Sunteți pe pagina 1din 10

CONSTRUCTION OF FLOCCULATOR CHILAW WATER SUPPLY SCHEME - PHASE II

CONTRACT NO:

Item CESMM
Description Unit Qty Rate (Rs) Amount (Rs.)
No 3 Code
CLASS D: DEMOLITION AND SITE
CLEARANCE

1 D100 General clearance of site covered by m2 130.0 53.00 6,890.00


flocculator including removal of bushes,
scrub, and undergrowth, grubbing up roots,
cutting down small trees and backfilled voids
with normal soil and well compacted

CLASS E: EARTH WORKS

Rate shall include for dewatering,


compaction of excavated surfaces,
upholding sides of excavation and
preparation of excavated surfaces if
necessary

2 E323 Excavation to reduced level in any material m3 173.0 1,077.30 186,372.90


other than rock or artificial hard material with
maximum depth 1-2 m commencing from
existing ground level.

3 E333 Excavation of rock maximum depth 1-2 m if m3 10.0 12,781.30 127,813.00


any (provisional quality) (not require blasting)

4 E532 Disposal of excavated material other than m3 135.0 792.00 106,920.00


topsoil, rock or artificial hard material.

5 E533 Disposal of excavated material, rock. m


3 10.0 914.00 9,140.00

6 E614 Filling to excavation, with selected excavated m3 38.0 565.00 21,470.00


material, well rammed and consolidated in
layers not exceeding 150mm as per the
drawing and as directed by the Engineer

Total of page No. 11-11 carried to 458,605.90


Summary in page 1-1
_______________________________________________________________________________________________________
NWSDB/SDB/CIVIL : Bills of Quantities
MPC:DPC:RPC : - July 2014 - Version 5 11-26
Item CESMM
Description Unit Qty Rate (Rs) Amount (Rs.)
No 3 Code

CLASS F - IN SITU CONCRETE

Rate for concrete shall include for plant for


mixing, depositing, handling, hoisting into
position, vibrating, curing etc. and making
good after removal of formwork etc.

(Formwork and reinforcement to be


measured separately otherwise stated)

Provision and Placing of Concrete


Grade 20 (Mass Concrete)

7 F511 75mm thick blinding concrete m


3 9.0 21,468.00 193,212.00

Provision and Placing of Concrete


Grade 25

8 F622 In landing;125 mm thick m


3 0.5 26,462.00 13,231.00

9 F663 In staircase m
3 1.5 26,875.00 40,312.50

10 F652 In flocculator benching concrete m


3 50.0 24,826.00 1,241,300.00

Provision and Placing of Concrete


Grade 35A - Ready-Mixed Concrete
(Reinforced Concrete)

11 F623 In base slabs;300 mm thick 3 33.0 26,224.00 865,392.00


m

12 F642 In all internal & external walls;250 mm thick 3 62.0 29,418.00 1,823,916.00
m

13 F641 In channel walls;125 mm thick 3 4.0 29,418.00 117,672.00


m

14 F631 In walkway slab;125 mm thick 3 18.0 29,418.00 529,524.00


m

15 F632 In channel base;200 mm thick m


3 1.5 29,418.00 44,127.00

16 F632 In channel base;250 mm thick 3 3.0 29,418.00 88,254.00


m

Total of page No. 11-11 carried to 4,956,940.50


Summary in page 1-2
_______________________________________________________________________________________________________
NWSDB/SDB/CIVIL : Bills of Quantities
MPC:DPC:RPC : - July 2014 - Version 5 11-27
Item CESMM
Description Unit Qty Rate (Rs) Amount (Rs.)
No 3 Code

CLASS G: CONCRETE ANCILLARIES

Form Work

Rate for formwork to be included for all


necessary boarding, supports, erecting,
framing, cutting angles, cleaning, wetting
and treatment with lime wash or other
material before placing concrete and
removal

Rough Finish Formwork


(Plane Vertical)

17 G141 To sides of 75mm thick blinding concrete m 47.0 128.00 6,016.00

18 G144 To sides of base of filter 2 6.0 1,279.00 7,674.00


m

Fair Finish Formwork


(Plane Horizontal)

