1) Daily starch quantity: 5000 ÷ 300 = 16.7 T/day (production days according to 300days one year)
a. Starch: 62 -65 %;
e. Protein: 4.5-6%;
1) Corn: starch content 70%: content water 14%.;the broken corn and impurity ≤3%; protein 8 ~ 10%
mildew: ≤ 1
2) Brimstone: meet GB
3. Technical choice:
This design uses the low energy consumption, high recovery and less pollution, wet closed-circuit
circulation new production process to greatly increase the economic benefit.
4. Flow chart:
corn impurity
breaking
seporating
cleaning dehydration drying dry germ
maize germ
fine grinding
seporating
cleaning dehydration drying crushing fiber feed
fiber
seporating
concentration dehydration drying crushing protein
protein
starch wash
refine
starch milk dehydration drying
starch
8 flowmeter ABS 1 pc
subtotal 10
1 sulfite tank PP 1 pc
pressure crank
2 304 7 pcs
sieve
3 cleaning slot 304 1 pc
subtotal 18
5 filter 304 1 pc
6 segregator 304 1 pc
foam-away
7 304 1 pc
cylinder
8 starch cyclone 304 1 set
pump for starch
9 304 9 pcs
cyclone
10 scraper centrifuge 304 1 pc
subtotal 26
1 floating slot PP 1 pc
Carbon steel
2 storage tank 4 pcs
(corrosion
3 transfer pump 304 3 pcs
subtotal 13
total 130
6) Workshop requirements
total : 970m2
height: 10m
Final product warehouse, raw material warehouse and other auxiliary land will be decided according the buyer's
conditions.
8) water consumption: 3.5-4.5 M3 / a ton of starch, pressure 0.2-0.25 MPa (drinking tap water standard)
11) Staffing: 12 people/shift for production line, do not contain the personnel in the office
Specific quotation see below < an annual output of 5000 tons of corn starch list>
8. Delivery time
In the user finish all civil, starting from the contract comes into effect the whole equipment delivery time: about 120
days, installation debugging time about: 50 days
After finishing the civil engeneering by the buyer and the contract comes into effect. the whole equipment delivery
time: about 120 days.
9. Others:
1) All equipment manufactured according to the national standards or the enterprise standard. The quality guarantee
period is one year
3) To provide all of the civil instruction equipment layout diagram, production process flow diagram, electric layout
drawings
4) Send 1 or 2 techincal personnel to guide and install the production line at abroad and give them technical training. Engineer
fees not included.
5) not inculding the followings:
a. Building and building facilities (workshop lighting water supply fire control system)
c. Equipment maintenance
Unit Price
Process Name Power(kw) Unit Remarks
(USD)
130
Total FOB CHINA 459.42Kw USD $850,000
pcs(sets)
Remarks :
4. The above price is FOB CHINA ONLY, and the freight charge from the factory to Shanghai port.