Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,

Solid Waste Management and Sewerage System during Last Five Years

Project Title: Country:


Preparation Of Topographical Map for Bidur Small Nepal
Town Water Supply Project
Location within Country: Professional Staff Provided by Your Firm/Entity
Bidur Municipality, Nuwakot (profiles): Senior Surveyor, Civil Engineer, Assistant
Surveyor

Name of Client: Funding Source:


PPTA 8346 NEP: Third Small Towns Water Supply Asian Development Bank
and Sanitation Project and executed by Department of
Water Supply and Sanitation, Ministry of Urban
Development
Address: No of Staff-Months: 12
Duration of Assignment: 3 months
Start Date Completion Date Approx. Value of Services
(Month/Year): March 2014 (Month/Year): Dec. 2014 (in Current NRs.): 908,750.00
Name of Associated Consultants, If Any: No of Months of Professional Staff Provided by
Associated Consultants:

Narrative Description of Project:


The assignment included conducting topographical surveys to produce longitudinal and cross sections with
digital geo referenced topographical maps to allow detail engineering design of the water supply projects.
The total length of the survey was 55 Km

Project Data Sheet : 01

Firm’s Name: DA Nepal (P) Ltd


Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,
Solid Waste Management and Sewerage System during Last Five Years

Project Title: Country:


Carryout detailed topographical surveys for proposed Nepal
water supply projects
Location within Country: Professional Staff Provided by Your Firm/Entity
Illam Municipality, Illam (profiles): Senior Surveyor, Civil Engineer, Assistant
Surveyor

Name of Client: Funding Source:


PPTA 8346 NEP: Third Small Towns Water Supply Asian Development Bank
and Sanitation Project and executed by Department of
Water Supply and Sanitation, Ministry of Urban
Development
Address: No of Staff-Months: 12
Duration of Assignment: 3 months
Start Date Completion Date Approx. Value of Services
(Month/Year): March 2014 (Month/Year): Dec. 2014 (in Current NRs.): 12,46,638.00
Name of Associated Consultants, If Any: No of Months of Professional Staff Provided by
Associated Consultants:

Narrative Description of Project:


The assignment included conducting topographical surveys to produce longitudinal and cross sections with
digital geo referenced topographical maps to allow detail engineering design of the water supply projects.
The total length of the survey was 61.29 Km
Project Data Sheet : 02

Firm’s Name: DA Nepal (P) Ltd


Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,
Solid Waste Management and Sewerage System during Last Five Years

Project Title: Country:


Carryout detailed topographical surveys for proposed Nepal
water supply projects
Location within Country: Professional Staff Provided by Your Firm/Entity
Tikapur Municipality, Kailali (profiles): Senior Surveyor, Civil Engineer, Assistant
Surveyor

Name of Client: Funding Source:


PPTA 8346 NEP: Third Small Towns Water Supply Asian Development Bank
and Sanitation Project and executed by Department of
Water Supply and Sanitation, Ministry of Urban
Development
Address: No of Staff-Months: 12
Duration of Assignment: 3 months
Start Date Completion Date Approx. Value of Services
(Month/Year): March 2014 (Month/Year): Dec. 2014 (in Current NRs.): 14,39,620.00
Name of Associated Consultants, If Any: No of Months of Professional Staff Provided by
Associated Consultants:

Narrative Description of Project:


The assignment included conducting topographical surveys to produce longitudinal and cross sections with
digital geo referenced topographical maps to allow detail engineering design of the water supply projects.
The total length of the survey was 96.6 Km

Project Data Sheet : 03

Firm’s Name: DA Nepal (P) Ltd


Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,
Solid Waste Management and Sewerage System during Last Five Years

Project Data Sheet : 04

Project Title: Country:


Carryout detailed topographical surveys for proposed Nepal
water supply projects
Location within Country: Professional Staff Provided by Your Firm/Entity
Nirmal Pokhari, Kaski (profiles): Senior Surveyor, Civil Engineer, Assistant
Surveyor

Name of Client: Funding Source:


PPTA 8346 NEP: Third Small Towns Water Supply Asian Development Bank
and Sanitation Project and executed by Department of
Water Supply and Sanitation, Ministry of Urban
Development
Address: No of Staff-Months: 12
Duration of Assignment: 3 months
Start Date Completion Date Approx. Value of Services
(Month/Year): March 2014 (Month/Year): Dec. 2014 (in Current NRs.): 17,03,040.00
Name of Associated Consultants, If Any: No of Months of Professional Staff Provided by
Associated Consultants:

