 MM MT/DISP 157.72 200 0.79 86.74 23.61
SHANK ADAPTER MT/DISP 167.37 3,500 0.05 238.74 3.94
RIMADORA DE 89 MM MT/DISP 9.66 200 0.05 205.28 3.42
ADAPTADOR DE RIMADORA MT/DISP 9.66 200 0.05 133.17 2.22
TUBO PVC (Voladura recorte) $ 5 PZAS/DISP 12.00 1.88 7.80
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP - 2.08 0.00
PETROLEO (JUMBO) GLN/HR 1.50 3.28 1.70
PETROLEO (SCOOP) GLN/HR 12.60 3.28 14.27
HERRAMIENTAS 1.02 0.35
ALCAYATAS DE 3/4" PZAS/DISP $ 4 7.27 10.04
SUB-TOTAL 78.51

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT
U.S.$/Pers
Implementos Seguridad Unidad 6.00 1.59 9.54 3.29
Implementos Operador Scoop Unidad 1.00 2.98 2.98 1.03
4.32
VOLADURA
CANTIDAD UNIDAD COSTO U.S.
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA U.S.$/MT
PZA KGS $/Kgs
LADRO
EMULEX 45% 1 1/8" X 12" (128) TALADROS 32.00 10.19 326.00 63.67 0.66 74.36
EXADIT 45% 7/8" X 7" (328) TALADROS 14.00 6.00 84.00 6.40 0.20 5.70
CORDON DETONANTE 5P MTS 41.00 0.27 3.79
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.86 0.59
EXSANEL 4.80 MTL PZAS 46.00 1.61 25.52
SUB-TOTAL 109.96

EQUIPOS
COSTO COSTO COSTO
COSTO TOTAL
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.25 $ 138 310.50
SCOOP DIESEL 4.1 YD3 HORAS 3.15 29.97 $ 63 $ 93 292.85
SCALER HORAS 0.90 0.00 0.00
BOMBA DE 10 HP $ 4 HORAS 5.00 1.56 7.82
PERFORADORA PIES 12.00 0.12 1.44
SUB-TOTAL 612.61 211.48

TOTAL COSTOS DIRECTOS 499.60

CONTINGENCIAS 3% 14.99
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 49.96

TOTAL COSTOS U.S.$/Mt (Con equipos) 564.54


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA 539.48
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 211 de 347

RAMPA 4.20 M X 3.50 M CON JUMBO Y LIMPIEZA SCOOP


02458
GRADIENTE: 5/1000 N° de Taladros: 48.00 Avance/Disp.

FACTOR
MANO DE OBRA UNIDAD CANTIDAD FACT MO PU
INCIDENCIA
OPERADOR DE JUMBO Hom/Disp 1.00 1.00 1.00 52.40
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 1.00 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 1.00 36.44
BOMBERO Hom/Disp 1.00 1.00 1.00 34.03
SERVICIOS AUXILIARES Hom/Disp 2.00 1.00 1.00 34.03
SUB-TOTAL

MATERIALES
VIDA UTIL ESTANDAR
DESCRIPCION UNIDAD MTS/DISP
MTS PZAS/DISP
BARRAS DE PERFORACION MT/DISP 189.34 2,500 0.08
BROCAS DE 45 MM MT/DISP 178.20 200 0.89
SHANK ADAPTER MT/DISP 189.34 3,500 0.05
AFILADOR BROCAS MT/DISP 178.20 100,000 0.00
COPLAS MT/DISP 0.00 3,000 0.00
RIMADORA DE 89 MM MT/DISP 11.14 200 0.06
ADAPTADOR DE RIMADORA MT/DISP 11.14 200 0.06
TUBO PVC (Voaldura recorte) PZAS/DISP 10.00
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00
TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00
HERRAMIENTAS
MANGA VENTILACION 30" MT/DISP 0.00 $ 1
ALCAYATAS DE 3/4" 4.00 PZAS/DISP 4.00
PETROLEO(Para Jumbo ) Glns/Hr 1.50
PETROLEO(Para Scooptram ) 13.20
SUB-TOTAL

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP
U.S.$/Pers
IMPLEMENTOS SEGURIDAD Unidad 8.00 1.59

VOLADURA
CANTIDAD/ CANTIDAD
DESCRIPCION UNIDAD MTS/DISP
TALADRO PZAS
EMULEX 45% 1 1/8" X 12" Cebos TALADROS 19.00 11.00 209.00
EMULEX 45% 1 1/8" X 12" Arrastres TALADROS 12.00 12.17 146.00
EXADIT 45% 7/8" X 7" Corona TALADROS 14.00 5.29 74.00
CORDON DETONANTE 5P MTS 41.00
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00
EXANEL 4.8 Mts PZAS 45.00
SUB-TOTAL

EQUIPOS
COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN
U.S.$/HR U.S.$/HR
JUMBO ELECTROHIDR DE 1 BRAZO HORAS 2.30
Pagina: 212 de 347
SCOOP DIESEL 4.1 YD3 (Incluye el carguio de mHORAS 3.30
SCALER HORAS 0.90
VENTILADOR DE 20,000 CFM HORAS 0.00
VENTILADOR DE 20,000 CFM HORAS 0.00
BOMBA DE 50 HP HORAS 0.00
BOMBA DE 10 HP HORAS 5.00
PERFORADORA HORAS 12.00
SUB-TOTAL

TOTAL COSTOS DIRECTOS

CONTINGENCIA 3%
UTILIDAD 10%
SUB TOTAL COSTOS INDIRECTOS

TOTAL COSTOS U.S.$/Mt (Con equipos)


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO DEL VOLQUETE, POCKET, O CAMARA DENTRO DE E
CARGUIO DE MATERIAL CON ESCOOPTRA HACIA LOS VOLQUETES INCLUIDO EL LOS PRECIOS UNITARIOS
Pagina: 213 de 347

ON JUMBO Y LIMPIEZA SCOOP

3.00 MT

SUB TOTAL U.S.$/MT


52.40
36.44
46.37
0.00
72.87
34.03
68.05
310.16 103.53

PRECIO U.S.
U.S.$/MT
$/PZA
482.66 12.20
86.74 25.80
238.74 4.31
0.00 0.00
79.65 0.00
205.28 3.82
133.17 2.48
1.88 6.29
0.00
0.00
1.02 0.34
0.00
7.27 9.71
3.28 1.64
3.28 14.45
81.03

COSTO U.S.$ U.S.$/MT


12.72 4.24

COSTO U.S.
UNIDAD KG U.S.$/MT
$/Kg
40.82 0.66 46.09
28.52 0.66 32.20
5.64 0.20 4.85
0.27 3.67
0.86 0.57
1.61 24.14
111.52

COSTO
COSTO TOTAL
TOTAL U.S. U.S.$/MT
U.S.$
$/HR
138.00 317.40
Pagina: 214 de 347
92.97 306.79
0.00 0.00
0.00
0.00
0.00
1.56 7.82
0.12 1.44
633.46 211.44

511.77

15.35
51.18
66.53

578.29
552.71
UETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 215 de 347

RAMPA 4.5M X 4.2 M con Jack Leg-Scoop de 2.0 Yd3. Acarreo hasta 150 mts.

03308 N° de Taladros: 51.00 Avance/Disp 1.50 Metros


N° de Tal. Cargados 47.00

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT

OPERADOR Hom/Disp 2.00 1.00 52.40 104.79


AYUDANTE Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 0.50 46.37 23.19
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 36.44 72.87
SERVICIO Hom/Disp 1.00 1.00 36.44 36.44
SUB-TOTAL 273.73 182.75

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP U.S.$/PZA
MTS
Barra de 6¨ P.P. 80.39 $ 1,820 0.04 63.87 1.88
Broca de 38 mm PP 76.39 $ 350 0.22 22.59 3.29
Aceite de Perforación Gln 0.40 1.00 7.86 2.10
Petroleo Gln/Hr $ 9 $ 3 19.71
Herramientas de Mina-Barretillas Global 0.00 1.02 0.68
ALCAYATAS DE 1/2" PZAS/DISP 4.00 7.27 19.42
$ -
SUB-TOTAL 47.09

IMPLEMENTOS SEGURIDAD
COSTO UNIT COSTO
DESCRIPCION UNIDAD MTS/DISP U.S.$/MT
U.S.$/Pers U.S.$
Implementos Seguridad Unidad 5.00 1.59 7.95 5.31
Implementos Operador Scoop Unidad 0.50 2.98 1.49 1.00
6.30
VOLADURA
COSTO
DESCRIPCION UNIDAD TALADROS PRECIO U.S.$/MT
U.S.$/Disp
EMULEX 45% x 1" x 7" (276) Pza $ 235 0.23 54.10
EXSABLOCK 7/8" X 7" (276) Pza $ 34 0.20 6.60
EXADIT 45% 7/8" X 7" (328) Pza $ 76 0.20 14.85
EXSANEL 3.0m Pza. $ 47 2.24 105.34
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. $ 2 0.86 1.71
CORDON DETONANTE 5P Mts. $ 15 0.27 4.02
IGNICION RAPIDA Mts. $ 0 1.31 0.13
SUB-TOTAL 186.75 124.68

EQUIPOS
COSTO COSTO
VIDA
DESCRIPCION UNIDAD HRS/DISP TOTAL U.S. TOTAL U.S. U.S.$/MT
ECONOMICA
$/HR $
SCOOP DIESEL 2.5 YD3 HORAS 3.00 $ 68 $ 204
SCALER HORAS 1.00 $ - $ -
BOMBA DE 10 HP HORAS 5.00 1.56 $ 8
PERFORADORA PIES 80.39 0.12 $ 10
Manguera Aire 1¨ Mts. $ 30 $ 150 3.17 $ 1
Manguera Agua 1/2¨ Mts. $ 30 $ 150 1.57 $ 0

SUB-TOTAL 222.32 148.43

TOTAL COSTOS DIRECTOS 509.26

CONTINGENCIAS 3% 15.28
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 50.93

TOTAL COSTOS U.S.$/Mt (Con equipos) 575.46


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA 552.31
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 216 de 347

RAMPA 4.5M X 4.2 M CON JUMBO


03307 N° de Taladros: 51.00 Avance/Disp 3.00

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL

OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40


AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM 1 Hom/Disp 1.00 1.00 46.37 46.37
CARGADOR/DISPARADOR 1 Hom/Disp 3.00 1.00 36.44 109.31
AUXILIAR 2 Hom/Disp 3.00 1.00 34.03 102.08
SUB-TOTAL 346.60

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION 14 FTS MT/DISP 200.24 $ 2,500 0.08 482.66
BROCAS DE 45 MM MT/DISP 189.12 $ 200 0.95 86.74
SHANK ADAPTER MT/DISP 200.24 $ 3,500 0.06 238.74
AFILADOR BROCAS MT/DISP 189.12 $ 100,000 0.00 0.00
COPLAS MT/DISP - $ 3,000 0.00 79.65
RIMADORA DE 89 MM MT/DISP 11.12 $ 200 0.06 205.28
ADAPTADOR DE RIMADORA MT/DISP 11.12 $ 200 0.06 133.17
TUBO PVC (Voladura recorte) 5 PZAS/DISP 12.00 1.88
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP - 2.08
PETROLEO (JUMBO) GLN/HR 1.50 3.28
PETROLEO (SCOOP) GLN/HR 16.00 3.28
HERRAMIENTAS 1.02
ALCAYATAS DE 1/2" PZAS/DISP 4.00 7.27
SUB-TOTAL

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP
U.S.$/Pers
Implementos Seguridad Unidad 8.00 1.59
Implementos Operador Scoop Unidad 1.00 2.98

VOLADURA
CANTIDAD UNIDAD
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA
PZA KGS
LADRO
EMULEX 45% 1 1/8" X 12" (128) 35 TALADROS 35.00 10.60 371.00 72.46
EXADIT 45% 7/8" X 7" (328) 13 TALADROS 13.00 6.00 78.00 5.95
CORDON DETONANTE 5P MTS 40.00
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00
EXSANEL 4.80 MTL PZAS 48.00
SUB-TOTAL

EQUIPOS
COSTO COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S.
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) HORAS 2.50 138.00
SCOOP DIESEL 4.1 YD3 HORAS 4.00 29.97 $ 63 92.97
SCALER HORAS 1.00 0.00
BOMBA DE 10 HP 4 HORAS 9.00 1.56
PERFORADORA PIES 12.00 0.12
Pagina: 217 de 347
SUB-TOTAL

TOTAL COSTOS DIRECTOS

CONTINGENCIAS 3%
GASTOS GENERALES 0%
UTILIDAD 10%

TOTAL COSTOS U.S.$/Mt (Con equipos)


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE
Pagina: 218 de 347

.2 M CON JUMBO
Metros

U.S.$/MT

115.39

U.S.$/MT

12.87
27.31
4.55
0.00
0.00
3.80
2.47
7.53
0.00
1.64
17.47
0.34
9.69
87.65

COSTO U.S.$ U.S.$/MT


12.72 4.23
2.98 0.99
5.23

COSTO U.S.
U.S.$/MT
$/Cartucho
0.66 81.61
2.57 5.09
0.27 3.57
0.86 0.57
1.61 25.68
116.53

COSTO TOTAL
U.S.$/MT
U.S.$
345.00
371.87
0.00
14.08
1.44
Pagina: 219 de 347
732.40 243.84

568.64

17.06
0.00
56.86

642.56
615.34
QUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 220 de 347

RAMPA 4.5M X 4.2 M CON JUMBO - ALTA DIFICULTAD


03316 N° de Taladros: 54.00 Avance/Disp 2.60 Metros

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT


OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM $ 1 Hom/Disp 1.00 1.00 46.37 46.37
CARGADOR/DISPARADOR $ 1 Hom/Disp 3.00 1.00 36.44 109.31
BOMBERO Hom/Disp 1.00 1.00 36.44 36.44
AUXILIAR $ 1 Hom/Disp 2.00 1.00 34.03 68.05
SUB-TOTAL 349.01 134.22

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION 14 FTS MT/DISP 184.35 $ 2,500 0.07 482.66 13.69
BROCAS DE 45 MM MT/DISP 171.64 $ 200 0.86 86.74 28.63
SHANK ADAPTER MT/DISP 184.35 $ 3,500 0.05 238.74 4.84
AFILADOR BROCAS MT/DISP 171.64 $ 100,000 0.00 0.00 0.00
COPLAS MT/DISP - $ 3,000 0.00 79.65 0.00
RIMADORA DE 89 MM MT/DISP 12.71 $ 200 0.06 205.28 5.02
ADAPTADOR DE RIMADORA MT/DISP 12.71 $ 200 0.06 133.17 3.26
TUBO PVC (Voladura recorte) $ 5 PZAS/DISP 12.00 1.88 8.69
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP - 2.08 0.00
PETROLEO (JUMBO) GLN/HR 1.50 3.28 1.89
PETROLEO (SCOOP) GLN/HR 16.00 3.28 20.18
HERRAMIENTAS 1.02 0.39
ALCAYATAS DE 3/4" PZAS/DISP 4.00 7.27 11.19
SUB-TOTAL 97.77

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT
U.S.$/Pers
Implementos Seguridad Unidad 7.00 1.59 11.13 4.28
Implementos Operador Scoop Unidad 1.00 2.98 2.98 1.15
5.43
VOLADURA
CANTIDAD UNIDAD COSTO U.S.
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA U.S.$/MT
PZA KGS $/Pza
LADRO
SEMEXSA 45% 1 1/8" X 12" (122) TALADROS $ 32 $ 9 $ 281 57.58 0.59 63.68
EXABLOCK 7/8" X 7" (276) TALADROS $ 15 $ 5 $ 75 5.43 0.20 5.67
CORDON DETONANTE 5P MTS $ 40 0.27 4.12
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS $ 2 0.86 0.66
EXSANEL 4.80 MTL PZAS $ 47 1.61 29.05
SUB-TOTAL 103.18

EQUIPOS
COSTO COSTO COSTO
COSTO TOTAL
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) $ 2 HORAS 2.30 138.00 317.40
SCOOP DIESEL 4.1 YD3 HORAS 4.00 29.97 $ 63 92.97 371.87
SCALER HORAS 1.00 0.00 0.00
BOMBA DE 10 HP HORAS 5.00 1.56 7.82
PERFORADORA PIES 12.00 0.12 1.44
SUB-TOTAL 698.54 268.64

TOTAL COSTOS DIRECTOS 609.23

CONTINGENCIAS 3% 18.28
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 60.92

TOTAL COSTOS U.S.$/Mt (Con equipos) 688.44


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA 661.61
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 221 de 347

PRECORTE - RAMPA 4.5M X 4.2 M CON JUMBO


03315 N° de Taladros: 65.00 Avance/Disp 3.01 Metros

MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/MT


OPERADOR DE JUMBO Hom/Disp 1.00 1.00 52.40 52.40
AYUDANTE OP. JUMBO Hom/Disp 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 46.37 46.37
CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 36.44 109.31
BOMBERO Hom/Disp 1.00 1.00 34.03 34.03
AUXILIAR 2 Hom/Disp 3.00 1.00 34.03 102.08
SUB-TOTAL 380.63 126.58

MATERIALES
VIDA
ESTANDAR PRECIO
DESCRIPCION UNIDAD MTS/DISP ECONOMICA U.S.$/MT
PZAS/DISP U.S.$/PZA
MTS
BARRAS DE PERFORACION 14 FTS MT/DISP 256.16 2,500.00 0.10 482.66 16.45
BROCAS DE 45 MM MT/DISP 241.31 200.00 1.21 86.74 34.80
SHANK ADAPTER MT/DISP 256.16 3,500.00 0.07 238.74 5.81
AFILADOR BROCAS MT/DISP 241.31 100,000.00 0.00 - -
COPLAS MT/DISP - 3,000.00 - 79.65 -
RIMADORA DE 89 MM MT/DISP 14.85 200.00 0.07 205.28 5.07
ADAPTADOR DE RIMADORA MT/DISP 14.85 200.00 0.07 133.17 3.29
TUBO PVC (Voladura recorte) 5 PZAS/DISP 12.00 1.88 7.52
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP - 2.08 -
PETROLEO (JUMBO) GLN/HR 1.50 3.28 1.64
PETROLEO (SCOOP) GLN/HR 18.00 3.28 19.63
HERRAMIENTAS 1.02 0.34
ALCAYATAS DE 3/4" PZAS/DISP 4.00 7.27 9.67
SUB-TOTAL 104.22

IMPLEMENTOS SEGURIDAD
COSTO UNIT
DESCRIPCION UNIDAD MTS/DISP COSTO U.S.$ U.S.$/MT
U.S.$/Pers
Implementos Seguridad Unidad 8.00 1.59 12.72 4.23
Implementos Operador Scoop Unidad 1.00 2.98 2.98 0.99
5.22
VOLADURA
CANTIDAD UNIDAD COSTO U.S.
DESCRIPCION UNIDAD TALADROS CANTIDAD/TA U.S.$/MT
PZA KGS $/Pza
LADRO
SEMEXSA 45% 1 1/8" X 12" (122) TALADROS 34.00 11.18 380.00 77.87 0.59 74.47
EXABLOCK 7/8" X 7" (276) TALADROS 15.00 6.00 90.00 6.52 0.20 5.88
CORDON DETONANTE 5P MTS 40.00 0.27 3.56
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) PZAS 2.00 0.86 0.57
EXSANEL 4.80 MTL PZAS 49.00 1.61 26.19
SUB-TOTAL 110.67

EQUIPOS
COSTO COSTO COSTO
COSTO TOTAL
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. U.S.$/MT
U.S.$
U.S.$/HR U.S.$/HR $/HR
JUMBO ELECTROHIDR DE 1 BRAZO (*) 3 HORAS 2.67 138.00 368.46
SCOOP DIESEL 4.1 YD3 4 HORAS 4.50 29.97 62.99 92.97 418.36
SCALER HORAS 1.00 0.00 0.00
BOMBA DE 10 HP 5 HORAS 5.00 1.56 7.82
PERFORADORA PIES 12.00 0.12 1.44
SUB-TOTAL 796.08 264.73

TOTAL COSTOS DIRECTOS 611.42

CONTINGENCIAS 3% 18.34
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 61.14

TOTAL COSTOS U.S.$/Mt (Con equipos) 690.90


TOTAL COSTOS U.S.$/Mt (Con equipos) - SIN UTILIDAD NI CONTINGENCIA 662.29
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 222 de 347
FORMATO DE PRECIOS UNITARIOS DE AVANCES

ACUMULACION PARCOY
04260 CONSORCIO MINER0 HORIZONTE S.A. 31-Aug
CH. 3.20 x 1.50 Mts.Limpieza Sin Scoop directo a la Tolva, hasta 30 mts altura N° Taladros: 26 u
N° Tal.carg.: 22 u
AVANCE: 0.65 ml