19 G215 To soffit of channel base slab 2 18.0 1,823.00 32,814.00


m

20 G215 To soffit of walk way slab 2 35.0 1,823.00 63,805.00


m

21 G115 To soffit of landing 2 1.0 2,019.00 2,019.00


m

22 G225 To slopping soffit of staircase 2 5.0 2,108.00 10,540.00


m

(Plane Vertical)

23 G242 Edges of 125 mm thick slab m 63.0 705.00 44,415.00

24 G245 To sides of concrete walls of flcculator 2 490.0 1,823.00 893,270.00


m

25 G245 To sides of concrete walls of channel 2 60.0 1,823.00 109,380.00


m

26 G245 To sides of concrete walls of baffle wall 2 178.0 2,169.00 386,082.00


m

27 G245 To sides of staircase 2 5.0 730.00 3,650.00


m

28 G284 To sides of rises m 14.0 346.00 4,844.00

Total of page No. 11-11 carried to 1,564,509.00


Summary in page 1-3
_______________________________________________________________________________________________________
NWSDB/SDB/CIVIL : Bills of Quantities
MPC:DPC:RPC : - July 2014 - Version 5 11-28
Item CESMM
Description Unit Qty Rate (Rs) Amount (Rs.)
No 3 Code

Forming holes in fair finish formwork

29 G271 For 500mm dia nr 1.0 1,995.00 1,995.00

30 G271 For 300mm dia nr 2.0 1,796.00 3,592.00

31 G271 For 150mm dia nr 4.0 1,197.00 4,788.00

32 G271 Forming holes in baffle walls Item 1.0 19,950.00 19,950.00

33 G271 Forming holes for penstock gate;1000x1000


mm nr 2.0 2,820.00 5,640.00

For concrete components of constant cross -


section

34 G282 Sides of columns;400 mm wide m 384.0 832.00 319,488.00

Reinforcement

Reinforcement paid for separately unless


otherwise specified in the item

Rate for reinforcement shall include for


supplying, cleaning, cutting, bending,
fabricating, binding temporary fixings and
supports etc.

Tor steel bar reinforcement cut to lengths,


bent to shape, placed in position and tied
with GI wire

35 G511 Mild Steel t 19.0 191,512.00 3,638,728.00

36 G524 Tor Steel t 0.1 191,512.00 19,151.20

G670 20 mm thick nonabsorbent joint filler m 5.0 3,112.00 15,560.00


movement joint and including necessary
fixings and accessories to complete the
installations; as shown on Drawing NW / W
/P02 /FC/ 01 datail A; all in accordance with
the Specifications

Total of page No. 11-11 carried to


4,028,892.20
Summary in page 1-4
_______________________________________________________________________________________________________
NWSDB/SDB/CIVIL : Bills of Quantities
MPC:DPC:RPC : - July 2014 - Version 5 11-29
Item CESMM
Description Unit Qty Rate (Rs) Amount (Rs.)
No 3 Code

CLASS J - PIPE WORK-FITTINGS AND


VALVES

Supply, laying and jointing or fixing in


position DI/PVC pipes, fittings and
specials, complete as shown in the drawing
and as directed by the Engineer

Rate shall include for all related pipe


brackets and other necessary accessories
where required and as mentioned in
drawing

Rate shall include supply, transport,


loading and unloading of pipes, excavation,
preparation of surface, disposal of
excavated material, upholding sides of
excavation, backfilling and removal of dead
services where necessary

Rate shall include cleaning, disinfection,


pressure testing and commissioning of
pipes

For scour pipe (Ø150 UPVC)

37 J411 110 mm dia UPVC 90°D bend,ref -B1 nr 16 2,230.00 35,680.00

38 J481 110 mm dia UPVC plain pipe piece 800 mm nr 8 611.00 4,888.00
length ,ref -B2

39 J421 110-160 mm dia UPVC tapper,ref -B3 nr 16 6,231.00 99,696.00

40 J481 110 mm dia UPVC plain pipe piece 500 mm nr 8 382.00 3,056.00
length ,ref -B4

41 J421 160-160 mm dia UPVC tee,ref -B5 nr 12 20,262.00 243,144.00

42 J481 160 mm dia UPVC plain pipe piece 600 mm nr 8 803.00 6,424.00
length ,ref -B6

Total of page No. 11-11 carried to 392,888.00


Summary in page 1-5
_______________________________________________________________________________________________________
NWSDB/SDB/CIVIL : Bills of Quantities
MPC:DPC:RPC : - July 2014 - Version 5 11-30
Item CESMM
Description Unit Qty Rate (Rs) Amount (Rs.)
No 3 Code

