Acknowledgement

Firstly, all praise is to Almighty Allah. Secondly, we thank the


entire ASED group for their hard work and undying dedication
to the preparation of this book. This would not have been
possible without the guidance of our lecturer and supervisor
Eng. Sarkar Mohammed Sayem from whom we have received a
great deal of assistance and our Dean Eng. Mohamed Harun
and we cannot thank them enough.

We deeply appreciate the help and advice we received from


Eng. Hasan Ateye, Eng. Horri and the UN weather forecasting
officials.

We thank our parents who have raised us to make the world


and especially our beloved country a better place and also
everyone who helped us along the way.

Presidential Building Compound


ASED Group 2011 Page 1
Preface
This book that we, ASED group, have prepared includes architectural plans and
structural analysis and design of presidential building compound. We have completed
this work as a final project in our civil engineering bachelor’s degree. It has taken us
about 2 months to complete this project and could not have done this without the help
of many engineers and lecturers. Following their advice and with hard work we have
managed to prepare this book that covers many areas but mostly structural
engineering.

We prepared this book as our thesis. The book consists of architectural design photos
that shows the inside and outside of the structures that we have designed and allows
the reader to have an adequate idea of the project’s huge scale and to understand the
engineering concepts behind its preparation. Chief Architect was used in the
architectural designing and drafting of the Presidential Building Compound.
Furniture, decorations, trees etc. were all carefully placed using that software. Our
team members discussed the many issues that arose and dealt with any design flaws
before the confirmation stage and diligently worked on the buildings to make them up
to standard. The pictures show the different views and angles from the outside and
also show the interior of the various rooms. The different dwellings for the president,
the presidential family and the staff live and work in the same environment so care
was taken in the placing of rooms and facilities. Architectural decision-making and
engineering judgment was number one in our project’s implementation. To prevent
confusion a simple style has been followed throughout. We have chosen this style to
make the book as reader-friendly as possible.

Analysis and design in our project was greatly simplified with the use of the Etabs 9
software which is one of the softwares that we learnt in our engineering courses. The
dimensions of the members and their ability to carry the loads that will be placed on
them was all determined with the use of that software. We initially used manual
calculations but was coupled with Etabs. The design of foundations, columns and
slabs etc were partly completed calculation methods that we learnt in the last couple
of semesters. The mathematical and analytical expertise that we gained in class was
put to good use.

Ased group consists of ten students that collaborated on each step of the project. The
work was divided at the different stages according to each person’s area of prowess
and their personal preference. For example, three people draw the building on a
computer while four others carry out the calculations for that building. Teamwork is
the backbone of our group and loyalty to the work at hand was key in the finishing of
the project.

Presidential Building Compound


ASED Group 2011 Page 2
CONTENTS
Page

I. Architectural design ………….……….……….. 008

- Site plan view……………………………………………………. 009


- Full site 3D view ………………………………….………………..010
- Main building ground floor plan……………….……………….011
- Main building first floor plan …………………….……………..012
- Main building 3D view …………………………….…………….013
- Main building front view…………………………….……………014
- Main building left side view ………………………….………….015
- Main building rear view …………………………………………..016
- Main building perspective view…………………………..……..017
- Main building section A-A ……………………………………….018
- Main building section B-B……………………….………….……019
- Main building 2D with furniture ground floor………….……020
- Main building 2D with furniture first floor……………………021
- Main building 3D with furniture ground floor…………….…022
- Main building 3D with furniture first floor……………………023
- Executive building ground floor plan………………………..…024
- Executive building first floor plan …………………………..….025
- Executive building 3D view …………………………………..…026
- Executive building front view………………………………… …027 .

- Executive building left side view ………………………………..028


- Executive building rear view …………………………………….029
- Executive building perspective view…………………………...030
- Executive building section A-A ………………………………....031
- Executive building section B-B……………………….…………032
- Executive building 2D with furniture ground floor…...…….033
- Executive building 2D with furniture first floor…………..….034
Presidential Building Compound
ASED Group 2011 Page 3
- Executive building 3D with furniture ground floor…...…….035
- Executive building 3D with furniture first floor……………..036
- President’s residence building ground floor plan……..…….037
- President’s residence building first floor plan ……………….038
- President’s residence building 3D view ………………..…….039
- President’s residence building 2D with furniture ground
floor………………………………………………………………..…..040
- President’s residence building 2D with furniture first
floor………………………………………………………………….…041
- President’s residence building front view…………………..…042
- President’s residence building rear view ……………..…..…..043
- President’s residence building left side view …………..…….044
- President’s residence building perspective view………..……045
- President’s residence building 3D with furniture ground
floor……………………………………………………………………046
- President’s residence building 3D with furniture first
floor……………………………………………………………………047

