Digitized switchboards
Blokset design and assembly guide
Measure
Connect
Save
Tested
Validated
Documented
Architectures
Dear customer,
Here is the new edition of Smart Panels switchboard assembly and installation guide.
In addtion to the guide showing how to assemble Smart Panels using Prisma, this
one explains and demonstrate how to make high power Smart Panels using Blokset.
Smart Panels make live in the same switchboard components of power and
communication with their own circuits.
It is essential to comply with installation and implementation best practices, to avoid
any risk of shut-down or malfunction due to insufficient distances between devices,
temperature rise or electromagnetic compatibility, for example.
It is intended for use by panelbuilders in the factory and on-site and also by design
engineers to integrate design rules, in compliance with IEC standards 61439-1&2.
These rules are essential because the digital architecture must be defined very early
in the design phase.
After a short review of basic rules, the guide develops more particularly the
"Auxiliary and low-power circuits" chapter.
Structured according to the logical procedure for switchboard building up to the test
conducted before shipping, it includes Quality control check list at the end of each
chapter, as well as a model form "Routine verification – testing report".
Introduction
Grouping most of the electrical protection, command and metering components,
the switchboards are now significant sources of data locally displayed and sent via
digital networks.
Smart Panels use reliable, simple to install and use displays, and Ethernet and
Modbus interfaces on the Enerlin'X communication system.
Information is safely transmitted through the most efficient networks, to monitoring
and control systems or on-line energy management services.
00-DESW060EN_presentation 1
Presentation Smart Panels switchboards
with Blokset
2 00-DESW060EN_presentation
I/O application module
The I/O (Input/Output) application module for LV
breaker is part of an ULP system with built-in
functionalities and applications to enhance the
application needs.
The ULP system architecture can be built without
any restrictions using the wide range of circuit
breakers.
The I/O application module is compliant with the
ULP system specifications.
Two I/O application modules can be connected in
the same ULP network.
The ranges of LV circuit breakers enhanced
by the I/O application module are:
b Masterpact NW/Easypact MVS
b Masterpact NT
b Compact NS 1600b-3200 and NS630b-1600
b Compact NSX100-630/ Easypact CVS100-630.
24 V DC power supply
An external 24 V DC power supply is required for
installations with communication,
whatever the type of trip unit.
A single external 24 V DC supply may be used for
the entire switchboard.
The required characteristics are:
b output voltage: 24 V DC ±5 %
b ripple: ±1 %.
b overvoltage category: OVC IV -
as per IEC 60947-1.
Ethernet switch
Ethernet switch, 5 copper ports
Communication port protocol: Ethernet TCP/IP
Ethernet port: 10BASE-T/100BASE-TX - 5 ports
copper cables
Max number of cascading switches: unlimited.
00-DESW060EN_presentation 3
How to assemble Contents
a digitized switchboard
Assembly of enclosures p. 8 1
Power busbar p. 14 2
Power connections p. 26 4
Appendices p. 86 8
00-DESW060EN_presentation 5
How to use the guide
How to assemble How to use the guide
a digitized
switchboard
1 - Assembling and covering 2- Main busbars and forms 3 - Installing the devices 4 - Power connectors 5 - Auxiliary and
enclosures low-power circuits
Information pictograms
To emphasise important information
Tip
Handy hints Compliant Non-compliant
Blokset
Pre-assembled
and universal
switchboards
Example
Blokset
Enclosure structure
Standards Good practice 1
400
600
Assembly of Enclosures.
01-DESW060EN_assembly 9
Assembly of enclosures Earthing continuity
Theory
Standards Theory
available.
switchboard: They are used to mechanically connect
- between each other, enclosures to each other. In most cases,
- between them and the main protective earthing continuity is obtained by the
screws, nuts and bolts or by the assembly design.
conductor PE (equipotential bonding).
To do this, you must:
All exposed conductive parts of the - use only components, screws, nuts and bolts and
switchboard must be connected to the accessories recommended by the manufacturer,
earthing circuit, except for those that do not - comply with the assembly instructions given in the
present a potential hazard for users (small technical manuals,
fasteners such as screws or rivets). - tighten the screws to the recommended torque.
