AFI ( Application for Inspection ) for All Area.

Status
Date
No Area Description of Inspection Inspection Condition Remark
(√)
Cable Tray Installation

DCS Control Panel, Power Supply Panel


Installation
1 Purification Station
System. Local Solenoid Valve / Control Panel
Installation

Local instruments Installation


Cable Laying
Cable Tray Installation
Local Solenoid Valve / Control Panel
Install

Desalination & Compressor Air Pipe Laying


2 Boiler Make-up Local Instrument Installation
Water System
Cable Laying
Field Instrument Equip. Calibration
Electrode Sensor for PH, Conductivity
&SiO2.
Cable Tray Installation
Local Solenoid Valve /Control Panel
3 Conprenhensive Installation
Local Panel Installation
Water System
Cable Laying
Instrument Equip. Calibration
Cable Tray Installation
Cable Laying & wiring Termination
UF tank A Instruments Installation
UF tank B Instruments Installation
4 Water Tanks First RO tank Instruments Installed
Second RO tank Instruments Installed
UF Tank A
UF Tank B
Cable Tray Installation

Local Control Panel Installation


Industrial Waste Instrument Equip. Installation
5 Water Treatment
Plant
Industrial Waste
5 Water Treatment
Plant Compressor Instrument Tube Installation
Cable Laying
Wiring Termination
Cable Tray Installation 5M Elev.
Control Cable Laying 10M Elev.
Control Panel Installation
6 CCB 5M & 10M
Elev. Termination and Wiring
Continued Control Cable pulling to
Electronic room
Wiring Termination in Electronic room
Power Cable for CPU & Monitor Back
Feeding Support
LAN (Local Area Net Work)
7 Engineering Room Communication Cable Laying For Back
Feeding Support

CPU & Monitor Installation for Back


feeding support
Cable Tray Installation
PA , FDAS Control Panel and
Synchronization Control Panel Unit 3&4
Installation
DCS Operation Console/Station
Installation
CCR Operator Furnace and Drum Level TV Installation
8
Room
DCS Operation Station (DEH Station),
Auxiliary Operation Station, CCTV
Operation Station, Shift Supervisor
Console, DCS Supervisory Station &SMS
Supervisory Station Installation

Wiring Termination
Cable Tray Installation
Cable Laying Installation

Water Sampling Instrument Equip. Installation


9 (Manufacture)
Analyzer
Instrument Equip. Calibration
(Manufacture) Submitted
Wiring Termination
Cable Tray Installation
Cable Laying Installation
Dosing room Instrument Equip. Installation
10
Chemical Injection (Manufacture)
10 Dosing room
Chemical Injection
Instrument Equip. Calibration
(Manufacture) Submitted
Wiring Termination
Cable Tray Installation
BOILER (Super Instrument Equipment Installation
11 Heater, Furnace &
Burner) Cable Laying
Wiring Termination
Cable Tray Installation

Local Control Panel Installation


12 Coal Pulverize and
Milling System Cable Laying
Instrument Equipment Installation
Wiring Termination
Cable Tray Installation
Local Control Panel Installation
13 Coal Feeder
System Cable Laying
Instrument Equipment Installation
Wiring Termination
Cable Trench Installation

ESP System, Control Panel Installation


14 Instrument Control Cable Laying
& Operator Room
Wiring Termination
Instrument Equipment Installation
Cable Tray Installation
Control Panel Installation
15 CWP (Circulation
Cable Laying
Water Pump)
Instrument Equipment Installation
Wiring Termination
Cable Tray/Trench Installation
Control Panel Installation
16 Chlorination Cable Laying
System Instrument Equipment Installation
Wiring Termination
Cable Tray Installation

Control Panel Installation


17 Compressor Room
Cable Laying
Instrument Equipment Installation
Wiring Termination
Cable Tray Installation
Control Panel Installation
18 Fuel Oil Station Cable Laying
18 Fuel Oil Station
Instrument Equipment Installation
Wiring Termination
Control Panel Installation

Cable Laying
19 Chemical
Generation Plant Instrument Equip. Calibration
(Manufacture) Submitted
Instrument Equipment Installation
Wiring Termination
Cable Tray Installation
20 TURBINE (HIP & Instrument Equipment Installation
LP) Cable Laying
Wiring Termination
Cable Tray Installation
Instrument Equipment ( Manufacture)
MBFP (Motor Calibration
21 Boiler Feed Pump)
System. Instrument Equipment Installation
Cable Laying
Wiring Termination
Cable Tray Installation
Cable Laying
Main Oil Tank Instrument Equipment Installation
22
Instrument Equip. Calibration
(Manufacture) Submitted
Cable Wiring Termination
Cable Tray Installation

23 Jacking Oil System Cable Laying Installation


Instrument Equipment Installation
Wiring Termination
Instrument Equip. Calibration
24 LP & HP Heater (Manufacture) Submitted
Instrument Equipment Installation
Instrument Equipment Installation
Cable Laying
Wiring Termination
25 Generator
Instrument Equip. Calibration
(Manufacture) Submitted
Cable Tray Installation
Instrument Equip. Calibration
(Manufacture) Submitted
Stator Cooling Instrument Equipment Installation
26
Generator (Manufacture) Submitted
Cable Laying
Wiring Termination
Instrument Equip. Calibration
Instrument Equipment Installation
27 CCCWP
Cable Laying
Wiring Termination
Instrument Equip. Calibration
(Manufacture) Submitted
Instrument Equipment Installation
28 EH Oil System (Manufacture) Submitted
Cable Laying
Wiring Termination
Cable Tray Installation
Instrument Equipment Installation
29 DEH System (Manufacture) Submitted
Cable Laying
Wiring Termination
Cable Tray Installation
Cable Laying Installation
30 Vacuum System
Instrument Equipment Installation
Wiring Termination
Cable Tray Installation
Cable Laying Installation
31 Condensate System
Instrument Equipment Installation
Wiring Termination
Cable Tray Installation
Ball Cleaning Cable Laying Installation
32
System Instrument Equipment Installation
Wiring Termination
Cable Tray Installation
Cable Laying Installation
Instrument Equipment Installation
33 CPP System Wiring Termination
Local Control Panel Installation
Compressor Instrument Tube Installation