Man-days
Sr. No. Description Unit Measure Skilled unskilled
1 Excavation
a- ordinary soil per cft - 0.022
b- gravelly soil per cft - 0.016
c- Boulder mix soil per cft - 0.031
2 PCC
(1:2:4) per cft 0.031 0.113
(1:4:8) per cft 0.031 0.113
3 RCC (1:2:4) per cft 0.047 0.095
4 Stone Masonry per cft 0.04 0.09
5 Plaster per sft 0.013 0.02
6 Pointing per sft 0.018 0.028
7 Steel work for RCC per kg - 0.01
8 Shingle work per cft - 0.015
9 Centring and shuttering for RCC work per cft 0.02 0.01
WATSAN Operational Team
Drinking Water Supply Scheme: KALSAN-II U/C SACHAN STAND POST (1.5' X 1.5'X 2.25')
Detail of Quantities Detail of Materials Labour
Sub Skilled Unskilled
Head Description Gravel/ Labour Labour
Length Breadth Depth/Ht No of Cement Sand
No Quantity Unit Crush Shingle
in ft in ft in ft Units (Bags) (cft)
(cft)
Men-days Men-days
1 Excavation (gravelly soil)
Pad 4.50 4.50 1.00 1.00 20.25 Cft
stand post 0.75 0.42 1.00 1.00 0.32 Cft
dispose off drain 5.41 1.00 1.00 1.00 5.41 Cft
Total 25.98 Cft 0.57
2 Shingle bed
Pad 4.50 4.50 0.33 1.00 6.68 Cft
stand post 0.75 0.42 0.33 1.00 0.10 Cft
dispose off drain 5.41 1.00 0.33 1.00 1.79 Cft
Total 8.57 Cft 8.57 0.13
3 P/L PCC (1:4:8)
Pad 4.50 4.50 0.33 1.00 6.68 Cft
stand post 0.75 0.42 0.33 1.00 0.10 Cft
dispose off drain 5.41 1.00 0.33 1.00 1.79 Cft
Total 8.57 Cft 0.90 4.50 9.00 0.27 0.97
4 P/L PCC (1:2:4)
Pad 4.00 4.00 0.33 1.00 5.28 Cft
stand post 0.75 0.75 3.42 1.00 1.92 Cft
dispose off drain 6.00 1.00 0.58 1.00 3.48 Cft
pad boundary projection Lond side 4.50 0.25 0.58 2.00 1.31 Cft
Short sides (stand post side) 3.25 0.25 0.48 1.00 0.39 Cft
(Drain side) 3.00 0.25 0.48 1.00 0.36 Cft
Seat pad 1.00 1.00 0.50 1.00 0.50 Cft
Total 13.24 Cft
deduct for drain flow 6.00 0.33 0.33 1.00 0.65 Cft
Net Total 12.59 Cft 2.60 6.50 13.00 0.39 1.42
5 GI Pipe 1/2 " dia 10.00 Rft 0.20 0.40
6 GI Socket 1/2" dia 1 No.
7 GI Elbow 1/2 " dia 2 No.
8 Brass tap 1/2" 1 No.
Quantities for 1 Stand Post 3.50 11.00 22.00 8.57 0.86 3.49
Quantities for 6 Stand Posts 21.00 66.00 132.00 51.43 5.14 20.94
Drinking Water Supply Scheme: KALSAN-II U/C SACHAN VALVE CHAMBER (1.5' X 1.5'X 2.25')
Drinking Water Supply Scheme: KALSAN- II U/C SACHAN SOURCE TANK (4' X 4'X 3')
# length
# bars of wt. of
As Area of bar Ab # bars in propo in full bars steel
(sq.in) Bar No. (sq.in) 1ft span sed span (ft) (kg) Remarks
Proposed (#3
0.096 3 0.11 0.9 2 20 200 34 bars @ 6" c/c)
0.096 4 0.196 0.5 1 10 100 30
SAY = 75 kg
Drinking Water Supply Scheme: KALSAN- II U/C SACHAN STORAGE TANK: 1500 US GALLONS
Detail of Quantities Detail of Materials Labour
Sub Skilled Unskilled