You must measure the earthing continuity
electrically in case of doubt.
This topic is developed in chapter 2 -
"Power busbar".
10 01-DESW060EN_assembly
Assembly of enclosures Earthing continuity
Earthing wire
01-DESW060EN_assembly 11
Assembly of enclosures Notes
12 01-DESW060EN_assembly
Assembly of enclosures Quality control check list
Minimum
checks
required
Control points Control resources Self-control
Objectives
01-DESW060EN_assembly 13
Power busbar
Power busbar Foreword
Foreword
Standards Theory
D D
horizontally between the various D Mw2
D
on the top, middle or bottom of the
switchboard depending on the type of
switchboard, customer specifications
and/or local practices, Distribution busbar
IEC 61439-1 2 The following must be taken into account when choosing a power busbar:
- environmental characteristics of the switchboard (ambient temperature,
IP degree of protection, pollution),
- type of switchboard installed regarding to validation test,
- characteristics of the client's power supply: on the top, middle or bottom,
- the rated current of the short-circuit: Icw.
The installation of a power busbar consists in the following steps:
- select the busbar material,
- size it (busbar section, number of busbars per phase) and define its position in the
switchboard based on the client's incoming devices,
- install it in compliance with the creepage and clearance distances of the standard,
- fasten it according to good practice.
02-DESW060EN_busbar 15
Power busbar Definition of a power busbar
Choice of material
Standards Good practice
16 02-DESW060EN_busbar
Power busbar Definition of a power busbar
Busbar sizing
Standards Good practice
IEC 61439-1 2 Busbar manufacturers usually provide the information required for sizing power busbars.
§ 8.6.1
These figures must be used in calculating the cross-section of the busbar.
The busbar cross-section depends on:
Tip - the rated current "In" to be conveyed in the busbar,
The various ratings and their - the rated current of the short-circuit (permissible short-time withstand current): "Icw",
names to be taken into
account are defined in
- the ambient temperature around the switchboard,
IEC 60947-2 and - the IP protection index of the enclosure,
IEC 61439-1 - the rated diversity factor (RDF),
- the space reserved for future enhancements,
- the constraint defined by the trigger time of the protective device.
Caution: never under-size a busbar (risk of overheating).
IEC 61439-1 3 Generally, not all the devices connected to a busbar are used at full load or at the same time.
§ 3.8.10
It is therefore not necessary to size the busbar to transport the sum of rated currents of all the
§ 5.3.3
devices continuously.
Appendix E
The rated current "In" in the busbar must be calculated:
IEC 61439-2 - by adding up the rated currents of all the connected devices,
§ 5.3.3
- by multiplying the result by the diversity factor (RDF) defined by IEC 61439-1.
The value of the diversity factor depends on the number of devices connected to the busbar:
Number of devices Diversity factor
2 and 3 0.9
4 and 5 0.8
6 to 9 0.7
10 + 0.6
02-DESW060EN_busbar 17
Power busbar Notes
18 02-DESW060EN_busbar
Power busbar Quality control check list
Minimum
checks
required
Control points Control resources Self-control 2
>>Busbar cross-section and number
Note: to be done preferably when the busbars are >>Manufacturing file
installed
>>Manufacturing quality*
Note: to be done preferably after the bars are >>Installation guide
manufactured
Objectives
02-DESW060EN_busbar 19
Installing
the devices
Installing the devices Foreword
Foreword
Standards Theory
03-DESW060EN_devices 21
Installing the devices Device layout
Positioning rules
Standards Good practice
IEC 61439-1
Define the layout of devices in the column based on constraints related to:
Table 6
-- the entry and exit points of the customer's wires (from the top, the bottom of the column or
other specific configuration) and the position of the main busbars in order to have the shortest
possible connections,
-- the routing of prefabricated wires or connections at the input and output of the switchboard,
-- the space required for the device to work correctly (volume of device, safety perimeter,
connection pads, radius of curvature of wires, control units, etc.),
-- the accessibility of the various control units and connection zones (side, rear, etc.) of
devices,
-- heat dissipation of devices that contributes to increasing the internal temperature of the
column,
-- the mutual thermal and electromagnetic influence between the main busbars and the
devices,
-- the maintenance or upgrade of the system (for example, enable the opening of the motorised
control of a circuit breaker).
