Sunteți pe pagina 1din 1

C

L Spillway crest
C
L B C
Bridge D' D E' Excavated slopes to be
E protected by turfing
EL. 144.85
CL
Original ground level

EL. 143.83 1 : 2.25


1
1
2
2

1
1:
Compocted earth backfill Exit channel bed slope = 0.002
EL. 141.80
6.00

Existing wall New mansory wall

A SECTION G - G
(TYPICAL SECTION OF EXIT CHANNEL)
R = 570

G
15.00

EL. 142.86

0
10.0
R=
Rip Rap Channel aligment shall

1:2
EL. 140.75 be as directed by the
Spillway approach Engineer on to suit
channel to be aligment of existing
excavated to full width channel and natural
1 : 2.25 watercourse.
30.00

Slope 0.025
6.25 5.00
22.00
A

6.00
EL. 142.20

8.00 Exit channel


1:1 New masonry stilling
Existing weir to be 0.70 Slope = 0.002
basin Clearing, grubbing, trimming and / or
reconstructed repaired
falling of apron area to profile as
and / or repainted as 0.30 directed by the Engineer
directed by the
Engineer

EL. 140.64

1:2
15.00

EL. 142.43
Stabilisation and furfing of existing slopes
as directed by the Engineer
R
=1
0.0
G
0

Drainase see detail " L "


2.20

R = 570
Crack = 37.00

New masonry wall

:1
1
EL. 143.0 1 : 2.25
Existing masonry
wall to be
C
removed and
replace with new
masonry wall
PLAN SPILLWAY
EL. 144.85

B D'
D
E E'
Bridge

0.30 0.60 4.00 0.60 0.30

0.16

Existing masonry wall Remove existing wall


EL. 144.75 EL. 144.85

Provide new Clearing, grubbing, trimming and / or falling of apron


EL. 143.90 EL. 143.85 Original ground level masonry wall area to profile as directed by the Engineer
HWL
EL. 142.64 EL. 142.85

EL. 142.00 EL. 141.80


0.001
EL. 140.75 Slope 0.025

1:2
EL. 140.64

Scale 1 : 100
0 2 4 6 8 10 m
6.25 5.00 3.00 8.00 2.50
SECTION A - A

S-ar putea să vă placă și