Subsea construction
Egypt - Norway Technology Days
February 12-13, 2017 - Cairo

Bjørn Kahrs – Business Development

Maersk Connector Edda Freya


Confidential – Not for Public Dissemination

The DeepOcean Locations and Operations

Rem Forza Deep Vision Volantis

www.deepoceangroup.com

Havila Phoenix Rem Ocean Edda Flora Edda Fauna


www.deepoceangroup.com 2
Service lines

Inspection, Renewable Subsea


Survey and
Maintenance Engineering Installation
Seabed Trenching Offshore Decommissioning
and Repair and Studies
Mapping wind SURF
(IMR)

DeepOcean is Survey, inspect Leading provider Engineering ROV based


Renewable Subsea Umbilical,
one of the largest and map terrain of subsea subsea
and study offshore wind Risers and
subsea IMR prior to the trenching and decommissioning
capacity and cable lay Flowlines -
service provider installation of protection services Subsea
in the Greater new subsea
Construction
North Sea systems • EPRD
 More than 120  Power Cables • Main and sub-
 SURF
 More than 90  Global leader and contractor on
 More than 1200 engineers in  Power Cables
000 km  Largest portfolio of Haugesund, Umbilicals subsea
vessel days per and Umbilicals
pipeline seventeen Stavanger,  Shore-to decomm.
year  Structures
surveyed trenching assets Darlington and shore projects
 500 call-offs
 Water depth  30 000 km of Aberdeen  Module
per year  Shore-to
to 2100 m product installed  offshore replacement
 Long term 40 Survey
 ROV, AUV,  Fleet of 16 engineers  Life of Field
service  Inter-
and vessel trenching assets:  connector Seismic cables
contracts Engineering
based  5 x Jet Trenching Agreements  6 owned vessel
 Extended IMR
 PRM ROVs  10 long term
scopes
capability  2 x Mechanical charter vessels
 Frame
 38 Work and Tractors
Agreements
obs ROV’s  Cable Ploughs
with oil&gas
majors  1 ROTV

www.deepoceangroup.com 3
Experienced Engineering Teams

Dedicated in-house engineering teams focused on providing engineering and design support for the planning and execution
of installation projects, also including FEED, etc:
• Front end engineering and design studies
• Installation analysis and calculations
• Seabed and soil geo-analysis
• Route designs and optimisation
• Cable design and manufacturing support
• Vessel and equipment layout planning
• Design and manufacturing support for installation
• equipment & subsea equipment

In the delivery of the above services, Engineers use a wealth


of advanced software in-house including:
• Finite Element Analysis (FEA
• Dynamic/Installation Analysis (Orcaflex)
• Makai Submarine Cable Software
Orcaflex pull-in analysis
Submarine Power Cable Credentials
Close to
More than 8 000 100 000km of
1400 km 2250 3m IMR vessel days subsea product
800km 0-2000m year in Greater surveyed in
Installed km Trenched Trench Depths
Installed Water Depths North Sea water depths to
By 2019 By 2019
2100m

Skaggerak4 Interconnector
Global Tech 1 OWF
Pre-cut trenching
Array cable trenching
Western HVDC Link
Interconnector burial DolWin Beta Platform
Gode Wind
Robin Rigg OWF Walk-to-Work
Walk-to-Work
Array cable installation
DolWin Alpha Platform
Walney Ormonde OWF Export cable repair
Hornsea 1 OWF
Export cable burial Array cable installation
DolWin 1 Platform
Walney Extension OWF Export cable burial
Export cable installation
Alpha Ventus OWF
Race Bank OWF Array cable repair
Array cable installation Export cable burial
Export cable burial
Egmond Aan Zee OWF
Sheringham Shoal OWF Export cable repair
Walk-to-Work

East Anglia One Bligh Bank OWF


Export cable installation Array cable installation
Wave Hub
Subsea hub & export cable Greater Gabbard OWF Nemo HVDC Link
installation Export cable installation Interconnector installation
CABLE LAY VESSEL - MAERSK CONNECTOR

