L Spillway crest
C
L B C
Bridge D' D E' Excavated slopes to be
E protected by turfing
EL. 144.85
CL
Original ground level
1
1:
Compocted earth backfill Exit channel bed slope = 0.002
EL. 141.80
6.00
A SECTION G - G
(TYPICAL SECTION OF EXIT CHANNEL)
R = 570
G
15.00
EL. 142.86
0
10.0
R=
Rip Rap Channel aligment shall
1:2
EL. 140.75 be as directed by the
Spillway approach Engineer on to suit
channel to be aligment of existing
excavated to full width channel and natural
1 : 2.25 watercourse.
30.00
Slope 0.025
6.25 5.00
22.00
A
6.00
EL. 142.20
EL. 140.64
1:2
15.00
EL. 142.43
Stabilisation and furfing of existing slopes
as directed by the Engineer
R
=1
0.0
G
0
R = 570
Crack = 37.00
:1
1
EL. 143.0 1 : 2.25
Existing masonry
wall to be
C
removed and
replace with new
masonry wall
PLAN SPILLWAY
EL. 144.85
B D'
D
E E'
Bridge
0.16
1:2
EL. 140.64
Scale 1 : 100
0 2 4 6 8 10 m
6.25 5.00 3.00 8.00 2.50
SECTION A - A