Documente Academic
Documente Profesional
Documente Cultură
Notes:
1. 26 projects and 2 bridge projects (34.15% of the total projects) increase their negative slippages with an average of (-3.19%). 100% of 26 projects consistently increase its negative slippage.
2. 14 projects and 4 bridge projects (21.87% of the projects) decrease their negative slippages with an average of (2.45%).
3. Only 12 projects have no updates (WER)
4. Only 4 projects or 4.88% of the total projects have positive slippage with an average of 12.93%. However, the positive slippage decreases with an average -0.62%
5. Only one (1) in house project (The Grid) is included in this report.
6. 16 new projects are yet to commence with 4 completed projects reported.
7. 62 projects (75.61% of the total projects) have negative slippage.