II. Structural Analysis ………………………………..048

- Main building typical floor plan………………………………...049


- Main building typical floor plan with slab…………………….050
- Main building 3D view & elevation……………………………..051
- Main building shear force (filled type) and (numbered)……052
- Main building Moment diagram ……………………………..…053
- Main building Reaction and 3D analysis……………………...054
- Executive building typical floor plan…………………………...055
- Executive building typical floor plan 3D view………………..056
- Executive building story 1-1 floor plan………………………..057
- Executive building 3D view with diaphragm and deformation
shape(short side)………………………………..………………….058
- Executive building Moment diagram (short side) ……….….059
Presidential Building Compound
ASED Group 2011 Page 4
- Executive building shear force diagram………………….…...060
- Executive building reactions……………………………………..061
- Executive building Deflection (long side)………………………062
- Executive building shear diagram (long side)……………..…063
- Executive building shear diagram (long side)…………..……064
- Executive building Moment diagram (long side)……………..065
- Executive building Moment diagram (long side)……………..066
- Executive building reaction(long side)………………………....067
- Executive building Analysis results with slab…………….….068
- Executive building Analysis results without slab………..….069
- Executive building Analysis results…………………………….070
- President’s residence building Typical floor plan……………071
- President’s residence building floor plan 3D &
elevation…………………………………………………..………….072
- President’s residence building floor plan 3D view with
diaphragm…………………………………………………….………073
- President’s residence building Moment diagram (long
side)filled and numbered ………………………………….……..074
- President’s residence building Analysis results 3D view1...075
- President’s residence building Analysis results 3D view 2..076

III. STRUCTURAL DESIGN CALCULATIONS….…076

- Foundation design(plan & elevation) …………….................077


- Calculation of foundation for F4 …………….…….……078 - 080
- Calculation of foundation for F2 and F3 …………..…080 - 088
- Beam design ………………………………………………….088 -090
- Column design …………………………………………….. ……...091
- Slab design …………………………………………….…….092 – 104

Presidential Building Compound


ASED Group 2011 Page 5
IV. LIST OF TABLES AND FIGURES……………………………….. 106

- Table A.1………………………………………………………………106
- Table A.9 …………………………………………………………..…107
- Graph A.4 & Table 13.5……………………………………….…..108
- Table 13.3 & Table 13.4………………………………………..…109
- Table 5.2 & Table 5.10………………………………………….…110
- Figure 5.9…………………………………………………………….111

Presidential Building Compound


ASED Group 2011 Page 6
ASED GROUP MEMBERS


 

 
 
 
 


 
 

Presidential Building Compound


ASED Group 2011 Page 7
Architectural design

SITE PLAN

Presidential Building Compound


ASED Group 2011 Page 8
Full site plan

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL ASED GROUP SUPERVISOR: Eng. Sarkar Not to Scale
BUILDING Mohammed
Hargeysa, Somaliland CONSULTANT: 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hassan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori Drawing No. : 01
CIVIL ENGINEERING FACULTY

FULL SITE

3D VIEW

Presidential Building Compound


ASED Group 2011 Page 9
PROJECT :
PRESIDENTIAL
BUILDING
Hargeysa, Somalilan

CONTENTS:
Site Plan Detail

Main building

Presidential Building Compound


ASED Group 2011 Page 10
GROUND FLOOR PLAN

GROUND FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL ASED GROUP SUPERVISOR: Eng. Sarkar Not to Scale
BUILDING Mohammed
Hargeysa, Somaliland CONSULTANT: 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hassan Aateye EELO UNIVERSITY
Site Plan Detail Drawing No. : 03
Eng. Hoori CIVIL ENGINEERING FACULTY

Presidential Building Compound


ASED Group 2011 Page 11
Main building

FIRST FLOOR PLAN

FIRST FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Drawing No. : 03
Eng. Hoori CIVIL ENGINEERING FACULTY

Presidential Building Compound


ASED Group 2011 Page 12
Main building

FULL 3D VIEW

FULL 3D FLOORS OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Drawing No. : 04
Eng. Hoori CIVIL ENGINEERING FACULTY