The resulting layout of the switchgear should also be studied to optimise connection zones,
busbars, enclosure sizes, etc.
22 03-DESW060EN_devices
Installing the devices Device layout
Positioning rules
Standards Good practice
IEC 61439-1 5 To avoid serious malfunctions, do not
Table 6
install devices that are sensitive to
temperature rises (e.g., control/command
devices) near devices with high heat
Tip dissipation.
For the electromagnetic
compatibility of the It is recommended to separate the
switchboard, the use of switchboard into two zones (high-power
separator sheets for all devices and low-power devices) to improve
communicating devices is
the efficiency of the installation.
recommended.
Installing the communicating devices at the
3
bottom of the switchboard is recommended
Tip (see example given below).
Use separate routings for power
cables and communication
cables is recommended.
Example
Smart panel modules to be isolated from heat sources.
03-DESW060EN_devices 23
Installing the devices Device layout
Positioning rules
Standards Good practice
Tip
7 The safety perimeter is usually stated by
the manufacturer in the device technical
The safety perimeter may be
reduced by adding a cover, manual or the catalogues.
terminal cover, barrier, etc.
24 03-DESW060EN_devices
Installing the devices Quality control check list
Minimum
checks
required
Control points Control resources Self-control
>>Conformity of the switchgear and controlgear*
(placing of equipment and conformity of front >>Manufacturing file
panel)
>>Fixing of switchgear and controlgear >>Switchgear & controlgear and system guide
Objectives
03-DESW060EN_devices 25
Power
connections
Power connections Foreword
Foreword
Standards Theory
04-DESW060EN_connections 27
Power connections Foreword
Foreword
Standards Theory
28 04-DESW060EN_connections
Power connections Connecting with cables
04-DESW060EN_connections 29
Power connections Notes
30 04-DESW060EN_connections
Power connections Quality control check list
Minimum
checks
required
Control points Control resources Self-control
>>Cable characteristics
>>Customer requirements (specifications)
(e.g. 1000 V, 105 °C)
Objectives
04-DESW060EN_connections 31
Auxiliary and
low-power circuits
Auxiliary and Foreword
low-power circuits
Foreword
Standards Theory
Foreword
Standards Theory
2 Example
5
Do not route cables between or too close
to power bars to avoid all risks:
-- of a temperature rise in the cable,
-- damage to the insulator,
-- electromagnetic disturbance.
Grommets are used to protect cables from the hole in the sheet.
> 70 %
Tip
5
Auxiliary circuit bundles
which generally carry low 3 Define the number of fastening points of a
Example
voltage (less than half the
insulation voltage of the trunking based on its mechanical
cable) may be secured characteristics and the fill rate. The trunking
directly to metal supports.
must be straight after fastening.
At any event, the centre distance between 600 max.
fastening points must not be more than
600 mm.
Cable stranding
Standards Good practice
Strand fastening
Standards Good practice
General rules
Standards Good practice
5
2 Place the current transformer as close as
possible to the measuring device to avoid
having cables that are too long.
Principle
Standards Theory
General rules
Standards Good practice
Earth bar
Acceptable if the
connection is
very short
Wiring rules
Standards Good practice
Wiring rules
Standards Good practice
1
1 Metallic tubing
Wiring rules
Standards Good practice
1 3 1 2
1 Power cable
2 Communication cable
3 Right angle
4 Parallel cable routing (NOK)
3
3
2
1 2
1
Screen continuity
Standards Good practice
Screen continuity
Standards Good practice
1 2 3
1 Electrical continuity
The electrical continuity between the drawer
frame and the cubicle structure shall be
obtained using the connector pins.
The connection length should be as short as
possible.
1 4 2
5
3 5
1 Internal FU connector
2 Connector earthing
3 Earthing connection too long
4 External FU connector
5 Earthing by a earth terminal DIN rail mounted.
2 Electromagnetic barrier
Connect together all the "earthing" contacts
of the removable connector
(= electromagnetic barrier) to the drawer
earth.
