Client: PACKE
Project Number:
Lumina Copper SAC FO
122.89 ft
1.15 ft
Task 2000:
Geotechnical and Hydrogeological Subsurface Investigation
2.10 m
GENERAL INFORMATION BOREHOLE INFORMATION
Contractor Company: North (m): Inclination/H () : Depth of the Test: From
569.20 ft
Field Engineer of MWH: Elevation(m): Borehole Diameter (2 r) : cm End Hour:
121.75
Date: Azimuth:ft
0.62 GWL (m) : hm (m):
Packer Inflation Pressure = Pp
Pressure Gauge Flowmeter Expansion Cylinder
Valves 1. Ph = (d top + a) psi
Pump 2. Pw 200 psi
3. Pp = (Ph + Pw)*1.2 psi
567.43 ft
587.12 ft
4. Hg = H(Gravity) x w
H(Gravity)
621.89 ft
Notes:
H(Gravity) 1. Maximum Allowable Pressure (
(dry test)
2. Account for pore water pressur
Packer 3. Test Zone (L) should not be gre
Hw
HRock 4. Hsoil, Hrock and Hw should be
G.W.L 5. Incrimintal Pressures depend o
6. Packer can only be setted in ro
7. soil = 100 pcf
(0.62 x 100 + 567.43 x 140) 8. rock = 140 pcf
1.- σt = = 552.1 ft . Psi
144 L/2 9. w = 62.4 pcf
10. 1m3/min = 1000 L/min
L 11. Wait until flow rate remains re
(0.62 + 567.43) - 121.75
2.- u = = 193.4 ft . Psi before starting tests
144 12. Calibrating the Flowmeter wee
hm : Height fo Gauge
6.- PM If RQD is > 75% in the test zone then: GWL Packer :Inflation Pressur
Grounf Water Lev
H(Gravitiy) Calculation:
: Distance from Gr
3.- σ' = 552.1 - 193.4 = 358.7 ft . Psi 2r dtop : Depth from Grou
PM1= 25%Pmax=
Maximum Allowable Pressure Calculation: 76 PM2= 50%Pmax= 153 PM3= 75%Pmax= 229 dbottom : Depth from Grou
1.- Ph = (168.2 + 2.1) mwith th
: Inclination
L :Length of the po
122.89 x 62.4 2r
4.- Hg = = 53.25 ft . Psi PM4= 25%Pmax= 153 PM5= 50%Pmax= 76 : Diameter of the
144 P2.-
M Pw = 200 psi Gauge
: Surface
RFlowmeter : Flow Meter Read
q : Change in Flow
5.- Pmax = 358.7 - 53.25 = 305.45 ft . Psi PM If RQD is < 75% in the test zone then:
H3.-w Pp = (243.29 + 200) x 1
: D e p t h f r o m G W L
a : Heigth of casing
Pp = 550 psi
PM1= 20%Pmax= 61 PM2= 40%Pmax= 122 PM3= 60%Pmax= 183
PACKER TEST PM1 (psi) = 76 PM2 (psi) = 153 PM3 (psi) = 229 PM4 (psi) = 153 PM5 (psi) = 76
Time Rflowmeter q Rflowmeter q Rflowmeter q Rflowmeter q Rflowmeter q
(minutes) (m3) (Liters) (m3) (Liters) (m3) (Liters) (m3) (Liters) (m3) (Liters
0 4.37470 ------------- 4.45650 ------------- 4.73500 ------------- 5.13840 ------------- 5.19240 ---------
1 PM1 (psi) = 6.05
PACKER TEST4.46255 PM2 (psi) = 34.50
4.76950 PM3 (psi) =
5.14455 PM4 (psi) =
4.38035 5.65 6.15 5.19540 3.00
Time RFlowmeter q RFlowmeter q RFlowmeter q RFlowmeter
2 4.38590 5.55(Minutes) 4.46845
( m3 ) 5.90(Liters) 4.80400
( m3 ) 34.50(Liters) 5.14930
( m3 ) ( m3 )
4.75(Liters) 5.19835 2.95
3 0 4.47400 5.55 _ 4.83900 35.00 _ 5.15375 _
4.39165 5.75 4.45 5.20135 3.00
4 4.39755 5.90 1 4.47950 5.50 4.87350 34.50 5.15795 4.20 5.20435 3.00
5 4.40365 6.10 2 4.48540 5.90 4.90850 35.00 5.16245 4.50 5.20735 3.00
6 4.40990 6.25 4.49150 6.10 4.94350 35.00 5.16680 4.35 5.21035 3.00
3
7 4.41635 6.45 4.49755 6.05 4.97950 36.00 5.17125 4.45 5.21335 3.00