Main building

Presidential Building Compound


ASED Group 2011 Page 13
FRONT VIEW

FORNT VIEW FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 05

Main building

LEFT SIDE VIEW

Presidential Building Compound


ASED Group 2011 Page 14
SIDE VIEW FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori Drawing No. : 06
CIVIL ENGINEERING FACULTY

Main building

REAR VIEW

Presidential Building Compound


ASED Group 2011 Page 15
REAR VIEW FLOORS OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Drawing No. : 07
Eng. Hoori CIVIL ENGINEERING FACULTY

Main building

PERSPECTIVE VIEW

Presidential Building Compound


ASED Group 2011 Page 16
PEREPICTIVE VIEW FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 08

Main building

SECTION
A-A

Presidential Building Compound


ASED Group 2011 Page 17
A A

SECTION A-A FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Drawing No. : 09
Eng. Hoori CIVIL ENGINEERING FACULTY
Main building

Presidential Building Compound


ASED Group 2011 Page 18
SECTION B-B

B
A

B
A

SECTION B-B FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Drawing No. : 10
Eng. Hoori CIVIL ENGINEERING FACULTY
MAIN BUILDING

2D WITH FURNITURE

GROUND FLOOR
Presidential Building Compound
ASED Group 2011 Page 19
2D WITH FURNITURE GROUND FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 11

Main building

2D WITH FURNITURE

FIRST FLOOR

Presidential Building Compound


ASED Group 2011 Page 20
2D WITH FURTITURE FIRST FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 12

Main building

GROUND FLOOR

3D WITH FURNITURE

Presidential Building Compound


ASED Group 2011 Page 21
3D WITH FURNITURE GROUND FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 13

Main building

FIRST FLOOR

3D WITH FURNITURE

Presidential Building Compound


ASED Group 2011 Page 22
3D WITH FURNITURE FIRST FLOOR OF THE MAIN BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed
Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 14

Executive building

GROUND FLOOR PLAN

Presidential Building Compound


ASED Group 2011 Page 23
GROUND FLOOR OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland
CONSULTANT: 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 15

Executive building

Presidential Building Compound


ASED Group 2011 Page 24
FIRST FLOOR PLAN

FIRST FLOOR OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland
CONSULTANT: 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 16

Executive building

FULL 3D VIEW

Presidential Building Compound


ASED Group 2011 Page 25
FULL 3D FLOOR OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 17

Executive building

FRONT VIEW

Presidential Building Compound


ASED Group 2011 Page 26
FRONT VIEW OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland
CONSULTANT: 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 18

Executive building

LEFT SIDE VIEW

Presidential Building Compound


ASED Group 2011 Page 27
SIDE VIEW OF THE EXECUTIVE BUILDING

PROJECT: DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeisa, Somaliland
CONSULTANT: 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hassan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

Executive

REAR VIEW

Presidential Building Compound


ASED Group 2011 Page 28
REAR VIEW OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 01

Executive building

PERSPECTIVE VIEW

Presidential Building Compound


ASED Group 2011 Page 29
PERESPICTIVE OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori CIVIL ENGINEERING FACULTY Drawing No. : 01

Executive building

SECTION A-A
A
A

Presidential Building Compound


ASED Group 2011 Page 30
A
A

SECTION A-A OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Aateye EELO UNIVERSITY
Site Plan Detail Eng. Hoori Drawing No. : 01
CIVIL ENGINEERING FACULTY

Executive building

Presidential Building Compound


ASED Group 2011 Page 31
SECTION B-B

B B
A A

SECTION B-B OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY : DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP SUPERVISOR: Eng. Sarkar Mohammed Not to Scale
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

Executive building

2D with furniture

Presidential Building Compound


ASED Group 2011 Page 32
Ground floor

Executive
building

2D WITH
FURNITURE

FIRST FLOOR

2D WITH FURNITURE OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

Presidential Building Compound


ASED Group 2011 Page 33
Executive building

3D WITH FURNITURE

GROUND FLOOR

FIRST FLOOR WITH FURNITURE OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

Presidential Building Compound


ASED Group 2011 Page 34
3D WITH FURNITURE GROUND FLOOR OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

Presidential Building Compound


ASED Group 2011 Page 35
Executive building

FIRST FLOOR

3D WITH FURNITURE

3D WITH FURNITURE, FIRST FLOOR OF THE EXECUTIVE BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland
CONSULTANT : 10th SEMESTER AUTOCAD SET
CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

