A B C D E F G H I J K L M N O P

1 OUTLET PIPING SYSTEM REV DATE DESCRIPTION


FOR APPROVAL
CHK'D APP'D
10
1 COMMENT ENGINEERING
2 COMMENT ENGINEERING

2 9

INLET PIPING SYSTEM

3 8

BV EXISTING

4 7

5 6
No. NAME SPECIFICATIONS QTY UNIT
1 FLANGES WNF#300_8'' 4 PCS
2 PIPE 8''_SCH80 2 ROD
3 TEE EQ.TEE_8x8''_SCH80 1 PCS
BV EXISTING 4 VALVE BALL VALVE_8''_#300 1 PCS
6 5 ELBOW 2 PCS 5
6 REDUCER CON_8x10''_SCH80 1 PCS
7 FLANGES WNF#300_10'' 2 PCS
8 PIPE 10''_SCH80 0.1 ROD
9 WELDOLET 10'' 2 PCS
10 FLANGES WNF#300_10'' 5 PCS
11 TEE EQ.TEE_10x10''_SCH80 1 PCS
7 4
12 ELBOW 7 PCS
13 PIPE 10''_SCH40 2 ROD
14 VALVE BALL VALVE_10''_#300 1 PCS

8 PROJECT 3
GAS COMPRESSOR PGN-AME
CUSTOMER
PT. ANUGERAH MEGA ENERGI
Operation Department
OWNER
PT. ANUGERAH MEGA ENERGI
PJB Muara Karang - Jakarta, Indonesia
DESIGN BY DATE CONTRACTOR

9 Firman
CHECKED BY DATE FiPER INDONESIA 2
Jl. Panduraya, No.27
APPROVED BY DATE Ruko Grande, Blok.B1
Bogor 16152, Indonesia
DRAWING TITLE
ORDER NUMBER
C3-I/O PIPING SYSTEM
TBA DRAWING NUMBER REV

JOB NUMBER - 0
10 TBA SCALE : NTS APPROXIMATE WEIGHT ( Kg ) -

This drawing is our property,


SIZE : A4 SHEET : 1 of 1
1
it can't be reproduced or comunicated without our written agreement

P O N M L K J I H G F E D C B A

S-ar putea să vă placă și