Head Description Gravel/ Shingle Steel #3 Steel #4 Binding Labour Labour
Length Breadth Depth/Ht No of Cement Sand Stone
No Quantity Unit Crush (cft) bars (kg) bars (kg) Wire
in ft in ft in ft Units (Bags) (cft) (cft)
(cft) (kg)
Men-days Men-days
4 P/L PCC (1:2:4) as in Bed 7.17 7.17 0.25 1 12.85 Cft 2.60 6.50 13.00 0.40 1.45
8 Seismic Bands
8.1 @ 2' from top of ring beam
8.11 RCC (1:2:4)
Long sides 10.17 1.5 0.33 2 10.07 cft
short sides 7.17 1.5 0.33 2 7.10 cft
Total 17.17 cft 3.60 9.00 18.00 0.81 1.63
8.12 Steel
Main steel (2,#4) bars 68 20.60 kg 27.00 0.62 0.21
Shear stirrups(#3 @ 12"c/c) 1.75 40 11.90 kg 15.00 0.36 0.12
11 Pointing (0.75") in (1:2) CSM 10.17 - 5.58 4 226.99 Sft 0.57 1.42 4.09 6.36
12.1 P/L RCC (1:2:4) as in Slab 10.67 10.67 0.333 1 37.91 Cft
Decuction for manhole cover 2 2 0.333 1 1.33 Cft
Net Total 36.58 Cft 7.40 18.50 37.00 1.72 3.48
Steel (#3 @ 6" c/c) (as per detail) 68.00 kg 75.00 2.04 0.75
12.2 Centring and shuttering 10.67 10.67 0.333 1 37.91 Cft 0.76 0.38
13 GI over flow pipe 1.5" dia. 12 Rft 0.24 0.48
14 GI wash out pipe 1.5" dia 6 Rft 0.12 0.24
15 GI Plug 1.5 " 1 No.
16 Steel man hole cover (2'x2') 2 2 4.00 Sft
Quantities for 1 Tank 56.33 212.92 263.00 203.55 22.24 270.00 274.00 14.94 28.73 68.23
Hydraulic Grade
Length of Projected Proposed dia Velocity in Head Total Terminal
Design Q in Ground
S.NO Name of Line pipe in Sector Zone Popolation of G.I pipe in " Loss per Head Pressrure in
US GAL U/End L/End Level
" ft " (persons) " inches" ft/sec " 1000 ft Losss ft of water
Supply Main
1 ST1--WST 4200 All All 257 2.14 0.75 1.51 29.10 122.22 5750 5627.78 5558 69.8
Distribution NetWork
1 WST--1 100 1 1 108 1.35 0.75 1.20 19.30 1.93 5558 5556.07 5500 56.1
2 1--2 20 1 1 28 0.35 0.5 0.53 5.82 0.12 5556.1 5556 5500 56.0
3 1--3 2250 1 1 81 1.01 0.5 1.03 21.00 47.25 5556.1 5508.85 5450 58.9
4 WST--4 20 2 1 108 1.35 0.75 0.90 11.30 0.23 5558 5557.77 5550 7.8
5 4--5 320 2 1 14 0.18 0.5 0.53 5.82 1.86 5557.8 5555.94 5535 20.9
6 4--6 800 2 1 95 1.19 0.75 0.90 11.30 9.04 5555.9 5546.86 5425 121.9
7 6--7 500 2 1 20 0.25 0.5 1.05 21.00 10.50 5546.9 5536.4 5450 86.4
8 6--8 500 2 1 81 1.01 0.75 0.90 11.30 5.65 5546.9 5541.25 5420 121.3
9 ST2--9 400 3 1 41 0.51 0.5 0.52 5.80 2.32 5545 5542.68 5451 91.7
Remarks
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
DESIGN POPULATION
SECTOR NO. 1
Design
Present population population
# of persons/ (July 2006) (July 2026)
Sr. # Zone Name H.Hs H.H Persons G.R.F Persons
1 ZONE 1 8 7.5 60 1.8 108
0 0
TOTAL 60 108
SECTOR NO. 2
Design
Present population population
# of persons/ (July 2006) (July 2026)
Sr. # Zone Name H.Hs H.H Persons G.R.F Persons
1 ZONE 2 8 7.5 60 1.8 108
