Sunteți pe pagina 1din 16
a2 asa sas sion SECTION 19 = SEWERAGE AND DRAINAGE WORES Seneraty ‘The equrements of he other scans of hr Speco art apy aot this section, The Work fo be cared out in accordance with he rules and reguatens of he lca and other unos der of Work “he onder inhich the work neh tes under this contact wil be eared out sal Be tthe 5. ‘iho wi endeovor for ats compatible wth the convenience of the publ, and evetiding ‘eauitemete seh neater of propress and completion of inchidualsdnage, to permit the Contactar to eranze he programe for compact working. T ths en the Contacto shal submit is poyammenn wing to. fn put made up rads, nous connection sal be constructed smutaneusy withthe main Sewer 1 ender to complete eich length sd thus minnie the eenseiene to the house les and feneral publ Inger sept where sets canbe completly dose, house connections il Fave to be constructed ene sd ofthe ond fist and ths see r-opened to tai betore works Commenced on the ofe side. The Wench forthe main sewer Would I most cases have to be aking ep at pips untos ear the emaing connections are costes. ‘Manholes shall be constructed semtancousy with sewers 0a to ensue thatthe onstruction vill rt long he prado which reas whol or paralysed eon of Sewer ‘Sewers wil general be constructed te one side ofthe ead reserve or mi block inthe pelon ‘shown onthe plans, bt there positions are ot to be taken sia Tenderers shal thereon, pice ‘the ils of Guanes onthe Dos af the sewer beng constuted anher nthe food ese, oF ‘The sewers wl nora be pstioed to all reasonable working widths on ether sé ofthe trench, snd the tenderer should stat n Ms tender what pam fay, he inlends to use onthe trench ‘revatio nd he dur working wth uch pant egies, fang submision of sch Information ‘Salle sbumed that mo specal wither other requrements are alee. ‘he poston ofeach ene wil b nate to the Conractr when equed for setting out Bench Maks ‘bench marks have én etalished to the sme dum a herded level shown onthe drawings nd wil be made aval othe Centacor. As tesa banch mars maybe etre inte itr, All seting out shoul beefed at east two bench marks. Any dsepancy between marks shoud Immediately be refered tthe 5.0. Ie shal be espana ofthe contractor to etabich at his oun expense such ational banc at ‘nay be cnsdeted nase, Te Contractor sl protect and preserve these t the satisfaction of thes. ‘tsa be the respontty ate Contractor to check evel over alleneh mats ie pegs, vel pees {rsuht rls whieh may be stable on the work from tine fo time andthe edced level of a "ich Dec mars tne pes, eal peso sight alls shal be acaratl referred tothe eral Bech ‘mack proléed bythe SD. fom which they sal be established. le 4 sia 186 petitofsoes ‘The los ard tings be ad and suppl by the Contractor stl b ofthe following pe: (2) Glazed viridis, tings ad exe jolts shale to BS. 65 (©) Asbestos come: pipes, spec ond tings or gray sewers and dais shall be Cass 3 to 1.3656 or presurepipes as" 1B. 485. ‘he ppes and aesos cement ings sabe cated tena and early by pagina ‘umes slant the place of malate Unless there species or ordered the pies shal be prove vith aporoved Nestle ons. “The uber regs gaskets othe jt sabe tS. 2664 (2) Cast kon sting and spac or re wth abertor coment pps sal bet BS. 78 Part 2 ane BS. 121 for thecsso pes shown on he drawings (8) Unpastsed Pv pipes and tings shal bet 8S 4660, (0) Concrete ina ppes ana fs sabe 8. 911 Pat The contactor wil be noted on acceptance of his tender, which of the varous types of pipe Inentoned above sab vee. 197 Manholecowesandrximes Unless otherwise sptled all manhole coves, Inspection covers and frames shal be cst fon to BS. 188 TimeotDelvary of Matus tobe Sunsied by the Enoloer ‘ny pips an ities be supped to the Contractor wl be purchased by the Employer under 3 Separately conract. ‘The Contatr will be advised of the delivery poston when the tender Is accepted, and ntlepted that the male le vale when requ on the Wks, ‘The employer ges no gaante of nd accepts no fespenibily fr the tine of avery ofthe ppes or therat or comity of deer. The Contactor shal sang fr prompt off lang and sal be spent fr any demurrage 399° Onder or Materials Sure bythe Emiouse {Al odes of mater which ar tobe supped by the Employer sal be submitted 10 the’. ‘wing ard laed bythe Contractor oh ly authorised epesentathe. ‘The contactor sal be requted to ode the pipes an iting In sch quantiles and sequence smaynecesat fc the reguerents these on as ected he 5.0, but nl nde exception ‘cumstances wl be ordering ess han 3 fl uc od be alowed 1910 Tong Door. rasgatingand Oftoadngat set Pies and fits The Contractor shal tke mediate enry of nd fad a theppes, special vates angling maori tbe supped bythe Employer 2 thy arNed ‘he concer shall be esponsiefr aay demuage charge duet Ns alae to otoad material onteiptof Advice Rots, bce sis ‘he employer andthe Conrator shal canjity check ech pip, ela va, iting or case on slvr, both in erp of ust an quar and shal record and sg, tate al aera 50 {hehe Oe copy sl be retained bythe employe, one copy by te Contractor, and the remaiing py shale forded tothe 0. bythe contacter ‘me contactor sha deal the motes to the pston egued andin such manne a wl avd necsiry hg very case shal ba taken not to drop the pipes sb the lps or thems o rough weatment iwc may danage thn In any way. Unnecessary handing shal be avoided Pipes and cases ‘Cnfaing mata al be cry packed on vehes which shall be evo al speeds consent with the condo ofthe ros suf, tao Jong. Overloading of weiss ust be strety bolded Special care sal be taken o prevent damage to extemal an items coatings dug handing and Mag of pes and specs. 2011 Record ofMataaleecved ‘the contractor stall ep an up to date shedue la form approved by the 0. ofall materi {upped to im by teemployer A copy of his schedule shale submtted tothe ©. many the contactor’ messirement of work one ‘The Canactr shal ako haep a recordin dupa on drawings 0 be proved bythe 5.0 ofthe Fostion ad deat fal mst din reteultin, TAs tec sal ep up to at the work Proceeds and one coprsallbesubtd tthe 5.0 cach nth “he conractor shat accpt fl espns thatthe pips speci, et. and oter materi taken Astvery of by him are condition ana he shal take such measures by testing reer to ns ‘ml hat no damaged or detective mater accepted by in, src shal be dese to neat that he hs sted hms that he materi enumerated thereon sein sound cndton and subeequent clam for cplacarent without charge of damaged inate wil be entertsnedby the erloye oe, fitings or other materi sto found damaged whist inthe Contractor’ char hal be ‘replaced he cantar ‘A mates supp to te Contractor shal be wed exesiely forth Woks unde hs Contract nd materi fund sure afer the Completion ofthe Conta salle retuned tthe sore ‘shat be the responsi ofthe Contactor atthe completion ofthe Contact to fr the 5.0, Soa semen crural debery to 3043 reeling ‘certain amount of he te feling are stumping may be necessary on some ofthe sewer routes. ‘hore provsona! Kap sum tem has Been nea i the Hs of Qnttes to cove any tee "orn he Convator may be called upon to Sach sum aha be expaned soley tthe escttion tthe 80. anid shal ote Heid to cover the caring of bush and ndereowth which shal be eluded for nthe price for exevaton Tees with gt ss than measured fOr fom the ground Wailbe conldere bu. fey

S-ar putea să vă placă și