The Smart Ceiling system


A Sustainable solution Innovation and Simplicity We use the Laws of Nature

* Burj Khalifa today. * Burj Khalifa with * Burj Khalifa with


Tallest building in the world. ”Smart Ceiling”. ”Smart Ceiling”.
828 meters, 740 meters, 828 meters,
165 Floors, 165 Floors, approximately 181 Floors,
330,000 m2 330,000 m2 approximately 362,000 m2

* See explanation on page 3


About JS Koncept A/S - JS Ventilation A/S
JS Koncept A/S, which was founded in 2017 to export innovative products, is 100% owned by JS Ventilation A/S.
Save 10%
In 1984, JS Ventilation A/S established and managed to manifest itself in the Danish ventilation branch as a on storey height
company, who found unique and unconventional solutions to any ventilation ­challenge. But unique solu-
tions require unique components. Therefore, JS Ventilation A/S ­established its own workshop and electrical
department that could produce the components, which were missing in the market in specialty solutions Minimize:
and controls. The company and ­employees have thus accumulated rich professional specialist knowledge
that works. Investment

The Smart Ceiling system - Innovation and simplicity - We use the laws of nature Energy consumption
"Smart Ceiling" is the fruit of skill and hard work. The solution is greeted by a hands-on approach combined Maintenance
with an innovative approach to solving often complicated challenges. With the use of natural laws and
smart design, JS Ventilation A/S has invented a combined cooling Ceiling and ventilation solution, which can Operating costs
reduce the floor height and provide space for multiple floors at high build height. This means: no ducts,
design freedom, shorter construction time, no maintenance, and it contributes to lower energy consumption.
"Smart Ceiling" is therefore a sustainable solution that can handle large refrigeration needs without conden-
sation and draught genes and meets the requirements for indoor climate category A. "Smart Ceiling" is Traditional
patented and developed in close cooperation with and tested by the Danish Technological Institute. The Smart ceilings
Ceiling system
600 – 900 mm
Export 300 mm is enough
In Denmark, the "Smart Ceiling" solution is being spread rapidly, and therefore JS Ventilation A/S
­established on 1 July 2017 the subsidiary JS Koncept A/S for export. Preliminary has created contacts
and cooperate in Germany, Austria and Norway and now started up Dubai.

The Madison Group, U.A.E.


The Madison Group focuses on consulting, selling and marketing of innovative products with an eye for
sustainability and green solutions. The company was founded in 2008, is owned by Jan Bak and is licensed
to Trade products, as well as providing Consultancy Management, including Real Estate Consultancy and * Explanation of the front page
Constructional Projects Management work in U.A.E (United Arab Emirates). Burj Khalifa is stated as 828 meters in height over
Segments:
165 floors and hosting 330,000sqm, hence if we • Offices • Concert halls
Regional key projects assume approximately 800 mm on average used on
• Industry • Auditoriums
As Adapa.dk Board member and Regional Commercial Consultant, The Madison Group FZE supported the each floor between floor separation and false ceiling,
sale of 80 Adapa Flexible Mould machines to Limak under the Kuwait International Airport Terminal II using the “Smart Ceiling” 300 mm solution could have • Housing • Schools
project. Another undertaking was providing CCI patented Z100 and Z200 sheet piles to Nakheel for secured the following options: 828 meters in height
• Hospitals • Kindergartens
­extensive use on the Palm Jumeirah, Dubai, UAE. Six pairs of parallel and continuous FRP sheet pile but achieving 81 floors and hosting 362,000sqm or,
walls, totalling over 4km in length, were installed on the fronds of the Jumeirah Pointe project to provide • Laboratories • Sports halls
beach stabilization and support a change in level from the beach to the gardens of the private villas. Reducing the height to 740 meters over same 165 • Pharmaceutical • Industrial
floors and delivering same 330,000sqm space. Industry kitchens
The Madison Group approached JS Koncept A/S and have concluded a cooperation agreement and a
­strategic partnership executing the marketing and sale of "Smart Ceiling", cool- and ventilation solution The last would not have happened as it was also
to customers in U.A.E., Saudi Arabia, Kuwait, Qatar, Oman and Bahrain. driven by an ambition to secure the highest building
in the world.

