PROVISIONAL ACCEPTANCE CERTIFICATE


This is to certify that the nominated equipment has been
Installed, Commissioned and Integrated at the following site :
REGION : xxxx
SITE CODE : xxxx
SITE NAME : xxxx
DETAIL OF WORK : AIS FIBRE: FTTx Phase 3
Latitude and Longitude
REF. QUOTATION NO. :

ZTE Thailand Co., Ltd. ADVANCED WIRELESS NETWORK CO.,LTD

Signature : Signature :

By [Name] : By [Name] :
Date : Date :
ZTE Representative AWN Inspector

ADVANCED WIRELESS NETWORK CO.,LTD ADVANCED WIRELESS NETWORK CO.,LTD

Signature : Signature :

By [Name] : By [Name] :
Date : Date :
AWN MC Manager AWN Project Manager
Site Deficiency Report

SITE NAME: xxxx SITE CODE: xxxx DATE : 25-Sep-18


VENDOR : ZTE Equipment Model: ZXA10 C320

Site Deficiency Report


Def. Failed Failed Clear of
Type Deficiency Category 1st Insp 2nd Insp Deficiencies

4.1 Materials Checklist

4.2 Hardware Installation Check

4.3 Software & Service Test

No Description of Deficiency Report Date Clear Date

No Material of Deficiency Report Date Clear Date

Remark : NIR01 or NIR03 YES NO

Site Deficiency Clearance

S : Standard หากไมผ ม มานหหวขขอนนข อนน ญาตใหขon service แบบมนเงงมอนไขโดยใหขรนบดาด เนน นการภายใน7 วหน
ม มานหหวนนข ไมอ
C : Critical หากไมผ ม นน ญาตใหขon service ใหขดาด เนน นการแกขไขใหขเสรรจกอ
ม น

First Inspection Result Second Inspection Result Verification Result

Pass Fail Pass Fail The work was verified and


accepted by:

Signature: ______________________ Signature: ______________________


Supervisor Supervisor

Signature: ______________________ Signature: ______________________ ________________________________


Installation team leader Installation team leader Authorized AWN field engineer

Date:_____/_______/_______ Date:_____/_______/_______ Date:_____/_______/_______

S-ar putea să vă placă și