SYEDAH MULTI TRADING (CA0194773-T)

SCAFFOLDING INSPECTION REPORT

TYPE OF WEEKLY MONTHLY UNSCHEDULED / INITIAL


INSPECTION

SCAFFOLDING DETAILS
TYPE OF SCAFFOLDING

LOCATION

PURPOSE OF SCAFFOLDING

USER

DATE OF ERECTION

INSPECTION DETAILS
INSPECTED

DESIGNATION

COMPANY

JKKP REG. NUMBER VALIDITY

DATE OF LAST
DATE OF INSPECTION INSPECTION

VERIFY BY
NAME

DESIGNATION

COMPANY

REQUIRED DOCUMENTS

Valid Scaffolding Competent Person

Design by Professional Engineer (PE Design)

Design & Calculation Of Base Plate & Bracket

Other (Please
Specify)

PAGE 1 OF 3
SYEDAH MULTI TRADING (CA0194773-T)
SCAFFOLDING INSPECTION REPORT

NO INSPECTION ITEMS YES NO REMARKS

1.0 SCAFFOLD DESIGN APPROVAL

1.1 Design approval by competent person / PE

1.2 Construction according to design / plan

2.0 FOUNDATION

2.1 Foundation firm and well supported

2.2 No eminent soil erosion / excavation affecting foundation

3.0 SOLE PLATES / BASE PLATES / U - HEADS

3.1 Properly installed and secured to ensure firmness

3.2 Installation on correct height

4.0 SCAFFOLD COMPONENTS / FITTINGS

4.1 No severe damage / bent, corrosion, deterioration

4.2 Secured rigidly and firmly in position

5.0 COMPONENTS ALIGNMENT

5.1 Verticality of standards and frames / slightly inclined inwards

5.2 Horizontality of ledgers and transoms

5.3 Spacing between wall and scaffold less than 200mm

6.0 CONNECTIONS OF COMPONENTS

6.1 Joint pins / sleeves used for connections

6.2 Cross bracing / arm locks installed

6.3 Horizontal bracing at every five (5) lifts of frame

7.0 TIE BACKS / FOOT TIES

7.1 At every two (2) lifts of every floor starting from base and three (3)
bays or 7.5m apart which ever lesser

7.2 Effective temporary ties at top most working level

7.3 Foot ties fitted to both inner and outer standards

PAGE 2 OF 3
SYEDAH MULTI TRADING (CA0194773-T)
SCAFFOLDING INSPECTION REPORT

NO INSPECTION ITEMS YES NO REMARKS

8.0 WORKING PLATFORM

8.1 Provided with guard rails / toe boards

8.2 Planks (200mm x 38mm) laid closely full length / secured

9.0 SCAFFOLD ERECTION / ACCESS WALKWAY

9.1 Scaffold erected one lift above working level / access

9.2 Catwalks / planks closely installed and secured

9.3 Barricades / guard rails installed on open side

10.0 STAIRCASES

10.1 Securely attached. Max 3 lifts with resting platform landing

10.2 Guard rails installed

11.0 TEMPORARY STRUCTURE

11.1 Must not be connected to temporary structure

12.0 HOUSEKEEPING

12.1 Cleanliness, free of obstruction on access, platform, stairs, etc

13.0 DEBRIS NETS

13.1 Installed as necessary to prevent falling debris / objects / enviro

14.0 SAFETY FACILITIES / SIGNAGE'S

14.1 Overhead protection for access / walkway below structure

14.2 Safety signage's / warning notices

14.3 Scaffold inspection tag

15.0 OVERALL COMMENT

PAGE 3 OF 3