Presidential Building Compound


ASED Group 2011 Page 36
President’s residence

GROUND FLOOR PLAN

GROUND FLOOR OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01
President’s residence

Presidential Building Compound


ASED Group 2011 Page 37
FIRST FLOOR PLAN

FIRST FLOOR OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

President’s residence

FULL 3D VIEW

Presidential Building Compound


ASED Group 2011 Page 38
FULL 3D VIEW OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

Presidential Building Compound


ASED Group 2011 Page 39
President’s residence

2D WITH FURNITURE

GROUND FLOOR

2D WITH FURNITURE GROUND FLOOR OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

President’s residence

Presidential Building Compound


ASED Group 2011 Page 40
2D WITH FURNITURE

FIRST FLOOR

2D WITH FURNITURE FIRST FLOOR OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

President’s residence

FRONT VIEW

Presidential Building Compound


ASED Group 2011 Page 41
FRONT VIEW OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

President’s residence

REAR VIEW

Presidential Building Compound


ASED Group 2011 Page 42
REAR VIEW OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET

CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY


Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

President’s residence

LEFT SIDE VIEW

Presidential Building Compound


ASED Group 2011 Page 43
SIDE VIEW OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

President’s residence

PERSPECTIVE VIEW

Presidential Building Compound


ASED Group 2011 Page 44
PERESPICTIVE VIEW OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

President’s residence

GROUND FLOOR

3D WITH FURNITURE

Presidential Building Compound


ASED Group 2011 Page 45
3D WITH FURNITURE GROUND FLOOR OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

President’s residence

FIRST FLOOR

3D WITH FURNITURE

Presidential Building Compound


ASED Group 2011 Page 46
3D WITH FURNITURE FIRST FLOOR OF THE RESIDENTIAL BUILDING

PROJECT : DESIGNED AND CHECKED BY: DATE: 17/8/2011 SCALE:


PRESIDENTIAL BUILDING ASED GROUP Not to Scale
SUPERVISOR: Eng. Sarkar Mohammed
Hargeysa, Somaliland

CONSULTANT : 10th SEMESTER AUTOCAD SET


CONTENTS: Eng. Hasan Ateye EELO UNIVERSITY
Site Plan Detail Eng. Hori CIVIL ENGINEERING FACULTY Drawing No. : 01

Presidential Building Compound


ASED Group 2011 Page 47
Structural ANALYSIS

Main BUILDING

Presidential Building Compound


ASED Group 2011 Page 48
Typical Floor Plan

Presidential Building Compound


ASED Group 2011 Page 49
Typical floor plan with slab

Presidential Building Compound


ASED Group 2011 Page 50
Floor (3D View)

Elevation

Presidential Building Compound


ASED Group 2011 Page 51
Shear force diagram (Filled type)

Shear force diagram (Numbered type)

Presidential Building Compound


ASED Group 2011 Page 52
Moment diagram (Filled type)

Moment diagram (Filled type)

Presidential Building Compound


ASED Group 2011 Page 53
Reaction

3D view Analysis result

Presidential Building Compound


ASED Group 2011 Page 54
EXECUTIVE BUILDING

Typical floor plan

Presidential Building Compound


ASED Group 2011 Page 55
Typical floor (3D View)

Elevation (Short direction)

Presidential Building Compound


ASED Group 2011 Page 56
Story 1-1 floor plan

Presidential Building Compound


ASED Group 2011 Page 57
3D View with diaphragm

Deformed shape (short side)

Presidential Building Compound


ASED Group 2011 Page 58
Moment diagram (short side)

Presidential Building Compound


ASED Group 2011 Page 59
Moment diagram (Short direction) (Filled type)

Shear force diagram (short direction)

Presidential Building Compound


ASED Group 2011 Page 60
Shear force diagram

Presidential Building Compound


ASED Group 2011 Page 61
Reactions

Deflection (long side)

Presidential Building Compound


ASED Group 2011 Page 62
Shear diagram (long side)

Presidential Building Compound


ASED Group 2011 Page 63
Shear diagram (long side)

Moment diagram (long side)

Presidential Building Compound


ASED Group 2011 Page 64
Moment diagram (long side)

Presidential Building Compound


ASED Group 2011 Page 65
Reactions (long side)

Presidential Building Compound


ASED Group 2011 Page 66
Analysis results with slab

Analysis results

Presidential Building Compound


ASED Group 2011 Page 67
Analysis result

Diaphragm

Presidential Building Compound


ASED Group 2011 Page 68
President’s Residence Building

Typical floor plan

Presidential Building Compound


ASED Group 2011 Page 69
Floor plan (3D View)

