Documente Academic
Documente Profesional
Documente Cultură
Best Performance
Stephen Wright
Performance Engineering
Midrange & Entry Solutions Group
What’s New with Dell EMC Unity
650F
________
Latency
IOPS
Response Time
0 10 20 30 40 50 60 70 80 90 100
Average CPU % Utilization
Latency
High
Availability
Hardware Considerations
U6xx
U5xx 3X
U4xx 2.5X
U3xx 2X
0 0.5 1X
1 1.5 2 2.5 3 3.5
0 2 4 6 8 10 12 14 16 18
14 © Copyright 2017 Dell Inc.
Balanced Access – Front-end Ports
• For HA, zone 1 initiator to 1
port from SPA, 1 port from SPA SPB
SPB
• For HA + load balancing, zone
to 2 ports per SP
• Cable and use as many front- Switch1 Switch2
end ports as possible
• We recommend at least 4
ports per SP in U3x0 and Host
U4x0
Host
• At least 6 ports per SP in
U5x0 and U6x0
15 © Copyright 2017 Dell Inc.
Front-end Port Considerations
Flash Tier
FAST Cache
FAST VP
5% = Flash Acceleration
Add Compression
– CPUs are not reserved for any
Add Replication
Add Snapshots
particular process
RAID-1/0
RAID-6
• Features require resources
– Use additional CPU and may
add drive IOPS
– CPU cycles can shift as
defined workload changes
Average CPU
Below 50% 50% to 70% 70% to 90% Above 90%
Utilization
Snapshots /
Replication
Compression
>25% space
savings from
Compression
Tolerant of
latency
fluctuations
8 hours
12 hours
12 hours
8 hours
4 hours
12 hours
12 hours
4 hours
12 hours
12 hours
22 © Copyright 2017 Dell Inc.
Asynchronous Replication
• Asynchronous Replication leverages Snapshots
8 hours
– Similar considerations
– Recovery Point Objective = snapshot schedule
– Longer RPOs with lots of replicated objects RPO
12 hours
12 hours
RPO
Replication Link
Storage Processor
Choose the right Have enough…? Start with Flash Consider CPU
model, based on Drives consumption
CPU power Enclosures All-Flash
Ports Snapshot schedules
Data-in-place Flash tier (Hybrid)
upgrades to move to Utilize all ports Replication RPOs
more powerful
model
For All-Flash,
consider new Ux50F
models
CONSULTING DEPLOYMENT
MANAGED SERVICES
SUPPORT
TRAINING IT PROVEN
Dell EMC Dell EMC Unity CloudIQ – Event Correlation & Analytics
Dell EMC Dell EMC Unity – Simplified Storage Management & Monday: 8:30AM – 9:00PM
Administration
Tuesday: 7:00AM – 5:30PM
Dell EMC Dell EMC Unity – VMware vSphere Integration
Wednesday: 7:00AM – 5:00PM
Dell EMC Dell EMC Unity – Configuring Snapshots & Replication Thursday: 7:00AM – 2:00PM
Guided Day/Time
Dell EMC Dell EMC Unity CloudIQ – Event Correlation & Analytics Tuesday: 1:30PM – 2:30PM
(Registration required and limited availability) Thursday: 8:30AM – 9:30AM
NO PURCHASE NECESSARY. Ends 05/11/2017. To enter and for Official Rules, visit
http://thecoreblog.emc.com/dell-emc-world-follow-win-sweepstakes-2017/
32 © Copyright 2017 Dell Inc.