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforistas Tareas 1.25 36.44 $/Tarea 45.55
Ayudante Perforista Tareas 1.25 34.03 $/Tarea 42.53
Ayudante Tareas 0.50 34.03 $/Tarea 17.01
105.09 161.68
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 3.00 1.59 4.77
4.77 7.34
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 130.000 90.92 $/pp 6.49
Broca de 40 mm PP 130.000 23.08 $/uni 8.57
Aceite de Perforación Gln. 0.250 7.86 $/gln. 1.96
Herramientas de Mina Global Global 1.02
18.06 27.78
4.- EXPLOSIVOS 3.58 m3
EMULEX 45% x 1" x 7" (276) Pza. 60.00 0.230 $/uni 13.80
EXSABLOCK 7/8" X 7" (276) Pza. 0.00 0.196 $/uni 0.00
EXADIT 45% 7/8" X 7" (328) Pza. 50.00 0.196 $/uni 9.82
EXSANEL 3.0 m Pza. 22.00 2.241 $/uni 49.31
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Mts. 10.00 0.268 $/mts. 2.68
IGNICION RAPIDA Mts. 0.25 1.313 $/mts. 0.33
77.65 119.46
5.- EQUIPOS
Scooptrams de 1.50 Yd3 Hrs. 0.00 62.97 $/hr 0.00
Ventilador Hrs. 0.00 0.89 $/hr 0.00
Perforadora P.P. 130.00 0.12 $/pp 15.60
Manguera de Aire 1¨ Mts. 30.00 3.17 $/mts. 0.63
Manguera de Agua 1/2¨ Mts. 30.00 1.57 $/mts. 0.31
16.55 25.46
341.72
6.- GASTOS INDIRECTOS
Contingencias 3% $ 10.25
Gastos Generales 0% $ 0.00
Utilidad 10% $ 34.17
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 386.14
Energía Eléctrica, Tuberias y Accesorios proporciona Cía, hasta 50 Mts del top del frente
Pagina: 223 de 347
FORMATO DE PRECIOS UNITARIOS DE AVANCES
ACUMULACION PARCOY
04261 CONSORCIO MINER0 HORIZONTE S.A.
CH. 2.40 x 1.20 Mts.Limpieza Sin Scooptram directo a la Tolva hasta 30 mts altura N° Taladros: 23 u
Distancia de recorrido 150 mts N° Tal.carg.: 19 u
AVANCE: 1.30 ml
ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL
UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforistas Tareas 1.00 36.44 $/Tarea 36.44
Ayudante Perforista Tareas 1.00 34.03 $/Tarea 34.03
Ayudante Tareas 0.50 34.03 $/Tarea 17.01
87.48 67.29
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.50 1.59 3.97
3.97 3.06
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 115.000 90.92 $/pp 5.74
Broca de 40 mm PP 115.000 23.08 $/uni 7.58
Aceite de Perforación Gln. 0.250 7.86 $/gln. 1.96
Herramientas de Mina Global Global 1.02
16.32 12.55
4.- EXPLOSIVOS 3.58 m3
EMULEX 45% x 1" x 7" (276) Unid. 70.00 0.230 $/uni 16.10
EXSABLOCK 7/8" X 7" (276) Unid. 0.00 0.196 $/uni 0.00
EXADIT 45% 7/8" X 7" (328) Unid. 40.00 0.196 $/uni 7.86
EXSANEL 3.0m Unid. 19.00 2.241 $/uni 42.58
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Mts. 10.00 0.268 $/mts. 2.68
IGNICION RAPIDA Mts. 0.25 1.313 $/mts. 0.33
71.26 54.82
5.- EQUIPOS
Perforadora P.P. 115.00 0.120 $/pp 13.80
Manguera de Aire 1¨ Mts. 30.00 3.173 $/mts. 0.63
Manguera de Agua 1/2¨ Mts. 30.00 1.568 $/mts. 0.31
Bomba de 10 HP Hrs. 0.00 1.565 $/hr 0.00
14.75 11.34
149.06
6.- GASTOS INDIRECTOS
Contingencias 3% $ 4.47
Gastos Generales 0% $ 0.00
Utilidad 10% $ 14.91
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 168.44
Energía Eléctrica, Tuberias y Accesorios proporciona Cía, hasta 50 Mts del top del frente
Pagina: 224 de 347
FORMATO DE PRECIOS UNITARIOS DE AVANCES

04262 CONSORCIO MINER0 HORIZONTE S.A. 31-Aug


CH. 1.50 x 1.50 Mts. Limpieza sin Scoop, defrente a Chute N° Taladros: 18 u
Distancia de recorrido 150 Mts. N° Tal.carg.: 14 u
AVANCE: 1.30 ml

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforistas Tareas 1.25 36.44 $/Tarea 45.55
Ayudante Perforista Tareas 1.25 34.03 $/Tarea 42.53
Operador Scooptram Tareas 0.00 46.37 $/Tarea 0.00
Bodeguero Tareas $/Tarea
88.08 67.75
2.- IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.50 1.59 3.97
Tareas sin ropa de agua Tareas 0.00 0.00
3.97 3.06
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 90.000 90.92 $/pp 4.50
Broca de 40 mm PP 90.000 23.08 $/uni 5.94
Aceite de Perforación Gln. 0.250 7.86 $/gln. 1.96
Herramientas de Mina Global Global 1.02
13.42 10.32
4.- EXPLOSIVOS

EMULEX 45% x 1" x 7" (276) Unid. 50.00 0.230 $/uni 11.50
EXSABLOCK 7/8" X 7" (276) Unid. 0.00 0.196 $/uni 0.00
EXADIT 45% 7/8" X 7" (328) Unid. 20.00 0.196 $/uni 3.93
EXSANEL 3.0m Unid. 14.00 2.241 $/uni 31.38
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.857 $/uni 1.71
CORDON DETONANTE 5P Mts. 10.00 0.268 $/mts. 2.68
IGNICION RAPIDA Mts. 0.25 1.313 $/mts. 0.33
0.00 51.53 39.64
5.- EQUIPOS
Scooptrams de 1.50 Yd3 Hrs. 0.00 62.97 $/hr 0.00
Perforadora P.P. 90.00 0.120 $/pp 10.80
Manguera de Aire 1¨ Mts. 30.00 3.173 $/mts. 0.63
Manguera de Agua 1/2¨ Mts. 30.00 1.568 $/mts. 0.31
Bomba de 10 HP Hrs. 0.00 1.565 $/hr 0.00
11.75 9.04
129.81
6.- GASTOS INDIRECTOS
Contingencias 3% $ 3.89
Gastos Generales 0% $ 0.00
Utilidad 10% $ 12.98
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L) 146.68
Energía Eléctrica, Tuberias y Accesorios proporciona Cía, hasta 50 Mts del tope del frente
PRECIOS UNITARIOS SUB_NIVEL 4' x 6' CON WINCHE Y LIMPIEZA SCOOP EN EL NIVEL

05520 CONSORCIO MINERO HORIZONTE FECHA 31/04/2005


SUB NIVEL 4' x 6' CON WINCHE Y LIMPIEZA SCOOP N° Taladros Pe 21.00 u
LIMPIEZA EN EL NIVEL CON SCOOP N° Taladros Di 17.00
Long.taladro 5.00 Piés
Rendimiento 1.40 ml

Precio Sub Total


ITEM DESCRIPCION Unid. Cant.
Unitario $ Total $ (US$)/Und

1.00 MANO DE OBRA


Maestro perforista Tareas 1.00 36.44 36.44
Ayudante de perforista Tareas 1.00 34.03 34.03
Operador Scooptram Tareas 0.50 46.37 23.19
93.65 66.89
2.00 IMPLEMENTOS
Tareas con ropa de Agua Tareas 2.00 1.59 3.18
Tareas sin ropa de agua Tareas 0.50 2.98 1.49
4.67 3.34
3.00 MATERIALES Y HERRAMIENTAS
Barras de 6' p.p 105.000 90.92 5.25
Broca de 40 mm PP 105.000 23.08 6.92
Petroleo Gln 3.120 3.28 10.23
Aceite de perforacion Gln 0.250 7.86 1.96
Herramientas de mina Global 1.02
25.39 18.14
4.00 EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 66 0.230 15.18
EXADIT 45% 7/8" X 7" (328) Pza. 30 0.196 5.89
EXSANEL 3.0 m Pza. 17.00 2.241 38.10
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300 Pza. 2.00 0.857 1.71
CORDON DETONANTE 5P Mts 4.00 0.268 1.07
IGNICION RAPIDA Mts 0.10 1.313 0.13
62.09 44.35
5.00 EQUIPOS
Ventilador 10 CFM Hrs. 0.00 0.89 0.00
Winche Hrs 4.00 3.53 14.10
Scooptram 1.50 Yds Hrs 1.56 62.97 98.23
Perforadora P.P. 105.0 0.120 12.60
Manguera Aire 1" Mts 30.0 3.17 0.63
Manguera agua 1/2" Mts 30.0 1.57 0.31
125.88 89.92
6.00 GASTOS DIRECTOS 222.63
Contingencias 3% 6.68
Gastos Generales 0% 0.00
Utilidad 10% 22.26
TOTAL COSTO LINEAL EN DOLARES (US$/M-L) 251.57
TOTAL COSTO LINEAL EN DOLARES (US$/M-L) - SIN UTILIDAD NI CONTING 243.02
PRECIOS UNITARIOS SUB_NIVEL 4' x 6' CON WINCHES EN EL NIVEL

05521 CONSORCIO MINERO HORIZONTE FECHA


SUB NIVEL 4' x 6' CON WINCHE N° Taladros Pe 21.00 U
LIMPIEZA EN NIVEL CON WINCHES N° Taladros Di 17.00
Long.taladro 5.00 Piés
Rendimiento 1.40 ml

Precio Sub Total


ITEM DESCRIPCION Unid. Cant.
Unitario $ Total $ (US$)/Und

1.00 MANO DE OBRA


Maestro perforista Tareas 1.00 36.44 36.44
Ayudante de perforista Tareas 2.30 34.03 78.26

114.70 81.93
2.00 IMPLEMENTOS
Tareas con ropa de Agua Tareas 3.30 1.59 5.25

5.25 3.75

3.00 MATERIALES Y HERRAMIENTAS


Barras de 6' p.p 105.000 90.92 5.25
Broca de 40 mm PP 105.000 23.08 6.92
Aceite de perforacion Gln 0.250 7.86 1.96
Herramientas de mina Global 1.02
15.16 10.83
4.00 EXPLOSIVOS
EMULEX 45% x 1" x 7" (276) Pza. 66 0.230 15.18
EXADIT 45% 7/8" X 7" (328) Pza. 30 0.196 5.89
EXSANEL 3.0 m Pza. 17.00 2.241 38.10
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300 Pza. 2.00 0.857 1.71
CORDON DETONANTE 5P Mts 4.00 0.268 1.07
IGNICION RAPIDA Mts 0.10 1.313 0.13
62.09 44.35
5.00 EQUIPOS
Ventilador 10 CFM Hrs. 0.00 0.89 0.00
Winche Hrs 4.50 3.53 15.87
Scooptram 1.50 Yds3 Hrs 0.00 62.97 0.00
Perforadora P.P. 105.0 0.120 12.60
Manguera Aire 1" Mts 30.0 3.17 0.63
Manguera agua 1/2" Mts 30.0 1.57 0.31
29.42 21.01
6.00 GASTOS DIRECTOS 161.86
Contingencias 3% 4.86
Gastos Generales 0% 0.00
Utilidad 10% 16.19
TOTAL COSTO LINEAL EN DOLARES (US$/M-L) 182.91
TOTAL COSTO LINEAL EN DOLARES (US$/M-L) - SIN UTILIDAD NI CONTING 175.25
PRECIOS UNITARIOS
ROTURA
Pagina: 228 de 347
EXPLOTACION_TAJEO_MECANIZADO ANCHO VETA 9MX4.
(CON JUMBO - SCOOP)
06544 N° de Taladros: 100.00

MANO DE OBRA UNIDAD CANTIDAD GDIAS/DISP FACTOR

OPERADOR DE JUMBO 1.00 Hom/Disp 1.00 0.77 1.00

AYUDANTE OPER.JUMBO 1.00 Hom/Disp 1.00 0.77 1.00

OPERADOR SCOOPTRAM Hom/Disp 1.00 2.09 1.00

CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 1.00

SERVICIOS PARA RELLENO Hom/Disp 2.00 1.00 1.00

SUB-TOTAL

MATERIALES

VIDA UTIL
DESCRIPCION UNIDAD MTS/DISP
MTS
BARRAS DE PERFORACION Mts/Disp 371.25 2,500
BROCAS DE 45 MM Mts/Disp 371.25 200
SHANK ADAPTER Mts/Disp 371.25 3,500
AFILADOR BROCAS Mts/Disp 371.25 100,000

TUBO PVC (Voladura recorte) Pzas/Disp 10.00


POLIYUTE Mts2/Ton 9.30
Petroleo para Jumbo 1.50 Glnz 1.50
Petroleo para Scoop 50.11 Glnz 50.11
HERRAMIENTAS GLB
ALCAYATAS DE 1/2" Pzas/Disp 4.00

SUB-TOTAL

IMPLEMENTOS SEGURIDAD

DESCRIPCION UNIDAD MTS/DISP

IMPLEMENTOS SEGURIDAD Unidad 7.00


Implementos Operador Scoop Tareas 2.09

VOLADURA
CANTIDAD/
DESCRIPCION UNIDAD MTS/DISP
TALADRO
EMULEX 45% 1 1/8" X 12" FILAS TALADROS 34.00 8.00
EXABLOC 7/8" X 7" Corona TALADROS 33.00 6.00
CORDON DETONANTE 5P MTS 50.00
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00
EXANEL 4.8 Mts PZAS 67.00
SUB-TOTAL

EQUIPOS
Pagina: 229 de 347
COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD
U.S.$/HR
JUMBO ELECTROHIDR DE 1 BRAZO (4.12) 4.64 HORAS 4.64 44.70
SCOOP DIESEL 4.1 YD3 (11.54) 12.53 HORAS 12.53 29.97
SCALER HORAS 1.50
SUB-TOTAL

RELLENO HIDRAULICO - DETRITICO


Relleno DETRITICO TMS 1.00 $/Tons

TOTAL COSTOS DIRECTOS

IMPREVISTOS 3%
UTILIDAD 10%
SUB TOTAL COSTOS INDIRECTOS

TOTAL COSTOS U.S.$/Ton (Con equipos)


TOTAL COSTOS U.S.$/Ton (Con equipos) - SIN UTILIDAD NI CONTINGENCIA
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE
Pagina: 230 de 347
ECANIZADO ANCHO VETA 9MX4.5M
JUMBO - SCOOP)
Tons/Disp. 438.43

PU SUB TOTAL U.S.$/Tons

52.40 40.52

34.03 26.32

46.37 96.82

36.44 109.31

34.03 68.05

341.03 0.78

ESTANDAR PRECIO U.S.


U.S.$/Ton
PZAS/DISP $/PZA
0.15 482.66 0.16
1.86 86.74 0.37
0.11 238.74 0.06
0.00 0.00 0.00

1.88 0.04
1.28 0.03
3.28 0.01
3.28 0.37
0.00 1.53 0.00
7.27 0.07

1.11

COSTO UNIT COSTO


U.S.$/Ton
U.S.$/Pers U.S.$
1.59 11.13 0.03
2.98 6.23 0.01
0.04

CANTIDAD COSTO
UNIDAD KG U.S.$/Ton
PZAS U.S.$/Kg
272.00 53.13 0.66 0.41
198.00 14.35 2.71 0.09
0.27 0.03
0.86 0.00
1.61 0.25
0.78
Pagina: 231 de 347
COSTO COSTO COSTO
OPERACIÓN TOTAL U.S. TOTAL U.S. U.S.$/Ton
U.S.$/HR $/HR $
93.30 138.00 640.32
62.99 92.97 1164.89
0.00 0.00
1,805.21 4.12

1.06 1.06

7.89

0.24
0.79
1.03

8.91
8.53
ETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 232 de 347
EXPLOTACION_TAJEO_MECANIZADO ANCHO VETA MENOR DE 6
(CON JUMBO - SCOOP)
N° de Taladros: 69.00
06543
MANO DE OBRA UNIDAD CANTIDAD GDIAS/DISP FACTOR

OPERADOR DE JUMBO 1.00 Hom/Disp 1.00 0.53 1.00

AYUDANTE OPER.JUMBO 1.00 Hom/Disp 1.00 0.53 1.00

OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00

CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 1.00


SERVICIOS PARA RELLENO Hom/Disp 2.00 1.00 1.00
SUB-TOTAL

MATERIALES

VIDA UTIL
DESCRIPCION UNIDAD MTS/DISP
MTS
BARRAS DE PERFORACION Mts/Disp 256.16 2,500
BROCAS DE 45 MM Mts/Disp 256.16 200
SHANK ADAPTER Mts/Disp 256.16 3,500
AFILADOR BROCAS Mts/Disp 256.16 100,000

TUBO PVC (Voladura recorte) Pzas/Disp 10.00


POLIYUTE Mts2/Ton 9.30
Petroleo para Jumbo 1.50 Glns 1.50
Petroleo para Scoop 36.37 Glns 36.37
HERRAMIENTAS GLB
ALCAYATAS DE 1/2" Pzas/Disp 3.00

SUB-TOTAL

IMPLEMENTOS SEGURIDAD

DESCRIPCION UNIDAD MTS/DISP

IMPLEMENTOS SEGURIDAD Unidad 7.00


Implementos Operador Scoop Tareas 1.00

VOLADURA
CANTIDAD/
DESCRIPCION UNIDAD MTS/DISP
TALADRO
EMULEX 45% 1 1/8" X 12" FILAS TALADROS 40.00 9.00
EXABLOC 7/8" X 7" Corona TALADROS 15.00 5.00
CORDON DETONANTE 5P MTS 45.00
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00
EXANEL 4.8 Mts PZAS 55.00
SUB-TOTAL

EQUIPOS
Pagina: 233 de 347
COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD
U.S.$/HR
JUMBO ELECTROHIDR DE 1 BRAZO (3.2) 6.00 HORAS 6.00 44.70
SCOOP DIESEL 4.1 YD3 (8.53) 9.09 HORAS 9.09 29.97
SCALER HORAS 1.00
SUB-TOTAL

RELLENO HIDRAULICO - DETRITICO


Relleno DETRITICO TMS 1.0 $/Tons

TOTAL COSTOS DIRECTOS

IMPREVISTOS 3%
UTILIDAD 10%
SUB TOTAL COSTOS INDIRECTOS

TOTAL COSTOS U.S.$/Ton (Con equipos)


TOTAL COSTOS U.S.$/Ton (Con equipos) - SIN UTILIDAD NI CONTINGENCIA
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE
Pagina: 234 de 347
IZADO ANCHO VETA MENOR DE 6.0 M X 4.5 M
N JUMBO - SCOOP)
Tons/Disp. 272.80

PU SUB TOTAL U.S.$/Tons

52.40 27.96

34.03 18.16

46.37 46.37

36.44 109.31
34.03 68.05
269.86 0.99

ESTANDAR PRECIO U.S.


U.S.$/Ton
PZAS/DISP $/PZA
0.10 482.66 0.18
1.28 86.74 0.41
0.07 238.74 0.06
0.00 0.00 0.00

1.88 0.07
1.28 0.04
3.28 0.02
3.28 0.44
0.00 1.53 0.01
7.27 0.08

1.31

COSTO UNIT
COSTO U.S.$ U.S.$/Ton
U.S.$/Pers
1.59 11.13 0.04
2.98 2.98 0.01
0.05

CANTIDAD COSTO U.S.


UNIDAD KG U.S.$/Ton
PZAS $/Kg
360.00 70.31 0.66 0.87
75.00 5.43 2.71 0.05
0.27 0.04
0.86 0.01
1.61 0.32
1.30
Pagina: 235 de 347
COSTO COSTO
COSTO
OPERACIÓN TOTAL U.S. U.S.$/Ton
TOTAL U.S.$
U.S.$/HR $/HR
93.30 138.00 828.00
62.99 92.97 845.08
0.00 0.00
1,673.08 6.13

1.06 1.05

10.83

0.33
1.08
1.41

12.24
11.76
QUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 236 de 347
EXPLOTACION_TAJEO_MECANIZADO ANCHO VETA MENOR DE 3.50 MX 4.50M
(CON JUMBO - SCOOP)
N° de Taladros: 44.00 Tons/Disp. 132.61
06542
GDIAS/
MANO DE OBRA UNIDAD CANTIDAD FACTOR PU SUB TOTAL U.S.$/Tons
DISP
OPERADOR DE JUMBO 1.00 Hom/Disp 1.00 0.34 1.00 52.40 17.83

AYUDANTE OPER.JUMBO 1.00 Hom/Disp 1.00 0.34 1.00 34.03 11.58

OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 46.37 46.37

CARGADOR/DISPARADOR Hom/Disp 3.00 1.00 1.00 36.44 109.31


SERVICIOS PARA RELLENO Hom/Disp 2.00 1.00 1.00 34.03 68.05
SUB-TOTAL 253.15 1.91

MATERIALES

VIDA UTIL ESTANDAR PRECIO U.S.