4
8 4.42315 6.80 4.50360 6.05 5.01350 34.00 5.17600 4.75
9 4.43000 6.85 4.50930 5.70 5.04800 34.50 5.18070 4.70
10 4.43710 7.10 4.51470 5.40 5.08400 36.00 5.18535 4.65
Lithology: Granodiorita
Comments: Prueba Normal,
TEST INFORMATION
95
0.20
184.10
2.1
BOREHOLE Nº :
PACKER TEST
Lumina Copper SAC FORM
hnical and Hydrogeological Subsurface Investigation PT-
BOREHOLE INFORMATION TEST INFORMATION
rth (m): Inclination/H () : Depth of the Test: From; (m) to (m)
st (m): Location: Initial Hour: d top:
vation(m): Borehole Diameter (2 r) : cm End Hour: d bottom:
muth: GWL (m) : hm (m): L:
Packer Inflation Pressure = Pp
eter Expansion Cylinder
Valves 1. Ph = (dtop + a) psi Hydrostatic Pressure on the Packer & Convert 1psi = 0.7 m
Pump 2. Pw 200 psi Packer Working Pressure
3. Pp = (Ph + Pw)*1.2 psi Packer Inflation Pressure
Maximum Allowable Pressure = Pmax
1. t = (Hsoil x soil + Hrock x rock) Correct for inclined holes & Convert 1 m = 3.28 feet
2. u = [ (Hsoil + Hrock) - GWL ] x w Correct for inclined holes & Convert 1 m = 3.28 feet
3. ' = t - u Convert 1 psi = 144 psf
4. Hg = H(Gravity) x w Correct for inclined holes & Convert 1 m = 3.28 feet
Convert 1 psi = 144 psf
5. Pmax = ' - Hg
HSoil 6. PM = % Pmax wich is dependant on RQD
If RQD is >75% in the test zone then: P M1 = 25% Pmax P M2 = 50% Pmax
P M3 = 75% Pmax P M4 = 50% Pmax
P M5 = 25% Pmax
If RQD is <75% in the test zone then: P M1 = 20% Pmax P M2 = 40% Pmax
d bottom
psi
76
q
(Liters)
-------------
M2 (psi) = PM3 (psi) = PM4 (psi) = PM5 (psi) =
3.00
RFlowmeter q RFlowmeter q RFlowmeter q RFlowmeter q
( m3 ) (Liters) ( m3 ) (Liters) ( m3 ) 2.95(Liters) ( m3 ) (Liters)
_ _ _ _
3.00
3.00
3.00
3.00
3.00
Revision Date: February 17, 2010
Revised by: K. Gudenkauf
Checked by: C. Brueckman PACKER TEST 0
Reviewed by: H. Ramirez
FLOW METER
H(Gravity)
a dBOTTOM = Depth from ground surface to bottom of testing zone 189.60 m.
If G.W.L. is above test = Inclination with the horizontal 70 deg
zone
G.W.L. H(Gravity) corrected = SIN x H(Gravity) 39.42 m.
L = Length of the portion of the hole tested 10.60 m.
dTOP H(Gravity) If G.W.L.is 2r = Two times the radius of hole tested (Diameter) 9.61 cm.
below test zone
PM = Gauge Pressure
G.W.L.
Dp = Head Loss
q = Volume in liters during the test
L
L/2 K(cm/s)
d BOTTOM
0.000E+00 5.000E-06 1.000E-05 1.500E-05 2.000E-05 2.500E-05
2r 1
6 4.410 6.25 4.492 6.10 4.944 35.00 5.167 4.35 5.210 3.00 5
7 4.416 6.45 4.498 6.05 4.980 36.00 5.171 4.45 5.213 3.00
8 4.423 6.80 4.504 6.05 5.014 34.00 5.176 4.75 #VALUE!
9 4.430 6.85 4.509 5.70 5.048 34.50 5.181 4.70 #VALUE!
10 4.437 7.10 4.515 5.40 5.084 36.00 5.185 4.65 #VALUE!
Sum of q (l) = 62.4 58.2 349.0 46.9 21.0
Average q(l) from raw data=Q(l/min) = 6.24 5.82 34.90 4.69 2.99 K : 4.349E-06 cm/s
Lugeon:
Average q(l) from raw data=Q (m /sec) = 1.04E-04 9.70E-05 5.82E-04 7.82E-05 4.99E-05
H P PMn ( psi) (w(pcf) x HGravity (Corrected) (ft)/144(p
0.5
3
0.00
0.0 5.0 10.0 15.0 Q (l/min)
20.0 25.0 30.0 35.0 40.0