2 3
Smart Ceiling Smart Ceiling
Example for office 10 – 1000 m2 with Fan Coil(s)
Normally to high cooling load Example for office 10 – 1000 m2
Normally to very high cooling load

Conditions Benefits Conditions


Room with heating load from persons, lighting, • Ventilation, cooling and heating in the same Main ventilation system with low air • Exhaust diffusers can be placed in the ceil-
IT (machinery), heat transmission through the installation. volume (only for air change). ing, in the wall or were its best for the design
building and solar irradiance through the of the room.
• No Ducts. Room with heating load from persons, lighting,
windows. IT (machinery), heat transmission through the
• Low differential pressure (Energy saving).
building and solar irradiance through the Benefits
Solution • Reduced floor height (gross). windows. • Ventilation, cooling and heating in the same
- 300 mm above ceiling.
Smart Ceiling controlled ventilation, cooling installation.
and heating. Control of the air volume • Cover large cooling needs up to 67W/m2 in Solution • No Ducts.
(VAV-Damper) according to whether there are Indoor Climate Cat. A and 100W/m2 in Cat. B.
Smart Ceiling controlled ventilation, cooling
persons in the room, temperature and/or CO2 • Smaller main ventilation system (Lower
• No Draught and heating. Supplied with Fan Coil(s) for high
load. building cost. Energy saving)
• Variable airflow 25-100%. cooling capacity. Control of the air volume
(VAV-Damper) and Fan Coil(s) speed according • Low differential pressure (Energy saving).
Components • Flexible ceiling solutions.
to whether there are persons in the room, • Reduced floor height (gross).
• Air inlet from the main ventilation system • Short construction period. temperature and/or CO2 load. - 300 mm above ceiling.
over the ceiling (no ducts). • Design, calculation and documentation. • Cover large cooling needs up to 67W/m2 in
• VAV-Damper.
Components Indoor Climate Cat. A and 100W/m2 in Cat. B.
• Air inlet from the main ventilation system • No Draught
• Smart Ceiling (Metal Ceiling).
over the ceiling (no ducts).
• Inlet diffusers mounted in the Ceiling. • Variable airflow 25-100%.
• VAV-Damper.
• Exhaust diffusers can be placed in the ceil- • Flexible ceiling solutions.
• Smart Ceiling (Metal Ceiling).
ing, in the wall or were its best for the design • Short construction period.
of the room. • Inlet diffusers mounted in the Ceiling.
• Design, calculation and documentation.
• Fan Coil(s)

VAV T ≤ 160C VAV T ≤ 160C

T ≥130C T ≥130C
300 mm

300 mm
T ≥ 130C T ≥ 130C T ≥ 130C T ≥ 130C

Radiant cooling Air cooling Air cooling Radiant cooling Radiant cooling Air cooling Air cooling Radiant cooling

Fan coil

4 5
Smart Ceiling with Hybrid solution
Example for office 10 – 1000 m2
Normally to very high cooling load

Conditions
low outdoor temperature in a part of the year • Inlet diffusers mounted in the Ceiling.
or at night for night cooling.
• Exhaust diffusers can be placed in the
Room with heating load from persons, lighting, ceiling, in the wall or were its best for the
IT (machinery), heat transmission through the design of the room.
building and solar irradiance through the
windows. Benefits
• Ventilation, cooling and heating in the same
Solution installation.
Smart Ceiling controlled ventilation, cooling
• No Ducts.
and heating supplied with Hybrid for direct
cooling and using low outside temperature. • Closing the inlet damper or halting the fan
The damper for the inlet air is closing (or the (Energy saving)
fan can be halted), when the Hybrid damper • Low differential pressure (Energy saving).
opens. Control of the air volume (VAV-Damper
• Reduced floor height (gross).
and Hybrid Damper) according to the tempera-
- 300 mm above ceiling.
ture and/or the CO2 load.
• Cover large cooling needs up to 67W/m2 in
Indoor Climate Cat. A and 100W/m2 in Cat. B.
Components
• No Draught
• Air inlet from the main ventilation system
over the ceiling (no ducts). • Variable airflow 25-100%.

• VAV-Damper. • Flexible ceiling solutions.

• Hybrid inlet with damper. • Short construction period.

• Smart Ceiling (Metal Ceiling). • Design, calculation and documentation.

VAV T ≤ 160C

T ≥130C Hybrid
300 mm

Damper
outside air

T ≥ 130C T ≥ 130C

Radiant cooling Air cooling Air cooling Radiant cooling

6 7
16. September 2015 Room and ceiling
The room had very recently been renovated and a new and airtight ceiling from Cool Ceiling A/S
installed. H14 filters had also been installed after the air injection system. The ceiling air handling
space had not been cleaned especially, treated with a dust control system or anything of that
nature after the renovation work had been completed, so there was a certain level of particles
present on the surfaces in the air handling space above the ceiling.