For scour pipe (Ø150 UPVC)…Cont'd

43 J411 160 mm dia UPVC 90°D bend,ref -B7 nr 4 4,424.00 17,696.00

44 J481 160 mm dia UPVC plain pipe piece 1775 mm nr 4 2376.00 9,504.00
length ,ref -B8

45 J411 160 mm dia UPVC 45°D bend,ref -B9 nr 4 4,424.00 17,696.00

46 J481 160 mm dia UPVC plain pipe piece 8100 mm nr 2 10,843.00 21,686.00
length ,ref -B10a

47 J481 160 mm dia UPVC plain pipe piece 2000 mm nr 2 2,677.00 5,354.00
length ,ref -B10b

For inlet pipe (Ø500 DI)

500 mm dia DI flange spigot pipe piece 1500 nr 1 95,926.00 95,926.00


48 J383
mm length ,ref -A1

500 mm dia DI 90°D doluble flanged duct nr 1 213,679.00 213,679.00


49 J313
foot bend,ref A-2

500 mm dia DI flange spigot pipe piece 1775 nr 1 162,994.00 162,994.00


50 J383 mm length with puddle flange 150 mm from
flange end,ref -A-3

300 mm dia DI double spigot pipe piece 600 nr 2 37,793.00 75,586.00


51 J382 mm length with puddle flange 150 mm from
flange end,ref -A-4

52 J352 300 mm dia DI Flange adaptor;ref A-5 nr 2 29,656.00 59,312.00

300 mm dia DI 90°D double flange bend,ref - nr 2 31,437.00 62,874.00


53 J312
A-7

300 mm dia DI flange spigot pipe piece 500 nr 2 45,930.00 91,860.00


54 J382 mm length with puddle flange 175 mm from
flange end,ref -A-8

Total of page No. 11-11 carried to 834,167.00


Summary in page 1-6
_______________________________________________________________________________________________________
NWSDB/SDB/CIVIL : Bills of Quantities
MPC:DPC:RPC : - July 2014 - Version 5 11-31
Item CESMM
Description Unit Qty Rate (Rs) Amount (Rs.)
No 3 Code

For scour pipe (Ø150 DI)

55 J351 150 mm dia DI coupling,ref B11 nr 4 10,240.00 40,960.00

150 mm dia DI filange spigot pipe piece 900 nr 23,578.00 94,312.00


56 J381 mm length with puddle flange 450 mm from 4
flange end,ref -B-12

150 mm dia DI flange & Plain ended pipe nr 20,544.00 82,176.00


57 J381 4
piece 1775 mm length ;ref -B-13

150 mm dia DI double flange pipe piece 450 nr 4 21,562.00 86,248.00


58 J381 mm length with puddle flange 225 mm from
plain end,ref -B-14

150 mm dia DI 90°D double flange bend,ref - nr 4 9,400.00 37,600.00


59 J311
B15

150 mm dia DI flange spigot pipe piece 1000 nr 4 13,638.00 54,552.00


60 J381
mm length;ref B-16

61 J351 150 mm dia DI Flange adaptor;ref B-17 nr 4 12,138.00 48,552.00

Inlet & Outlet Valves

62 J841 300 mm dia DI butterfly valve,ref 06 nr 2 135,593.00 271,186.00

63 J880 Supply and fixing 1000x1000 mm Manual nr 2 1,709,844.00 3,419,688.00


Penstock Gate (Outlet Gate to Channel)
inclusive of headstock, penstock and
intermidiate support for spindle if required as
shown in Drawing No. NW/W/P02/FC/01 as
described in particular specification.