Elevation

Presidential Building Compound


ASED Group 2011 Page 70
3D View with diaphragm

Presidential Building Compound


ASED Group 2011 Page 71
Shear force diagram (short direction)

Shear force diagram (short direction)

Presidential Building Compound


ASED Group 2011 Page 72
Moment diagram (long direction) (Filled type)

Moment diagram (long direction)

Presidential Building Compound


ASED Group 2011 Page 73
Presidential Building Compound
ASED Group 2011 Page 74
Presidential Building Compound
ASED Group 2011 Page 75
STRUCTURAL DESIGN

Presidential Building Compound


ASED Group 2011 Page 76
FOUNDATION DESIGN

Foundation plan

Foundation elevation
Presidential Building Compound
ASED Group 2011 Page 77
Calculation of Foundation F4
Slab = 6in/12 x 150 lb/ft3+ 10 psf= 85 psf

Live Load = 100 psf (from table)

Total Load = 185 psf

At= 60 x 21.5 = 344 ft2

Load from slab = 1 x 344 x 0.185 = 63.64 kips

Load from beam = 12 x 14 x 16 x 150lb/ft3 / 144 = 2850 lb = 2.85 kips

Load from column= (20in / 12) x (20in / 12) x (10in/12) x 150lb/ft3 = 347 lb =
0.347 kips

Load from first floor = 63.64 + 2.85 + 0.347 = 66.837 kips

Load from hold building = 2 x 66.837 = 133.8 kips

qa = 36,987 psf
Material filling weight = 125 pcf x 6’ = 750 psf

qe= 36987 – 750 – 2948 = 2.49 kips


Required Area = 133.8 /2.948 = 45.4 in2

L= 6.74 ft ≈ 7ft

Presidential Building Compound


ASED Group 2011 Page 78
Upward pressure caused by the factored column

qu = (1.2 x 85 + 1.6 x 100) / 49 = 5.35 kips

qu= 5.35 x 1000 / 144 = 37 psi

Finding d

V1=φ4 (√fc) bod

bo = 4 x (20 + d)

V1= 0.75 x 4 x 4 x (20 + d)d √4000

V1=758.95(20 + d) d

Vc= qu(L)2-(20+d)2

Vc= 37 ( 7 x 12 )2 – (20 +d)2

Vc= V1

37(7 x 12)2-(20 +d)2 = 758.95 (20 + d)d

d= 11 in

Beam Shear Capacity

Capacity = φ 2 (√fc) bd

=0.75 x 2 √4000 x 7 x 11 x 12

= 87.66 kips

Presidential Building Compound


ASED Group 2011 Page 79
Capacity Beam Shear = qu x L x (b-d) = 64.65 kips

Design Moment
Mu = wl2/ (2 x width) = 37 (31.8)2 / 2 x (7 x 12) = 1571.5 kip-in

Steel Area
As= M/ φfy (d - a/2) [assume a=1]

= 1571.5 / (0.9 x 60 x (11-0.5 = 2.77 in2

Check the minimum reinforcement

Asmin=200/60000 x 7 x 12 x 11 = 3.08 in2

Asmin= 3√fc’ / fy = 3 √ 4000 / 60000 x 7 x 12 x 11 = 2.92 in2

Our Steel Area = 3 in2

No. of Steel bars= 3 in2 / 0.44 = 7 bars [No 6 bar is used]

Spacing = 0.44 x 12 /3 = 1.76 in2 ≈ 1.5 in

Presidential Building Compound


ASED Group 2011 Page 80
Calculation of Foundation F2 & F3
N.B Foundation F2 = Foundation F3

Slab = 6/ 12 x 150 + 10 = 85 psf

Live Load = 100 psf

Total Load = 185 psf

At = 8 x 15 = 92 ft2

Presidential Building Compound


ASED Group 2011 Page 81
Load from slab = 92 ft2 x 0.185 k/ft3 x 1ft = 17 kips

Load from beam = 12 x 14 / 144 x 150 x 16 = 2.8 kips

Load from column = 20 x 20 / 144 x 10/12 x 150 = 0.3472 kips

Load from first floor = 17 + 2.8 + 0.3472 = 20.15 kips

Load from whole building = 2 x 20.15 = 40.13 kips

Given

Load = 40.3 kips

qa= 3698 psf

Material Filled = 125 psf

Filling Material Weight = 6 x 125 = 750 psf

qe = 3698 – 750 = 2948 psf

Required area = 40.3 / 2.948 = 13.7 in2

A = 4’ x 4’ L=4’

