Sunteți pe pagina 1din 1

REV DATE DESCRIPTION REVIEWED AUTHORIZED

CLIENT:

PROGRAMME MANAGER:

CONTRACTOR:

CONSULTANT:

Arup Singapore Pte Ltd


10 Hoe Chiang Road, #26-01 Keppel Towers S089315
Tel +65 6411 2500 Fax +65 6411 2501
www.arup.com

SUB-CONTRACTOR:

PROJECT TITLE:

CONTRACT T-08
N DESIGN AND CONSTRUCTION OF SEWER
TUNNELS FOR THE DEEP TUNNEL
SEWERAGE SYSTEM PHASE 2 PROJECT

DRAWING TITLE:

KEY PLAN P2
N.T.S.
V MACHINE DISTANCE
V1 FOR SOUTH TUNNEL SHAFT V3
W V2
W1 V3 DRAFTED: DESIGNED: SHEET SIZE:
Wsat EFS TAT A1
DRAFTING CHECK: DESIGN CHECK: SCALE:
V4 - - 1:100/1:40
V3sat
DATE: REVIEWED: PBS:
19/02/2018 - 122104
CONTRACT: DRAWING NUMBER

PUB-DTSS2-2018
THIS SITE T08 SHEET NUMBER: REVISION:

Z Zi Zi-S-XXXX -

Key Plan THIS DRAWING IS COPYRIGHT


Plot Date: 18/1/2017 11:33:32 AM

S-ar putea să vă placă și