TOTAL 60 108
SECTOR NO. 3
Design
Present population population
# of persons/ (July 2006) (July 2026)
Sr. # Zone Name H.Hs H.H Persons G.R.F Persons
1 ZONE 3 3 7.5 23 1.8 41
TOTAL 41
TOTAL 45
TOTAL 77.1
2 Animals
daily
# in requirement @
Large animals No. # in 2006 2026 12 GPD (Imp)
9 14 168
daily
# in requirement @ 6
Small animals No. # in 2006 2026 GPD (Imp)
2 3 18
TRANSPORTATION COST
TRANSPORTATION COST UP TO NEAREST ROAD SITE 6 % of Total Cost
Total Amount Amount
Sr.# Item Description quantity Unit Transp. Rate (PKR) (PKR) (USD) Remarks
1 Cement 99 Bags 75 per bag 7425 123.8
2 Sand 359 cft 0 per cft 0 0 will be arranged locally
3 Gravel 452 cft 25 per cft 11300 188.3 from Ichrian by trolly
4 Shingle 74 cft 25 per cft 1850 30.8 from Ichrian by trolly
5 Steel & Binding wire 649 kg 5 per kg 3245 54.1
6 Stone 310 cft 25 per cft 7750 129.2 from Sachan by trolly
7 Pipe materials 1 LS 5500 per job 5500 91.7
8 Steel manhole cover 3 No. 150 per No. 450 7.5
ACCESSORIES' DETAIL
Unit
Sr
Item Description Location Quantity unit cost Total Cost (PKR)
#
(PKR)
1 GI strainer 2" dia source tank 3 RFt 132.65 398
2 GI Over flow pipe 1.5" dia source tank 6 RFt 93.9 563
3 GI wash out pipe 1" dia source tank 5 RFt 62.35 312
wash out
GI Plug 1" 1 No. 30 30
source tank
4 GI Over flow pipe 1.5" dia main tank 12 RFt 93.9 1127
5 GI wash out pipe 1.5" dia main tank 6 RFt 93.9 563
wash out main
1 No. 45 45
6 GI Plug 1.5" tank
Steel Man hole cover Source tank,
2 No. 600 1200
7 (2'x2') main tank
Steel Man hole cover
Valve chamber 1 No. 350 350
8 (1.5'x1.5')
9 Barbed wire source tank 100 Ft 3.35 335
TOTAL COST FOR ACCESSORIES 4,923
A CIVIL WORKS
1 Cement 99 Bags 370 36630 610.5
2 Sand 359 cft 0 0
3 Gravel 452 cft 0 0
4 Shingle 74 cft 0 0
5 Stone 310 cft 0 0
6 Steel 632 kg 48 30336 505.6
7 Steel Binding wire 17 kg 48 816 13.6
SUB TOTAL - A 67,782 1,130
B PIPE WORKS
1 Supply main
300 Rft is already installed
3/4" dia 3900 Rft 42.9 167310 2789 (excluding this)
2 Distribution mains
3/4" dia 1420 Rft 42.9 60918 1015
2700 Rft is already installed
1/2" dia 790 Rft 32.75 25873 431 (excluding this)
Fitting & fixtures
3 (as per detail) 1 L.S. 14867 14,867 248
4 Accessories (as per detail) 1 L.S. 11288 4,923 82
SUB TOTAL- B 273,892 4,565
SUB TOTAL MATERIAL COST 341,674 5,695
TRANSPORTATION COST
LABOR COST
Rate Amount Amount
Sr.# Category Quantity unit (PKR) (PKR) (USD) Remarks
1 Unskilled Labor 45.27 man-days 250 11318 189 2 % of Total Cost
2 Skilled Labour 117.62 man-days 450 52929 882 9 % of Total Cost
3 Plumber 142 man-days 450 63900 1065 11 % of Total Cost
SUB TOTAL LABOR COST 128,147 2,136 22 % of Total Cost