Sunteți pe pagina 1din 3
Design Calculations for BND Project at sg Liang (DRAIN - Rev. 1) COOPT ENGINEERING SDN BHD Av, 1ST FLOOR, BLOCK A SEMPURNA. COMPLEX JALAN BATU BERSURAT, GADONG BS.B. 3164 BRUNEL DARUSSALAM. TEL: 2349435, FAK: 2938043, H/P: 8711676 DESIGNED ENGINEER: LIM SOON HIN MLE AUST DATE: 20th December 2017 Design of Drain Manning's Formula Q = _ARcH 7 © n = Concrete ( formed without finishing) = 0.015 S = a 6m A = 06h R= _ 06h mh + 06 Q = 0.19 Try h = 0.26m Q = (0.6x0.26)7 (0.6 x 0.26) ] 23 Tx 026) +061 Jy rn 0) | = 0.198m3/s Required Depth = 0.26m Velocity = $ = ghif$, = 1.27m/s (max 3m/s) OK Available Depth = 1.4m Due to gradient of 1:200 Required 600mm wide drain for construction due to deep drain NOTE The undeveloped plot in front of plant is not considered in catchment area. Developed plot of Plant A = 94.2m x 171.Jm hectare x } = 0.81 hectare tot me C = Industrial (Partially Built Up) = 0.60 = 67s o " s + ty = 67 + 165 = 232s = 0.73 2 2 x 232 wie Wx y+ Qo = xo CSCIA = af x 0.73 x 0.60 x 200 x 0.81 = 0.19m3/s Discharge at each outlet to river for 1 : 20 years storm = 0.19m'/s

S-ar putea să vă placă și