qu= 1.2 x 85 + 1.6 x 100 / 4x4 = 16.375 x 1000 / 144 = 114 psi

Presidential Building Compound


ASED Group 2011 Page 82
Finding d

V1=φ4 (√fc) bod

V1= 0.75 x 4√4000 x 4 (20+d) x d

V1= 758.9 (20+d)d

Coming Punching Shear

Vc=qv(a)2-ba

Vc= 114 (4 x 12)2 – (20 +d) 2

V1=Vc

758.95 (20 +d) d = 114 ( 4 x 12 )2 – (20+d)2

d=11 in

Beam Shear Check

Capacity = φ 2 (√fc) bd

Capacity = 0.75 x 2 √ 4000 x 4 x 12 x 11 = 50.09 kips

Capacity beam shear = qu x L x (13.8 – 11) = 15.32 kips

Presidential Building Compound


ASED Group 2011 Page 83
Design Moment

Mu= wl2 x width = 114 (13.8)2/2 x 4 x 12 = 658 kips

Area of Steel

As= M/ φfy (d - a/2) [ assume a=1 ]

Asmin = (3√fc / fy ) x b x d = 3√ 4000 / 60000 x 4 x 12 x11 = 1.67 in2

Asmin = (200 / 60000) x b x d = 200/60000 x 4 x 12 x 11 = 1.76 in2

Presidential Building Compound


ASED Group 2011 Page 84
Foundation Load Calculation

[Foundation FB2 & FB3]


DL= (6/12) x150+10=85psf

LL=100psf

Total load=85+100=185psf=0.185ksf

At = 21.5 x 8 = 172 ft2

Load from slab = 0.185 x 172 = 32 kips

Load from beam = 12 x 14 / 144 x 16 x 150 = 2850 lb ≈ 2.85 kips

Load from column = 20 x 20 / 144 x 10/12 x 150 = 347 lb ≈ 0.347 kips

Load from 1st floor = 32 + 2.85 + 0.347 = 35.2 kips

Load from whole building = 32.2 x 2 = 70.4 kips

Presidential Building Compound


ASED Group 2011 Page 85
qa = 3698 psf
Material Filling = 125 psf

Filling Material Weight = 125 x 6 = 750 psf

qa= 3698 – 750 = 2948 psf = 2.948 ksf


Areq= 70.4 / 2.948 = 24 ft

L=5 ft

qu= (1.2 DL + 1.6 LL) / A2 = (1.2x85 + 1.6x100) / 25 = 10.5 psf

qu= 10.5 x 1000 / 144 = 72.9 psi ≈ 73 psi

Finding d

V1=φ4 (√fc) bod

V1= 0.75 x 4√4000 x 4 (20+d) x d

V1= 758.9 (20+d)d

Coming punching shear

V2 = qv(a)2 - (20 + d)2

V2 = 73(5 x 12 )2- (20 +d)2

= 262800 – (20 +d)2

Presidential Building Compound


ASED Group 2011 Page 86
V1=V2

758(20+d)d = 262800 – (20 +d)

d=11in

Beam shear Check

Capacity = φ 2 (√fc) bd

= 0.75 x 2√4000 x 5 x 12 x 11 = 62.6 kips

Capacity Beam Shear = qv x L x ( b – d )

= 73 x 5 x 12 x ( 19.8 – 11 ) = 39 kips

Design Moment

M= wl2/2 x width= 73 x 19.82 x 5 x 12 / 12 = 858567 lb-in ≈ 858.6 kips

Area of Steel

As= M/ φfy (d - a/2) a=1

As= 858.6 / (0.9 x 60 x (11-0.50))