Filters
Nilan ventilation system type VPM 120 with built-in prefilter. After the system is a Camfil FCBS-A
filter cabinet, with a built in Camfil Absolut-V H14 Hepa Filter VEXL 14 610X610X292-M.

A 250 mm duct is running from the filter cabinet to the air handling space above the dropped
ceiling in the intensive care ward, and this duct ends with a silencer. The air extracted from the
intensive care ward, exited through two 250 mm air outlets in the ceiling, with a duct running from

“Loose particles” Test in the new each outlet ending in one 250 mm duct that runs directly back to the Nilan system.

mockup at OUH-intensive care ward


The ceiling is a Cool Ceiling climate ceiling, and it´s featured with four 160 mm integrated air
injection units that is not connected by ducts.
During the testing, there was quite a bit of construction work going on in connection with moving
Hypothesis the walls for the mock-up. For this reason, there was a great deal of dust in the area, which affect-
Thesis: “Loose" particles in the air handling space above the ceiling, will be out of the ventilation ed the test measurements in the intensive care ward. However, measurements taken from the air
system within a short period of time, after which time the air handling space above the ceiling will inflows in the ceiling, show that there were absolutely no particles in the pressure chamber above
no longer contaminate the air being injected into the room. the dropped ceiling or in the injection air.

Discussion Particle size Measurement areas


In the duct after
When there is a varying volume of airflow and possible mechanical effects on parts of the air the H14 Hepa filter
In the air inflow unit Intensive care ward Hall near entrance
handling space above the ceiling, is it probable that there would be a short-term effect of particles
0.3 - 0.5 µm 0 0 2,210,161 8,723,172
being released into the injected ventilation air?
0.5 - 1.0 µm 0 0 113,523 336,450
When the air handling space above the ceiling is used as part of the ventilation system for clean- 1.0 - 3.0 µm 0 0 60,309 147,196
rooms, shouldn’t the surfaces in the air handling space be cleaned of dust before closing off the 3.0 - 5.0 µm 0 0 0 10,514
system? Would this not reduce the risk of a short-term particle load to a negligible level? 5.0 - 10.0 µm 0 0 0 3,504

>10.0 µm 0 0 0 0
Conclusion
The figures indicate the number of particles per cubic metre.
The testing showed that the air handling space does not contribute to any contamination of the
ventilation air, when the air handling space is used as a pressure chamber. This is documented in Particle levels were measured in the hall at the entrance, to serve as a reference.
the figure below.

Measuring instrument
Testing in the new mockup at OUH-intensive care ward
The particle-level testing was performed using an Aerotrak 8220 particle counter, serial number
The testing was performed on Tuesday, 15 September 2015, with measurements taken in and 70 910 218.
outside the intensive care ward, an area of about 25 m² with a ventilation rate of approximately
800 m³/h.

8 9
”Smart Ceiling” causes no draught or condensation problems and produces 67 Watt/m2 in indoor
Sustainability climate category A and more than 100 Watt/m2 in indoor climate category B.
JS Koncept’s calculation programme, developed by Teknologisk Institut, makes a complete and
Where can “Smart Ceiling accurate calculation of air and temperature. This calculation is made for all rooms and equals as
documentation for the system. With this documentation it is only necessary with regulation for
­contribute” to sustainability: the room and not for every inlet diffuser.

Integrated Design Process: Indoor Air Quality (Knockout-criteria, where a minimum score is needed):

Relevant qualifications and subject areas are included in The purpose is to secure the users’ comfort and health.
the planning process. Especially schools and child care centers are important. Gradually, it is well- documented that
If guidance of ”Smart Ceiling” is included early in the children are particularly sensitive to the innumerable impact of the indoor climate and that it may
design process, it may be possible to build lower or more affect students' well-being and, in particular, learning; if the indoor climate in the classroom is not
floors. Ventilation systems can be minimised and reduce good enough.
installation costs. This can be avoided by not having too high concentrations of harmful substances and obnoxious
smells.
 ife Cycle Assessment (LCA)
L
– Primary Energy ”The Experienced” ”The Healthy”
Air Quality can
3 Resource Indicators:
be divided into 2: • too low humidity • degassing from material
• consumption of non-renewable energy
• smell • degassing from people
”The Experienced”
• consumption of primary energy
and ”The Healthy” • too high/low temperature • particles by burning
• share of renewable primary energy
• draught • moisture build-up
With ”Smart Ceiling” ventilations systems should only be
• radon
dimensioned according to volume of fresh air, as energy
can be added via fan coils. Less volume of air results in a
smaller duct system and lower energy consumption. Indicators
”Smart Ceiling” has lower pressure drop, which also • CO2 concentration below 1000 ppm
provides less energy consumption.
• measuring of volatile organic compound (VOC). TVOC-concentration below 3000 µg/m3