Next Generation

• LENGTH 138M X 27.5M BEAM


• 7000TE CAROUSEL - CABLE HANDLING EQUIPMENT
• DP2 AND 7 POINT MOORING – CAPABLE OF GROUNDING FULLY LOADED
• 2200M2 DECK AREA, 9200TE DECK LOAD, 20TE/M² DECK STRENGTH
• PCP POWER CABLE PLOUGH - 125HP WORK CLASS ROV
• 60TE A-FRAME & 50TE AHC SUBSEA CRANE
• Can “park” on seabed during landfall pull-in

6
Deepwater X-tree installation
Client: Tullow Ghana Ltd.
Location: Offshore Ghana, Jubilee and TEN field

Year: 2013-2016

W.Depth: 1000-1500 mtr

Product: X-mast trees 50-60T/air, 4m x 4,5m x 3,7m

Scope: Provide rigging, engineer lift plans, offshore operations,


load out, ship-to-ship, Commissioning and project management.

Vessel: Rem Forza, Dina Star

Assets: Constructor and Supporter WROV

• Installed more than 10 trees, both Injection trees and production


trees.

• Require high degree of co-ordination by both marine and


construction crew..
Ghana SURF and IMR
2013 - 2016
Flexible riser lay down and abandonment
Client: Tullow Ghana Ltd.

Location: Offshore Ghana, Jubilee and TEN field

Year: 2015

W.Depth: 1000 mtr

Product: Flexible riser, OD: 379mm, approx 150T tension


in crane wire

Scope: Execute offshore operations, lay down, cutting


and abandonment, project management.

Vessel: Rem Forza

Assets: 2 x Supporter 3000 WROV

• Requires skilled ROV crew

• Critical production still on line on FPSO

• Working in close proximity of turret


Riser work – Kristin
 Replacement of 10 inch P-101
production riser
 Replacement of DEH riser, OD 199
/ 218 mm
 Installation of Umbilical Riser, OD
245 mm
 Pliant wave configuration

15.02.2017 Not for Public Distribution 10


IMR Frame Contracts

www.deepoceangroup.com 11
Diverless ACFM inspection
ACFM = Alternating Current Field Measurement Inspection
Innovation

https://www.youtube.com/watch?v=1ndeC1Ky90M#t=37.6958111
Pipeline
Visual mode - 615 km 3.1 km/h (0,85 m/s)
Acoustic mode - 1900 km 5.3 km/h (1.50 m/s)
(Several sections of 7.5 km/h ( 2.0 m/s) ~50km)
Route Survey
Pipeline Route - 285km 4.4 km/h (1.2 m/s)
Average 17km long lines - Max speed 5.25 km/h
Clients saving 1,5 day per every 15 days campaign
www.deepoceangroup.com 13
Trenching and Ploughing

World leader 2 AMP500


14 different trenches and ploughs

The UT-1 is the world’s most powerful


jetting ROV with 2.1MW of total power

https://www.youtube.com/watch?v=00BInc
https://deepoceangroup.com/assets/trenchers-ploughs/
Design, Fabrication and Operation – Subsea innovation
Clamp Handling Frame, Machining Unit and ROV Extension Arms

• Complex IMR-project performed for Statoil in 2015


• Subsea machining (milling & cutting)
• Innovative solutions developed, to avoid taking the Snorre-platform to shore
Running Tool for Choke and SM Replacement

• Cost efficient and reliable


• 12 weeks lead time
• MNOK 4,4
Innovation – Bolt tie-in tool
Remote bolt Tie-in tool (Innovation by 4C Solution)

• System has been used at the Norne location – 380 meter water depth
• Replace divers and large and heavy tie-in tools like “Big Brother” etc.
• Half tie-in time at large bore compared to divers tie-in or other remote tools.
• Can be re-used for same pipe OD
• H-frame or similar alignment tool
Innovation – Bolt tie-in tool
Innovation – Bolt tie-in tool

• Pre-installed torque
tool
• Bolt initiation at swivel
flange (one end)
High ambitions – Deep knowledge
www.deepoceangroup.com

S-ar putea să vă placă și