DESCRIPCION UNIDAD MTS/DISP U.S.$/Ton
MTS PZAS/DISP $/PZA
BARRAS DE PERFORACION Mts/Disp 163.35 2,500 0.07 482.66 0.24
BROCAS DE 45 MM Mts/Disp 163.35 200 0.82 86.74 0.53
SHANK ADAPTER Mts/Disp 163.35 3,500 0.05 238.74 0.08
AFILADOR BROCAS Mts/Disp 163.35 100,000 0.00 0.00 0.00
POLIYUTE Mts2/Ton 9.30 1.28 0.09

TUBO PVC (Voladura recorte) Pzas/Disp 12.00 1.88 0.17

Petroleo para Jumbo 1.50 Glns 1.50 3.28 0.04


Petroleo para Scoop 21.22 21.22 3.28 0.52
HERRAMIENTAS GLB 0.00 1.53 0.01
ALCAYATAS DE 1/2" Pzas/Disp 3.00 7.27 0.16

SUB-TOTAL 1.85

IMPLEMENTOS SEGURIDAD
COSTO UNIT COSTO
DESCRIPCION UNIDAD MTS/DISP U.S.$/Ton
U.S.$/Pers U.S.$
IMPLEMENTOS SEGURIDAD Unidad 7.00 1.59 11.13 0.08
Implementos Operador Scoop Tareas 1.00 2.98 2.98 0.02
0.11

VOLADURA

CANTIDAD COSTO
DESCRIPCION UNIDAD MTS/DISP CANTIDAD/ UNIDAD KG U.S.$/Ton
PZAS U.S.$/Kg
TALADRO

EMULEX 45% 1 1/8" X 12" FILAS TALADROS 10.00 8.00 80.00 15.63 0.66 0.40
EXABLOC 7/8" X 7" Corona TALADROS 17.00 6.00 102.00 7.39 2.71 0.15
CORDON DETONANTE 5P MTS 45.00 0.27 0.09
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.86 0.01
EXANEL 4.8 Mts PZAS 27.00 1.61 0.33
SUB-TOTAL 0.98

EQUIPOS

COSTO COSTO COSTO COSTO


DESCRIPCION UNIDAD HRS/DISP PROPIEDA OPERACIÓN TOTAL U.S. TOTAL U.S.$/Ton
D U.S.$/HR U.S.$/HR $/HR U.S.$

JUMBO ELECTROHIDR DE 1 BRAZO (1.81 2.04 HORAS 2.04 44.70 93.30 138.00 281.52
SCOOP DIESEL 4.1 YD3 (4.42) 5.30 HORAS 5.30 29.97 62.99 92.97 492.73
SCALER HORAS 0.80 0.00 0.00
SUB-TOTAL 774.25 5.84

RELLENO HIDRAULICO - DETRITICO


Relleno DETRITICO TMS 1 $/Tons 1.06 1.06

TOTAL COSTOS DIRECTOS 11.75

IMPREVISTOS 3% 0.35
UTILIDAD 10% 1.17
SUB TOTAL COSTOS INDIRECTOS 1.53

TOTAL COSTOS U.S.$/Ton (Con equipos) 13.28


TOTAL COSTOS U.S.$/Ton (Con equipos) - SIN UTILIDAD NI CONTINGENCIA 12.76
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
Pagina: 237 de 347
PRECIOS UNITARIOS ROTURA - MECANIZADO CON 1 SCOOPTRAM

06540
EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTING N° Taladros: 15 u
LIMPIEZA CON SCOOP DE 2.50 Yds3 N° Tal.carg.: 15 u
Acarreo de mineral a la Tolva(Chute) ROTURA MINER 27.00 TMS/DISPARO

ITEM DESCRIPCION FACTOR UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.20 Tareas 1.00 36.44 $/Tarea 1.62
Ayudante Perforista 1.20 Tareas 1.00 34.03 $/Tarea 1.51
Operador Scoop 0.50 Tareas 1.00 46.37 $/Tarea 0.86
3.99
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.40 1.59 3.82
Implementos Operador Scoop Tareas 0.50 2.98 1.49
5.31 0.20
3.- MATERIALES Y HERRAMIENTAS
Barra cónica 6' PP 75.000 90.92 1,820.00 3.75
Broca de 40 mm Pza 75.000 23.08 350.00 4.95
Aceite de Perforación Gln 0.250 7.86 $/uni 1.96
Petroleo D2 Gln/Hr 3.990 3.28 $/uni 13.09
Herramientas Global $/gdia 1.53
25.27 0.94
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 75.00 0.196 $/uni 14.73
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.857 $/pie 1.71
EXSANEL 2.1 m Pza 15.00 1.027 $/pie 15.40
IGNICION RAPIDA mts 0.10 1.313 $/m 0.13
CORDON DETONANTE 5P mts 10.00 0.268 $/m 2.68
34.66 1.28
5.- EQUIPOS
Scooptram 2.50 Yds3 h-m 1.33 67.97 $/hr 90.40
Perforadora manual pp 75.00 0.12 $/pp 9.00
Mangueras 1" mts 30.00 3.17 $/mt 0.63
Mangueras 1/2" mts 30.00 1.57 $/mt 0.31
100.35 3.72

6.- RRHH
Relleno DETRÍTICO TMS 0.80 $/Tons 1.06 0.85
10.97
7.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.33
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.10

TOTAL COSTO ROTURA EN DOLARES (US$/TM) 12.40


TOTAL COSTO ROTURA EN DOLARES (US$/TM) - SIN UTILIDAD NI CONTINGENCIA 11.97
Pagina: 238 de 347
PRECIOS UNITARIOS ROTURA - CON 1 WINCHE

06537
EXPLOTACION DE ROTURA EN TAJEOS CON 1 WINCHE N° Taladros: 12.00 Unid
LIMPIEZA CON WINCHE N° Tal.carg.: 12.00 Unid
ROTURA MINER 15.00 TMS/DISPARO

ITEM DESCRIPCION FACTOR UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.20 Tareas 1.00 36.44 $/Tarea 43.72
Ayudante Perforista 1.20 Tareas 1.00 34.03 $/Tarea 40.83
Ayud.- Movimiento Winche 0.50 Tareas 1.00 34.03 $/Tarea 17.01
101.57 6.77
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.90 1.59 4.61
4.61 0.31
3.- MATERIALES Y HERRAMIENTAS
Barra cónica 6' PP 66.00 90.92 1,820.00 3.30
Broca de 40 mm Pza 66.00 23.08 350.00 4.35
Aceite de Perforación Gln 0.25 7.86 $/uni 1.96
Herramientas Global $/gdia 1.53
11.14 0.74
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 60.00 0.196 $/uni 11.79
EXSANEL 2.1 m Pza 12.00 1.027 $/pie 12.32
IGNICION RAPIDA mts 0.10 1.313 $/m 0.13
CORDON DETONANTE 5P mts 6.00 0.268 $/m 1.61
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.857 $/uni 1.71
27.56 1.84
5.- EQUIPOS
Winche de 20 HP h-m 3.00 3.53 $/hr 10.58
Perforadora manual pp 66.00 0.12 $/pp 7.92
Mangueras 1" mts 30.00 3.17 $/mt 0.63
Mangueras 1/2" mts 30.00 1.57 $/mt 0.31
19.45 1.30
6.- RRHH
Relleno Hidraúlico TMS 1 $/Tons 0.00 0.00
10.96
7.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.33
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.10

TOTAL COSTO ROTURA EN DOLARES (US$/TM) 12.38


TOTAL COSTO ROTURA EN DOLARES (US$/TM) - SIN UTILIDAD NI CONTINGENCIA 12.00
Pagina: 239 de 347
PRECIOS UNITARIOS ROTURA - MECANIZADO CON 1 SCOOPTRAM

06545 Densidad 3.00 Tons/M3


TAJEOS SEMI MECANIZADO VETA ANGOSTA 2.4MX2.2M 1 SCOOP N° Taladros: 15.00 Unid
LIMPIEZA CON SCOOP DE 1.50 Yds3 N° Tal.carg.: 15.00 Unid
Acarreo de mineral a la Tolva(Chute) Avan.Neto $ 2 ROTURA MINER 23.76 TMS/DISPARO

ITEM DESCRIPCION FACTOR UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.20 Tareas 1.00 36.44 $/Tarea 1.84
Ayudante Perforista 1.20 Tareas 1.00 34.03 $/Tarea 1.72
Operador Scoop 0.50 Tareas 1.00 46.37 $/Tarea 0.98
4.53
2.- IMPLEMENTOS

Implementos personal operativo normal Tareas 2.40 1.59 3.82

Implementos Operador Scoop Tareas 0.50 2.98 1.49 0.22


3.- MATERIALES Y HERRAMIENTAS
Barra cónica 6' PP 75.000 90.92 1,820.00 3.75
Broca de 40 mm Pza 75.000 23.08 350.00 4.95
Aceite de Perforación Gln 0.250 7.86 $/uni 1.96
Petroleo D2 Gln/Hr 3.990 3.28 $/uni 13.09
Herramientas Global $/gdia 1.53
25.27 1.06
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 90.00 0.196 $/uni 17.68
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.857 $/pie 1.71
EXSANEL 2.1 m Pza 15.00 1.027 $/pie 15.40
IGNICION RAPIDA mts 0.10 1.313 $/m 0.13
CORDON DETONANTE 5P mts 10.00 0.268 $/m 2.68
37.61 1.58
5.- EQUIPOS
Scooptram 1.5 Yds3 h-m 1.33 62.97 $/hr 83.75
Perforadora manual pp 75.00 0.12 $/pp 9.00
Mangueras 1" mts 30.00 3.17 $/mt 0.63
Mangueras 1/2" mts 30.00 1.57 $/mt 0.31
93.70 3.94

6.- RRHH
Relleno DETRITICO TMS 0.80 $/Tons 1.06 0.85
12.20
6.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.37
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.22

TOTAL COSTO ROTURA EN DOLARES (US$/TM) 13.78


TOTAL COSTO ROTURA EN DOLARES (US$/TM) - SIN UTILIDAD NI CONTINGENCIA 13.30
Pagina: 240 de 347
PRECIOS UNITARIOS ROTURA - RECUPERACION PILARES CON 1 WINCHE
06539
EXPLOTACION DE TAJEOS RECUPERACION PILARES CON 1 WIN N° Taladros: 6.00 Unid
RECUPERACION DE PILAR LIMPIEZA SOLO CON WINCHE N° Tal.carg.: 6.00 Unid
ROTURA MINER 10.00 TMS/DISPARO

ITEM DESCRIPCION FACTOR UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.20 Tareas 1.00 36.44 $/Tarea 43.72
Ayudante Perforista 1.20 Tareas 1.00 34.03 $/Tarea 40.83
84.56 8.46
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.40 1.59 3.82
3.82 0.38
3.- MATERIALES Y HERRAMIENTAS
Barra cónica 6' PP 24.00 90.92 1,820.00 1.20
Broca de 40 mm Pza 24.00 23.08 350.00 1.58
Aceite de Perforación Gln 0.25 7.86 $/uni 1.96
Herramientas Global $/gdia 1.53
6.28 0.63
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 30.00 0.196 $/uni 5.89
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.857 $/pie 1.71
EXSANEL 2.1 m Pza 6.00 1.027 $/pie 6.16
IGNICION RAPIDA mts 0.10 1.313 $/m 0.13
CORDON DETONANTE 5P mts 5.00 0.268 $/m 1.34
15.24 1.52
5.- EQUIPOS
Winche de 20 HP h-m 2.00 3.53 $/hr 7.05
Scooptram 1.50 Yds3 Hrs 0.00 62.97 $/hr 0.00
Perforadora manual pp 24.00 0.12 $/pp 2.88
Mangueras 1" mts 30.00 3.17 $/mt 0.63
Mangueras 1/2" mts 30.00 1.57 $/mt 0.31
10.88 1.09
6.- RRHH
Relleno Hidraúlico TMS 1 $/Tons 0.00 0.00
12.08
7.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.36
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.21

TOTAL COSTO ROTURA EN DOLARES (US$/TM) 13.65


TOTAL COSTO ROTURA EN DOLARES (US$/TM) - SIN UTILIDAD NI CONTINGENCIA 13.32
Pagina: 241 de 347
ROTURA VETA ANGOSTA CON ALTO GRADO DIFICULTAD CON 1 WINCHE

06538
EXPLOT. TAJEOS VETAS ANGOSTAS < 1.20 MTS CON 1 WINCHE N° Taladros: 11.00 Unid
LIMPIEZA SOLO WINCHE N° Tal.carg.: 11.00 Unid
ROTURA MINE 11.00 TMS/DISPARO

ITEM DESCRIPCION FACTOR UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 1.20 Tareas 1.00 36.44 $/Tarea 43.72
Ayudante Perforista 1.20 Tareas 1.00 34.03 $/Tarea 40.83
84.56 7.69
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.40 1.59 3.82
3.82 0.35
3.- MATERIALES Y HERRAMIENTAS
Barra cónica 6' PP 55.00 90.92 1,820.00 2.75
Broca de 40 mm Pza 55.00 23.08 350.00 3.63
Aceite de Perforación Gln 0.25 7.86 $/uni 1.96
Herramientas Global $/gdia 1.53
9.87 0.90
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 55.00 0.196 $/uni 10.80
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.857 $/pie 1.71
EXSANEL 2.1 m Pza 11.00 1.027 $/pie 11.30
IGNICION RAPIDA mts 0.10 1.313 $/m 0.13
CORDON DETONANTE 5P mts 5.00 0.268 $/m 1.34
25.28 2.30
5.- EQUIPOS
Winche de 20 HP h-m 2.00 3.53 $/hr 7.05
Perforadora manual pp 55.00 0.12 $/pp 6.60
Mangueras 1" mts 30.00 3.17 $/mt 0.63
Mangueras 1/2" mts 30.00 1.57 $/mt 0.31
14.60 1.33
6.- RRHH
Relleno Hidraúlico TMS 1 $/Tons 0.00 0.00
12.56
7.- GASTOS INDIRECTOS
Imprevistos 3% $ 0.38
Gastos Generales 0% $ 0.00
Utilidad 10% $ 1.26

TOTAL COSTO ROTURA EN DOLARES (US$/TM) 14.19


TOTAL COSTO ROTURA EN DOLARES (US$/TM) - SIN UTILIDAD NI CONTINGENCIA 13.73
PRECIOS UNITARIOS ROTURA - MECANIZADO CON 1 MICRO SCOOP (0.5 YD)

06546
EXPLOTACION DE TAJEOS CORTE Y RELLENO EN BREASTING N° Taladros: 18
LIMPIEZA CON SCOOP DE 0.5 Yds3 N° Tal.carg.: 13
Acarreo de mineral a la Tolva(Chute) ROTURA MINER 25.19
AVANCE NETO 1.94
ITEM DESCRIPCION FACTOR UNI. CANTID. PRECIO SUBTOT.
UNITARIO $
1.- MANO DE OBRA
Maestro Perforista 1.00 Tareas 1.00 36.44 $/Tarea 1.45
Ayudante Perforista 1.00 Tareas 1.00 34.03 $/Tarea 1.35
Operador Scoop 0.34 Tareas 1.00 46.37 $/Tarea 0.63

2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 2.00 1.59 3.18
Implementos Operador Scoop Tareas 0.34 2.98 1.01
4.19
3.- MATERIALES Y HERRAMIENTAS
Barra cónica 8' PP 129.600 96.90 1,820.00 6.90
Broca de 40 mm Pza 129.600 23.08 350.00 8.55
Aceite de Perforación Gln 0.250 7.86 $/uni 1.96
Petroleo D2 Gln/Hr 2.200 3.28 $/uni 7.22
Tubo PVC (Recorte Y Voladura) Global 6.500 1.88 $/gdia 12.25
36.87
4.- EXPLOSIVOS
EXADIT 45% 7/8" X 7" (328) uni 65.00 0.196 $/uni 12.77
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza 2.00 0.857 $/pie 1.71
EXSANEL 2.1 m Pza 13.00 1.027 $/pie 13.35
IGNICION RAPIDA mts 0.10 1.313 $/m 0.13
CORDON DETONANTE 5P mts 10.00 0.268 $/m 2.68
30.64
5.- EQUIPOS
Scooptram 0.5 Yds3 h-m 2.50 49.97 $/hr 124.92
Perforadora manual pp 129.60 0.12 $/pp 15.55
Mangueras 1" mts 30.00 3.17 $/mt 0.63
Mangueras 1/2" mts 30.00 1.57 $/mt 0.31
141.42

6.- RRHH
Relleno DETRITICO TMS 1.00 $/Tons 1.06

6.- GASTOS INDIRECTOS


Imprevistos 3% $
Gastos Generales 0% $
Utilidad 10% $

TOTAL COSTO ROTURA EN DOLARES (US$/TM)


P (0.5 YD)

u
u
TMS/DISPARO

TOTAL
US$/UNID

3.42

0.17

1.46

1.22

5.61

1.06
12.95

0.39
0.00
1.29

14.63
PRECIOS UNITARIOS
SOSTENIMIENTO
MECANIZADO
Pagina: 245 de 347

PRECIOS UNITARIOS SHOTCRETE 1" VIA SECA (1disparos)


12806
SHOTCRETE TODO COSTO 1" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla...........: 1.50 M3 20.08 m2 13.39

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia


MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.23 0.50 17.62
Ayudantes Shotcrete Tarea 3.00 34.03 0.50 51.04
Operador Scoop Tarea 1.00 46.37 - -
2.00 68.66 3.42
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 2.00 3.85 7.69
7.69 0.38
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
Pesaje $/M3 - - -
Cemento Bolsas 15.00 8.18 122.75
Acelerante Kg 22.50 0.78 17.49
Dramix Kg - 1.76 -
Calibradores Pza 20.00 0.11 2.13
Petroleo D2 Gln/Hr - 3.28 -
143.88 7.17
EQUIPO DE PERFORACION
Scooptram de 2.5 Yd3. Hrs. - 67.97 -
Shotcretera y accesorios Hrs. 2.00 3.57 7.14
7.14 0.36
SUB-TOTAL COSTOS DIRECTOS 11.32
Contingencias 3% 0.34

Utilidad 10% 1.13


COSTO TOTAL U.S.$/M2. 12.80
COSTO TOTAL U.S.$/M2. - SIN UTILIDAD NI CONTINGENCIA 11.81
Nota: La arena lo proporciona la Cía. en zona de trabajo
VARIACION DE PRECIOS SEGÚN GRADO DE MEZCLA DE DRAMIX
DRAMIX (0 KGS/M3) U.S.$/M2 12.80
DRAMIX (10 KGS/M3) U.S.$/M2 15.77
DRAMIX (20 KGS/M3) U.S.$/M2 18.74
DRAMIX (30 KGS/M3) U.S.$/M2 21.71
DRAMIX (40 KGS/M3) U.S.$/M2 24.68
Pagina: 246 de 347

PRECIOS UNITARIOS SHOTCRETE 2" VIA SECA (1disparos)


12807
SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla...........: 1.50 M3 10.04 m2 6.69
DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.23 0.50 17.62
Ayudantes Shotcrete Tarea 3.00 34.03 0.50 51.04
2.00 68.66 6.84
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 2.00 3.85 7.69
7.69 0.77
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
Pesaje $/M3 - - -
Cemento Bolsas 15.00 8.18 122.75
Acelerante Kg 22.50 0.78 17.49
Dramix Kg - 1.76 -
Calibradores Pza 10.00 0.11 1.06
Petroleo D2 Gln/Hr - 3.28 -
142.82 14.23
EQUIPO DE PERFORACION
Scooptram de 2.5Yd3. Hrs. - 67.97 -
Shotcretera y accesorios Hrs. 2.00 3.57 7.14
7.14 0.71
SUB-TOTAL COSTOS DIRECTOS 22.54
Contingencias 3% 0.68
Utilidad 10% 2.25
COSTO TOTAL U.S.$/M2. 25.47
Nota: La arena lo proporciona la Cía. en zona de trabajo
VARIACION DE PRECIOS SEGÚN GRADO DE MEZCLA DE DRAMIX
DRAMIX (0 KGS/M3) U.S.$/M2 25.47
DRAMIX (10 KGS/M3) U.S.$/M2 31.41
DRAMIX (20 KGS/M3) U.S.$/M2 37.35
DRAMIX (30 KGS/M3) U.S.$/M2 43.29
DRAMIX (40 KGS/M3) U.S.$/M2 49.23
Pagina: 247 de 347

PRECIOS UNITARIOS SHOTCRETE 3" VIA SECA (1disparos)


12808
SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla...........: 1.50 M3 6.69 m2 4.46

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia


MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.23 0.50 17.62
Ayudantes Shotcrete Tarea 3.00 34.03 0.50 51.04
Operador Scoop Tarea 1.00 46.37 - -
2.00 68.66 10.26
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 2.00 3.85 7.69
7.69 1.15
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
Pesaje $/M3 - - -
Cemento Bolsas 15.00 8.18 122.75
Acelerante Kg 22.50 0.78 17.49
Dramix Kg 1.76 -
Calibradores Pza 6.00 0.11 0.64
Petroleo D2 Gln/Hr - 3.28 -
142.39 21.27
EQUIPO DE PERFORACION
Scooptram de 2.5 Yd3. Hrs. - 67.97 -
Shotcretera y accesorios Hrs. 2.00 3.57 7.14
7.14 1.07
SUB-TOTAL COSTOS DIRECTOS 33.75
Contingencias 3% 1.01

Utilidad 10% 3.37


COSTO TOTAL U.S.$/M2. 38.14
COSTO TOTAL U.S.$/M2. - SIN UTILIDAD NI CONTINGENCIA 35.22
Nota: La arena lo proporciona la Cía. en zona de trabajo
VARIACION DE PRECIOS SEGÚN GRADO DE MEZCLA DE DRAMIX
DRAMIX (0 KGS/M3) U.S.$/M2 38.14
DRAMIX (10 KGS/M3) U.S.$/M2 47.05
DRAMIX (20 KGS/M3) U.S.$/M2 55.96
DRAMIX (30 KGS/M3) U.S.$/M2 64.87
DRAMIX (40 KGS/M3) U.S.$/M2 73.78
Pagina: 248 de 347

PRECIOS UNITARIOS SHOTCRETE TK 40 1" -VIA HUMEDA


12809
SHOTCRETE 1" TK-40
Avance Mts 2/Cuadrilla...........: 6.00 M3 46.06 m2

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia


MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.23 0.50 17.62
Operador TK-40 Tarea 1.00 46.37 0.50 23.19
Ayudantes Shotcrete Tarea 1.00 34.03 0.50 17.01
1.50 57.82 1.26
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 1.50 3.85 5.77
5.77 0.13
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
Pesaje $/M3 - 10.00 -
Cemento Bolsas - 8.18 -
Acelerante Kg - 0.78 -
Dramix Kg - 1.76 -
Calibradores Pza - 0.11 -
Petroleo D2 Gln/Hr - 3.28 -
1.50 0.03
EQUIPO DE PERFORACION
Scooptram de 2.5 Yd3. Hrs. - 67.97 -
TK40 Hrs. - 3.57 -
- -
SUB-TOTAL COSTOS DIRECTOS 1.41
Contingencias 3% 0.04

Utilidad 10% 0.14


COSTO TOTAL U.S.$/M2. 1.60
COSTO TOTAL U.S.$/M2. - SIN UTILIDAD NI CONTINGENCIA 1.58
Pagina: 249 de 347

PRECIOS UNITARIOS SHOTCRETE 2" TK 40 VIA HUMEDA


12810
SHOTCRETE 2" TK-40
Avance Mts 2/Cuadrilla...........: 6.00 M3 23.03 m2

DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia


MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 35.23 0.50 17.62
Operador TK-40 Tarea 1.00 46.37 0.50 23.19
Ayudantes Shotcrete Tarea 1.00 34.03 0.50 17.01
1.50 57.82 2.51
IMPLEMENTOS SEGURIDAD Nº Tars.
Tareas sin ropa de agua 1.50 3.85 5.77
5.77 0.25
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 1.50
Pesaje $/M3 - 10.00 $ - -
Cemento Bolsas - 8.18 - -
Acelerante Kg - 0.78 - -
Dramix Kg - 1.76 - -
Calibradores Pza - 0.11 - -
Petroleo D2 Gln/Hr - 3.28 - -
1.50 0.07
EQUIPO DE PERFORACION
Scooptram de 2.5 Yd3. Hrs. - 67.97 -
TK40 Hrs. - 3.57 -
- -
SUB-TOTAL COSTOS DIRECTOS 2.83
Contingencias 3% 0.08

Utilidad 10% 0.28


COSTO TOTAL U.S.$/M2. 3.19
COSTO TOTAL U.S.$/M2. - SIN UTILIDAD NI CONTINGENCIA 3.15
Pagina: 250 de 347
INSTALACION PERNO HELICOIDAL DE 6' CEMBOL CON JACKLEG
Solo instalación del perno
12871
Longitud Taladro : 1.80 Mts. 6 FTS
Rendimiento : 17.00 Unid.

DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.


Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 36.44 36.44
Ayud. Perforista Tarea 1.00 34.03 34.03
Ayud. Tarea 1.00 34.03 34.03
3.00 104.49 6.15
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.59 3.18
Tareas sin ropa de agua Tar. 1.00 1.59 1.59
4.77 0.28
3. MATERIALES Y HERRAMIENTAS
Barra de 6 pies Pza 102.00 90.92 1,820 5.10
Broca 40 mm Pza 102.00 23.08 350 6.73
Aceite Perforación Gln. 0.17 7.86 1.34
Perno Helicohidal de 6',tuerca,placa Pza. 17.00 7.25 123.26
Resina Cart 17.00 0.64 10.93
Cembolt Cart 102.00 0.20 20.04
Adaptador para inst perno Pza. 1.00 78.58 350.00 0.22
Herramientas de mina Global 1.02
168.63 9.92
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 102.00 0.12 12.24
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
13.19 0.78
COSTOS DIRECTOS 17.12
COSTOS FIJOS ( van en lista por separado )
IMPREVISTOS 3% 0.51
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.71
COSTO TOTAL (US$/Pza) 19.35
COSTO TOTAL (US$/Pza) - SIN UTILIDAD NI CONTINGENCIA 18.02
Pagina: 251 de 347
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JACKLEG
Solo instalación del perno
12811
Longitud Taladro : 2.40 Mts. 8 FTS
Rendimiento : 13.00 Unid.

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 36.44 1.20 43.72
Ayud. Perforista Tarea 1.00 34.03 1.20 40.83

2.00 84.56 6.50


2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.59 3.18
3.18 0.24
3. MATERIALES Y HERRAMIENTAS
Barra de 8 pies P.P. 104.00 96.90 1,820 5.54
Broca 40 mm Pza 104.00 23.08 350 6.86
Aceite Perforación Gln. 0.17 7.86 1.34
Perno Helicohidal de 8',tuerca,placa Pza. 13.00 7.84 101.92
Resina Cart 26.00 0.64 16.72
Cembol Cart 130.00 0.20 25.54
Adaptador para inst perno Pza. 1.00 78.58 350 0.22
Herramientas de mina Global 1.02
159.15 12.24
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 104.00 0.12 12.48
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
13.43 1.03
COSTOS DIRECTOS 20.02
COSTOS FIJOS ( van en lista por separado )
IMPREVISTOS 3% 0.60
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 2.00
COSTO TOTAL (US$/Pza.) 22.63
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 21.00
Pagina: 252 de 347
INSTALACION PERNO HELICOIDAL DE 8' CEMBOL - JUMBO
Solo instalación del perno
12888
Longitud Taladro : 2.40 Mts. 8 FTS
Rendimiento : 60.00 Unid.

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
OPERADOR JUMBO 1 Tarea 1.00 52.40 1.20 62.88
Ayudante 1 Tarea 1.00 34.03 1.20 40.83
-
2.00 103.71 1.73
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 2.98 5.96
5.96 0.10
3. MATERIALES Y HERRAMIENTAS
Barra de extension R32 H25 (BOLTER) P.P. 480.00 156.17 5,000 14.99
Broca boton R25 x 37 mm (BOLTER) Pza 480.00 71.70 500 68.83
Shank adapter hembra (BOLTER) Gln. 480.00 304.48 3,500 41.76
Afiladora de Brocas Pza 480.00 - 100,000 -
Perno Helicohidal de 8',tuerca,placa Pza. 60.00 7.84 470.38
Resina Cart 120.00 0.64 77.15
Cembol Cart 600.00 0.20 117.86
Adaptador para inst perno Pza. 1.00 78.58 350 0.22
Herramientas de mina Global 1.02
792.22 13.20
5. EQUIPO PERFORACIÓN-LIMPIEZA
Empernador Bolter 77 con Brazo Enmallador Hrs. 5.80 119.93 695.61
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
696.56 11.61
COSTOS DIRECTOS 26.64
COSTOS FIJOS ( van en lista por separado )
IMPREVISTOS 3% 0.80
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 2.66
COSTO TOTAL (US$/Pza.) 30.10
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 28.37
Pagina: 253 de 347
INSTALACION PERNO HYDRABOLT DE 5' (BOMBA MANUAL)
Solo instalación del perno
12812
Longitud Taladro : 1.50 Mts. 5 FTS
Rendimiento : 70.00 Unid./gdia (6 horas)

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 36.44 1.20 43.72
Ayud. Perforista Tarea 1.00 34.03 1.20 40.83
Ayud. Tarea 1.00 34.03 1.20 40.83
3.00 125.39 1.79
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.59 3.18
Tareas sin ropa de agua Tar. 1.00 1.59 1.59
4.77 0.07
3. MATERIALES Y HERRAMIENTAS
BARRA CONICA 6' Pza 350.00 90.92 1,820 17.48
Broca 38 mm Pza 350.00 22.59 350 22.59
Aceite Perforación Gln. 0.17 7.86 1.34
Perno Hydrabolt 5',tuerca,placa Pza. 70.00 11.10 776.91
Herramientas de mina Global 1.50
819.83 11.71
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 350.00 0.12 42.00
BOMBA INYECTORA HRS 6.00 0.96 5.78
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
48.73 0.70
COSTOS DIRECTOS 14.27

IMPREVISTOS 3% 0.43
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.43
COSTO TOTAL (US$/Pza) 16.12
COSTO TOTAL (US$/Pza) - SIN UTILIDAD NI CONTINGENCIA 14.59
Pagina: 254 de 347
INSTALACION PERNO HYDRABOLT DE 6' (BOMBA MANUAL)
Solo instalación del perno
12813
Longitud Taladro : 1.80 Mts. 6 FTS
Rendimiento : 56.00 Unid./gdia (6 horas)

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 36.44 1.20 43.72
Ayud. Perforista Tarea 1.00 34.03 1.20 40.83
Ayud. Tarea 1.00 34.03 1.20 40.83
3.00 125.39 2.24
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.59 3.18
Tareas sin ropa de agua Tar. 1.00 1.59 1.59
4.77 0.09
3. MATERIALES Y HERRAMIENTAS
BARRA CONICA 6' Pza 336.00 90.92 1,820 16.78
Broca 38 mm Pza 336.00 22.59 350 21.69
Aceite Perforación Gln. 0.17 7.86 1.34
Perno Hydrabolt 6',tuerca,placa Pza. 56.00 10.83 606.53
Herramientas de mina Global 1.50
647.84 11.57
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 336.00 0.12 40.32
BOMBA INYECTORA HRS 6.00 0.96 5.78
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
47.05 0.84
COSTOS DIRECTOS 14.73

IMPREVISTOS 3% 0.44
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.47
COSTO TOTAL (US$/Pza) 16.65
COSTO TOTAL (US$/Pza) - SIN UTILIDAD NI CONTINGENCIA 15.13
Pagina: 255 de 347
INSTALACION PERNO HYDRABOLT DE 7' (BOMBA MANUAL)
Solo instalación del perno
12814
Longitud Taladro : 2.10 Mts. 7 FTS
Rendimiento : 43.00 Unid./gdia (6 horas)
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas 1 Tarea 1.00 36.44 1.20 43.72
Ayud. Perforista 1 Tarea 1.00 34.03 1.20 40.83
Ayud. 1 Tarea 1.00 34.03 1.20 40.83
3.00 125.39 2.92
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.59 3.18
Tareas sin ropa de agua Tar. 1.00 1.59 1.59
4.77 0.11
3. MATERIALES Y HERRAMIENTAS
BARRA CONICA 8' Pza 301.00 96.90 1,820 16.03
Broca 38 mm Pza 301.00 22.59 350 19.43
Aceite Perforación Gln. 0.17 7.86 1.34
Perno Hydrabolt 7',tuerca,pla Pza. 43.00 11.59 498.36
Herramientas de mina Global 1.50
536.66 12.48
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 301.00 0.12 36.12
BOMBA INYECTORA HRS 6.00 0.96 5.78 -
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
42.85 1.00
COSTOS DIRECTOS 16.50

IMPREVISTOS 3% 0.50
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.65
COSTO TOTAL (US$/Pza) 18.65
COSTO TOTAL (US$/Pza) - SIN UTILIDAD NI CONTINGENCIA 17.01
Pagina: 256 de 347
INSTALACION PERNO HYDRABOLT DE 8' (BOMBA MANUAL) CON JACKLEG
Solo instalación del perno
12872
Longitud Taladro : 2.40 Mts. $ 8 FTS
Rendimiento : 41.00 Unid./gdia (6 horas)
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas $ 1 Tarea 1.00 36.44 1.20 43.72
Ayud. Perforista $ 1 Tarea 1.00 34.03 1.20 40.83
Ayud. $ 1 Tarea 1.00 34.03 1.20 40.83
3.00 125.39 3.06
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.59 3.18
Tareas sin ropa de agua Tar. 1.00 1.59 1.59
4.77 0.12
3. MATERIALES Y HERRAMIENTAS
BARRA CONICA 8' Pza 328.00 96.90 1,820 17.46
Broca 38 mm Pza 328.00 22.59 350 21.17
Aceite Perforación Gln. 0.17 7.86 1.34
Perno Hydrabolt 7',tuerca,placa Pza. 41.00 12.77 523.51
Herramientas de mina Global 1.50
564.98 13.78
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 328.00 0.12 39.36
BOMBA INYECTORA HRS 6.00 0.96 5.78 -
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
46.09 1.12
COSTOS DIRECTOS 18.08

IMPREVISTOS 3% 0.54
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.81
COSTO TOTAL (US$/Pza) 20.43
COSTO TOTAL (US$/Pza) - SIN UTILIDAD NI CONTINGENCIA 18.62
Pagina: 257 de 347
PERNO HIDRABOLT 5FTS CON JUMBO EMPERNADOR
12816
Longitud Taladro : $ 2 Mts. $ 5 Fts
Rendimiento : $ 80 Unid./gdia (8 horas)

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Operdaor Jumbero Tarea 1.00 52.40 1.20 62.88
Ayud. Perforista Tarea 1.00 34.03 1.20 40.83
2.00 103.71 1.30
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 2.98 5.96
5.96 0.07
3. MATERIALES Y HERRAMIENTAS
Barra Extension R32 Pza 400.00 156.17 5,000.00 12.49
Broca boton R25 x 37mm Pza 400.00 69.16 500.00 55.33
Shank Adapter hembra Pza 400.00 304.48 11,480.00 10.61
Perno Hydrabolt 5',tuerca,placa Pza. 80.00 11.10 887.90
Herramientas de mina Global 1.50
967.84 12.10
5. EQUIPO PERFORACIÓN-LIMPIEZA
Manguera aire 1" Mts. 30.00 3.17 150.00 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150.00 0.31
Empernador Bolter 77 con Brazo Enmall Hrs 6.67 119.93 799.55
800.50 10.01
COSTOS DIRECTOS 23.48

Contingencia 3% 0.70
Utilidad 10% 2.35
COSTO TOTAL (US$/Pza Con material) 26.53
COSTO TOTAL (US$/Pza Con material) - SIN UTILIDAD NI CONTINGENCIA 24.94
Pagina: 258 de 347
PERNO HIDRABOLT 7FTS CON JUMBO EMPERNADOR
12817
Longitud Taladro : $ 2 Mts. $ 7 Fts
Rendimiento : $ 70 Unid./gdia (8 horas)

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Operdaor Jumbero $ 1 Tarea 1.00 52.40 1.20 62.88
Ayud. Perforista $ 1 Tarea 1.00 34.03 1.20 40.83
2.00 103.71 1.48
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 2.98 5.96
5.96 0.09
3. MATERIALES Y HERRAMIENTAS
Barra Extension R32 Pza 490.00 156.17 5,000.00 15.30
Broca boton R25 x 37mm Pza 490.00 69.16 500.00 67.78
Shank Adapter hembra Pza 490.00 304.48 11,480.00 13.00
Perno Hydrabolt 7',tuerca,placa Pza. 70.00 11.59 811.29
Herramientas de mina Global 1.50
908.88 12.98
5. EQUIPO PERFORACIÓN-LIMPIEZA
Manguera aire 1" Mts. 30.00 3.17 150.00 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150.00 0.31
Empernador Bolter 77 con Braz Hrs 6.40 119.93 767.57
768.52 10.98
COSTOS DIRECTOS 25.53

Contingencia 3% 0.77
Utilidad 10% 2.55
COSTO TOTAL (US$/Pza Con material) 28.85
COSTO TOTAL (US$/Pza Con material) - SIN UTILIDAD NI CONTINGENCIA 27.15
Pagina: 259 de 347
PERNO HIDRABOLT 8FTS CON JUMBO EMPERNADOR
12815
Longitud Taladro : $ 2 Mts. $ 8 fts
Rendimiento : $ 60 Unid./gdia (8 horas)

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Operdaor Jumbero Tarea 1 52.40 1.20 62.88
Ayud. Perforista Tarea 1 36.44 1.20 43.72
2 106.60 1.78
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2 2.98 5.96
5.96 0.10
3. MATERIALES Y HERRAMIENTAS
Barra Extension R32 Pza 480 156.17 5,000 14.99
Broca boton R25 x 37mm Pza 480 69.16 500 66.40
Shank Adapter hembra Pza 480 304.48 11,480 12.73
Perno Hydrabolt 8',tuerca,placa Pza. 60 12.77 766.11
Herramientas de mina Global 1.50
861.73 14.36
5. EQUIPO PERFORACIÓN-LIMPIEZA
Manguera aire 1" Mts. 30 3.17 150 0.63
Manguera agua 1/2" Mts. 30 1.57 150 0.31
Empernador Bolter 77 con Brazo Enm Hrs 5.83 119.93 699.61
700.56 11.68
COSTOS DIRECTOS 27.91

Contingencia 3% 0.84
Utilidad 10% 2.79
COSTO TOTAL (US$/Pza Con material) 31.54
COSTO TOTAL (US$/Pza Con material) - SIN UTILIDAD NI CONTINGENCIA 29.66
PERNO SWELEX 7FTS CON JUMBO EMPERNADOR
12892
Longitud Taladro : $ 2 Mts. $ 7 Fts
Rendimiento : $ 70 Unid./gdia (8 horas)

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Operdaor Jumbero $ 1 Tarea 1.00 52.40 1.20 62.88
Ayud. Perforista $ 1 Tarea 1.00 34.03 1.20 40.83
2.00 103.71 1.48
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 2.98 5.96
5.96 0.09
3. MATERIALES Y HERRAMIENTAS
Barra Extension R32 Pza 490.00 156.17 5,000.00 15.30
Broca boton R25 x 37mm Pza 490.00 69.16 500.00 67.78
Shank Adapter hembra Pza 490.00 304.48 11,480.00 13.00
Perno SWELEX BULTECK 28MM X 7' Pza. 70.00 8.17 571.74
Herramientas de mina Global 1.50
669.32 9.56
5. EQUIPO PERFORACIÓN-LIMPIEZA
Manguera aire 1" Mts. 30.00 3.17 150.00 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150.00 0.31
Empernador Bolter 77 con Brazo Enmallador Hrs 6.40 119.93 767.57
768.52 10.98
COSTOS DIRECTOS 22.11

Contingencia 3% 0.66
Utilidad 10% 2.21
COSTO TOTAL (US$/Pza Con material) 24.98
INSTALACION DE CIMBRAS DE 10'X10' ( No incluye las tablas)
12820
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 36.44 1.20 43.72
Ayudante Tarea 1.00 34.03 1.20 40.83
Soldador Tarea 0.50 36.44 1.20 21.86
2.50 106.42 106.42
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.50 1.59 3.97

3.97 3.97
3. HERRAMIENTAS
Herramientas Global 1.50
1.50 1.50

MATERIALES
Und Pies²/Uni pies² $ / Pza $
Entablado (8"x2"x4') 0 5.25 - 2.36 -
Cancamo Pzas/Unidad 4 7.27 29.07
SUB-TOTAL - 29.07 29.07

COSTOS DIRECTOS 140.96

140.96
IMPREVISTOS 3% 4.23
GASTOS GENERALES 0% -
UTILIDAD 10% 14.10
COSTO TOTAL (US$/Pza.) 159.29

Costo de Transporte de Madera - 0.043 0.00


COSTO TOTAL (US$/Pza.) 159.29
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
No incluye cimbra
INSTALACION DE CIMBRAS DE 4.5mX4.2m (Incluye Plancha Acanalada+Bolsacrete)
12818
Taladros 4 Fts Perf. 7.00
Rendimiento / Gdia. 1.00 Cimbra + 14 Planchas Acanaladas + 87 Bolsascrete
DESCRIPCIÓN Cantidad Incidencia Costo Costo x Costo/Pza.
FACTOR
UNIDAD Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 1.00 36.44 1.20 43.72
Ayudante Tarea 3.00 1.00 34.03 1.20 122.50
Soldador Tarea 1.00 0.50 36.44 1.20 21.86
4.00 188.08 188.08
2. IMPLEMENTOS SEGURIDAD
Implementos SeguridadTarea 4.00 1.59 6.36

6.36 6.36
3. HERRAMIENTAS
Herramientas Global 1.57
1.57 1.57

4. MATERIALES
DESCRIPCION UNIDAD CANTIDAD ESTANDAR PRECIO
VIDA UTILPZAS/UNID U.S.$/PZA U.S.$
Barra de 6" FTS/Unidad 28.00 1820.00 0.02 90.92 1.40
Broca de 40 mm FTS/Unidad 28.00 350.00 0.08 23.08 1.85
Aceite de Perforación GLNS/Unidad 0.50 7.86 3.93
Cemento Bolsas/Unida 0.50 0.00 0.00
Soldadura Supercito 1/ Kgs/Unidad 1.00 3.33 3.33
Cancamo Pzas/Unidad 4.00 7.27 29.07
39.57 39.57

5. EQUIPOS
Perforadora Fts /Unidad 28.00 0.12 3.36
Maquina Soldar Hrs/Unidad 2.00 1.00 2.00
5.36 5.36
COSTOS DIRECTOS 240.94

IMPREVISTOS 3% 7.23
GASTOS GENERALES 0% -
UTILIDAD 10% 24.09
COSTO TOTAL (US$/Pza.) 272.27
CEMENTO Y CANCAMO A COSTO DE CMH
INSTALACION DE CIMBRAS DE 10'X10' Y 8'X8' (Rehabilitacion+25 Marchavante)
12821
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 36.44 1.20 43.72
Ayudante Tarea 2.00 34.03 1.20 81.67
Soldador Tarea 0.50 36.44 1.20 21.86
3.50 147.25 147.25
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.50 1.59 5.56

5.56 5.56
3. HERRAMIENTAS
Herramientas Global 1.50
1.50 1.50
4.- MATERIALES
Und Pies²/Uni pies² $ / Pza $
Marchavantes (4"x8') 25 8.25 206.14 3.25 81.28
Cancamo 4 7.27 29.07
SUB-TOTAL 206.14 110.34 110.34

COSTOS DIRECTOS 264.66

IMPREVISTOS 3% 7.94
GASTOS GENERALES 0% -
UTILIDAD 10% 26.47
COSTO TOTAL (US$/Pza.) 299.07

Costo de Tranbsporte de Madera 206.14 0.043 8.78


COSTO TOTAL (US$/Pza.) 307.85
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
No incluye cimbra
La recuperación de cuadros intermedios se paga por tareas
INSTALACION DE CIMBRAS DE 3.5m X 3.5m
12819
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 36.44 1.20 43.72
Ayudante Tarea 2.00 34.03 1.20 81.67
Soldador Tarea 0.50 36.44 1.20 21.86
3.50 147.25 147.25
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.50 1.59 5.56

5.56 5.56
3. HERRAMIENTAS
Herramientas Global 1.50
1.50 1.50
MATERIALES
Und Pies²/Uni pies² $ / Pza $
Cancamo 4 7.27 29.07
SUB-TOTAL - 29.07 29.07

COSTOS DIRECTOS 183.38


183.38
IMPREVISTOS 3% 5.50
GASTOS GENERALES 0% -
UTILIDAD 10% 18.34

COSTO TOTAL (US$/Pza.) 207.22


- Plancha acanaldas no se considera, pero para esta seccion se considera 11 unidades y se paga
con Precio de Cuenta Administrativa
- No incluye cimbra
INSTALACION DE CIMBRAS DE 3.5mX3.5m ( Que incluye las tablas)
12819
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 36.44 1.20 43.72
Ayudante Tarea 2.00 34.03 1.20 81.67
Soldador Tarea 0.50 36.44 1.20 21.86
3.50 147.25 147.25
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.50 1.59 5.56

5.56 5.56
3. HERRAMIENTAS
Herramientas Global 1.50
1.50 1.50

MATERIALES
Und Pies²/Uni pies² $ / Pza $
Entablado (8"x2"x4') 48 5.25 252.00 2.36 113.32
Cancamo 4 7.27 29.07
SUB-TOTAL 252.00 142.39 142.39

COSTOS DIRECTOS 296.71

296.71
IMPREVISTOS 3% 8.90
GASTOS GENERALES 0% -
UTILIDAD 10% 29.67
COSTO TOTAL (US$/Pza.) 335.28

Costo de Transporte de Madera 252.00 0.043 10.73


COSTO TOTAL (US$/Pza.) 346.01
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
No incluye cimbra
Pagina: 266 de 347

TABLAS EN CIMBRAS DE 10'X10' Y 8'X8'


12822
Rendimiento / Gdia. 60.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 36.44 1.20 43.72
Ayudante Tarea 1.00 34.03 1.20 40.83

2.00 84.56 1.41


2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.59 3.18

3.18 0.05
3. HERRAMIENTAS
Herramientas Global 1.50
1.50 0.03
4.- MATERIALES
Und Pies²/Uni pies² $ / Pza $
Tablas (2"x8"x10') 60 13.12 787.40 6.38 382.94

SUB-TOTAL 787.40 382.94 6.38


COSTOS DIRECTOS 7.87

7.87

IMPREVISTOS 3% 0.24
GASTOS GENERALES 0% -
UTILIDAD 10% 0.79
COSTO TOTAL (US$/Tabla) 8.89

Costo de Tranbsporte de Madera 13.12 0.043 0.56


COSTO TOTAL (US$/Pza.) 9.45
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 8.61
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
No incluye cimbra
La recuperación de cuadros intermedios se paga por tareas
Pagina: 267 de 347
INSTALACION DE MALLA ELECTROSOLDADA
12823
Rendimiento / Gdia. 42.50 M2 Taladros: $ 50
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 36.44 1.20 43.72
Ayudante Tarea 1.00 34.03 1.20 40.83
2.00 84.56 1.99
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.59 3.18
3.18 0.07
3. MATERIALES Y HERRAMIENTAS
Malla Electrosoldada 4'x4' M2 50.00 2.69 1.00 134.38
Cemento Bolsa 1.00 8.18 1.00 8.18
Alambre No16 Kgs 3.00 1.08 1.00 3.24
Herramientas Global 1.50
147.31 3.47
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 50.00 0.12 6.00
Barra de 4¨ P.P. 50.00 63.87 $/uni 1.75
Broca de 40 mm PP 50.00 23.08 $/uni 3.30
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
12.00 0.28

COSTOS DIRECTOS 5.81

IMPREVISTOS 3% 0.17
GASTOS GENERALES 0% -
UTILIDAD 10% 0.58
COSTO TOTAL (US$/M2.) 6.57
COSTO TOTAL (US$/M2.) - SIN UTILIDAD NI CONTINGENCIA 6.11
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Malla Electrosoldada y todos los materiales es a costo del Contratista
Pagina: 268 de 347
INSTALACION PERNO SPLIT SET DE 5' - jackleg
12825
Longitud Taladro : 1.50 Mts. 6 Fts
Rendimiento : 35.00 Unid./gdia 50

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforista Tarea 1.00 36.44 1.20 43.72
Ayud. Perforista Tarea 1.00 34.03 1.20 40.83
SUB TOTAL 2.00 84.56 2.42
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.59 3.18
3.18 0.09
3. MATERIALES Y HERRAMIENTAS
Barra 6 FTS Pza 192.50 90.92 1,820 9.62
Broca boton 38 mm Pza 192.50 22.59 350 12.42
Herramientas de mina Global 1.50
SUB TOTAL 23.54 0.67
5. EQUIPO PERFORACIÓN-LIMPIEZA
Perno Split Set 5 fts Pzas 35.00 4.40 154.07
Adaptador Perno Split Set Pzas 35.00 147.33 100.00 51.57
Manguera aire 1" Mts. 30.00 3.17 150.00 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150.00 0.31
SUB TOTAL 206.58 5.90

COSTOS DIRECTOS 9.08

Contingencia 3% 0.27
Utilidad 10% 0.91
COSTO TOTAL (US$/Pza Con material) 10.26
COSTO TOTAL (US$/Pza Con material) - SIN UTILIDAD NI CONTINGENCIA 10.16
Pagina: 269 de 347
INSTALACION PERNO SPLIT SET DE 7' - jackleg
12868
Longitud Taladro : 2.10 Mts. 8 Fts
Rendimiento : 20.00 Unid./gdia

DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.


Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforista Tarea 1.00 36.44 1.20 43.72
Ayud. Perforista Tarea 1.00 34.03 1.20 40.83
SUB TOTAL 2.00 84.56 4.23
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 1.59 3.18
3.18 0.16
3. MATERIALES Y HERRAMIENTAS
Barra 8 FTS Pza 150.00 96.90 1,820 7.99
Broca boton 38 mm Pza 150.00 22.59 350 9.68
Herramientas de mina Global 1.50
SUB TOTAL 19.17 0.96
5. EQUIPO PERFORACIÓN-LIMPIEZA
Perno Split Set 7 fts Pzas 20.00 5.48 109.65
Adaptador Perno Split Set Pzas 20.00 147.33 100.00 29.47
Manguera aire 1" Mts. 30.00 3.17 150.00 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150.00 0.31
SUB TOTAL 140.06 7.00

COSTOS DIRECTOS 12.35

Contingencia 3% 0.37
Utilidad 10% 1.23
COSTO TOTAL (US$/Pza Con material) 13.95
COSTO TOTAL (US$/Pza Con material) - SIN UTILIDAD NI CONTINGENCIA 13.81
Pagina: 270 de 347
INSTALACION PERNO SPLIT SET DE 5' CON JUMBO EMPERNADOR
12869
Longitud Taladro : 1.50 Mts. $ 6 Fts
Rendimiento : 90.00 Unid./gdia

DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.


FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Operador Jumbo Tarea 1.00 52.40 1.20 62.88
Ayud. Perforista Tarea 1.00 34.03 1.20 40.83
SUB TOTAL 2.00 103.71 1.15
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 2.98 5.96
5.96 0.07
3. MATERIALES Y HERRAMIENTAS
Barra de extension R32 H25 (BOLTER) Pza 495.00 156.17 5,000 15.46
Broca boton R25 x 37 mm (BOLTER) Pza 495.00 69.16 500 68.47
Shank adapter hembra (BOLTER) Pza 495.00 304.48 3,500 43.06
Afiladora de Brocas Pza 495.00 - 100,000 -
Aco Top Cen R38 55,7994-3655 (COPLAS) Pza 495.00 79.65 3,000 13.14
Perno Split Set 5 fts Pza 90.00 4.40 396.18
Herramientas de mina Global 1.50
SUB TOTAL 537.82 5.98
5. EQUIPO PERFORACIÓN-LIMPIEZA
Empernador Bolter Hrs. 5.80 119.93 695.61
Manguera aire 1" Mts. 30.00 3.17 150.00 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150.00 0.31
SUB TOTAL 696.56 7.74

COSTOS DIRECTOS 14.93

Contingencia 3% 0.45
Utilidad 10% 1.49
COSTO TOTAL (US$/Pza Con material) 16.88
COSTO TOTAL (US$/Pza Con material) - SIN UTILIDAD NI CONTINGENCIA 16.09
Pagina: 271 de 347
INSTALACION PERNO SPLIT SET DE 7' CON JUMBO EMPERNADOR
12870
Longitud Taladro : 2.10 Mts. $ 8 Fts
Rendimiento : 70.00 Unid./gdia

DESCRIPCIÓN Unid. Cant. Costo FACTOR Costo x Costo/Pza.


Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Operador Jumbo Tarea 1.00 52.40 1.20 62.88
Ayud. Perforista Tarea 1.00 34.03 1.20 40.83
SUB TOTAL 2.00 103.71 1.48
2. IMPLEMENTOS SEGURIDAD
Tareas sin ropa de agua Tar. 2.00 2.98 5.96
5.96 0.09
3. MATERIALES Y HERRAMIENTAS
Barra de extension R32 H25 (BOLTER) Pza 525.00 156.17 5,000 16.40
Broca boton R25 x 37 mm (BOLTER) Pza 525.00 69.16 500 72.62
Shank adapter hembra (BOLTER) Pza 525.00 304.48 3,500 45.67
Afiladora de Brocas Pza 525.00 - 100,000 -
Aco Top Cen R38 55,7994-3655 (COPLAS) Pza 525.00 79.65 3,000 13.94
Perno Split Set 7 fts Pza 70.00 5.48 383.77
Herramientas de mina Global 1.50
SUB TOTAL 533.90 7.63
5. EQUIPO PERFORACIÓN-LIMPIEZA
Empernador Bolter Hrs. 5.80 119.93 695.61
Manguera aire 1" Mts. 30.00 3.17 150.00 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150.00 0.31
SUB TOTAL 696.56 9.95

COSTOS DIRECTOS 19.14

Contingencia 3% 0.57
Utilidad 10% 1.91
COSTO TOTAL (US$/Pza Con material) 21.63
COSTO TOTAL (US$/Pza Con material) - SIN UTILIDAD NI CONTINGENCIA 20.63
PRECIOS UNITARIOS
SOSTENIMIENTO
CONVENCIONAL
Pagina: 273 de 347
CUADRO COMPLETO TAJEO DE MADERA 6' x 6'

12830
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 27.70


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(6''X8') $ 3 18.55 57.93 7.32 22.86
Tirante (5"x10') $ 1 16.10 16.10 6.35 6.35
74.04 29.21
29.21
COSTOS DIRECTOS 58.48
COSTOS FIJOS ( van en lista por separado )
58.48

IMPREVISTOS 3% 1.75
GASTOS GENERALES 0% -
UTILIDAD 10% 5.85
COSTO TOTAL (US$/Pza.) 66.08

Costo de Transporte de Madera 74.04 0.043 3.15


COSTO TOTAL (US$/Pza.) 69.23
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 65.23
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 274 de 347
CUADRO COMPLETO TAJEO DE MADERA 7' x 7'

12831
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 27.70


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(7''X8') 3.12 25.25 78.85 9.96 31.11
Tirante (5"x10') 1.00 16.10 16.10 6.35 6.35
94.96 37.46
37.46
COSTOS DIRECTOS 66.73
COSTOS FIJOS ( van en lista por separado )
66.73

IMPREVISTOS 3% 2.00
GASTOS GENERALES 0% -
UTILIDAD 10% 6.67
COSTO TOTAL (US$/Pza.) 75.40

Costo de Transporte de Madera 94.96 0.043 4.04


COSTO TOTAL (US$/Pza.) 79.45
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 74.37
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 275 de 347
CUADRO COMPLETO TAJEO DE MADERA 8' x 8'

12832
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 41.56


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.59
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.75
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X8') 3.00 32.98 98.95 13.01 39.04
Tirante (5"x10') 1.00 16.10 16.10 6.35 6.35
Redondos(7''X8') 0.12 25.25 3.09 9.96 1.22
118.15 46.62
46.62
COSTOS DIRECTOS 90.51
COSTOS FIJOS ( van en lista por separado )
90.51

IMPREVISTOS 3% 2.72
GASTOS GENERALES 0% -
UTILIDAD 10% 9.05
COSTO TOTAL (US$/Pza.) 102.28

Costo de Transporte de Madera 118.15 0.043 5.03


COSTO TOTAL (US$/Pza.) 107.31
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 100.95
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 276 de 347

PEC
CUADRO COMPLETO DE MADERA 6' x 6' (subnivel)

12829
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 41.56


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18
Tareas sin ropa de agua Tar. - - -
3.18 1.59
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.75
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(6''X8') 3.12 18.55 57.93 7.32 22.86
Tirante (5"x10') $ 1 16.10 16.10 6.35 6.35
74.04 29.21
29.21
COSTOS DIRECTOS 73.11
COSTOS FIJOS ( van en lista por separado )
73.11
SUPERVISIÓN
IMPREVISTOS 3% 2.19
GASTOS GENERALES 0% -
UTILIDAD 10% 7.31
COSTO TOTAL (US$/Pza.) 82.62

Costo de Transporte de Madera 74.04 0.043 3.15


COSTO TOTAL (US$/Pza.) 85.77
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 81.67
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
LABOR >20 MTS SE PAGARA 2% + DEL PU
Pagina: 277 de 347

CUADRO COMPLETO DE MADERA 8' x 8'

12828
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.30 45.80
Ayud. Enmaderador Tarea 1.00 34.03 1.30 44.24

2.00 90.04 45.02


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.59
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.75
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X8') 3.12 32.98 102.99 13.01 40.64
Tirante (5"x10') 1.00 16.10 16.10 6.35 6.35
119.09 46.99
46.99
COSTOS DIRECTOS 94.35
COSTOS FIJOS ( van en lista por separado )
94.35
SUPERVISIÓN -
IMPREVISTOS 3% 2.83
GASTOS GENERALES 0% -
UTILIDAD 10% 9.43
COSTO TOTAL (US$/Pza.) 106.61

Costo de Transporte de Madera 119.09 0.043 5.07


COSTO TOTAL (US$/Pza.) sin CUNETA 111.69
COSTO TOTAL (US$/Pza.) sin CUNETA - SIN UTILIDAD NI CONTINGENCIA 105.27
COSTO TOTAL (US$/Pza.) con CUNETA (mas 2.0%)

Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata


El encribado se pagará por separado
Pagina: 278 de 347
CUADRO COMPLETO DE MADERA 8' x 9'

12827
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.40 49.32
Ayud. Enmaderador Tarea 1.00 34.03 1.40 47.64

2.00 96.96 48.48


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.59
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.75
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X10') 3.10 41.23 127.73 16.27 50.41
Tirantes (5"x10') 1.00 16.10 16.10 6.35 6.35
143.83 56.76
56.76
COSTOS DIRECTOS 107.58
COSTOS FIJOS ( van en lista por separado )
107.58
SUPERVISIÓN -
IMPREVISTOS 3% 3.23
GASTOS GENERALES 0% -
UTILIDAD 10% 10.76
COSTO TOTAL (US$/Pza.) 121.57

Costo de Transporte de Madera 143.83 0.043 6.12


COSTO TOTAL (US$/Pza.) sin Cuneta 127.69
COSTO TOTAL (US$/Pza.) sin Cuneta - SIN UTILIDAD NI CONTINGENCIA 120.01
COSTO TOTAL (US$/Pza.) con CUNETA (mas 2%)

Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata


El encribado se pagará por separado
Pagina: 279 de 347
CUADRO COMPLETO DE MADERA 10' x 10'
12826
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 83.11


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 3.18
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 1.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X10') 3 41.23 127.73 16.27 50.41
Tirantes (6"x10') 1 23.19 23.19 9.15 9.15
150.92 59.56
59.56
COSTOS DIRECTOS 147.35
COSTOS FIJOS ( van en lista por separado )
147.35

IMPREVISTOS 3% 4.42
GASTOS GENERALES 0% -
UTILIDAD 10% 14.74
COSTO TOTAL (US$/Pza.) 166.51

Costo de Transporte de Madera 150.92 0.043 6.43


COSTO TOTAL (US$/Pza.) 172.94
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata.
El encribado se pagará por separado
CUADRO COMPLETO DE MADERA 8'' x 4m

12893
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 83.11


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 3.18
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 1.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X10') 2 41.23 82.46 16.27 32.54
Redondos(8''X4m) 1 54.11 54.11 21.69 21.69
Tirantes (6"x10') 1 23.19 23.19 9.15 9.15
159.75 63.39
63.39
COSTOS DIRECTOS 151.18
COSTOS FIJOS ( van en lista por separado )
151.18

IMPREVISTOS 3% 4.54
GASTOS GENERALES 0% -
UTILIDAD 10% 15.12
COSTO TOTAL (US$/Pza.) 170.83

Costo de Transporte de Madera 159.75 0.043 6.80


COSTO TOTAL (US$/Pza.) 177.64
Pagina: 281 de 347
CUADRO INTERMEDIO DE MADERA 8'x8'

12835
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 83.11


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 3.18
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 1.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X8') 3.12 32.98 102.99 13.01 40.64
Tirante (5"x10') 1.00 16.10 16.10 6.35 6.35
119.09 46.99
46.99
COSTOS DIRECTOS 134.78
COSTOS FIJOS ( van en lista por separado )
134.78
SUPERVISIÓN -
IMPREVISTOS 3% 4.04
GASTOS GENERALES 0% -
UTILIDAD 10% 13.48
COSTO TOTAL (US$/Pza.) 152.31

Costo de Transporte de Madera 119.09 0.043 5.07


COSTO TOTAL (US$/Pza.) sin CUNETA 157.38
COSTO TOTAL (US$/Pza.) sin CUNETA - SIN UTILIDAD NI CONTINGENCIA 150.66
'COSTO TOTAL (US$/Pza.) con CUNETA (mas 2%)
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
El encribado se pagará por separado
Pagina: 282 de 347
CUADRO INTERMEDIO DE MADERA 8' x9'

12834
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 83.11


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 3.18
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 1.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X10') 3.10 41.23 127.73 16.27 50.41
Tirante (5"x10') 1.00 16.10 16.10 6.35 6.35
143.83
56.76 56.76
COSTOS DIRECTOS 144.55
COSTOS FIJOS ( van en lista por separado )
144.55

IMPREVISTOS 3% 4.34
GASTOS GENERALES 0% -
UTILIDAD 10% 14.46
COSTO TOTAL (US$/Pza.) 163.34

Costo de Transporte de Madera 143.83 0.043 6.12


COSTO TOTAL (US$/Pza.) sin CUNETA 169.47
COSTO TOTAL (US$/Pza.) sin CUNETA - SIN UTILIDAD NI CONTINGENCIA 161.48
COSTO TOTAL (US$/Pza.) con CUNETA (mas 2%)
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
El encribado se pagará por separado
Pagina: 283 de 347
CUADRO INTERMEDIO DE MADERA 8' x10'

12833
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 83.11


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 3.18
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 1.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X10') 3.10 41.23 127.73 16.27 50.41
Tirante (6"x10') 1.00 23.19 23.19 9.15 9.15
150.92
59.56 59.56
COSTOS DIRECTOS 147.35
COSTOS FIJOS ( van en lista por separado )
147.35

IMPREVISTOS 3% 4.42
GASTOS GENERALES 0% -
UTILIDAD 10% 14.74
COSTO TOTAL (US$/Pza.) 166.51

Costo de Transporte de Madera 150.92 0.043 6.43


COSTO TOTAL (US$/Pza.) 172.94
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 164.58
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
El encribado se pagará por separado
Pagina: 284 de 347
CUADRO EN CHIMENEA 5'X5' - SIN ENCOSTILLADO
12837
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 27.70


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (7"x10') 3.0 31.57 94.70 12.46 37.37
Tirantes (7"x10') 1 31.57 31.57 12.46 12.46
126.26 49.82
49.82
COSTOS DIRECTOS 79.08
COSTOS FIJOS ( van en lista por separado )
79.08

IMPREVISTOS 3% 2.37
GASTOS GENERALES 0% -
UTILIDAD 10% 7.91
COSTO TOTAL (US$/Pza.) 89.37

Costo de Transporte de Madera 126.26 0.043 5.38


COSTO TOTAL (US$/Pza.) 94.74
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 88.06
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 285 de 347
CUADRO EN CHIMENEA 5'X5' - CON ENCOSTILLADO
12836
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 41.56


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.59
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.75
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (7"x10') 3.0 31.57 94.70 12.46 37.37
Tirantes (7"x10') 1 31.57 31.57 12.46 12.46
126.26 49.82
49.82
COSTOS DIRECTOS 93.72
COSTOS FIJOS ( van en lista por separado )
93.72

IMPREVISTOS 3% 2.81
GASTOS GENERALES 0% -
UTILIDAD 10% 9.37
COSTO TOTAL (US$/Pza.) 105.90

Costo de Transporte de Madera 126.26 0.043 5.38


COSTO TOTAL (US$/Pza.) 111.28
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 104.50
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 286 de 347
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 8'X4' CON ENTABLADO
12838
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 83.11


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 3.18
3. MATERIALES Y HERRAMIENTAS
Clavo 6" Kgr. 1.50 1.28 1.92
Herramientas Global 1.50
3.42 3.42
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (7"x8') 1.50 25.25 37.88 9.96 14.95
Redondos (7"x10') 5.49 31.57 173.29 12.46 68.38
Tablas (8"X2"X10') - Entablado 12.00 13.12 157.48 6.38 76.59
368.65 159.91
159.91
COSTOS DIRECTOS 249.62

IMPREVISTOS 3% 7.49
GASTOS GENERALES 0% -
UTILIDAD 10% 24.96
COSTO TOTAL (US$/Pza.) 282.07

Costo de Transporte de Madera 368.65 0.043 15.70


COSTO TOTAL (US$/Pza.) 297.77
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 276.13
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 287 de 347
ENMADERADO DOBLE COMPARTIMIENTO EN CHIMENEA 3.20mX1.50m CON ENTABLADO
12839
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.50 52.85
Ayud. Enmaderador Tarea 1.00 34.03 1.50 51.04

2.00 103.89 103.89


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 3.00 1.59 4.77

4.77 4.77
3. MATERIALES Y HERRAMIENTAS
Clavo 6" Kgr. 2.00 1.28 2.55
Herramientas Global 1.50
4.06 4.06
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (7"x8') 3.00 25.25 75.76 9.96 29.89
Redondos (7"x10') 6.59 31.57 207.95 12.46 82.05
Tablas (8"X2"X10') - Entablado 18.00 13.12 236.22 6.38 114.88
519.93 226.83
226.83
COSTOS DIRECTOS 339.54

IMPREVISTOS 3% 10.19
GASTOS GENERALES 0% -
UTILIDAD 10% 33.95
COSTO TOTAL (US$/Pza.) 383.69

Costo de Transporte de Madera 519.93 0.043 22.14


COSTO TOTAL (US$/Pza.) 405.83
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 375.19
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 288 de 347

PEC
CUADRO COJO 6'X6' (En avances y Tajeos)
12842
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 27.70


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(6''X8') 2 18.55 38.24 7.32 15.09
Tirante (5"x8') 1 12.88 12.88 5.08 5.08
51.13 20.17
20.17
COSTOS DIRECTOS 49.44
COSTOS FIJOS ( van en lista por separado )
49.44

IMPREVISTOS 3% 1.48
GASTOS GENERALES 0% -
UTILIDAD 10% 4.94
COSTO TOTAL (US$/Pza.) 55.87

Costo de Transporte de Madera 51.13 0.043 2.18


COSTO TOTAL (US$/Pza.) 58.04
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 55.22
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 289 de 347

PEC
CUADRO COJO 7'X7' (En avances y Tajeos)
12843

Rendimiento / Gdia. 3.00 Unidad


DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 27.70


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(7''X8') 2.06 25.25 52.05 9.96 20.54
Tirante (5"x8') $ 1 12.88 12.88 5.08 5.08
64.94 25.62
25.62
COSTOS DIRECTOS 54.88
COSTOS FIJOS ( van en lista por separado )
54.88

IMPREVISTOS 3% 1.65
GASTOS GENERALES 0% -
UTILIDAD 10% 5.49
COSTO TOTAL (US$/Pza.) 62.02

Costo de Transporte de Madera 64.94 0.043 2.77


COSTO TOTAL (US$/Pza.) 64.78
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 61.25
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 290 de 347
CUADRO COJO TAJEO DE MADERA 8' x 8'
12844
Cuadro Incluye una vuelta de encribado
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 27.70


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X8') 2.00 32.98 65.97 13.01 26.03
Tirante (5"x8') $ 1 12.88 12.88 5.08 5.08
Redondos(7''X8') 0.06 25.25 1.55 9.96 0.61
80.40 31.72
31.72
COSTOS DIRECTOS 60.99
COSTOS FIJOS ( van en lista por separado )
60.99

IMPREVISTOS 3% 1.83
GASTOS GENERALES 0% -
UTILIDAD 10% 6.10
COSTO TOTAL (US$/Pza.) 68.91

Costo de Transporte de Madera 80.40 0.043 3.42


COSTO TOTAL (US$/Pza.) 72.34
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 68.01
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 291 de 347

PEC
CUADRO COJO 8"X9' (En avances y Tajeos)
12840
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 27.70


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X10') $ 2 41.23 82.46 16.27 32.54
Tirante (5"x8') $ 1 12.88 12.88 5.08 5.08
Redondos(6''X8') 0.12 18.55 2.27 7.32 0.90
97.61 38.52
38.52
COSTOS DIRECTOS 67.78
COSTOS FIJOS ( van en lista por separado )
67.78

IMPREVISTOS 3% 2.03
GASTOS GENERALES 0% -
UTILIDAD 10% 6.78
COSTO TOTAL (US$/Pza.) 76.60

Costo de Transporte de Madera 97.61 0.043 4.16


COSTO TOTAL (US$/Pza.) 80.75
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 75.54
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 292 de 347