= 1.51 in2

Asmin= 3√fc / fy x b x d = (3 √4000 / 60000) x 5 x 12 x 11 = 2.1 in2

Asmin = (200 / fy) x b x d = (200 / 60000) x 5 x 12 x 11 = 2.2 in2

Number of Bars = 2.2 / 0.44 = 5 bars

Spacing = 0.44 x 12 / 2.2 = 2.4 ≈ 2in

5 # 6 @ 2” c/c

Presidential Building Compound


ASED Group 2011 Page 87
BEAM DESIGN
Story 1-1

FB1 Steel calculation

Number Of bars = 7.629in2÷1in2 = 8 bar

Spacing = 1*12 ÷ 7.629 = 1.57in

8 # 9@1.5 c/c

d=10.9in

Presidential Building Compound


ASED Group 2011 Page 88
FB2 Steel calculation

Number Of bars = 6.03in2

Spacing =1*12 ÷ 6.03 = 1.99

6 # 9@1.5c/c

d =10.94in

FB3 Steel calculation

Number of bars = 2.719 ÷ 0.44 in2 =


6bars

Spacing = 0.44 *12÷ 2.72 9 = 1.9

6 # 6@1.5 c/c

d =10.9in

Presidential Building Compound


ASED Group 2011 Page 89
Story 2-2

FB1 Steel Calculation

Number of bars = 7.64in2 ÷ 0.79


=10bars

Spacing = 0.79 * 12 ÷ 7.64 =1.2

10#8@1c/c

d =10.9in

FB2 Steel Calculation

# of bars = 6.11÷ 0.79 = 8bars

Spacing = 12 * 0.79 ÷ 6.11 =1.5

8#8@1.5c/c

d =10.9in

FB3 Steel Calculation

# of bars = 2.738 ÷ 0.44 = 6 bars

Spacing = 12* 0.44 ÷ 2.738 =1.9

6#6@1.5c/c

d =10.9in

Presidential Building Compound


ASED Group 2011 Page 90
Column Design

Column Bar calculation

Area of bar = 4 in2 (FROM


ETABS CALCULATION)

Number of bars = 4in2/0.79 =


6 bars

6 # 8 bars

Spacing of Tie

Smallest of :

48 dbt

16 dbt

Use #3 bar

48 x (3/8) = 18

16 x (10 /8) = 20

Presidential Building Compound


ASED Group 2011 Page 91
SLAB DESIGN
TWO-WAY SLAB

Note: Highlighted portion is the slab to be designed

Presidential Building Compound


ASED Group 2011 Page 92
Dead load

Slab thickness= 6’’ [assumed]

Dead Load = 150 lb/ft3 x (6/12) ft = 75 psf

Dead Load from walls and furniture = 10psf (from table ……)

So, total dead load = 85psf

Live Load

Live load = 100 psf [from table 2.2] for Fundamentals of Structural
Analysis (Kenneth M.Leet Chia-Ming Uang).

Material Capacities:

fc’ = 4000 psi

fy= 6000 psi

Presidential Building Compound


ASED Group 2011 Page 93
Beam Dimensions:

12’’ x 14’’ [Assumed]

“h” Calculation:

h= ln/33

ln= 16 -12/12 = 15’’ [ Short direction]

so, h= [15’’ x 12]/[33] = 5.5’

ln=23 – 12/12 = 22’

Checking “h”.

β= 22’/15’ = 1.5

αm > 2

as, αm lies between 0.2 to 2

so, h= ln [0.8 +fy/200000]/36+ 5β(αm – 0.2)

hw = 8’’ hw = 8’’

4hf = 24’’ 4hf = 24’’

Presidential Building Compound


ASED Group 2011 Page 94
α m = [α1 + α2 + α3 + α4]/4
α = Ib / Is
Ib1 = bh3 / 12 = [[12 x 143 ]/12] x
1.5= 4116 in4.

Ib2,3,4 = bh3 / 12 = [[12 x 143 ]/12]


x 2 = 5488 in4.

Is1 = [10.5 x 12 x 63 ]/12 = 2268 in4.

Is2 = Is4 = bh3 / 12 = [16 x 12 x 63]/12


= 3456 in4.

Is3 = [23 x 12 x 63 ]/ 12 = 4968 in4.

α1 = Ib1 / Is1 = (4116/ 2268) = 1.8


α 2 = α4 = Ib2 / Is2 = 5488/3456 = 1.6
α 3= Ib3 / Is3 = 5488/4968 = 1.1
α m = [1.8+1.6+1.6+1.1]/4 = 1.5
h= ln (0.8+fy(200,000)/(36+5β(αm-0.2)

h=22*12(0.8+60000(200000))/(36+5*1.5(1.5-0.2)

h=6.14in =6.5in

DL= 150lb/ft3*6.5”/12=81.25psf

LL=100psf

Wu=1.2*DL+1.6*LL= 1.2*81.25*1.6*100=257.5psf

Presidential Building Compound


ASED Group 2011 Page 95
Wu=0.2575ksi

Moment calculation

A) short direction (16’span)