24 21
23 20
22 19
3
2 1
4
2 1 5
1 Coil relay
2 Un
3 Arcing voltage
4 NO arcing voltage
5 Transient Voltage Suppressor (TVS)
1 This chapter is dedicated to general rules on cable lengths, shielding, path and preparation
to comply with EMC and communication specifications.
The Modbus RTU protocol (a.k.a. Modbus SL) is based on a Master-Slave concept.
In the standard Modbus system, all the devices are connected to a main 3 wires cable.
Two wires form a balanced twisted pair, on which bi-directional data are transmitted.
The Modbus topology is a main cable with devices connected directly (daisy chaining) or by
short derivation cables.
The main cable, a.k.a. "Bus", must be connected at its two extremities with Line Terminations.
Generally speaking, the sum of all the derivation lengths must be lower than the length of the
bus.
The "Common" circuit must be connected directly to protective ground, preferably at one
point only for the entire bus. In general, this point is chosen either on the master device or on
the polarization device.
A Modbus Serial Cable must be shielded. The shield must be connected to protective ground
at both ends.
Rules Standard Modbus RTU Smart Panels
Maximum number of 32 (without repeater) 8
devices per bus
Bus Speed 1200 bps to 115.2 Kbps 19.2 Kbps
Maximum bus length 1300 m (without repeaters) and depending on 1000 m
the transmission rate
Maximum length of Depends on the transmission rate 40 m
the sum of the
derivations
Cable type TIA / EIA - 485 Standard Ditto standard
Location of the Line termination at the 2 extremities of the bus Line termination at the 2 extremities of the bus
terminations (R or RC) (Only R = 120 Ω)
Location of the The polarization is given by only one Ditto standard
polarization equipment at the beginning of the bus (in
general: the master)
E
R
5 5
6
5v
Ground
7
8
R
E
R
E 5
2 3
1 Master
2 Slave 1
3 Slave n
4 Balanced twisted pair
5 Line termination at the 2 extremities of the bus
6 Length of the main line > sum of slaves derivation lines
7 Ground signal to reference all the devices
8 Polarity resistor (generally integrated in the master)
Architecture example
Web Pages
IO module IO module
PM Meter
Masterpact Masterpact
Incomer - 1 Bus coupler
Modbus
ULP
Ethernet
Architecture example
Architecture example
10
3 9
play
er + dis
ata serv
om er Uni ts: D
t: inc onal
l Uni Func
ti
iona
Ethernet
unct
24 Vdc
F
PS 1
24 Vdc
PS 2 R
POWE
0V
100-23 R
POWE
7
230V
24V ~
50/6 1.2A 0.6A
0 Hz
200
Com’X
or serious injury.
Mad
e in
GERM
ANY
Ethernet 1
1 Et
PS 1 h
8 Et ern
he et
rn 1
et
2
24 Vdc
10
Power
ULP system supply
C
24VD
ETH2
ETH2
ETH1
ETH1
set)
(factory
3
Y.ZZ
XX.Y
IFE-
I6 CT
C 00/A
I5 10-1
I4 1 LK/
C ETH CT
I3 IFE 10-1
00/A
2 LK/ us
ETH
+ ule Stat
5
24VD
C Mod
us
k Stat
Networ
bus-SL
Mod
A1
T2
O3 T1
34
33
O1
14
13
ers
its: feed
tion al Un
Func
Modbus
Ethernet network
5
ULP system
ULP system
6
ETH2
ETH2
ETH1
ETH1
Minimum
checks
required
Control points Control resources Self-control
>>Customer requirements,
>>Wiring cross-section and characteristics
installation guide
Objectives
Configuration
Standards Theory
PB113849.eps
1 The configuration and the check are
carried out with configuration software tools
or through devices’ web pages based on the
Blokset Smart Panels switchboard
configuration.
To go further on commissioning
recommendation a specific guide is
available: “TVDA - How can I configure a
Smart Panels”, see reference document list.
Smart Panels system can be configured by
the device web pages.
Enerlin’X devices have web pages that
allow an easy configuration of the system.