Thermic Comfort: • formaldehyde concentration below 100 µg/m3

Users' satisfaction with the indoor climate; no excess All components of the metal ceiling are free from formaldehyde and are therefore assigned to
temperature, draught or cold radiation. Class E1.

Indicators: The manufacturer declares that no substances were used for manufacturing metal ceilings, which
cause hazardous emissions, thus no initial test is required. Furthermore, sub-structure com­
• operative temperature Summer and Winter
ponents and covering layers were tested for compliance with the reference values for volatile
• humidity Summer and Winter organic compounds (VOC) according to the assessment system of the German Committee for
• draught Summer and Winter Health-Related Evaluation of Building Products (AgBB).

• radiation- and floor temperature Summer and Winter ”Smart Ceiling” is not a part of the problem, but part of the solution because the system supplies
fresh air.

10 11
Users’ possibility for controlling the indoor climate:
Focus on the fact that users, to a great extent, can control ventilation, solar radiation and glare
shielding, temperature and lighting.
”Smart Ceiling” is controllable through CO2 and temperature of plain operation.

Fire Proofing and Safety:


Compliance of current fire regulations.
“Smart Ceiling” complies with the current fire regulations with a fire damper for each room like all
other ventilation systems.
The fire classification was verified in accordance with EN 13501-1 and certified by classification
reports from „MPA Stuttgart” (Notified Body No. 0672).

Acoustics and Soundproofing:


To be evaluated from e.g. reverberation time in primary room.
”Smart Ceiling” is the markets’ best metal ceiling
Class B (alpha) w = 0.80
Further acoustics muffling can be mounted over the ceiling. 50% covering is tested by TI.

Maintenance and cleaning-friendliness of buildings:


To be evaluated from e.g. maintenance grade and cleaning-friendliness.
”Smart Ceiling” consists of no movable parts and needs no maintenance. The system has smooth
surfaces and is very cleaning-friendly; with either a vacuum cleaner or a dry or damp cloth. In
kitchens, laboratories etc. where standards may be higher, surfaces without perforation should be
used.

Suitability as regards dismounting and reusability:


To be evaluated from whether the material can be split up and sorted as regards reusability.
All ”Smart Ceiling” parts can be split up and reused.

12 13
!ŁŢŹŢƁŗŞŁŢŗŞƼɈ ȊɌȏž ȍ Dĕſ

Design, calculation and documentation


ȍȐȆ!

In cooperation with the Danish Technological Institute we have developed a calculation program,
that can make an exact calculation of each room. We calculate the air volume, the cooling needs
and the noise level. We will work closely together with you and your architects and engineers to
ŠƩŠſȁƉǛ ŠƩŠſȁƉǛ

Ȏȋȋƀƀ
meet your requirements and give you a good-looking design of the Ceiling and the indoor climate 4 ȌȐȆ!

Ȏȋȋƀƀ
5
2
you want.
1
3 ȌȓɏȐȆ! !ĿŠŷŠſŕ ȍȋɏȏȆ! ȌȓɏȐȆ!
ŠƩƉǀƺȁƉǛ
žǀſ
ȌȐȋȋÉ ¨ƩĕſưžŠưưŠƉſ
ȍȍɏȌȆ!
Calculation Program ȑȋȋÉ
ȐȋȋÉ
ȍȋȋȋÉ ȋÉ

Case reference: Test facility 01


Test customer 01
Test street 01
Test city !ŁŢŹŢƁŗ—ėĺŢėƼŢǜŁĴƋƋŹŢƁŗɈȏɌȊÉɒžȊ ŢƫĴƋƋŹŢƁŗɈȌȈÉɒžȊ DŹƋƋƫėƫŁėɈȉȉȌžȊ !ŁŢŹŢƁŗŞŁŢŗŞƼɈȊɌȏž