Narrative Description of Project:


The assignment included conducting topographical surveys to produce longitudinal and cross sections with
digital geo referenced topographical maps to allow detail engineering design of the water supply projects.
The total length of the survey was 96.6 Km

Firm’s Name: DA Nepal (P) Ltd


Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,
Solid Waste Management and Sewerage System during Last Five Years

Project Title: Country:


Feasibility study of sewerage projects in Nepal
Okhaldhunga, Dhankuta and Katunje, Bhaktapur
Location within Country: Professional Staff Provided by Your Firm/Entity
Okhaldhunga, Dhankuta and Katunje (profiles): Senior Sanitary Engineer cum Team Leader
,Bhaktapur Sewerage Network and Treatment Design Specialist,
Civil Engineer, Surveyor

Name of Client: Funding Source:


Water Supply and Sewerage Divison, Bhaktapur Government of Nepal
Address: Bhaktapur No of Staff-Months: 12
Duration of Assignment: 3 months
Start Date Completion Date Approx. Value of Services
(Month/Year): 2067/68 (Month/Year): 2068/69 (in Current NRs.): 548,050.00
Name of Associated Consultants, If Any: No of Months of Professional Staff Provided by
Associated Consultants:
Narrative Description of Project:
The Feasibility study of sewerage project is developed in response to the Government's sewerage management
projects emphasis on planning, designing and implementing the water supply projects with basic sanitation to
contribute towards a sustainable improvement lifestyle of the community people.The projects covers
Okhaldhunga, Dhankuta and Katunje, Bhaktapur.

The main objective of the such Sewerage Project is to contribute towards the sustainable improvement in: (i)
access to medium level sanitation services (ii) sanitation and environmental conditions for the resident
communities; and (ii) the water quality in the selected drainage basins within the served areas
Services Provided for Feasibility Study:
1. Assess the current conditions of sewerage management infrastructure, identify zones, for wastewater,
conveyance system and disposal stations.
2. To identify core areas of the project area, which are suitable for sewerage network system and rest by
onsite sanitation system. The appropriate system for collection, transport and sludge treatment should
be proposed.
3. Preliminarily study of waste water collection and conveyance, location of disposal facility, sewer design
parameter, waste water generation, design of sewer, its appurtenances, design of manholes / scraper
manholes / ventilating column etc.
4. To analyze the past, present and future data regarding wastewater loading rate etc. Study and
recommend the types of treatment need.
5. Alignment study (detail survey not required) in order to identify the most suitable alignment for gravity
flow of effluent (as far as possible)

Project Data Sheet : 05

Firm’s Name: DA Nepal (P) Ltd


Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,
Solid Waste Management and Sewerage System during Last Five Years

Project Data Sheet : 06

Project Title: Country:


Detail Engineering Survey, Design and Cost Estimate Nepal
for Banchare Dande Long Term Landfill Site.
Location within Country: Professional Staff Provided by Your Firm/Entity
Banchare Dande, Sisdol (profiles): Senior Sanitary Engineer, Solid Waste
Management Design Specialist, Civil Engineer,
Surveyor, Geotechnical Engineer, Structural engineer

Name of Client: Funding Source:


Solid Waste Management Technical Support Center, Government of Nepal
Minister of Urban Development
Address: Shree Mahal, Pulchowk Duration of Assignment: 12 months
Start Date Completion Date Approx. Value of Consultancy Services
(Month/Year): July 2014 (Month/Year): July 2015 (in Current NRs.): 2,036,000.00
Name of Associated Consultants, If Any:
MULTI Disciplinary consultants (P) Ltd.,
WELINK Consultants (P) Ltd

Narrative Description of Project:


The project is developed in response to the Government's Solid Waste Management projects emphasis on
planning, designing and implementing the solid waste management projects with basic sanitation to contribute
towards a sustainable improvement lifestyle of the community people.