However configuration tool may be useful
for some advanced setting (protection
setting, automatic check report…)
Ethernet discovery 6
Standards Good practice
1 Enerlin’X devices provide an automatic discovery and identification over Ethernet network.
This feature is called device profile for web services (DPWS) and is available by Windows 7.
Connect your computer to your Smart Panels Ethernet network or individually to each device.
Open the windows explorer:
DB417229.eps
1 Modbus addressing
Example
To set the Modbus address to 4,
Modbus addressing must be set with the proceed as follows:
two rotary switches symbolized with X1 and IFM rotary switch:
X10. The symbol X10 corresponds to the - set the X10 switch to 0,
tens, and the symbol X1 to the ones.
- set the X1 switch to 4,
- turn the padlock switch to the
unlocked position.
2 ULP connection
Example
The aim is to check the ULP system
connection between IFM and circuit
breaker, thanks to “ULP test button”.
Press the test button on IFM and check that
IFM and associated Micrologic trip unit flash
simultaneously (ON: 1000 ms/OFF: 1000 ms).
1 ULP connection
Example
All connection configurations require the
breaker ULP cord. The insulated NSX cord
is mandatory for system voltages greater
than 480 Va. When the second ULP RJ45
connector is not used, it must be closed with
a ULP terminator.
The next step is to check the ULP system
connection between IFE, I/O application
module and circuit breaker, thanks to “ULP
test button”. Press the test button on IFE
and check that IFE, I/O application module
and associated Micrologic trip unit flash
simultaneously (ON: 1000 ms/OFF: 1000 ms).
2 Ethernet connection
--IFE has two Ethernet ports E1 and E2.
--Ethernet Cabling,
100 base T – 2* RJ45 – E1 and E2
6
--Ethernet 1 and Ethernet 2 ports act as a
non manageable switch.
Note: IFE doesn’t support redundant
Ethernet protocol (RSTP, MRP, Hyper
Ring...).
IFE provides Ethernet daisy chain
connection.
If daisy chain loop is requested an
Ethernet loop manager must be used.
DB417242.eps
From Ethernet discovery feature (DPWS)
open the IFE Ethernet web pages by
clicking on IFE_XXYYZZ and enter login
and password to access the web pages.
3 Modbus configuration
Then configure the Modbus slave devices: Name, Modbus addressing.
The IFE provides an autodiscovery feature of connected Modbus serial slave devices.
DB417244.eps
6
4 Test report
Both communication and functional aspects (Open/Close status and Open/Close control) can be
tested with the web pages. A print screen of the web page can be used to create a report:
DB417245.eps
A print screen of the web page can be used to create a report on the I/O application module
correct installation.
1 Value Proposition:
Panel Builders: Simple & Easy Software to
setup and test a Panel board with Smart
Devices.
Device Discovery
This part details the device discovery function of Ecoreach. When the user
connects Ecoreach on a communication network, he can discover all
devices which are known to Ecoreach and wired in the network. Once the
devices are discovered, the user will be able to add the devices to the
project.
1 From the main page, click Tools and then Device Discovery.
DB418492.eps
or 6
Click Import to do the device discovery.
DB418493.eps
Device Discovery
DB418495.eps
Additionally you can save the discovery results as a pdf report as well.
1 Once general and communication architecture is made, select the device and connect.
project.
Project architecture can be made as per
the SLD by drag and drop.
Communication Test
When a user has installed communicating devices in a switchboard/panel
board, Ecoreach offers the capability to test the communication network.
Regardless of the communication network deployed inside a switchboard
or a panel board, the communication test will cover the connection of
devices to switchboard access point and provides a communication test
report.
1
DB418499.eps
Communication Test Results will be displayed and the report can be generated.
Minimum
checks
required
Control points Control resources Self-control
6
Please photocopy the check list before completing it
Objectives
+
Factory quality What standard IEC 61439-1
inspection
says about quality inspections?
Routine verification
Routine verification is designed to detect materials and manufacturing defects and
to ensure that the manufactured assembly is working properly. It is performed on
each assembly.
Panelbuilders must determine whether routine is carried out during and/or after
manufacturing.