PEC
CUADRO COJO 8"X10' (En avances y Tajeos)
12841
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.40 49.32
Ayud. Enmaderador Tarea 1.00 34.03 1.40 47.64

2.00 96.96 32.32


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X10') $ 2 41.23 82.46 16.27 32.54
Tirante (5"x8') $ 1 12.88 12.88 5.08 5.08
Redondos(6''X8') 0.06 18.55 1.14 7.32 0.45
96.48 38.07
38.07
COSTOS DIRECTOS 71.95
COSTOS FIJOS ( van en lista por separado )
71.95

IMPREVISTOS 3% 2.16
GASTOS GENERALES 0% -
UTILIDAD 10% 7.20
COSTO TOTAL (US$/Pza.) 81.31

Costo de Transporte de Madera 96.48 0.043 4.11


COSTO TOTAL (US$/Pza.) 85.42
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 80.26
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 293 de 347

PEC
CUADRO DE CAMBIO 10'X10'
12845
Rendimiento / Gdia. 1.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83
Ayud. Tarea 1.00 34.03 34.03
3.00 117.14 117.14
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 3.00 1.59 4.77

4.77 4.77
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 1.50
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X10') 2.10 41.23 86.50 16.27 34.14
Redondos(8''X4m) 1.00 54.11 54.11 21.69 21.69
Tirante (5"x10') 1.00 16.10 16.10 6.35 6.35
156.71 62.18
62.18
COSTOS DIRECTOS 185.59
COSTOS FIJOS ( van en lista por separado )
185.59

IMPREVISTOS 3% 5.57
GASTOS GENERALES 0% -
UTILIDAD 10% 18.56
COSTO TOTAL (US$/Pza.) 209.72

Costo de Transporte de Madera 156.71 0.043 6.67


COSTO TOTAL (US$/Pza.) 216.39
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 207.49
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 294 de 347

PEC
SOBRECUADRO DE MADERA 7' x 7'
Cuadro Incluye una vuelta de cribing
12846
Rendimiento / Gdia. 2.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.00 35.23
Ayud. Enmaderador Tarea 1.00 34.03 1.00 34.03
Ayud. Tarea 0.50 34.03 17.01
2.50 86.27 43.14
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.50 1.59 3.97

3.97 1.99
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.75
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(7''X8') 3.12 25.25 78.85 9.96 31.11
Tirantes (5"x10') 1.00 16.10 16.10 6.35 6.35
94.96 37.46
37.46
COSTOS DIRECTOS 83.34
COSTOS FIJOS ( van en lista por separado )
83.34

IMPREVISTOS 3% 2.50
GASTOS GENERALES 0% -
UTILIDAD 10% 8.33
COSTO TOTAL (US$/Pza.) 94.17

Costo de Transporte de Madera 94.96 0.043 4.04


COSTO TOTAL (US$/Pza.) 98.22
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 92.99
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 295 de 347

PEC
GUARDACABEZA 4"X 2.40Mts (MARCHAVANTES)
12848
Rendimiento / Gdia. 14.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 5.94


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.23
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.11
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(4''X8') 1 8.25 8.25 3.25 3.25
3.25
COSTOS DIRECTOS 9.52
COSTOS FIJOS ( van en lista por separado )
9.52

IMPREVISTOS 3% 0.29
GASTOS GENERALES 0% -
UTILIDAD 10% 0.95
COSTO TOTAL (US$/Pza.) 10.76

Costo de Transporte de Madera 8.25 0.043 0.35


COSTO TOTAL (US$/Pza.) 11.11
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 296 de 347

PEC
GUARDACABEZA 5"X 3Mts (MARCHAVANTES)
12847
Rendimiento / Gdia. 14.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 5.94


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.23
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.11
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(5''X10') 1 16.10 16.10 6.35 6.35
6.35
COSTOS DIRECTOS 12.62
COSTOS FIJOS ( van en lista por separado )
12.62

IMPREVISTOS 3% 0.38
GASTOS GENERALES 0% -
UTILIDAD 10% 1.26
COSTO TOTAL (US$/Pza.) 14.26

Costo de Transporte de Madera 16.10 0.043 0.69


COSTO TOTAL (US$/Pza.) 14.95
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 14.08
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 297 de 347

PEC
ENCRIBADO DE CUADRO 5"X6 PIES
12849
Rendimiento / Gdia. 10.00 Vuelta 4 elementos
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.40 49.32
Ayud. Enmaderador Tarea 1.00 34.03 1.40 47.64

2.00 96.96 9.70


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.32
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.15
4. MADERA Und pies²/und pies² $ / Pza US$
Encribado (5"x7') 2 11.27 22.55 4.45 8.90
Encribado (5"x10') 1 16.10 16.10 6.35 6.35
SUB TOTAL 38.65 15.25

15.25
COSTOS DIRECTOS 25.41
COSTOS FIJOS ( van en lista por separado )
25.41

IMPREVISTOS 3% 0.76
GASTOS GENERALES 0% -
UTILIDAD 10% 2.54
COSTO TOTAL (US$/Vuelta) 28.72

Costo de Transporte de Madera 38.65 0.043 1.65


COSTO TOTAL (US$/Pza.) 30.36
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 298 de 347

PEC
ENCRIBADO DE CUADRO 5"X8 PIES
12851
Rendimiento / Gdia. 10.00 Vuelta 4 elementos
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 8.31


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.32
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.15
4. MADERA Und pies²/und pies² $ / Pza US$
Encribado (5"x8') 2 12.88 25.77 5.08 10.16
Encribado (5"x10') 1 16.10 16.10 6.35 6.35
SUB TOTAL 41.87 16.51

16.51
COSTOS DIRECTOS 25.29
COSTOS FIJOS ( van en lista por separado )
25.29

IMPREVISTOS 3% 0.76
GASTOS GENERALES 0% -
UTILIDAD 10% 2.53
COSTO TOTAL (US$/Vuelta) 28.58

Costo de Transporte de Madera 41.87 0.043 1.78


COSTO TOTAL (US$/Pza.) 30.36
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 28.16
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 299 de 347

PEC
ENCRIBADO DE CUADRO 6"X8 PIES
12850
Rendimiento / Gdia. 10.00 Vuelta 4 elementos
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 8.31


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.32
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.15
4. MADERA Und pies²/und pies² $ / Pza US$
Encribado (6"x8') 2 18.55 37.11 7.32 14.64
Encribado (5"x10') 1 16.10 16.10 6.35 6.35
SUB TOTAL 53.21 21.00

21.00
COSTOS DIRECTOS 29.77
COSTOS FIJOS ( van en lista por separado )
29.77

IMPREVISTOS 3% 0.89
GASTOS GENERALES 0% -
UTILIDAD 10% 2.98
COSTO TOTAL (US$/Vuelta) 33.65

Costo de Transporte de Madera 53.21 0.043 2.27


COSTO TOTAL (US$/Pza.) 35.91
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 33.12
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 300 de 347

PEC
SOLERA 6"X8'
12852
Rendimiento / Gdia. 5.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 16.62


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.64
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.30
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (6"x8') 1 18.55 18.55 7.32 7.32
7.32
COSTOS DIRECTOS 24.88
COSTOS FIJOS ( van en lista por separado )
24.88
IMPREVISTOS 3% 0.75
GASTOS GENERALES 0% -
UTILIDAD 10% 2.49
COSTO TOTAL (US$/Pza.) 28.12

Costo de Transporte de Madera 18.55 0.043 0.79


COSTO TOTAL (US$/Pza.) 28.91
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 27.83
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 301 de 347

PEC
SOLERA 7"X8'
12853
Rendimiento / Gdia. 5.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 16.62


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.64
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.30
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (7"x8') 1 25.25 25.25 9.96 9.96
9.96
COSTOS DIRECTOS 27.52
COSTOS FIJOS ( van en lista por separado )
27.52
IMPREVISTOS 3% 0.83
GASTOS GENERALES 0% -
UTILIDAD 10% 2.75
COSTO TOTAL (US$/Pza.) 31.10

Costo de Tranbsporte de Madera 25.25 0.043 1.08


COSTO TOTAL (US$/Pza.) 32.18
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 30.76
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 302 de 347

PEC
12854
Rendimiento / Gdia.
SOLERA 8"X8'

5.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 16.62


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.64
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.30
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (8"x8') 1 32.98 32.98 13.01 13.01
13.01
COSTOS DIRECTOS 30.57
COSTOS FIJOS ( van en lista por separado )
30.57

IMPREVISTOS 3% 0.92
GASTOS GENERALES 0% -
UTILIDAD 10% 3.06
COSTO TOTAL (US$/Pza.) 34.55

Costo de Tranbsporte de Madera 32.98 0.043 1.40


COSTO TOTAL (US$/Pza.) 35.95
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 34.14
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 303 de 347

PEC
12855
Rendimiento / Gdia.
SOLERA 8"X10'

5.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 16.62


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.64
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.30
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (8"x10') 1 41.23 41.23 16.27 16.27
16.27
COSTOS DIRECTOS 33.83
COSTOS FIJOS ( van en lista por separado )
33.83

IMPREVISTOS 3% 1.01
GASTOS GENERALES 0% -
UTILIDAD 10% 3.38
COSTO TOTAL (US$/Pza.) 38.23

Costo de Tranbsporte de Madera 41.23 0.043 1.76


COSTO TOTAL (US$/Pza.) 39.98
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 37.75
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 304 de 347

PEC
Con Plantilla
12856
PUNTAL DE SEGURIDAD 5"X8'

Rendimiento / Gdia. 10.00 Unidad


DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 8.31


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.32
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.15
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (5"x8´) 1 12.88 12.88 5.08 5.08
Tabla (8"x2"x2´) 1 2.62 2.62 1.18 1.18
15.50 6.26
COSTOS DIRECTOS 15.04
COSTOS FIJOS ( van en lista por separado )
15.04

IMPREVISTOS 3% 0.45
GASTOS GENERALES 0% -
UTILIDAD 10% 1.50
COSTO TOTAL (US$/Pza.) 16.99

Costo de Tranbsporte de Madera 15.50 0.043 0.66


COSTO TOTAL (US$/Pza.) 17.65
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 16.78
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 305 de 347

PEC
PUNTAL DE SEGURIDAD 6"X8'
Con Plantilla
12857
Rendimiento / Gdia. 8.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83
2.00 83.11 10.39
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18
3.18 0.40
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.19
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (6"x8') 1 18.55 18.55 7.32 7.32
Tabla (8"x2"x2´) 1 2.62 2.62 1.18 1.18
21.17 8.50
COSTOS DIRECTOS 19.47
COSTOS FIJOS ( van en lista por separado )
19.47
IMPREVISTOS 3% 0.58
GASTOS GENERALES 0% -
UTILIDAD 10% 1.95
COSTO TOTAL (US$/Pza.) 22.00
Costo de Tranbsporte de Madera 21.17 0.043 0.90
COSTO TOTAL (US$/Pza.) 22.91
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 21.73
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 306 de 347

PEC
Con Plantilla
12858
PUNTAL DE SEGURIDAD 7"X8'

Rendimiento / Gdia. 6.00 Unidad


DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 13.85


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.53
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.25
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (7"x8') 1 25.25 25.25 9.96 9.96
Tabla (8"x2"x2´) 1 2.62 2.62 1.18 1.18
27.87 11.14 11.14
COSTOS DIRECTOS 25.77
COSTOS FIJOS ( van en lista por separado )
25.77

IMPREVISTOS 3% 0.77
GASTOS GENERALES 0% -
UTILIDAD 10% 2.58
COSTO TOTAL (US$/Pza.) 29.12

Costo de Tranbsporte de Madera 27.87 0.043 1.19


COSTO TOTAL (US$/Pza.) 30.31
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 28.76
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 307 de 347

PEC
Con Plantilla
PUNTAL DE SEGURIDAD 8"X8'

12859
Rendimiento / Gdia. 4.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 20.78


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.79
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.38
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos (8"x8') 1 32.98 32.98 13.01 13.01
Tabla (8"x2"x2´) 1 2.62 2.62 1.18 1.18
35.60 14.19
COSTOS DIRECTOS 36.14
COSTOS FIJOS ( van en lista por separado )
36.14

IMPREVISTOS 3% 1.08
GASTOS GENERALES 0% -
UTILIDAD 10% 3.61
COSTO TOTAL (US$/Pza.) 40.84

Costo de Tranbsporte de Madera 35.60 0.043 1.52


COSTO TOTAL (US$/Pza.) 42.35
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 40.36
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 308 de 347

CACHO DE TORO (En avances y Tajeos)


12860
Rendimiento / Gdia. 60.00 Unidad $ 4 fts
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 0.70 36.44 25.51
Ayudante Tarea 0.70 34.03 23.82
1.40 49.32 0.82
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 1.40 1.59 2.23
2.23 0.04
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.53
- -
5. MATERIALES DE PERFORACION
Barra conica 6" Pies 240.00 90.92 1,820 11.99
Broca 40 mm Pza 240.00 23.08 350 15.83
Aceite Perforación Gln. 0.17 7.86 1.34
Cacho de toro (3/4" x 1.80m) Pza. 60.00 5.88 352.80
381.95 6.37
6. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 240.00 0.12 28.80
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
29.75 0.50
COSTOS DIRECTOS 7.72

IMPREVISTOS 3% 0.23
GASTOS GENERALES 0% -
UTILIDAD 10% 0.77
COSTO TOTAL (US$/Pza.) 8.72

COSTO TOTAL (US$/Pza.) 8.72


COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 7.89
Pagina: 309 de 347

ENTABLADO DE MADERA CON MALLA PARA RELLENO (LOZA)


12861
Rendimiento / Gdia. 11.00 M2
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro $ 1 Tarea 1.00 35.23 1.20 42.28
Ayudante $ 1 Tarea 1.00 34.03 1.20 40.83

2.00 83.11 7.56


2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.59 3.18

3.18 0.29
3. HERRAMIENTAS
Herramientas Global 1.50 0.14

4. MATERIALES CANTIDAD PIES2 TOT.PIES2 PRECIO MONTO


Redondos (5"x8´) Pza $ 5 12.88 64.40 5.08 25.40
Tabla (8"x2"x10´) Pza $ 12 13.12 157.44 6.38 76.59
Clavos 6 " Kgs $ 4 1.28 5.11
Malla Electrosoldada M2 11.00 2.69 29.56
221.84 136.67
12.42

COSTOS DIRECTOS 20.41

20.41
SUPERVISIÓN -
IMPREVISTOS 3% 0.61
GASTOS GENERALES 0% -
UTILIDAD 10% 2.04
COSTO TOTAL (US$/M2.) 23.06

COSTO DE TRANSPORTE DE MADERA 221.84 0.043 0.86

COSTO TOTAL (US$/M2.) 23.92


COSTO TOTAL (US$/M2.) - SIN UTILIDAD NI CONTINGENCIA 22.25
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Malla Electrosoldada y todos los materiales es a costo del Contratista
Pagina: 310 de 347
INSTALACION DE WOOD PACK CON MAD. REDONDA Ø7 y Ø8"
12862
Rendimiento / Gdia. 3.00 Altura castillo (mts) $ 2
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 2.00 34.03 1.20 81.67

3.00 123.94 41.31


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 3.00 1.59 4.77

4.77 1.59

Fts x
Precio/U
redondo
3. MATERIALES Y HERRAMIEN CANTIDAD FTS TOTAL nidad
Madera redonda Ø8" x 3.0m Unid $ 51 41.23 2,103 16.27 829.82
Herramientas Global 1.50
831.32 277.11
4. EQUIPO DE PERFORACION Y LIMPIEZA
Manguera de aire Ø1" Unid 30 150.00 0.20 3.17 0.63
BOMBA INYECTORA Unid 6 0.96 5.78
Manguera de agua Ø1/2" Unid 30 150.00 0.20 1.57 0.31
SUB TOTAL 6.73 2.24

COSTOS DIRECTOS 322.25

IMPREVISTOS 3% 9.67
GASTOS GENERALES 0% -
UTILIDAD 10% 32.23
COSTO TOTAL (US$/Vuelta) 364.15

Costo de Transporte de Madera 2,102.64 0.043 29.85


COSTO TOTAL (US$/Pza.) 393.99
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 357.76
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 311 de 347
INSTALACION DE WOOD PACK CON MADERA ASERRADA
12863
Rendimiento / Gdia. 3.00 Altura castillo (mts) $ 2
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 35.23
Ayud. Enmaderador Tarea 2.00 34.03 68.05

3.00 103.29 34.43


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 3.00 1.59 4.77

4.77 1.59

Fts x
Precio/U
redondo
3. MATERIALES Y HERRAMIENCantidad FTS TOTAL nidad
Durmiente 8" x 8" x 1.50m Unid $ 51 26.25 1,339 22.62 1,153.60
Herramientas Global 1.50
1,155.10 385.03
4. EQUIPO DE PERFORACION Y LIMPIEZA
Manguera de aire Ø1" Unid 30 150.00 0.20 3.17 0.63
Manguera de agua Ø1/2" Unid 30 150.00 0.20 1.57 0.31
SUB TOTAL 0.95 0.32

COSTOS DIRECTOS 421.37

IMPREVISTOS 3% 12.64
GASTOS GENERALES 0% -
UTILIDAD 10% 42.14
COSTO TOTAL (US$/Vuelta) 476.15

Costo de Transporte de Madera 1,338.58 0.043 19.00


COSTO TOTAL (US$/Pza.) 495.15
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 444.89
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata 11%
Pagina: 312 de 347

PEC
COLOCADO ENTABLADO (FORRADO CUADROS EN VEZ CANTONERA)
12864
Rendimiento / Gdia. 60.00
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 1.39


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.05
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.03
4. MADERA Und pies²/und pies² $ / Pza US$
Entablado (5"x1"x8') 1 3.28 1.47 1.47

SUB TOTAL 3.28 1.47

1.47
COSTOS DIRECTOS 2.93
COSTOS FIJOS ( van en lista por separado )
2.93

IMPREVISTOS 3% 0.09
GASTOS GENERALES 0% -
UTILIDAD 10% 0.29
COSTO TOTAL (US$/Vuelta) 3.32

Costo de Transporte de Madera 3.28 0.043 0.14


COSTO TOTAL (US$/Pza.) 3.45
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 3.25
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 313 de 347

PEC
COLOCADO CANTONERAS
12865
Rendimiento / Gdia. 60.00
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 1.39


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.05
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.03
4. MADERA Und pies²/und pies² $ / Pza US$
Cantoneras 1 5.00 5.00 2.86 2.86
SUB TOTAL 5.00 2.86
2.86
COSTOS DIRECTOS 4.33
COSTOS FIJOS ( van en lista por separado )
4.33

IMPREVISTOS 3% 0.13
GASTOS GENERALES 0% -
UTILIDAD 10% 0.43
COSTO TOTAL (US$/Vuelta) 4.89

Costo de Transporte de Madera 5.00 0.043 0.21


COSTO TOTAL (US$/Pza.) 5.10
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 314 de 347

PEC
COLOCADO DE RAJADO
12866
Rendimiento / Gdia. 60.00
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 1.39


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.05
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.03
4. MADERA Und pies²/und pies² $ / Pza US$
Redondo (4"x8') rajado 1 8.25 4.12 3.25 1.63
SUB TOTAL 4.12 1.63
1.63
COSTOS DIRECTOS 3.09
COSTOS FIJOS ( van en lista por separado )
3.09

IMPREVISTOS 3% 0.09
GASTOS GENERALES 0% -
UTILIDAD 10% 0.31
COSTO TOTAL (US$/Vuelta) 3.49

Costo de Transporte de Madera 4.12 0.043 0.18


COSTO TOTAL (US$/Pza.) 3.67
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 3.44
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Pagina: 315 de 347
ELABORACION + INSTALACION BOLSACRETE (Arena+Cemento)
12867
Rendimiento / Gdia. 8.00 M3 $ 480 Bolsacrete
DESCRIPCIÓN Cantidad Incidencia Costo Costo x Costo/Pza.
FACTOR
UNIDAD Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 1.00 35.23 1.20 42.28
Ayudante Tarea 1.00 1.00 34.03 1.20 40.83

2.00 83.11 10.39


2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tarea 2.00 1.59 3.18

3.18 0.40
3. HERRAMIENTAS
Herramientas Global 1.50
1.50 0.19
4. MATERIALES
DESCRIPCION UNIDAD CANTIDAD Estandar CANTIDAD PRECIO

Bolsas/M3 U.S.$/PZA U.S.$


Saco Polipropileno Bolsas 480.00 1.00 $ 480 0.34 162.87
Cemento Bolsas 8.00 2.00 $ 16 8.18 130.94
293.80 36.73

COSTOS DIRECTOS 47.70

47.70
IMPREVISTOS
CONTINGENCIA 3% 1.43
GASTOS GENERALES 0% -
UTILIDAD 10% 4.77
COSTO TOTAL (US$/M3.) 53.90
COSTO TOTAL (US$/M3.) - SIN UTILIDAD NI CONTINGENCIA 49.05
PRECIOS UNITARIOS
SERVICIOS
Pagina: 317 de 347
ACARREO CON WINCHE

08146 ROTURA: 15.00 TMS/DISPARO

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Maestro Perforista 0.50 Tareas 1.00 36.44 $/Tarea 18.22
18.22 1.21
2.- IMPLEMENTOS
Implementos personal operativo normal Tareas 0.50 1.59 0.79
0.79 0.05
3.- EQUIPOS
Winche de 20 HP Hrs 3.00 3.53 $/hr 10.58
10.58 0.71
4.- GASTOS INDIRECTOS 1.97
Imprevistos 3% $ 0.06
Gastos Generales 0% $ 0.00
Utilidad 10% $ 0.20

TOTAL COSTO ROTURA EN DOLARES (US$/TM) 2.23


TOTAL COSTO ROTURA EN DOLARES (US$/TM) - SIN UTILIDAD NI CONTINGENCIA 2.22
Pagina: 318 de 347
PLATAFORMA DESCANSO CON ESCALERA
08435
Rendimiento / Gdia. 5.00 Unidad 5 ESCALERAS Y 5 DESCANSOS SIN PUNTALES
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 16.62


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.64
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
Clavos
1.50 0.30
4. MADERA Und pies²/und pies² $ / Pza US$
Escalera (3m.) 1 13.21 13.21
Tabla 8" x 2" x 10' 1 13.12 13.12 6.38 6.38
13.12 19.59
19.59
COSTOS DIRECTOS 37.15
COSTOS FIJOS ( van en lista por separado )
37.15

