- 1:200 <
- 1:200 <
- 1:200 <
- 1:200
(ALLOWED) (ALLOWED) (ALLOWED) (ALLOWED)
SIDE VIEW
PROGRAMME MANAGER:
LEGEND:
DESIGN LINE
DEVIATION LINE PRIMARY PRIMARY PRIMARY PRIMARY
PANEL PANEL PANEL PANEL
CONTRACTOR:
NOTE:
TO ENSURE THE OVERCUTTING DIMENSION SHOWN IN LAYOUT, 70 Bendemeer Road, #05-04 Luzerene
Singapore 339940
NO DEVIATION FOR INWARD DIRECTION IS ALLOWED AT BOTH SIDES Tel: +65 6298 0566
Fax: +65 6291 1449
OF ADJACENT PANEL (CLOSING PANEL) INTERFACE
DURING ALL PRIMARY PANEL EXCAVATION.
CONSULTANT:
<
- 1:200 < 1:200
- <
- 1:200 < 1:200
- <
- 1:200 <
- 1:200 SUB-CONTRACTOR:
ALLOWED ALLOWED
PROJECT TITLE:
CONTRACT T-10
DESIGN AND CONSTRUCTION OF SEWER
TUNNELS FOR THE DEEP TUNNEL
SEWERAGE SYSTEM PHASE 2 PROJECT
DRAWING TITLE:
ALLOWABLE DEVIATION
FOR PRIMARY PANEL EXCAVATION
PUB-DTSS2-2018
T10 SHEET NUMBER: REVISION:
NLS1-SK-1305 -