: ABC/1001
101, Known Street, Known Area, Known City, Pin …. Design by: UVW
Client: Very Important Industries Ltd, Well Known City Date: 14-Jan-16
Project: XYZ Building Page No. S/101
RCDesignCD
Concrete Grade = M 3
Yield Strength of steel, fy = 3 N/mm2
Clear cover to Reinforcement = 20 mm
Design of Two-way Restrained Slabs Types 1 to 9 Spans O/A thk Working load
Slab Mk. Panel Type Description lx (m) ly (m) 'D' (mm) Live (kN/m2)
S1 1 Interior Panels 3.000 5.000 100 2.000
S2 2 One Short Edge Discontinous 4.000 5.000 100 3.000
S3 3 One Long Edge Discontinuous 3.200 4.600 100 2.500
S4 4 Two Adjacent Edges Discont. 3.730 5.955 120 2.000
S5 5 Two Short Edges Discont. 9.000 9.000 220 2.500
S6 6 Two Long Edges Discont. 5.000 6.000 150 2.000
S7 7 3 Edg. Discont(1 Long Edg. Cont) 4.000 8.000 120 2.500
S8 8 3 Edg. Discont(1 Short Edg. Cont) 4.000 6.000 130 2.000
S9 9 Four Edges Discontinuous 5.000 5.000 150 2.000
S10 5 Two Short Edges Discont. 3.000 4.000 100 2.000
Company's Name: ABC Consultants Job No.: ABC/1001
101, Known Street, Known Area, Known City, Pin …. Design by: UVW
Client: Very Important Industries Ltd, Well Known City Date: 14-Jan-16
Project: XYZ Building Page No. S/102
RCDesignCD
Company's Name: ABC Consultants Job No.: ABC/1001
101, Known Street, Known Area, Known City, Pin …. Design by: UVW
Client: Very Important Industries Ltd, Well Known City Date: 14-Jan-16
Project: XYZ Building Page No. S/103
RCDesignCD
Reinforcement Calculation - Short Span
Steel at bottom Steel at top
Slab Mk. 2
Eff. 'd' Reqd.Ast(mm ) (mm ) Provide Ast Eff. 'd' Reqd.Ast(mm2)
2
Provide Ast
S1 76 120.00 120 8 dia at 225 crs 76 158.71 8 dia. at 225 crs
S2 76 220.54 380 8 dia at 130 crs 76 296.26 8 dia. at 165 crs
S3 68 187.62 245 8 dia at 200 crs 68 253.81 8 dia. at 195 crs
S4 96 255.91 260 8 dia at 190 crs 96 347.90 8 dia. at 140 crs
S5 192 574.50 800 16 dia at 250 crs 192 750.68 16 dia. at 265 crs
S6 125 293.22 390 10 dia at 200 crs 125 0.00 -
S7 95 365.58 520 10 dia at 150 crs 95 498.10 10 dia. at 155 crs
S8 106 323.83 335 8 dia at 150 crs 106 0.00 -
S9 125 323.31 350 10 dia at 220 crs 125 0.00 -
S10 76 124.93 125 8 dia at 225 crs 76 165.85 8 dia. at 225 crs
Reinforcement Calculation - Long Span
Steel at bottom Steel at top
Slab Mk. 2
Eff. 'd' Reqd.Ast(mm ) Provide Ast Eff. 'd' Reqd.Ast(mm2) Provide Ast
S1 68 120.00 8 dia. at 200 crs 68 120.00 8 dia. at 200 crs
S2 68 183.39 8 dia. at 200 crs 68 246.29 8 dia. at 200 crs
S3 76 120.00 8 dia. at 225 crs 76 125.65 8 dia. at 225 crs
S4 88 164.17 8 dia. at 260 crs 88 223.01 8 dia. at 225 crs
S5 178 625.38 12 dia. at 180 crs 178 0.00 -
S6 116 215.01 8 dia. at 230 crs 116 279.09 8 dia. at 180 crs
S7 86 233.18 8 dia. at 215 crs 86 0.00 -
S8 98 194.54 8 dia. at 255 crs 98 260.91 8 dia. at 190 crs
S9 116 351.08 8 dia. at 140 crs 116 0.00 -
S10 68 120.00 8 dia. at 200 crs 68 0.00 -
Check on Deflection (Ref.: Clauses 23.2.1 and 24.1 of IS:456-2000)
Reqd. Short Span Btm Ast(mm2) Percentage Modifcn. Actual
Slab Mk. Span of Tension Factor Span Final Status
Reqd. Provided
Eff. d or D Reinf't (MF) (Eff.d or D x MF)
S1 32.0 120.00 223.4 0.2940 3.23635 9.2697 O.K.
S2 26.0 220.54 383.0 0.5039 2.06062 25.5416 O.K.
S3 26.0 187.62 251.3 0.3696 1.87473 25.1016 O.K.
S4 26.0 255.91 261.1 0.2720 1.58429 24.5247 O.K.
S5 26.0 574.50 800.2 0.4168 1.83868 25.4938 O.K.
S6 20.0 293.22 390.3 0.3122 2.03516 19.6545 O.K.
S7 26.0 365.58 523.6 0.5512 1.6544 25.4505 O.K.
S8 20.0 323.83 335.1 0.3161 1.51196 24.9583 Rev Thk or Ast
S9 20.0 323.31 351.0 0.2808 1.68309 23.7658 Rev Thk or Ast
S10 26.0 124.93 223.4 0.2940 3.06662 12.8721 O.K.
Company's Name: ABC Consultants Job No.: ABC/1001
101, Known Street, Known Area, Known City, Pin …. Design by: UVW
Client: Very Important Industries Ltd, Well Known City Date: 14-Jan-16
Project: XYZ Building Page No. S/104
RCDesignCD
Company's Name: ABC Consultants Job No.: ABC/1001
101, Known Street, Known Area, Known City, Pin …. Design by: UVW
Client: Very Important Industries Ltd, Well Known City Date: 14-Jan-16
Project: XYZ Building Page No. S/105
Reinforcement Calculation
Short Span Steel at bottom Long Span Steel at bottom
Slab Mk. 2 2
Eff. 'd' Reqd.Ast(mm ) (mm ) Provide Ast Eff. 'd' Reqd.Ast(mm2) Provide Ast
S11 76 268.09 269.0 8 dia at 185 crs 68 166.09 8 dia. at 200 crs
S12 114 405.85 580.0 12 dia at 190 crs 104 282.32 8 dia. at 175 crs
S13 78 334.70 335.0 8 dia at 150 crs 82 148.46 8 dia. at 245 crs
S14 100 294.27 375.0 10 dia at 205 crs 91 247.46 8 dia. at 200 crs
S15 272 883.77 1100.0 16 dia at 180 crs 256 946.44 16 dia. at 210 crs
S16 155 499.54 500.0 10 dia at 155 crs 145 370.73 10 dia. at 210 crs
S17 124 505.46 730.0 12 dia at 150 crs 114 180.00 8 dia. at 275 crs
S18 125 406.29 480.0 10 dia at 160 crs 116 188.27 8 dia. at 265 crs
S19 146 327.56 335.0 8 dia at 150 crs 138 348.23 8 dia. at 140 crs
S20 96 199.19 200.0 8 dia at 250 crs 88 218.85 8 dia. at 225 crs