Mo=0.257*152=166.6 kip-ft

+ve Mo=0.35*166.6kip-ft=58.3kip-ft

-ve Mo=0.65*166.6kip-ft=108.3kip-ft

L2/L1=23/16=1.44

From Graph A-4…..Appendix =63%

Column panel moment =63% of –ve moment=

Presidential Building Compound


ASED Group 2011 Page 96
=0.63*108.3=68.23kip-ft

Moment 0.85 moments Beam

0.15 moments slab

68.23kip-ft

Slab Beam

15% 85%

0.15*68.23=10.2kip-ft 0.85*68.23=58kip-ft

Column panel (b=10.5)

M=wnLn2/8=0.2575*152*10.5=76kip-ft

-ve M =0.68*76=49.4kip-ft

+ve M = 0.35*76=26.6kip-ft

Column panel moment

L2/L1=1.44 63% From graph A-4 Appendix A

Presidential Building Compound


ASED Group 2011 Page 97
Column panel moment =63/100*49.4=31.12kip-ft

Slab Beam

0.15*31.25 0.85*31.25

=4.7kip =26.6 kip-ft

Summary of short direction moments (kip-ft)

Presidential Building Compound


ASED Group 2011 Page 98
B) long direction

Mo = wu Ln2 /8 = 0.2575*22*16/8

Mo =249.26 kip-ft

+ve moment =0.35*249.26=87.2kip-ft

-ve moment =0.65*249.26=162kip-ft

L2/L1=16/23=0.7

From table ………………………………………………….

Exterior –ve moment =0.57*249.26=142.1kip-ft

Interior –ve moment =0.7*249.26=174.5kip-ft

Positive moment =0.16*249.26=40kip-ft

Presidential Building Compound


ASED Group 2011 Page 99
From graph A-41

Exterior moment

85% of moment carried by column strip .

15% of moment carried by middle strip

Interior moment

85%of moment carried column strip.

15% of moment carried middle strip

Bt =C/2Is

C=∑(1-0.63x/y)(x3y/3)

C=(1-0.63*12/14)(123*14/3)+(1-0.63*6.5/7.5)(6.53*7.5/3)

C=4021.14

Bt =4021.14/(2*3456)=0.6

1.26 and Bt=0.6

Presidential Building Compound


ASED Group 2011 Page 100
Summary of long direction moment (kips-ft)

Presidential Building Compound


ASED Group 2011 Page 101
Design of slab reinforcement

(1) (2) (3) (4) (5) (6) (7) (8) (9)


Location Mu b d Mux12ib Numbe
Kip-ft in in Kips- P As r of
ft/ft In2 No.4
No.(13)
bars
23’span Exterior 5.82 84 4.5 0.83 0.002 0.76 4
Two half negative
column positive 18.15 84 4.5 2.6 0.002 0.76 4
strips Interior
negative 22.3 84 4.5 3.2 0.003 1.134 6

Middle Exterior 1.2 96 4.5 0.15 0.002 0.864 5


Strip negative
positive 21.3 96 4.5 2.7 0.002 0.864 5
Interior
negative 26.25 96 4.5 3.3 0.003 1.296 7
16’ span Negative 4.7 42 5 1.34 0.002 0.42 3
Exterior
Half
column Positive 2.5 42 5 0.72 0.002 0.42 3
strips
Middle Negative 40 180 5 2.67 0.0024 1.8 9
strips
Positive 22 180 5 1.467 0.002 1.8 9
Interior Negative 10.2 42 5 2.91 0.0024 0.5 3
Half
column Positive 5.6 42 5 1.6 0.002 0.42 3
strips

Presidential Building Compound


ASED Group 2011 Page 102
Presidential Building Compound
ASED Group 2011 Page 103
Presidential Building Compound
ASED Group 2011 Page 104
Presidential Building Compound
ASED Group 2011 Page 105
List of tables and figures

Table A.1

Presidential Building Compound


ASED Group 2011 Page 106
Table A.9

Presidential Building Compound


ASED Group 2011 Page 107
Graph A.4

Table 13.5

Presidential Building Compound


ASED Group 2011 Page 108
Table 13.4

Table 13.3

Presidential Building Compound


ASED Group 2011 Page 109
Table 5.2

Table 5.10

Presidential Building Compound


ASED Group 2011 Page 110
Figure 5.9

Presidential Building Compound


ASED Group 2011 Page 111

S-ar putea să vă placă și