Services Provided for Project:


1. Data collection and review of Conceptual Design Reports. EIA Reports, Guidelines. Manuals related to
solid waste management and landfill site
2. Topographical survey of 45 Ropani Iand and Geotechnical investigation for Landfill site
3. Hydrological study, Traffic survey and Baseline survey-2000 household
4. Sample collection and test of leachate from Sisdol and conduct investigation for construction and
solid waste cover material.
5. Design of landfill site considering the effects of seisrnic events and sub -surface geotechnical
conditions including determination Liquefaction including following components:
 Master plan for landfill site including landscaping, buffer zone and waste management
facilities
 Gate control building for vehicles, support buildings for offices, training hall, canteen and
accommodations
 Repair and maintenance workshop for landflll equipment
 Vehicle washing facilities, weighing bridge of 60 tone capacity
 Design of wastewater treatment plant for leachate managelment
 Design of flood control, erosion control structures.
 Design of subsurface drainage and peripheral surface drainage

Firm’s Name: DA Nepal (P) Ltd


Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,
Solid Waste Management and Sewerage System during Last Five Years
 Design of waste retaining dam of 30 m height
6. Preparation of operation and maintenance manual including sanitary landfill operation, waste
compaction: health and safety
7. Preparation of environmental management and investigation plan including impact to neighborhoods,
leachate quality before and after test, landfill gas quality of site and off site.
8. Preparation of detailed construction drawing for all structures.
9. Preparation of bill of quantities, cost estimate, technical specification and standard bid documents.
10. Preparation of Operation and maintenance manual including sanitary landfill operation,

Firm’s Name: DA Nepal (P) Ltd


Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,
Solid Waste Management and Sewerage System during Last Five Years

Project Data Sheet : 07

Project Title: Country:


Detail survey, design and drawing for sewerage Nepal
system at Manthali, Ramechap
Location within Country: Professional Staff Provided by Your Firm/Entity
Manthali Ramechap (profiles): Senior Sanitary Engineer cum Team Leader
Sewerage Network and Treatment Design Specialist,
Civil Engineer, Surveyor

Name of Client: Funding Source:


Department of Water Supply & Sewerage (DWSS), Government of Nepal
Sewerage Development and Management Section,
Panipokhari, Kathmandu
Address: Panipokhari, Kathmandu Duration of Assignment: 3 months
Start Date Completion Date Approx. Value of Services
(Month/Year): 2071/7/21 (Month/Year): (in Current NRs.): 2,98,500.00
2071/10/21
Name of Associated Consultants, If Any: No of Months of Professional Staff Provided by
Associated Consultants:
Narrative Description of Project:
The project comprises detail survey of the project area and finalized the sewer alignment and its detail design,
design of sewerage treatment plant, preparation of detail estimate, rate analysis, and specification of the works,
socio-economic and environmental study. The length of sewer designed corresponding to the project site were
listed below:
Total length of sewer line: 3036.30 m
Services Provided for Study:
1. Detail topographical survey along sewer alignment
2. Detail design of sewerage treatment plant, detail estimate, rate analysis, specification of the works.
3. Socio economic and environmental study

Firm’s Name: DA Nepal (P) Ltd


Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,
Solid Waste Management and Sewerage System during Last Five Years

Project Data Sheet : 08

Project Title: Country:


Preparation of Solid Waste Management Strategic Nepal
Plan and action Plan for 15 Municipalities.
Location within Country: Professional Staff Provided by Your Firm/Entity
Illam, Dhankuta, Janakpur, Dhulikhel, Bhimeshwor, (profiles): Senior Sanitary Engineer, Solid Waste
Lekhnath, Baglung, Tansen, Ghorahi, Tulsipur, Management Design Specialist, Civil Engineer,
Birendranagar,, Tiakpur, Dhangadhi and Bhimdatta. Surveyor, Geotechnical Engineer, Structural engineer

Name of Client: Funding Source:


Solid Waste Management Technical Support Center, Government of Nepal
Minister of Urban Development
Address: Shree Mahal, Pulchowk Duration of Assignment: 12 months
Start Date Completion Date Approx. Value of Consultancy Services
(Month/Year): 2067/12/14 (Month/Year): (in Current NRs.):
2068/12/12
Name of Associated Consultants, If Any:
MULTI Disciplinary consultants (P) Ltd.,
Devtec Nepal Consultants (P) Ltd

Narrative Description of Project:


The project is developed in response to the Government’s Solid Waste Management projects emphasis on
planning, designing and implementing the solid waste management projects with basic sanitation to contribute
towards a sustainable improvement lifestyle of the community people.

