PREPARATION OF TECHNICAL DOCUMENTS / DESIGN REVIEW:


1. Prepared the Final Detailed Architectural and Engineering Design of the
Proposed Project Acute Stroke Unit.
1.1 Architectural Plans and Details:
 Site Development Plan including Perspective
 Floor Plan
 Roof Plan
 Longitudinal and Cross Section
 Front and Rear Elevation
 Right Side and Left Side Elevation
 Schedule of Wall and Floor Finishes
 Type of Wall Partition
 Reflected Ceiling Plan
 Schedule of Doors
 Window Schedule and Glass Partition
 Toilet Details
 Specialized Design Feature
1.2 Structural Plans and Details:
 Foundation Plan
 Roof Deck Framing Plan
 Schedule of Footing and Isolated Footing Detail
 Schedule and Detail of Reinforced Concrete Column
 Typical Gravity Top and Moment Frame of Reinforced Concrete
Column Splice Detail
 Schedule of Reinforced Concrete Footing Tie Beam
 Typical Footing Tie Beam Elevation and Typical Ductile Moment
Frame Beam Detail
 Schedule of Reinforced Concrete Beams and Floor Beam Section
 Design Criteria, Specifications and General Construction Notes
 Table of Lap Splice and Anchorage Length
 Masonry and Structural Details
 Canopy Steel Truss Diagram and Connection Details
1.3 Final Lay-out of Electrical, Mechanical and Sanitary Plans and
Details.
2. Preparation of Detailed Architectural and Engineering Design of the
Proposed Project Two-Storey Dialysis Center.
2.1 Architectural Plans and Details:
 Site Development Plan
 Ground Floor Plan
 Second Floor Plan
 Roof Plan – Option 01 to option 06

1|Page
CC: OMCC Accomplishment Report as of August 1-31, 2018
Republic of the Philippines
Department of Health
Cagayan Valley Medical Center
Regional Tertiary,Teaching and Training Hospital
Carig, Tuguegarao City, Cagayan
Tel. No. 302-0000
 Elevation Plan – Option 01 to option 07

2.2 Structural Plans and Details:


 Foundation Plan
 Second Floor Framing Plan
 Roof Framing Plan
 Schedule of Isolated and Combined Footing
 Schedule of Footing Tie Beam
 Schedule of Reinforced Concrete Column
 Schedule of Reinforced Concrete Beams and Girders
 Structural Section of Ramp
 Roof Steel Truss Plan and Details
3. Preparation of Master Site Development Plan of CVMC.
4. Attended Pre-procurement meeting with the Technical Working Group
and BAC regarding the Construction of Acute Stroke Building Phase I on
August 07, 2018.
5. Presentation of Schematic Plan for the Proposed Two-Storey Dialysis
Center to various end users/stakeholders on August 14, 2018.
6. Attended the consultative meeting with the various end
users/stakeholders regarding the Final Schematic Plan of the Proposed
Two-Storey Dialysis Center on August 17, 2018.
7. Submitted the Final Schematic Plan of the Proposed Two-Storey Dialysis
Center on August 20, 2018.
8. Attended the Pre-bid meeting with the Contractor, Technical Working
Group and BAC regarding the Construction of Acute Stroke Building
Phase I on August 23, 2018.
9. Submitted the CVMC Master Site Development Plan on August 24,
2018.
10. Attended Meeting with Chief Admistrative Officer and Engineering
Department Re: Final Design of CR Doors of the Project Five-Storey
Payward Building Phase 2 on August 28, 2018.
 From PVC Door to Wooden Flush Door (Ducco Paint Finish)

CONSTRUCTION MANAGEMENT/QUALITY ASSURANCE:


1. Attended Infra-meeting with Medical Center Chief-OIC, Contractor R.R.
Encabo and CVMC Engineering Department on August 09, 2018
regarding various issues and concerns of the Project: Cancer Center
Building and Five Storey Payward Building Phase 2.
2. Prepared and submitted letter dated August 29, 2018 to the Chief
Administrative Officer for the Project Five Storey Payward Building
Phase 2 regarding the following issues:
 Evaluation and recommendation for 75 days-time extension of the
said project.

2|Page
CC: OMCC Accomplishment Report as of August 1-31, 2018
Republic of the Philippines
Department of Health
Cagayan Valley Medical Center
Regional Tertiary,Teaching and Training Hospital
Carig, Tuguegarao City, Cagayan
Tel. No. 302-0000
3. Supervision of Five Storey Payward Building Phase II – 4 th & 5th Floor,
Four Storey OPD/MAB Building Phase I&II, Two (2) Storey Cancer
Building and Two (2) Storey Psychiatry OPD Building.

COST ANALYSIS AND ESTIMATION:


1. Prepared and Submitted the Detailed Cost Estimate and/ Bill of
Quantities of the Proposed Project: Construction of Acute Stroke
Building Phase 1.

PROPER CONSTRUCTION DOCUMENTATION


1. Along with the CVMC Engineers, issued various site instructions to
contractors on various issues and concerns in the sites.

AS-BUILT DOCUMENTS
1. Continuous update of Site Development Plan of CVMC including Water
System, Plumbing, and Drainage System.

Submitted by:

Ms. Lezeil Mae E. Enriquez Engr. Andy Jake


Javier
Draftsman Civil Engineer Consultant

Engr. Cresencio P. Natividad Jr.


Infra Head Consultant

3|Page
CC: OMCC Accomplishment Report as of August 1-31, 2018