Traditional Critical Chain Benefits obtained from CCPM
Project Project Management Management Methods (CCPM) 1. Schedules Schedules Task times do not collect safety worst-case task average task time "fudge factors". Risk, durations. durations. stress, and effort are shared equally amongst all tasks & resources. People start to think differently than before. "Sacred cow" schedules are avoided. People can see what's really consuming the elapsed time. Management can manage, project durations are cut, people can go faster with less stress. Everybody and every resource are treated fairly & by the same rules. Ineffective hierarchies are broken down.
2. Protects Protects overall Safety time is not hoarded by
individual tasks project individual tasks and people, but with safety time. completion with shared by everyone. Safety time buffers. is conserved and used most wisely over the entire project. Focus is placed on what is most important to the customer: speedy deliverables.
3. Emphasizes Emphasizes Everybody sees the "Big
task progress. project progress. Picture". Micro-management is avoided. Project Managers have a consistent outlook through the entire project. Events that slow the project are constantly in the schedule spotlight. People stay focused on the problems. Problems get identified more Traditional Vs Critical Chain PM
quickly, and get solved sooner.
4. Starts gating Starts gating Critical and limited resources are
tasks ASAP. tasks when they not plugged up with non-critical need to start. tasks which block & slow critical tasks. This is similar to Fire Lanes and sirens on emergency vehicles. Non-critical traffic stays off the roads until the emergency vehicles have passed. Use of bottleneck resources is based on priority, not "first come, first served". Projects get completed faster.
5. Starts and Starts tasks as Project is managed and
finishes tasks at soon as implemented like a relay race. scheduled start predecessors are The baton always goes around and finish times. done, finishes the track at maximum speed. tasks as quickly Runners pace themselves for as possible. hand-offs so the baton never stops nor slows down. If you are carrying the baton, just finished carrying, or getting ready to carry it next, your activities are tightly monitored, controlled, and managed; all others are of lesser priority and have freedom to self- manage. People focus better, and projects get done faster and cheaper.
6. Makes Resolves Bottleneck resource is identified
resource resource by CCPM schedule. All users of contention a PM contentions the critical resource are "fact of life". explicitly. identified up-front and conflicts resolved. Project Managers watch only the critical resource; constantly focusing on what's important and preventing Traditional Vs Critical Chain PM
problems from occurring.
Constraints are managed.
7. Makes multi- Minimizes multi- The terrible cost of multi-tasking
tasking a PM tasking by is exposed. All personnel are "fact of life". setting priorities. trained on "bad multi-tasking". People hunt down & eliminate their own multi-tasking, multi- tasking forced on them by others, and multi-tasking done by others. This alone can cut project schedules elapsed time by up to 40%.
8. Reacts to Manages Project schedules and their
uncertainty by uncertainty by priorities stay consistent. changing monitoring People don't get confused, nor priorities, impact of events lost as readily. The impact of expediting, and on buffer one project on all other projects creating a new consumption. is minimized. Entire organization schedule. stabilizes into busy and productive status quo activities, rather than chaos. People feel benefits from CCPM; they are more productive, less frustrated, involved. Their contributions & efforts matter. Morale climbs.
9. Makes task Makes task "Sacred cows" like "we've always
linkages and linkages and done it that way" get challenged. constraints constraints People innovate. Opportunities reflect ad hoc or reflect only are identified automatically. habitual physical Historical systems are re- scheduling scheduling designed & changed to take decisions. requirements. advantage of theoretical opportunities; making these opportunities reality. Rate of learning in the organization & adaptability are maximized. Competitors are left behind with Traditional Vs Critical Chain PM
their old, non-competitive
paradigms. You become a world- leader in your industry.