IMPREVISTOS 3% 1.11
GASTOS GENERALES 0% -
UTILIDAD 10% 3.72
COSTO TOTAL (US$/Pza.) 41.98

Costo de Transporte de Madera 13.12 0.043 0.56


COSTO TOTAL (US$/Pza.) 42.54
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 39.87
Pagina: 319 de 347

PEC
INSTALACION DE ESCALERA
08436
Rendimiento / Gdia. 20.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 1.20 42.28
Ayud. Enmaderador Tarea 1.00 34.03 1.20 40.83

2.00 83.11 4.16


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.16
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
Clavos
1.50 0.08
4. MADERA Und $ / und US$
Escalera (3m.) 1 13.21 13.21
13.21
COSTOS DIRECTOS 17.60
COSTOS FIJOS ( van en lista por separado )
17.60

IMPREVISTOS 3% 0.53
GASTOS GENERALES 0% -
UTILIDAD 10% 1.76
COSTO TOTAL (US$/Pza.) 19.89
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 18.14
Pagina: 320 de 347

FORMATO DE PRECIOS UNITARIOS DE RELLENO HIDRAULICO


08451
Producción Relleno en Tajeos (M3/MES) 8,000

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO Días Mes $ US$/UNID
1.- MANO DE OBRA US$
Capataz Tareas - 45.97 30.00 0.00
Maestro Relleno M2/M3 Tareas 6.00 36.44 30.00 6,558.57
Preparacion A1 Tareas 7.00 34.03 30.00 7,145.76
SUB TOTAL 13.00 13,704.33

SUB TOTAL 13,704.33 1.71

2.- IMPLEMENTOS
Implementos Ropa Agua Tareas 180.00 2.98 536.82
Implementos sin Ropa agua Tareas 210.00 1.59 333.82
SUB TOTAL 870.64 0.11
3.- MATERIALES Y HERRAMIENTAS RRHH
Poliyute M2 2,000.00 1.28 2,553.70
Clavos 3" Kgs 60.00 0.00 0.00
Tubo 4"X3m PVC Unid 150.00 3.13 470.11
Codos 4" x 90 Un 0.00 0.00 0.00
Herramientas de Mina-Barretillas Global 1.53
Floculante Kgs 0.00 0.00 0.00
Alambre No 8 Kgs 0.00 1.08 0.00
Madera Redondo Fts2 500.00 0.346 173.10
Madera Aserrada Fts2 1,000.00 0.396 395.65

3,594.08 0.45

4.- EQUIPOS
BOMBA SUMERGIBLE 1.00 Hrs 320.00 1.56 500.77
0.00
SUB TOTAL 500.77 0.06

CONTINGENCIA 3% 0.07
UTILIDAD 10% 0.23
SUB TOTAL COSTOS INDIRECTOS

TOTAL COSTOS POR TMS SEGÚN MEDICION TOPOGRAFICO DE TAJEOS U.S.$/M3 2.64
TOTAL COSTOS POR TMS SEGÚN MEDICION TOPOGRAFICO DE TAJEOS - SIN UTILIDAD NI CONTINGE U.S.$/M3 2.56
Pagina: 321 de 347
LIMPIEZA CON PALA DE LINEA
08380
Avance Neto/Gdia.(m3 30.00
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/M3
Unit.$ Util Disp. $ (US$/M3.)
MANO DE OBRA
Maestro Tarea 1.00 35.23 1.00 35.23
Ayudante Tarea 1.00 34.03 1.00 34.03
TOTAL 2.00 69.26 2.31
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.59 3.18
SUB TOTAL 3.18 0.11
3. HERRAMIENTAS
Herramientas Global 1.02 0.03
4. EQUIPOS Unidad Hrs PU
Pala de Linea Hrs 3.00 6.11 $/hr 18.32
SUB TOTAL 18.32 0.61

COSTOS DIRECTOS 3.06


COSTO INDIRECTOS
IMPREVISTOS 3% 0.09
GASTOS GENERALES 0% -
UTILIDAD 10% 0.31
SUB TOTAL INDIRECTOS 0.40

COSTO TOTAL (US$/M3.) 3.46


COSTO TOTAL (US$/M3.) - SIN UTILIDAD NI CONTINGENCIA 3.44
Pagina: 322 de 347
PARRILLERO - BOMBERO
08452 Rendimiento $ 1 TMS/Guardia

ITEM DESCRIPCION INCID. UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA $/Tarea
Parrillero Tareas 1.00 34.03 34.03

34.03 34.03
2.- IMPLEMENTOS
Implementos seguridad Tareas 1.00 1.59 1.59
1.59 1.59
3.- MATERIALES Y HERRAMIENTAS $/Glb
Herramientas Glb 1.02 1.02
1.02 1.02
36.64
5.- GASTOS INDIRECTOS
Contingencias 3% $ 1.10
Gastos Generales 0% $ 0.00
Utilidad 10% $ 3.66

TOTAL COSTO POR TAREA EN DOLARES (US$/DIA/PARRILERO) 41.41


TOTAL COSTO POR TAREA EN DOLARES (US$/DIA/PARRILERO) - SIN UTILIDAD NI CONT 41.07
ALQUILER SIN OPERADOR 87.72 US$/HR SIN PETROLEO
ALQUILER CON OPERADOR 113.19 US$/HR INCLUYE PETROLEO Y OPERADOR

ESTRUCTURA DE COSTOS DE DESATADOR PAUS 853-S8 PAUS


08453
DATOS
DESCRIPCION UNID. US$
PRECIO STOCK LIMA U.S.$ $ 424,800
VALOR RESCATE (20%) U.S.$ $ 84,960
VALOR NETO EQUIPO U.S.$ $ 339,840
VIDA ECONOMICA EN HORAS(8*25*72) HRS 12,000.00
HRS POR MES HRS 200.00
VIDA ECONOMICA EN AÑOS UNID 5.00

DEPRECIACION DE EQUIPOS

COSTO DE POSESION
DEPRECIACION U.S.$/HR 28.32
C.INTERESES,SEGUROS E IMPUESTOS U.S.$/HR 15.25

SUB-TOTAL COSTO POSECION U.S.$/HR 43.57

COSTO DE OPERACIÓN
Repuestos y Mantenimiento U.S.$/HR 30.50
Neumaticos U.S.$/HR 2.00
Petroleo (1.5 Gln x Hr) U.S.$/HR
Mecanico U.S.$/HR 11.64
SUB-TOTAL OPERACIONES U.S.$/HR 44.14

TOTAL (OPERACIÓN+DEPRECIACION) U.S.$/HR 87.72

COSTO HORARIO SCALER

DESCRIPCION UNIDAD DATOS U.S.$


Alquiler SCALER U.S.$/Hr 87.72
Petroleo Glns/Hr 3.00
Petroleo U.S.$/Galon 3.28
Petroleo U.S.$/Hr 9.84
Operador U.S.$/Hr 4.22 4.22 93%
Alimentacion U.S.$/Hr 0.61 0.61
EPPS U.S.$/Hr 0.37 0.37
Pasaje U.S.$/Hr 0.14 0.14

SUB TOTAL U.S.$/Hr 102.90


UTILIDAD U.S.$/Hr 10% 10.29
COSTO TOTAL U.S.$/Hr 113.19
ESTRUCTURA DE COSTOS DE JUMBO - TALADROS DE CONSOLIDACION
08454
DATOS
DESCRIPCION UNID. US$
PRECIO STOCK LIMA U.S.$ $ 402,000
VALOR RESCATE (20%) U.S.$ $ 80,400
VALOR NETO EQUIPO U.S.$ $ 321,600
VIDA ECONOMICA EN HORAS(8*25*66) HRS 13,200.00
HRS POR MES HRS 200.00
VIDA ECONOMICA EN AÑOS UNID 5.50

DEPRECIACION DE EQUIPOS

COSTO PROPIEDAD
DEPRECIACION U.S.$/HR 24.36
C.INTERESES,SEGUROS E IMPUESTOS U.S.$/HR 15.57

SUB-TOTAL COSTO POSECION U.S.$/HR 39.9

COSTO OPERACIÓN
DESCRIPCION UNIDAD CANTIDAD PU US$ U.S.$
Repuestos y Mantenimiento U.S.$/Hr 1.00 59.95 59.95
Reparaciones Terceros U.S.$/Hr 1.00 7.99 7.99
Neumaticos U.S.$/Hr 1.00 1.00 1.00
Mecanico U.S.$/Hr 1.00 12.00 12.00
OPERADOR U.S.$/Hr 1.00 6.55 6.55
AYUDANTE U.S.$/Hr 2.00 4.25 8.51
Alimentacion U.S.$/Hr 3.00 0.61 1.84
EPPS U.S.$/Hr 3.00 0.37 1.12
Pasaje U.S.$/Hr 3.00 0.14 0.41
PETROLEO U.S.$/Hr 1.50 3.28 4.92
ACEROS U.S.$/Hr 1.00 25.02 25.02
SUB TOTAL 129.30
CONTINGENCIA 3% 3.88
UTILIDAD 10% 12.93
COSTO TOTAL U.S.$/Hr 121.2 146.1

TOTAL (OPERACIÓN+DEPRECIACION) U.S.$/HR 186.04


ESTRUCTURA DE COSTOS DE TRACTOR

DATOS
DESCRIPCION UNID. US$
PRECIO STOCK LIMA U.S.$ $ 190,000
VALOR RESCATE (20%) U.S.$ $ 38,000
VALOR NETO EQUIPO U.S.$ $ 152,000
VIDA ECONOMICA EN HORAS(8*25*66) HRS 13,200.00
HRS POR MES HRS 200.00
VIDA ECONOMICA EN AÑOS UNID 5.50

DEPRECIACION DE EQUIPOS

COSTO PROPIEDAD
DEPRECIACION U.S.$/HR 11.52
C.INTERESES,SEGUROS E IMPUESTOS U.S.$/HR 7.36

SUB-TOTAL COSTO POSECION U.S.$/HR 18.9

COSTO OPERACIÓN

DESCRIPCION UNIDAD CANTIDAD PU US$ U.S.$


Repuestos y Mantenimiento U.S.$/Hr 1.00 13.21 13.21
Reparaciones Terceros U.S.$/Hr 1.00 3.77 3.77
Neumaticos U.S.$/Hr 1.00 0.00
Mecanico U.S.$/Hr 1.00 10.00 10.00
OPERADOR U.S.$/Hr 6.55 0.00
AYUDANTE U.S.$/Hr 4.25 0.00
Alimentacion U.S.$/Hr 0.00 0.61 0.00
EPPS U.S.$/Hr 0.00 0.37 0.00
Pasaje U.S.$/Hr 0.00 0.14 0.00
PETROLEO Gl/Hr 3.00 3.28 9.84
0.00
SUB TOTAL 36.83
CONTINGENCIA 0.00
UTILIDAD 0.00
COSTO TOTAL U.S.$/Hr 43.2 36.8

TOTAL (OPERACIÓN+DEPRECIACION) U.S.$/HR 55.70


ESTRUCTURA DE COSTOS DE MINICARGADOR

DATOS
DESCRIPCION UNID. US$
PRECIO STOCK LIMA U.S.$ $ 55,000
VALOR RESCATE (20%) U.S.$ $ 11,000
VALOR NETO EQUIPO U.S.$ $ 44,000
VIDA ECONOMICA EN HORAS(8*25*66) HRS 13,200.00
HRS POR MES HRS 200.00
VIDA ECONOMICA EN AÑOS UNID 5.50

DEPRECIACION DE EQUIPOS

COSTO PROPIEDAD
DEPRECIACION U.S.$/HR 3.33
C.INTERESES,SEGUROS E IMPUESTOS U.S.$/HR 2.13

SUB-TOTAL COSTO POSECION U.S.$/HR 5.5

COSTO OPERACIÓN

DESCRIPCION UNIDAD CANTIDAD PU US$ U.S.$


Repuestos y Mantenimiento U.S.$/Hr 1.00 2.73 2.73
Reparaciones Terceros U.S.$/Hr 1.00 1.09 1.09
Neumaticos U.S.$/Hr 1.00 1.00 1.00
Mecanico U.S.$/Hr 1.00 10.00 10.00
OPERADOR U.S.$/Hr 6.55 0.00
AYUDANTE U.S.$/Hr 4.25 0.00
Alimentacion U.S.$/Hr 0.00 0.61 0.00
EPPS U.S.$/Hr 0.00 0.37 0.00
Pasaje U.S.$/Hr 0.00 0.14 0.00
PETROLEO GL/HR 2.50 3.28 8.20
0.00
SUB TOTAL 23.02
CONTINGENCIA 0.00
UTILIDAD 0.00
COSTO TOTAL U.S.$/Hr 30.0 23.0

TOTAL (OPERACIÓN+DEPRECIACION) U.S.$/HR 28.49


LIMPIEZA DE VIA CON MINICARGADOR + TRACTOR

Rendimiento / Gdia. 210 Mts/Gdia


DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Minicargador Tarea 1.00 46.37 46.37
Ayudante Sangrillero Tarea 1.00 34.03 34.03
Ayudante Limpieza apulso Tarea 1.00 34.03 34.03
Maestro Tractorista Tarea 1.00 46.37 46.37
Ayudante Tractorista Tarea 1.00 34.03 34.03
5.00 194.83 0.93 1
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 5.00 1.59 7.95

7.95 0.04 0
3. HERRAMIENTAS
Herramientas Global 1.50
1.50 0.01 0

4. EQUIPOS Unidad Hrs PU


Tractor Hrs 4.00 55.70 $/hr 222.80
Minicargador Hrs 4.00 28.49 $/hr 113.95
SUB TOTAL 336.75 1.60 1

COSTOS DIRECTOS $ 2.58

IMPREVISTOS 3% $ 0.08
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.26
COSTO TOTAL (US$/MT) 2.91 0
n° dias al mes 1

MES
MTS/GDIA 350
$ DIA $ 1,019
$ MES $ 30,568
Pagina: 329 de 347
LIMPIEZA A PULSO
08139
Avance Neto/Gdia.(m3): 10.00
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/M3
Unit.$ Util Disp. $ (US$/M3.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.23 1.00 35.23
Ayudante Tarea 1.00 34.03 1.00 34.03
TOTAL 2.00 69.26 6.93
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.59 3.18
SUB TOTAL 3.18 0.32
3. HERRAMIENTAS
Herramientas Global 1.02 0.10

COSTOS DIRECTOS 7.35

COSTO INDIRECTOS
IMPREVISTOS 3% 0.22
GASTOS GENERALES 0% -
UTILIDAD 10% 0.73
SUB TOTAL INDIRECTOS 0.96

COSTO TOTAL (US$/M3.) 8.30


COSTO TOTAL (US$/M3.) - SIN UTILIDAD NI CONTINGENCIA 8.25
Pagina: 330 de 347
RECUPERACION DE CUADRO DE MADERA 7X7, 8'x8', 10X10
08381
Rendimiento / Gdia. 3.00 Unidad
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 35.23
Ayud. Enmaderador Tarea 1.00 34.03 34.03

2.00 69.26 23.09


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 1.06
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
1.50 0.50

COSTOS DIRECTOS 24.65


COSTOS FIJOS ( van en lista por separado )
24.65
SUPERVISIÓN -
IMPREVISTOS 3% 0.74
GASTOS GENERALES 0% -
UTILIDAD 10% 2.46
COSTO TOTAL (US$/Pza.) 27.85
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 27.65
Pagina: 331 de 347

INSTALACION TUBERIA POLIETILENO 4" EN LINEA RECTA (Incluye Traslado)


08209
Rendimiento / Gdia. $ 200 Mts/Cuadrilla
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x
Unit.$ Util Disp. $ (US$/MTS.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.23 35.23
Ayudante Tarea 2.00 34.03 68.05
3.00 103.29 0.52
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 3.00 1.59 4.77

4.77 0.02
3. HERRAMIENTAS
Herramientas Global 1.02
1.02 0.01

COSTOS DIRECTOS $ 0.55

IMPREVISTOS 3% $ 0.02
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.05
COSTO TOTAL (US$/MTS) 0.62
COSTO TOTAL (US$/MTS) - SIN UTILIDAD NI CONTINGENCIA 0.61
NOTA:
1. empalmado e instalacion
Pagina: 332 de 347

LIMPIEZA DE VIA CON MINICARGADOR


08215
Rendimiento / Gdia. 200 Mts/Gdia
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util $ (US$/UNI.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.23 35.23

1.00 35.23 0.18


2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 1.00 1.59 1.59

1.59 0.01
3. HERRAMIENTAS
Herramientas Global 1.50
1.50 0.01

COSTOS DIRECTOS $ 0.19

IMPREVISTOS 3% $ 0.01
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.02
COSTO TOTAL (US$/MT) 0.22
COSTO TOTAL (US$/MT) - SIN UTILIDAD NI CONTINGENCIA 0.21
EQUIPO CMHSA
Pagina: 333 de 347

ENTABLADO
08437
Rendimiento / Gdia. 12.00 M2
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.23 1.20 42.28
Ayudante Tarea 1.00 34.03 1.20 40.83

2.00 83.11 6.93


2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.59 3.18
-
3.18 0.26
3. HERRAMIENTAS
Herramientas Global 1.50 0.13

4. MATERIALES CANTIDAD PIES2 TOT.PIES2 PRECIO MONTO


Tabla (8"x2"x10´) Pza $ 20 13.12 262.47 6.38 127.65
Clavos 6 " Kgs $ 5 1.28 6.38
262.47 134.03
11.17
COSTOS DIRECTOS 18.49

18.49

IMPREVISTOS 3% 0.55
GASTOS GENERALES 0% -
UTILIDAD 10% 1.85
COSTO TOTAL (US$/M2.) 20.89

COSTO DE TRANSPORTE DE MADERA 262.47 0.04 0.93

COSTO TOTAL (US$/M2.) 21.82


COSTO TOTAL (US$/M2.) - SIN UTILIDAD NI CONTINGENCIA 20.32
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Malla Electrosoldada y todos los materiales es a costo del Contratista
Pagina: 334 de 347
INSTALACION DE TOLVA SIMPLE
08438
Cuadro Incluye una vuelta de encribado
Rendimiento / Gdia. 0.50 Unidad
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Maestro Enmaderador Tarea 1.00 35.23 3.30 116.27
Ayud. Enmaderador Tarea 1.00 34.03 3.30 112.29

2.00 228.56 457.11


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 6.60 1.59 10.49

10.49 20.98
3. MATERIALES Y HERRAMIENTAS
Herramientas Global 1.50
Clavos 6" Kgr. 1.50 1.28 1.92
3.42 6.84
4. MADERA Und pies²/und pies² $ / Pza US$
Redondos(8''X10') 7 41.23 288.61 16.27 113.90
Redondos(8''X8') 2 32.98 65.96 13.01 26.03
Redondos(6''X8') - Tirante y top 2 18.55 37.10 7.32 14.64
Tablas 8"x4"x10' 5 26.25 131.25 11.41 57.06
Tablas 8"x2"x10' 11 13.12 144.32 6.38 70.21
Cuñas (8"X4"X2")
667.24 281.83 281.83

COSTOS DIRECTOS 766.77

IMPREVISTOS 3% 23.00
GASTOS GENERALES 0% -
UTILIDAD 10% 76.68
COSTO TOTAL (US$/Pza.) 866.45

Costo de Tranbsporte de Madera 667.24 0.04 28.41


COSTO TOTAL (US$/Pza.) 894.86
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 854.60
Costo Incluye transporte de la cancha de madera a sus labores a cuenta Contrata
Asimismo, el costo incluye los cuadros base, puntales, pata de gallo, etc.
Costo incluye EL CUADRO + LA TOLVA
Pagina: 335 de 347
FORMATO DE PRECIOS UNITARIOS NICHO TABLERO

08439 CONSORCIO MINER0 HORIZONTE S.A.


NICHO PARA TABLERO ELECTRICO 0.60m x 0.60m N° Taladros: 30.00 u
Long. Perfor.: 2.00 pies
AVANCE: 1.00 Unid

ITEM DESCRIPCION INCID UNI. CANTID. PRECIO SUBTOT. TOTAL


UNITARIO $ US$/UNID
1.- MANO DE OBRA
Perforista 0.60 Tareas 1.00 36.44 $/Tarea 21.86
Ayudante Perforista 0.60 Tareas 1.00 34.03 $/Tarea 20.42

42.28 42.28
2.- IMPLEMENTOS
Implementos Tareas 1.20 1.59 1.91
1.91 1.91
3.- MATERIALES Y HERRAMIENTAS
Barra de 6¨ P.P. 60.000 90.92 $/uni 3.00
Broca de 40 mm PP 60.000 23.08 $/uni 3.96
Aceite de Perforación Gln 0.250 7.86 $/uni 1.96
Herramientas de Mina-Barretillas Global $/uni 1.02
9.94 9.94
4.- EQUIPOS
Perforadora P.P. 60.00 0.120 $/pp 7.20
Manguera Aire 1¨ Mts. 30.00 3.17 $/hr 0.63
Manguera Agua 1/2¨ Mts. 30.00 1.57 $/hr 0.31

8.15 8.15
62.28
6.- GASTOS INDIRECTOS
Contingencias 3% $ 1.87
Gastos Generales 0% $ 0.00
Utilidad 10% $ 6.23
TOTAL COSTO EN DOLARES (US$/UNIDAD) 70.37
TOTAL COSTO EN DOLARES (US$/UNIDAD) - SIN UTILIDAD NI CONTINGENCIA 68.83
Energía Eléctrica, Tuberias, accesorios proporciona Cía.
Pagina: 336 de 347
RELLENO DETRITICO CON WINCHE
08440 Avance Neto/Gdia.(m3)........ 20.00

DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/M3


Unit.$ Util Disp. $ (US$/M3.)
MANO DE OBRA
Maestro Tarea 1.00 35.23 1.00 35.23
Ayudante Tarea 1.00 34.03 1.00 34.03
69.26 3.46
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.59 3.18
3.18 0.16
3. HERRAMIENTAS
Herramientas Global 1.53 0.08
4. EQUIPOS
Ventilador Hrs 0.00 0.89 $/hr 0.00
Winche de 20 HP h-m 2.00 3.53 $/hr 7.05
7.05 0.35
COSTOS DIRECTOS 4.05
COSTO INDIRECTOS
IMPREVISTOS 3% 0.12
GASTOS GENERALES 0% -
UTILIDAD 10% 0.41
COSTO TOTAL (US$/M3.) 4.58
COSTO TOTAL (US$/M3.) - SIN UTILIDAD NI CONTINGENCIA 4.55
Pagina: 337 de 347