Services Provided for Project:


1. Participating for preparation of SWM Strategic and action plan in 15 municipalities are Illam, Dhankuta,
Janakpur, Dhulikhel, Bhimeshwor, Lekhnath, Baglung, Tansen, Ghorahi, Tulsipur, Birendranagar,,
Tiakpur, Dhangadhi and Bhimdatta.
2. Review of previous reports, the different acts and regulations, existing laws, policies, plans and
strategies
3. Management and conduct of the field survey, the site meetings and discussions with various
stakeholders
4. Identification of the existing SWM related problems and issues
5. Management and conduct of inventory survey of socioeconomic and environmental conditions
6. Analysis of present solid waste management scenario in participating municipalities
7. Identification of existing waste collection systmes, 3R facilities, appropriate solid waste management
technologies and land fill sites
8. Preparation of objectives to address SWM problems and prioritizing objectives
9. Identification of the key stakeholders
10. Assessment of the investment options for promoting PPP
11. Preparation of long term strategic plan and short term action plan for SWM along with development of
potential CDM project
12. Conduction of workshops in the municipalities during planning stage and draft report stage in the centre
and the municipalities.

Firm’s Name: DA Nepal (P) Ltd


Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,
Solid Waste Management and Sewerage System during Last Five Years

Project Data Sheet : 09

Project Title: Country:


Detail survey, design and drawing for sewerage Nepal
system.
Location within Country: Professional Staff Provided by Your Firm/Entity
Sallari Bazzar, Solukhumbu (profiles): Senior Sanitary Engineer cum Team Leader
Sewerage Network and Treatment Design Specialist,
Civil Engineer, Surveyor

Name of Client: Funding Source:


Department of Water Supply & Sewerage (DWSS), Government of Nepal
Sewerage Development and Management Section,
Panipokhari, Kathmandu
Address: Panipokhari, Kathmandu Duration of Assignment: 3 months
Start Date Completion Date Approx. Value of Services
(Month/Year): 2071/2/10 (Month/Year): 2071/5/8 (in Current NRs.): 2,99,000.00
Name of Associated Consultants, If Any: No of Months of Professional Staff Provided by
Associated Consultants:
Narrative Description of Project:
The project comprises detail survey of the project area and finalized the sewer alignment and its detail design,
design of sewerage treatment plant, preparation of detail estimate, rate analysis, and specification of the works,
socio-economic and environmental study. The length of sewer designed corresponding to the project site were
listed below:
Services Provided for Study:
1. Detail topographical survey along sewer alignment
2. Detail design of sewerage treatment plant, detail estimate, rate analysis, specification of the works.
3. Socio economic and environmental study

Firm’s Name: DA Nepal (P) Ltd


Consultant’s Experience in Detailed Engineering Survey and Design of Water Supply,
Solid Waste Management and Sewerage System during Last Five Years

Project Data Sheet : 10

Project Title: Country:


Nepal
Training on Operation and Maintenance of the Water
Supply System and the Water Treatment Plant of Deo
Bhumi Baluwa Community Water Supply Project, Asia
Onluse, 2013

Location within Country: Professional Staff Provided by Your Firm/Entity


Deo Bhumi Baluwa (profiles): Senior Water Supply Engineer cum Team
Leader, Sewerage Network and Treatment Design
Specialist, Civil Engineer, Surveyor

Name of Client: Funding Source:


Asia Onluse,
Address: Country Office Sherhen Marg Duration of Assignment: 3 months
Boudhanath_6, Kathmandu Nepal
Start Date Completion Date Approx. Value of Services
(Month/Year): 2013 (Month/Year): 2013 (in Current NRs.): 450,000.000
Name of Associated Consultants, If Any: No of Months of Professional Staff Provided by
Associated Consultants:
Narrative Description of Project:
The project comprises detail survey of the project area and finalized the sewer alignment and its detail design,
design of sewerage treatment plant, preparation of detail estimate, rate analysis, and specification of the works,
socio-economic and environmental study. The length of sewer designed corresponding to the project site were
listed below:
Services Provided for Study:
1. Detail topographical survey along sewer alignment
2. Detail design of sewerage treatment plant, detail estimate, rate analysis, specification of the works.
3. Socio economic and environmental study

Firm’s Name: DA Nepal (P) Ltd