Total of page No. 11-11 carried to 4,135,274.00


Summary in page 1-7
_______________________________________________________________________________________________________
NWSDB/SDB/CIVIL : Bills of Quantities
MPC:DPC:RPC : - July 2014 - Version 5 11-32
Item CESMM
Description Unit Qty Rate (Rs) Amount (Rs.)
No 3 Code

CLASS N : MISCELLANEOUS METAL


WORK

All material supplied, fabricated and fixed


in position complete as shown in detail
drawing and as specified. Provision shall be
made for breaking walls / concrete floors,
wherever necessary and making good as
directed by the Engineer

Hand rails

64 N140 Supply and install 1100 mm high handrail m 67.0 7,000.00 469,000.00
with 32 mm dia GI pipe,32 mm dia vertical
pipe and 32 mm dia intermediate pipe
including base plate, chemical anchoring,
painting, erection, welding and all necessary
accessories, as shown in drawing No NW / W
/P02 /FC/ 02. and all as specified

65 N130 Supply and fixing 750x400 mm removable GI nr 6.0 11,978.00 71,868.00


grating on channel including all necessary
accessories, complete as shown in
drawings.No. NW / W /P02 /FC/ 01 and all as
specified

66 Adjustable overflow weir in 900x1200x5 mm nr 2.0 188,500.00 377,000.00


stainless steel plate.

CLASS V : PAINTING

Work externally

Applying putty on walls or sofit two coats,


finished smooth with sand papering, and
prepare for colour washing.

2
67 V533 To concrete walls 152 m 372.00 56,544.00

2
68 V531 To soffit of concrete slab 18 m 372.00 6,696.00

Total of page No. 11-11 carried to 981,108.00


Summary in page 1-8
_______________________________________________________________________________________________________
NWSDB/SDB/CIVIL : Bills of Quantities
MPC:DPC:RPC : - July 2014 - Version 5 11-33
Item CESMM
Description Unit Qty Rate (Rs) Amount (Rs.)
No 3 Code

Applying putty…Con'd

2
69 V531 To soffit of landing 1 m 372.00 372.00

2
70 V532 To soffit of staircase 5 m 372.00 1,860.00

Prepare and apply approved type one(1)


coat of filler and two(2) coat of weather
shield emulsion paint to specified colour all
in accordance with the Specifications

2
71 V533 To concrete walls 152 m 617.00 93,784.00

2
72 V531 To soffit of concrete slab 18 m 657.00 11,826.00

2
73 V531 To soffit of landing 1 m 657.00 657.00

2
74 V532 To soffit of staircase 5 m 657.00 3,285.00

CLASS Z : SIMPLE BUILDING WORKS


INCIDENTAL TO CIVIL ENGINEERING
WORKS (CONT'D)

Surface Finishes

Floor, Wall and Ceiling Finishings

Rendering 20 mm thick cement and sand (1:3)


and finished smooth with neat cement floating
as specified and as shown in drawins

2
75 Z 411 To walkway floors 32 m 926.00 29,632.00

To stairecase

76 Z 415 Thred 200 mm wide 13 m 211.00 2,743.00

77 Z 415 Rises 200 mm high 14 m 211.00 2,954.00

Total of page No. 11-11 carried to 147,113.00


Summary in page 1-9
_______________________________________________________________________________________________________
NWSDB/SDB/CIVIL : Bills of Quantities
MPC:DPC:RPC : - July 2014 - Version 5 11-34
Item CESMM
Description Unit Qty Rate (Rs) Amount (Rs.)
No 3 Code

CLASS W: WATERPROOFING

1(one) layer of 1000 gauge polythene sheet,


as shown in drawing
No.ADZWSSP/N/STD/S-03 and all as per
specification

2
78 W131 Horizontally 12 m 104.00 1,248.00

2
79 W130 Vertically 13 m 104.00 1,352.00

Bituminous paint, 1000 microns; all in


accordance with the Specifications and
subject to the Engineer's approval

2
80 W500 Genarally 19 m 399.00 7,581.00

CLASS X : MISCELLANEOUS WORK

Anti-Termite Application

81 X000 Anti-termite application including warranty,


as shown in drawing No. 2
30.0 170.00 5,100.00
ADZWSSP/N/STD/S-01 and all as per m
specification

Total of page No. 11-11 carried to 15,281.00


Summary in page 1-10
_______________________________________________________________________________________________________
NWSDB/SDB/CIVIL : Bills of Quantities
MPC:DPC:RPC : - July 2014 - Version 5 11-35

S-ar putea să vă placă și