Sunteți pe pagina 1din 1
SH OPTIBUILD Synergy of Quality Cost Eciency oO SNM] PROJECT ; SEISMIC EVALUATION AND RETROFIT DESIGN ASSESMENT OF AN EX STEEL BUILDING FOR THE CHANGE OF OCCUPANCY FROM BADMINTON COURT OFFICE BUILDING. SUBJECT : SEISMIC EVALUATION WORK FLOW N.0 Basic Informaon 1. Collect Basic Seismic Data ang. Distance ot Fault Basic Project Informaon _f? Type of Occupancy and target Level af Porformance 3 Age of Building and Overall Condion y 2. Conduct Site Invesgaon 2.1 Indenfy Basie Structural System 2.1.1 Type of Lateral Resisng Frame . 2.1.2 Locaon of Lateral Resisng Frame 2.Site Inspecon & Collect 2.1.3 All Moment or with Brace/Shear wall! Actual Building Informaon | 2.2 Complete Structural & Foundaon Checklist | 2.3 Complete basic Non-Structural Chect i? 2.4 Gather Informaon for Creaon of Basic As-Built Plans 3. Create As-Built Plans 3.1 Craate Locaon Map and Bullding Key Pl: 3.2 Column Lacaan & Orlentaan 3. Create Basic As-Built-Plan 3.3 Floor Framing Plan 3.4 Floor Diaphragm and Floar Opening 5 Frame Clevaon (Each Grid) 3.6 Wall, Floor, Coiling & Roof Material & Finishes 3.7 |denfy Heavy Equipment (More than Live Loac 4, Tesng of Materials and Soil Invesgaan 4.1 Determine Main Frame Materials, 4.1.1 Tensile Strength of Stee! 4.2 Determine Foundaon Materials snd Details, 12:1 concrete Strength (Corngand Tesng) 4.1.2 Pedestal Dimensions 4.1.3 Anchor Bolt ancl Rebar Detall 4.1.4 Foang Size, Depth, Thickness 4.1.5 Foang Rebar Details 4.3 Determine Diaphragm Materials and Details 4.3.1 Floor Slab Thickness 4.3.2 Metal Deck Informaon 4.3.3 Coring and Tesng 4.3.4 Floor Slab Rebar Details 4.4 Determine Connecon Details 4.4.1 Type of Weld and Weld Thickness 4.4.2 Column Splices / Beam Splices 4.4.3 Shear Studs Size and layout Prepared by : Dante vari Page 1 Checked by : Francis Quile: SH OPTIBUILD Synergy of Quality Cost Eclency oO w PROJECT : SEISMIC EVALUATION AND RETROFIT DESIGN ASSESMENT OF AN EX STEEL BUILDING FOR THE CHANGE OF OCCUPANCY FROM BADMINTON COURT OFFICE BUILDING, SUBJECT : SEISMIC EVALUATION WORK FLOW .0 Basic Infarmaon 4 5. Create Detailed As-Built Plans 5.1 Anchor bolt Plan and Details (Embedment De} 5.2 Column Base Plate Details 5.3 Beam To Column Connecan Deta 5.4 Beam to Beam Connecan Details 5.5 Column Splice Detalls, 5.6 Foundaon Plan 5.7 Foong Details 5.8 Exisng Cracks and Defects of Welds 5.9 Material deterioraon (Steel Corrasion) 5.10 Other Building Defects 5. Creaon of Detailed As- Built Drawings & Addional Site Inspecon (If Needed) 6. Perform Sek Analysis & Design Invesgaon 6.1, Develop Analycal Computer Model 6. Perform Seismic Analysi 6.2 Input of Loadings(Exisng and Future) : = G é

S-ar putea să vă placă și