If necessary, the routine verification must ensure that design verification is available.
"Construction" verifications
1 (see sections 11.2 to 11.8 of the standard)
1 Degree of protection of enclosures
7 Mechanical operation
"Performance" verifications
2 (see sections 11.9 to 11.10 of the standard)
1 Dielectric properties
What is the risk if the quality inspection is not conducted (during and/or after manufacturing)?
07-DESW060EN_quality inspection 81
Factory quality Quality organisation
inspection
recommended by
Schneider Electric
Benefits
Other useful documents: notification of
non-compliance, check list of missing components,
quality measurements
Manufacturing file
Switchgear guide
Technical documentation
To find out more about the final quality inspection, see the "Quality inspection guide" written by our experts.
82 07-DESW060EN_quality inspection
Factory quality List of checks
inspection
to be made during the
final quality inspection
Make sure that self-checks have been performed throughout the assembly and installation process or validated
(e.g. by the line controller).
>> Compliance of installation mode (fastening, sharp edges, etc.) >> Technical guide
>> Auxiliary Power separation >> Assembly and installation guide and communication guide
>> EMC protection >> Assembly and installation guide and communication guide
Connection
>> Compliance and quality of bolted connections >> Technical guide
(e.g. covering and fastener type)
>> Torque and marking
>> Crimping quality
Protection of persons
>> Earth bar (cross-section and fastening) >> Technical guide and assembly technical guide
>> Earthing braids
>> Forms
>> Bonding continuity
>> IP of measuring devices (fastened on doors)
>> Blanking shutters
>> Terminal guards and covers
>> Fastening of protective barriers
Safety distances
>> Clearance >> Assembly and installation guide and visual inspection
>> Creepage distances >> Installation and assembly guide
Dielectric check (power circuit)
>> Insulation tester
07-DESW060EN_quality inspection 83
Factory quality List of checks
inspection
to be made during the
final quality inspection
>> Megohmmeter
Electrical compliance
>> Phase order >> Phasing test
>> Voltages, control polarities >> Electric tests, voltmeter
>> Distribution of polarities (inter-column connections) >> Electric tests, voltmeter
Functional tests: >> Test consoles, injection test bench, etc.
>> Operating sequence (controls and signalling)
>> Checking of source transfer
>> Electrical and mechanical inter-locking
>> Checking of opening/closing orders of units
>> Trip tests (defects)
>> Information report (OF-SDE-SD)
>> Signalling (indicator lights, etc.)
>> Injection on protection and measurements (values, etc.)
Measurement and protection: >> Electric tests
>> Protection tests (fault tripping, etc.)
>> Injection on measuring devices (Pa, PWH, etc.)
>> CT winding direction
Device settings (circuit monitors, protections, etc.) >> Technical documentation
Objectives
84 07-DESW060EN_quality inspection
Factory quality Model form
inspection
"Routine verification -
Testing report"
Manufacturer of the assembly: .................................................................................................................................................................................
Address: ........................................................................................................................................................................................................................
Original Manufacturer: ...............................................................................................................................................................................................
Routine verification - checking report
Customer: ............................................................................................. Report No: ....................................................................................
................................................................................................................. .........................................................................................................
................................................................................................................. .........................................................................................................
Quantity: ...............................................................................................
1. Construction Done
g. mechanical operation T
V: visual
T: test
7
2. Performance
a. dielectric properties T
Please photocopy the check list before completing it
Comments:
Having passed the above checks, the LV switchgear assembly under consideration is in compliance with the Std. IEC 61439-2
(IEC/EN 61439-2).
........................................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................................................................
