Sunteți pe pagina 1din 4

General Report Page 1 of 4

ETAP
11.0.0.C
Project: Date:
Location: SN:
Contract: Study Case: Revision:
Engineer: Config:
File Name:

Electrical Transient Analyzer Program

Switching Sequence Analysis

Switching Sequence:

Description:

Name Date Time


Editor:
Checker:
Verifier:
Approver:

System Frequency:
Unit System:
Project File Name:
Output File Name:
Builder Report Page 2 of 4

ETAP
11.0.0C
Project: Date:
Location: SN:
Contract: Study Case: Revision:
Engineer: Config:
File Name:

Switch Sequence
ID:

Device/Logic Operation Modification


Action Group Active Type ID Delay T Action Crew Remarks Cost Name Date Time
# # H:M:S $
Sequence Report Page 3 of 4

ETAP
11.0.0C
Project: Date:
Location: SN:
Contract: Study Case: Revision:
Engineer: Config:
File Name:

Sequence List
ID:

Command Device/Logic Original Current End


Action Group Time Action Status ID Type Status Action Status Duration Time Crew Remarks Cost
# # H:M:S H:M:S H:M:S $
Alert Report Page 4 of 4

ETAP
11.0.0C
Project: Date:
Location: SN:
Contract: Study Case: Revision:
Engineer: Config:
File Name:

Alerts
Sequence ID:

Command Device Alert


Action Time ID Type Status Action Type Condition Device ID DeviceType Required Actual
# H:M:S

S-ar putea să vă placă și