DIMENSI ABUTMENT
TINGGI
HT = 13.5 m
H1 = 3 m
H2 = 6 m
H3 = 9 m
H4 = 2 m
H5 = 2.5 m
H6 = 1 m
H7 = 0.5 m
H8 = 7.5 m
LEBAR
BT = 10 m
B1 = 2.5 m
B2 = 1 m
B3 = 0.5 m
B4 = 4 m
B5 = 2 m
B6 = 4 m
DATA - DATA PENUNJANG YANG DIPERLUKAN
DATA TEKNIS
Panjang Jembatan = 10 m (L)
Lebar Jembatan = 8 m (W)
Jumlah Gelagar = 4 buah
Jarak Antar Gelagar = 2 m
SPESIFIKASI KONSTRUKSI
( TA ) Tebal Aspal = 8 cm = 0.08 m
( TS ) Tebal Slab Beton = 25 cm = 0.25 m
( AH ) Air Hujan = 4 cm = 0.04 m
( TP ) Tebal Paving Block = 5 cm = 0.05 m
( PS ) Pipa Sandaran = 3 " = 0.0762 m
BERAT JENIS
Perkerasan Aspal = 2.4 t/m3 ( BJA )
Slab Beton = 2.4 t/m3 ( BJB )
Air Hujan = 1 t/m3 ( BJH )
Paving Block = 2.2 t/m3 ( BJP )
Pipa Sandaran = 7.25 t/m3 ( BJS )
DATA TROTOAR
( WT ) Lebar Trotoar = 150 cm = 1.5 m
( DT ) Tinggi Trotoar = 30 cm = 0.3 m
DATA GELAGAR
( JG ) Jumlah Gelagar = 4 buah
( WG ) Lebar Gelagar = 35 cm = 0.35 m
( DG ) Tinggi Gelagar = 110 cm = 1.1 m
PEMBEBANAN BAGIAN ATAS
A. BEBAN MATI
- Lantai Kendaraan, TS * W * L * BJB = 48 t
- Air Hujan, AH * W * L *BJH = 3.2 t
- Aspal, TA * W * L * BJA = 15.36 t
- Trotoar, 2*WT*DT*L*BJB = 21.6 t
- Pipa Sandaran, 4 * PS * L * BJS = 22.098 t
- Tiang Sandaran, L*DS*WSA*WSB*BJB = 0.24 t
- Gelagar Utama, JG*WG*DG*L*BJB = 36.96 t
+
P total = 147.458
P total 147.458
RVD = = = 73.729 t
2 2
B. BEBAN HIDUP
- Muatan Hidup, PL = 12 ton
qL = 2.4 t/m
- Lebar Lajur Lalin, = 5 m
q*L 2,4 * 5
RqL = = = 4.3636364 t
2.75 2.75
P*k*L 12*1,36*5
RPL = = = 29.752066 t
2.75 2.75
E. GAYA GEMPA
B1 B2
H1
1
2 H6
3A H7
H3 B3
B
HT C
H2
4 H8
H4 E 6 7 8 D
H5 9
O BT
B4 B5 B6
1. BADAN ABUTMENT
ΣMx 319.08
Xc = = = 5.32 m
ΣAc 60.00
ΣMy 261.42
Yc = = = 4.36 m
ΣAc 60.00
ΣMx 351.33
Xt1 = = = 7.98 m
ΣAt1 44.00
ΣMy 378.00
Yt1 = = = 8.59 m
ΣAt1 44.00
ΣMx 5.33
Xt2 = = = 1.33 m
ΣAt2 4.00
ΣMy 10.67
Yt2 = = = 2.67 m
ΣAt2 4.00
B. GAYA - GAYA YANG BEKERJA PADA ABUTMENT
B1 B2
H1
H6
H7
H3 B3
HT
H2 Pa1
H8
H4 Pa2
H5
Pp
BT
B4 B5 B6
DATA TANAH
q = 1.2
Data Tanah Di Belakang Abutment
=
Kp = 1 - sinɸ /1 + sinɸ = 1 - sin(20) /1 + sin(20) 2.04
1. Saat Normal
Rv = Rd + RL = 73.729+(4.36 + 29.75) = 107.84 t
Berat Abutment
Wc = v*ɣbeton = 60*13.5*2,4 = 1944 t
Berat Tanah di Belakang Abutment
Wt1 = v*ɣtanah = 44*13.5*1.75 = 1039.5 t
Berat Tanah di Depan Abutment
Wt1 = v*ɣtanah = 4*13.5*1,75 = 94.5 t
Gaya Akibat Rem dan Traksi
Rrt = 2 t
Gaya Tumbuk = 55 t
Gaya Gesek pada Tumpuan Bergerak
Gg = 14.75 t
2. Saat Gempa
Gaya Gempa Akibat Bangunan Atas (E1) = 14.01 t
Gaya Gempa Akibat Abutment
E2 = K * Wc = 0,19*1944 = 369.36 t
8D (qc1) + 4D (qc2)
qc ujung =
2
50 + 60
=
2
= 55 kg / cm2
Tf ujung = 1950 kg / cm
TEGANGAN TEKAN BETON YANG DIIJINKAN
ϑb = 0,33*f'c ; f'c = 25 Mpa = 250 kg/cm2
= 0,33*250 = 82.5 kg/cm2
P tiang = ϑb * Ap
= 82.5 * 3316.625
= 273621.56 kg = 273.62156 t
= 274 t
qc * Ap K * Tf
Pall = + * 70%
3 5
55 * 3316.625 204.1 * 1950
= + * 70%
3 5
= 60804.792 + 79599 * 70%
= 98282.654 kg
= 98.282654 t ~ 99 t
MENETUKAN JUMLAH TIANG
Pall = 99 t/tiang
Vu 496.00
n = = = 5.01010101 tiang
Pall 99
= 6 tiang
Satu buah jembatan memerlukan = 12 tiang
D
Ø = ATAN
S
0.65
= ATAN
1.5
= 0.41 rad
= 23.43 deg
1- Ø
E = (((n-1)*m)+((m-1)*n))/(m*n)
90
1- 23.43
= (((6-1)*7)+((7-1)*6))/(7*6)
90
= 0.567 = 1.000
Jika hasil perhitungan " TIDAK AMAN ", maka perdalam penanaman pondasi,
cek hitungan beban, perpendek jarak penanaman tiang, dan rubah dimensi tiang pancang.
HARAP DIPERHATIKAN
12345 adalah angka yang dapat diubah, apabila melakukan perubahan harap merubah angka pd rumus yg dituli
contoh,
Konstanta dapat dirubah dengan menyesuaikan dengan peraturan yang ada dalam PPPJJR