INSTALACION ALCAYATAS ELECTRICAS DE 3 ESPACIOS


08448
Rendimiento : 30.00 Unid. de 2 fts
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/Pza.
Unit.$ Util Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 36.44 36.44
Ayud. Perforista Tarea 1.00 34.03 34.03

2.00 70.46 2.35


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.11
3. MATERIALES Y HERRAMIENTAS
BARRA CONICA 6" Fts 60.00 90.92 1,820 3.00
Broca 40 mm Fts 60.00 23.08 350 3.96
Aceite Perforación Gln. 0.12 7.86 0.94
Alcayata Electrica trip espaci Pza. 30.00 3.37 101.08
Cembolt Pza 60.00 0.20 11.79
Herramientas de mina Global 1.57
122.33 4.08
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 60.00 0.12 7.20
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31

8.15 0.27
COSTOS DIRECTOS 6.80
COSTOS FIJOS ( van en lista por separado )
6.80

IMPREVISTOS 3% 0.20
GASTOS GENERALES 0% -
UTILIDAD 10% 0.68
COSTO TOTAL (US$/Pza. 7.69
COSTO TOTAL (US$/Pza. - SIN UTILIDAD NI CONTINGENCIA 7.14
Pagina: 338 de 347

INSTALACION ALCAYATAS PARA MANGA DE VENTILACION


08442
Rendimiento : 60.00 Unid./Gud. $ 1 Fts
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 36.44 1.20 43.72
Ayud. Perforista Tarea 1.00 34.03 1.20 40.83

2.00 84.56 1.41


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.05
3. MATERIALES Y HERRAMIENTAS
Barra cónica 6" P.P 30.00 90.92 1,820 1.50
Broca 40 mm P.P 30.00 23.08 350 1.98
Aceite Perforación Gln. 0.12 7.86 0.94
Alcayata Pza. 60.00 7.27 436.37
Cembolt Pza 30.00 0.20 5.89
Herramientas de mina Global 1.57
448.25 7.47
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 30.00 0.12 3.60
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31

4.55 0.08
COSTOS DIRECTOS 9.01
COSTOS FIJOS ( van en lista por separado )
9.01

IMPREVISTOS 3% 0.27
GASTOS GENERALES 0% -
UTILIDAD 10% 0.90
COSTO TOTAL (US$/Pza.) 10.18
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 9.20
Pagina: 339 de 347

INSTALACION ALCAYATAS
08441
Rendimiento : 30.00 Unid. de 2 fts
DESCRIPCIÓN Unid. Cant. Costo Costo x Costo/Pza.
FACTOR
Unit.$ Disp. $ (US$/pza.)
1. MANO DE OBRA
Perforistas Tarea 1.00 36.44 1.20 43.72
Ayud. Perforista Tarea 1.00 34.03 1.20 40.83

2.00 84.56 2.82


2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18

3.18 0.11
3. MATERIALES Y HERRAMIENTAS
BARRA CONICA 6" Fts 60.00 90.92 1,820 3.00
Broca 40 mm Fts 60.00 23.08 350 3.96
Aceite Perforación Gln. 0.12 7.86 0.94
Alcayata Pza. 30.00 7.27 218.18
Cembolt Pza 60.00 0.20 11.79
Herramientas de mina Global 1.57
239.44 7.98
5. EQUIPO PERFORACIÓN-LIMPIEZA
perforadora P.P. 60.00 0.12 7.20
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31

8.15 0.27
COSTOS DIRECTOS 11.18
COSTOS FIJOS ( van en lista por separado )
11.18

IMPREVISTOS 3% 0.34
GASTOS GENERALES 0% -
UTILIDAD 10% 1.12
COSTO TOTAL (US$/Pza.) 12.63
COSTO TOTAL (US$/Pza.) - SIN UTILIDAD NI CONTINGENCIA 11.58
Pagina: 340 de 347
DESQUINCHE CON JUMBO Y LIMPIEZA CON SCOOP
08449
GRADIENTE: 5/1000 N° de Taladros: 60.00 Avance/Disp. 108.00 MT3
Factor Incidencia 12%
FACTOR
MANO DE OBRA UNIDAD CANTIDAD FACT MO PU SUB TOTAL U.S.$/MT
INCIDENCIA
OPERADOR DE JUMBO Hom/Disp 1.00 0.67 1.00 52.40 35.11
AYUDANTE OPER.JUMBO Hom/Disp 1.00 1.00 1.00 36.44 36.44
OPERADOR SCOOPTRAM Hom/Disp 1.00 1.00 1.00 46.37 46.37
OPERADOR CAMION DE BAJO PERFIL Hom/Disp 0.00
CARGADOR/DISPARADOR Hom/Disp 2.00 1.00 1.00 36.44 72.87
SERVICIOS AUXILIARES Hom/Disp 2.00 1.00 1.00 34.03 68.05
SUB-TOTAL 258.84 2.40

MATERIALES
VIDA UTIL ESTANDAR PRECIO U.S.
DESCRIPCION UNIDAD MTS/DISP U.S.$/MT
MTS PZAS/DISP $/PZA
BARRAS DE PERFORACION MT/DISP 208.48 2,500 0.08 482.66 40.2504
BROCAS DE 45 MM MT/DISP 208.48 200 1.04 86.74 90.4155
SHANK ADAPTER MT/DISP 208.48 3,500 0.06 238.74 14.2212
AFILADOR BROCAS MT/DISP 208.48 100,000 0.00 0.00 0.0000
COPLAS MT/DISP 0.00 3,000
RIMADORA DE 89 MM MT/DISP 0.00 200
ADAPTADOR DE RIMADORA MT/DISP 0.00 200
TUBO PVC (Voladura recorte) PZAS/DISP 5.00 1.88 9.4201
TUBERIA DE POLIETILENO DE 2" AGUA PZAS/DISP 0.00
TUBERIA DE POLIETILENO DE 4" AIRE PZAS/DISP 0.00
HERRAMIENTAS GLB 1.02 1.0247
MANGA VENTILACION 30" MT/DISP 0.00 1
ALCAYATAS DE 3/4" 4.00 PZAS/DISP 4.00 7.27 29.0912
PETROLEO(Para Jumbo ) Glns/Hr 1.50 3.28 4.9196
PETROLEO(Para Scooptram ) 16.00 3.28 52.4753
SUB-TOTAL 241.8180 2.24

IMPLEMENTOS SEGURIDAD
COSTO UNIT COSTO
DESCRIPCION UNIDAD MTS/DISP U.S.$/MT
U.S.$/Pers U.S.$
IMPLEMENTOS SEGURIDAD Unidad 6.67 1.59 10.60 0.10

VOLADURA
CANTIDAD/ CANTIDAD COSTO
DESCRIPCION UNIDAD MTS/DISP UNIDAD KG U.S.$/MT
TALADRO PZAS U.S.$/Kg
EMULEX 45% 1 1/8" X 12" Cebos TALADROS 50.00 9.00 450.00 87.89 0.66
EMULEX 45% 1 1/8" X 12" Arrastres TALADROS 5.00 9.00 45.00 8.79 0.66
EXADIT 45% 7/8" X 7" Corona TALADROS 5.00 5.00 25.00 1.91 0.20
CORDON DETONANTE 5P MTS 45.00 0.27
GUIA ENSAMBLADA 2.4 mts (Carmex) PZAS 2.00 0.86
EXANEL 4.8 Mts PZAS 60.00 1.61
SUB-TOTAL 4.09
EQUIPOS
COSTO COSTO COSTO COSTO
DESCRIPCION UNIDAD HRS/DISP PROPIEDAD OPERACIÓN TOTAL U.S. TOTAL U.S.$/MT
U.S.$/HR U.S.$/HR $/HR U.S.$
JUMBO ELECTROHIDR DE 1 BRAZO HORAS 2.50 138.00 345.00
SCOOP DIESEL 4.1 YD3 (Incluye el carguio de mate HORAS 4.00 92.97 371.87
CAMION DE BAJO PERFIL (2 CAMIONES X 2HrsxD HORAS 0.00 0.00
VENTILADOR DE 60,000 CFM HORAS 0.00 0.00
VENTILADOR DE 20,000 CFM HORAS 0.00 0.00
BOMBA DE 50 HP HORAS 0.00 0.00
BOMBA DE 10 HP HORAS 0.00 0.00
PERFORADORA P.P 12.00 0.12 1.44
SUB-TOTAL 718.31 6.65
TOTAL COSTOS DIRECTOS 15.48

CONTINGENCIA 3% 0.46
UTILIDAD 10% 1.55
SUB TOTAL COSTOS INDIRECTOS 2.01
TOTAL COSTOS U.S.$/Mt (Con equipos) 17.49
LIMPIEZA SCOOPTRAM HASTA 150 MTS DEL FRENTE O CARGUIO AL VOLQUETE, POCKET, O CAMARA DENTRO DE ESTE RANGO
CARGUIO DE MATERIAL CON SCOOPTRAM HACIA LOS VOLQUETES INCLUIDO EN LOS PRECIOS UNITARIOS
Pagina: 341 de 347
PRECIOS UNITARIOS DESQUINCHE LIMPIEZA CON WINCHE

08445 Long. Barreno 1.80 Mts.


Producción tajo/mes TM Eff. Perf. 93%
Rend. TM/TAL TM/TAL Eff. Volad. 95%
Producción tajo/Gdia. 10.00 m3 Av. Efectivo 1.50
25.00 TMS N° Tal/Guar. 25.00
Rend./ Tal. 0.45 m3
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/m.
Unit.$ Util Disp. $ (US$/m.)
1. MANO DE OBRA
Perforistas Tarea 1.00 36.44 36.44
Ayud. Perforista Tarea 1.00 34.03 34.03
2.00 70.46 7.05
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18
3.18 0.32
3. MATERIALES Y HERRAMIENTAS
Barra de 6 pies P.P. 150.00 90.92 1,820 7.49
Broca de 40 mm PP 150.00 23.08 350 9.89
Aceite Perforación Gln. 0.25 7.86 1.96
Herramientas de mina Global 1.02
20.37 2.04
4. EXPLOSIVOS 3.33 m3.
EXADIT 45% 7/8" X 7" (328) Unid 125.00 0.20 24.55
EXSANEL 2.1 m Pza. 25.00 1.03 25.67
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.86 1.71
CORDON DETONANTE 5P Mts. 5.00 0.27 1.34
IGNICION RAPIDA Mts. 0.10 1.31 0.13
53.41 5.34
5. EQUIPO PERFORACIÓN-LIMPIEZA
Winche de 20 HP Hrs. 3.00 3.53 10.58
perforadora P.P. 150.00 0.12 18.00
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
29.53 2.95
COSTOS DIRECTOS 17.70
COSTOS FIJOS ( van en lista por separado )
17.70
GASTOS GENERALES (por separado)
IMPREVISTOS 3% 0.53
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 1.77
COSTO TOTAL (US$/m3.) CON WINCHE 20.00
COSTO TOTAL (US$/m3.) CON WINCHE - SIN UTILIDAD NI CONTINGENCIA 19.00
La energia eléctrica, proporciona Cia.
Todas las tuberias y accesorios necesarios proporciona Cia, hasta 50 Mts del tope del trabajo
Pagina: 342 de 347
PRECIOS UNITARIOS DESQUINCHE CON JACK LEG Y LIMPIEZA CON
SCOOPTRAM

08444 Long. Barreno 1.80 Mts.


Producción tajo/mes TM Eff. Perf. 93%
Rend. TM/TAL TM/TAL Eff. Volad. 95%
Producción tajo/Gdia. 13.50 m3 Av. Efectivo 1.50
33.75 TMS N° Tal/Guar. 25.00
Rend./ Tal. 0.45 m3
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/m.
Unit.$ Util Disp. $ (US$/m.)
1. MANO DE OBRA
Perforistas Tarea 1.00 36.44 36.44
Ayud. Perforista Tarea 1.00 34.03 34.03
Operador Scooptram 0.50 46.37 23.19
-
2.50 93.65 6.94
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18
Implementos Operador Scoop Tareas 0.50 2.98 1.49
4.67 0.35
3. MATERIALES Y HERRAMIENTAS
Barra de 6 pies P.P. 150.00 90.92 1,820 7.49
Broca de 40 mm PP 150.00 23.08 350 9.89
Aceite Perforación Gln. 0.25 7.86 1.96
Petroleo D2 Gln/Hr 6.90 3.28 22.63
Herramientas de mina Global 1.02
43.00 3.19
4. EXPLOSIVOS 4.50 m3.
EXADIT 45% 7/8" X 7" (328) Unid 125.00 0.20 24.55
EXSANEL 2.1 m Pza. 25.00 1.03 25.67
GUIA ENSAMBLADA 2.4 MTL - CARMEX (300) Pza. 2.00 0.86 1.71
IGNICION RAPIDA mts 0.25 1.313 $/m 0.33
CORDON DETONANTE 5P mts 10.00 0.268 $/m 2.68
54.95 4.07
5. EQUIPO PERFORACIÓN-LIMPIEZA
Scooptram 2.5 Yds3 1.25 Hrs. 2.30 67.97 156.33
perforadora P.P. 150.00 0.12 18.00
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
175.27 12.98
COSTOS DIRECTOS 27.52
COSTOS FIJOS ( van en lista por separado )
27.52
GASTOS GENERALES (por separado)
IMPREVISTOS 3% 0.83
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 2.75
COSTO TOTAL (US$/m3.) CON SCOOPTRAM 31.10
COSTO TOTAL (US$/m3.) CON SCOOPTRAM - SIN UTILIDAD NI CONTINGENCIA 30.11
La energia eléctrica, proporciona Cia.
Todas las tuberias y accesorios necesarios proporciona Cia, hasta 50 Mts del tope del trabajo
Pagina: 343 de 347

PRECIOS UNITARIOS DESQUINCHE EN REBATIDO DE RAMPA

08443 Long. Barreno 1.80 Mts.


Producción tajo/mes TM Eff. Perf. 93%
Rend. TM/TAL TM/TAL Eff. Volad. 95%
Producción tajo/Gdia. 13.50 m3 Av. Efectivo 1.50
N° Tal/Guar. 25.00
Rend./ Tal. 0.45 m3
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x Costo/m.
Unit.$ Util Disp. $ (US$/m.)
1. MANO DE OBRA
Perforistas Tarea 1.00 36.44 36.44
Ayud. Perforista Tarea 1.00 34.03 34.03
Operador Scoop 0.50 46.37 23.19
2.50 93.65 6.94
2. IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tar. 2.00 1.59 3.18
Implementos Operador Scoop Tareas 0.50 2.98 1.49
4.67 0.35
3. MATERIALES Y HERRAMIENTAS
Barra de 6 pies P.P. 150.00 90.92 1,820 7.49
Broca de 40 mm P.P 150.00 23.08 350.00 9.89
Aceite Perforación Gln. 0.25 7.86 1.96
Petroleo D2 Gln/Hr 7.50 3.28 24.60
Herramientas de mina Global 1.02
44.97 3.33
4. EXPLOSIVOS 4.50 m3.
Exadit 45% 7/8" x 7" (328) Unid 125.00 0.20 24.55
EXSANEL 2.1 m Pza. 25.00 1.03 25.67
Guia ensamblada 2.4 mtl - carmex (300) Pza. 2.00 0.86 1.71
Ignicion rapida mts 0.10 1.313 $/m 0.13
Cordon detonante 5p mts 10.00 0.268 $/m 2.68
54.75 4.06
5. EQUIPO PERFORACIÓN-LIMPIEZA
Scooptram de 2.2 Yd3. Hrs. 2.50 67.97 169.92
perforadora P.P. 150.00 0.12 18.00
Manguera aire 1" Mts. 30.00 3.17 150 0.63
Manguera agua 1/2" Mts. 30.00 1.57 150 0.31
188.87 13.99
COSTOS DIRECTOS 28.66
COSTOS FIJOS ( van en lista por separado )
28.66
GASTOS GENERALES (por separado)
IMPREVISTOS 3% 0.86
GASTOS GENERALES 0% 0.00
UTILIDAD 10% 2.87
COSTO TOTAL (US$/m3.) 32.39
COSTO TOTAL (US$/m3.) - SIN UTILIDAD NI CONTINGENCIA 31.38
La energia eléctrica, proporciona Cia.
Pagina: 344 de 347

INSTALACION TUBERIA POLIETILENO 2" EN LINEA RECTA (Incluye Traslado)


08446
Rendimiento / Gdia. $ 250 Mts/Cuadrilla Mts/Mes 15,000
DESCRIPCIÓN Unid. Cant. Costo Vida Costo x
Unit.$ Util Disp. $ (US$/MTS.)
1. MANO DE OBRA
Maestro Tarea 1.00 35.23 35.23
Ayudante Tarea 1.00 34.03 34.03
2.00 69.26 0.28
2. IMPLEMENTOS SEGURIDAD
Implementos Seguridad Tar. 2.00 1.59 3.18

3.18 0.01
3. HERRAMIENTAS
Herramientas Global 1.02
1.02 0.00

COSTOS DIRECTOS $ 0.29

IMPREVISTOS 3% $ 0.01
GASTOS GENERALES 0% $ 0.00
UTILIDAD 10% $ 0.03
COSTO TOTAL (US$/MTS) 0.33
COSTO TOTAL (US$/MTS) - SIN UTILIDAD NI CONTINGENCIA 0.33
NOTA:
1. empalmado e instalacion
Pagina: 345 de 347
COSTO DE TAREA ADMINISTRATIVA
08447
Costo Unit. Costo x Costo
Unid. Cant. Vida Util
DESCRIPCIÓN $ Tarea (US$/Tarea)
1. MANO DE OBRA
Ayudante Perforista Tarea 1.00 28.65 28.65
SUB TOTAL 28.65

2. IMPLEMENTOS SEGURIDAD MINEROS SUBTERRANEO

Precio Vida Util Costo Unitario


Unid. Cant.
US$/Unid. (Disparos) por Disparo
DESCRIPCION
Botas de Jebe Punta Acero Par 1.00 13.74 183 0.08
Chaleco de malla con cinta reflectiva Pza 1.00 5.15 90 0.06
Casco Tipo Sombrero Portalámpara Pza 1.00 11.32 1,095 0.01
Casco Tipo Sombrero Portalampara con orejera Pza 0.00 0.00 1,095 0.00
Barbiquejo Elástico Gancho Metálico SEKUR Uni 1.00 0.48 90 0.01
Respirador Pza 1.00 17.64 365 0.05
Filtro Par 2.00 2.83 60 0.09
Cartucho para gases Par 0.60 3.66 365 0.01
Retenedor Par 2.00 1.94 365 0.01
Guante de cuero Par 1.00 2.58 7 0.37
Correa Portalámpara Faja Plana 1 1/2" Uni 1.00 2.55 365 0.01
Tapón de Oido Uni 1.00 0.47 45 0.01
Camisa + Saco Uni 1.00 27.49 183 0.15
Pantalón de Jebe Uni 1.00 8.82 90 0.10
Casaca de Jebe Uni 1.00 8.82 90 0.10
Lámpara Uni 1.00 15.05 30 0.50
Anteojos de cristal endurecido Uni 1.00 4.64 120 0.04

Tafilete de 4 Puntas (Suspensión ECO V) Uni 1.00 3.76 365 0.01


SUB-TOTAL 1.59
3. HERRAMIENTAS SUB-TOTAL 1.35
COSTOS DIRECTOS 31.59
Imprevistos (Alimentacion S/10.8, Pasaje S/.3.44= ) 4.19
Utilidad 10% 3.16
COSTOS INDIRECTOS SUB-TOTAL 7.35
COSTO TOTAL (US$/TAREA) 38.94
Pagina: 346 de 347
SOBREDISTANCIA SCOOPTRAM

Distancia Precio
Mts U.S.$/M3 U.S.$/TMS
08430 50 2.52 0.93
08118 100 3.54 1.31
08130 150 4.55 1.69
08119 200 5.57 2.06
08131 250 6.59 2.44
08120 300 7.60 2.82
08132 350 8.62 3.19
08121 400 9.64 3.57
08133 450 10.65 3.95
08122 500 11.67 4.32
08134 550 12.69 4.70
08123 600 13.71 5.08
08135 650 14.72 5.45
08124 700 15.74 5.83
08136 750 16.76 6.21
08125 800 17.77 6.58
08137 850 18.79 6.96
08126 900 19.81 7.34
08138 950 20.82 7.71
08127 1,000 21.84 8.09
Pagina: 347 de 347
TRANSPORTE CON DUMPER 12 Y 16 TON

08431 08432 08433 08434


U.S.$/TMS
Distancia 12 TMS 16 TMS
Mts MINERAL DESMONTE MINERAL DESMONTE
50 1.36 1.64 1.31 1.57
100 1.63 1.95 1.51 1.81
150 1.89 2.27 1.71 2.05
200 2.15 2.58 1.90 2.28
250 2.42 2.90 2.10 2.52
300 2.68 3.22 2.30 2.76
350 2.94 3.53 2.50 2.99
400 3.21 3.85 2.69 3.23
450 3.47 4.17 2.89 3.47
500 3.73 4.48 3.09 3.71
550 4.00 4.80 3.29 3.94
600 4.26 5.11 3.48 4.18
650 4.53 5.43 3.68 4.42
700 4.79 5.75 3.88 4.65
750 5.05 6.06 4.08 4.89
800 5.32 6.38 4.27 5.13
850 5.58 6.70 4.47 5.37
900 5.84 7.01 4.67 5.60
950 6.11 7.33 4.87 5.84
1,000 6.37 7.64 5.06 6.08
1,050 6.63 7.96 5.26 6.31
1,100 6.90 8.28 5.46 6.55
1,150 7.16 8.59 5.66 6.79
1,200 7.42 8.91 5.86 7.03
1,250 7.69 9.22 6.05 7.26
1,300 7.95 9.54 6.25 7.50
1,350 8.21 9.86 6.45 7.74
1,400 8.48 10.17 6.65 7.98
1,450 8.74 10.49 6.84 8.21
1,500 9.00 10.81 7.04 8.45
1,550 9.27 11.12 7.24 8.69
1,600 9.53 11.44 7.44 8.92
1,650 9.80 11.75 7.63 9.16
1,700 10.06 12.07 7.83 9.40
1,750 10.32 12.39 8.03 9.64
1,800 10.59 12.70 8.23 9.87
1,850 10.85 13.02 8.42 10.11
1,900 11.11 13.34 8.62 10.35
1,950 11.38 13.65 8.82 10.58
2,000 11.64 13.97 9.02 10.82

S-ar putea să vă placă și