Customer representative Quality inspector Quality manager
07-DESW060EN_quality inspection 85
Appendices
Appendices IP and IK degree of protection
Foreword
Standards Theory
IK degree of protection
Standards Theory
08-DESW060EN_Appendices 87
Appendices IP and IK degree of protection
IP degree of protection
Standards Theory
2 Protected against Protected against solid 2 Protected against drops C Protected against access with
access with a bodies larger of water falling at an a tool of Ø 2.5 mm
finger than 12.5 mm angle up to 15° from the
vertical position
3 Protected against Protected against solid 3 Protected against D Protected against access with
access with a tool bodies larger rainwater falling at an a wire of Ø 1 mm
than 2.5 mm angle up to 60° from the
vertical position
4 Protected against Protected against solid 4 Protected against water
access with a wire bodies larger projections from all
than 1 mm directions
88 08-DESW060EN_Appendices
Appendices Bill of material
er ers
t: in com its: feed
l Uni al Un
tiona tion
Func Func 8
Ethernet 1
7
3
1 PS 1
24 Vdc
2 Ethernet 1
24VD
C
PS 1
ETH2
ETH2
ETH1
ETH1
B
C
I4
I5
C
I6
3 24 Vdc
A
I3
+ C
24VD
24VD
C G
5 ETH1
ETH1
ETH2
ETH2
B
A1
T2
O3 T1
34
33
O1
14
6
13
y
ispla
rve r+d
ata se
ts: D
na l Uni
nctio ution
istrib
Ethernet Ethernet 2
Fu 24 Vdc
ts: d
l Uni 3
tiona
PS 2
Func 24 Vdc
PS 1
24 Vdc 3
PS 2 R
COM
LK/10-1
NETWO
STATUS
00/ACT
RK
R
ETHERN
ET
COM
D1 D0
0V
POWE
STATUS
0V
100-23 R
POWE
Turn off all power before working on this equipment.
Failure to follow these instructions will result in death
AI2 24V
7 0V AI1 0V
Q 24V +24V
DANGER
HAZARD OF ELECTRIC SHOCK,
R I2
6
8
I1
POWE 0V
Q 24V
8
EXPLOSION, OR ARC FLASH
I2
5 0V
I1
Q 24V
EB 4 I1
I2 7
0V
X2 Q 24V
00 6
H
I2
100-
230V 3 0V
I1
24V ~ Q 24V
50/6 1.2A 0.6A
0 Hz 2 I1
I2 5
0V
E
200 Q 24V
Com’X 1 I1
I2 4 D0/-
D1/+
0V 0V
or serious injury.
D
Q 24V
I2
Mad 0V
I1
e in
GERM N.C.
ANY 2 N.C.
C D0
D1
C/-
1
J
ON
iEM31
63A
Imax:
Et
h
Et ern
he et
C rn 1
et
2
4
I
Power F
supply
08-DESW060EN_Appendices 89
Appendices Bill of material
O1 Module)
Internal terminal block 33119
A1
T2
O3 T1
34
O2 33
24
23
for LV breaker
L=3m LV434197
ETH2
ETH2
ETH1
ETH1
4 wires (2 x RS485 +
100-23
Turn off all power before working on this equipment.
POWER
Failure to follow these instructions will result in death
HAZARD OF ELECTRIC SHOCK,
DANGER
EXPLOSION, OR ARC FLASH
R
POWE
EB
X2
100-2 00
24V 30V
~
50/60 1.2A 0.6A
Made
in GERM
ANY
length of 60 m
Switchboard front LV434128 10 ULP line terminators TRV00880
F display module FDM128
5
ULP cable, L = 0.3 m TRV00803
6 shielded cable L = 0.6 m TRV00806
L=1m TRV00810
IFM Modbus-SL TRV00210 L=2m TRV00820
G interface module L=3m TRV00830
Stacker (set of 10) TRV00217 L=5m TRV00850
5 RJ45 connectors TRV00870
female/female
A9MEM3150 Communicating device LV434205
H 7
C/-
D1
N.C.
C D0
N.C.
0V
D0/-
D1/+
63A
Imax:
90 08-DESW060EN_Appendices
Appendices References
Reference Documents
The table below outlines referenced documents that can be used as a resource to gather more details when
needed.
08-DESW060EN_Appendices 91
Make the most of your energy™
© 2015 - Schneider Electric - All rights reserved.
www.schneider-electric.com
RCS Nanterre 954 503 439 Publishing: Schneider Electric Industries SAS This document has been
Capital social 896 313 776 Photos: Schneider Electric Industries SAS printed on ecological paper.
www.schneider-electric.com
DESW060EN 04-2015