Abstract Sheet

ABSTRACT SHEET

Name of Work :- Construction of Road Over Bridge at Km 800/500-600 in lieu of L.C. No. 19 between Chandargao – Margao Jn.

ROB Approach (Viaduct + Solid Approach)

GSR 2013 - Conducting Standard Penetration Test as per IS :2131 - 1981 (with up to date
4.01 Per No. 2.00 587 1174
Item amendments) and as directed by the Engineer incharge.

Conducting Laboratory test as per relevant IS specification with up to date


4.02 GSR 2013
amendments
Determination of Natural Moisture Contents (IS-2720 part-II) - 1969 with up to
a 21 Per No. 2.00 237 474
date amendments
Determination of liquid limit & plastic limit (Atterberg's limit), plasticity index
b 22 Per No. 2.00 658 1316
conforming to IS : 2720 part - III 1980 with up to date amendments
c 23 Grain size analysis of soils by using sieves (Sieve analysis) Per No. 2.00 475 950
Determination of Specific Gravity of soil as per IS : 2720 part - III 1980 with up to
d 24 Per No. 2.00 304 608
date amendments
e 26 Conducting Shear Strength Test (Box Shear) Per No. 2.00 854 1708
f 27 Conducting Triaxial Shear Test (without poor pressure measurements) Per No. 2.00 2707 5414
g 28 Conducting Unconfined compression test Per No. 2.00 850 1700
h 30 Conducting Consolidation test Per No. 2.00 1541 3082

M/s. TECHNOGEM CONSULTANTS PVT. LTD. AAP-1


Abstract Sheet

Preparation & submission of Final report in quadruplicate indicating samples,


general description of strata met, different levels, fault and strong joints, inflow of
water, depth and strike of bedding and cleavage etc. (in rock percentage of
GSR 2013 -
recovery to be ascertained by means of core samples), specific recommandations
4.03 regarding bearing capacity, permissibles variations in bearing capacity due to Per job 1.00 13951.5 13951.5
Item No. 45
increase or decrease in depth of foundation levels of foundation work, stability of
ii)*50%
embankments, sattlement of different depths, including note of sattlement of
clayey strata indicating N -Q values etc. and results of field test and laboratory
test together with sil profile etc. complete. :- Bridge Work (including land spans)

Total Cost Rs. 30378

i.e. Total Cost in Cr. 0.0030

M/s. TECHNOGEM CONSULTANTS PVT. LTD. AAP-2