Phone E-Mail Reference number


1 lĿƺĕŷIJĿŠŷŠſŕ 2 ŠƩŠſȁƉǛǀſŠƺ 3 !ƉƉŷĕŠƩ 4 LƉŷŷƉǛưƦĕIJĿɒ”ƩĿưưǀƩĿIJŜĕžıĿƩ 5 Dĕſ!ƉŠŷɠwƦƺŠƉſĕŷɡ

Smart Ceiling
Input

Load W/m3 I alt W

Sun 1500 W Ceiling height 2,7 m Total load 40,40 4600

Lighting 600 W Floor area 114 m2 Transmission 0 0

PC machines 2000 W Outdoor temperature 25 C


0
building Density 0,2 0,2

Persons 500 W Indoor temperature 23 0C Heating Load 40,6 4028

Inlet air diffuser 15 0C

Air volume 1846,8 m3/h

Area U-value Temp. Calculation Result

Outer walls Air exchange (times per hour) 6

Inside walls Inlet air temperature 18,5 0C

Windows/doors Operating temperature 22,1 0C

Floor/deck Ceiling Temperature 20,4 0C

Cooling Total 47,2 W/m3

14 15
Sound effect
Exsample Inlet Diffuser Ø200 35

30 37,1 dB(A)

Inlet Diffuser Ø200 25


14

Δpt[Pa]
45
20
29,3 dB(A)
40
12
y = 0.0219x 15
35
26,2 dB(A)
10
10
30

Throw [m/s]
8
Δpt[Pa]

25 5 25,2 dB(A)*

20 6 25,2 dB(A)*
0
y = 0.0001x + 0.0011x
2
0 100 200 300 400 500 600
15
4
Flow [m3/h]
10
2 Sound effect
5
Working Area
0 0 50
0 100 200 300 400 500 600
45 Sound effect niveau Ø200
Flow [m3/h]
40
Throw

Sound power level A dB [re1pW]


Pressure difference 35

30

25
Ø200
20

15

10

0
63 125 250 500 1000 2000 4000 8000 16000

Frequency 1/3-octave [Hz]

100 m3/h 323 m3/h 500 m3/h


Ø340
202 m3/h 390 m3/h background 1

16 17
Diffuser Data sheet
Newly developed inlet air diffuser Integrated in the ceiling.
KQK Square tiles - clip-in system
Ø200 1.1.02 Druck

Standard design with cross rail at the same level (50 pascal)

5
Ø340
7
4

Design Freedom
8

2
1
5.5 .5
ø2
5.5

Standard components required:


m2 Quantity / m2

Designation 750 625 600

1 Ceiling tile 1,78 2,56 2,78 units

2 Clipping rail 16/38 1,33 1,60 1,67 lin. ft.

3 Main runner connector 0,33 0,40 0,42 units


Format up to Colors Perforation
4 Lower nonius 0,89 1,07 1,11 units
625x3000 mm. 5 Securing pin 1,78 2,14 2,22 units

6 Upper nonius 0,89 1,07 1,11 units

7 T-connector 3,56 5,12 5,56 units

8 Clipping rail 1,33 1,60 1,67 lin. ft.

18 19
Contact us if you are considering an ­innovative
and ­sustainable ventilation solution for new
­construction or retrofitting of existing ­buildings.
We design, ­calculate and solve the task in close
cooperation with your ­architects and engineers.

As soon as we heard about "Smart Ceiling" and its "Smart Ceiling" is developed in Denmark where the
references, we thought the product suited the UAE high cooling range can only be utilized for a few
fantastic and we wanted The Madison Group to be a part periods a year. That's why we immediately agreed
of it. Therefore, we approached JS Koncept A/S and are with The Madison Group when they offered us the
now looking forward to being partners in a cooperation opportunity to collaborate on marketing and selling
agreement in the sale of "Smart Ceiling". our product in the UAE, where the climate fits better to
take advantage of all the benefits of Smart Ceiling.

Jan Bak Jørgen Stokbro


CEO & Owner
xxx
PO Box 476242, Dubai, UAE
Tel :+971 (0)4 441 5789 Telefon: +45 43 42 20 10
Fax: +971 (0)4 441 5796 Mobil: +45 26 12 26 18
Mob: +971 (50) 4523128 Fax: +45 43 42 71 12
e-mail : jan@themadison-group.com Email: jostok@jskoncept.com
www.themadison-group.com Homepage: www.jskoncept.com

S-ar putea să vă placă și