0.5 m
0.45 m
0.5 m
Q = 1.4 × X ×P x Uc
= 1.281 m3s-1
Q = At×Vt
At = Q/ Vt
= 0.126 m2
At = π × Dt2/4
Dt =
= 0.4 m
Dt = 400 mm
2) Duct line from Slot Hood (0.5m × 0.5m)
0.5 m
0.6 m
0.5 m Source
Q = 0.5 × X ×L x Uc
= 1.525 m3s-1
Q = At×Vt
At = Q/ Vt
= 0.125 m2
At = π × Dt2/4
Dt =
= 0.4m
Dt = 400 mm
3) Duct line from Slot Hood (0.5m × 0.75m)
0.75 m
0.55 m
Q = 0.5 × X ×L x Uc
= 0.5 × 0.5 m × (0.55) m x (2000/60s × 0.305m) ms-1 (hood is placed along the 0.5 m side)
= 1.4 m3s-1
Q = At×Vt
At = Q/ Vt
= 0.125 m2
At = π × Dt2/4
Dt =
= 0.398 m
Dt = 400 mm
4) Duct line between Canopy hood and 2nd Slot Hood (0.5m × 0.75m)
Q3=Q1+Q2
= (1.281+1.525) m3S-1
= 2.806 m3S-1
Q = At×Vt
At = Q/ Vt
= 0.158m2
At = π × Dt2/4
Dt =
= 0.448 m
Dt = 450 mm
∆Pb = C x ρ×Ut2
2s
Assume that the vertical length of the duct line is 1.5 m from the Hood to ceiling
level and 900 bend is needed to connect each vertical lines with the horizontal pipe
system at the ceiling level.
-3
Length – 11 m + 1.5 m = 12.5 m, take “f” – 0.005, ρ- 1.5 kgm
∆Pb = C x ρ×Ut2
2
= 0.8 × 1.5 kgm-3×12.22 m2s-2/ 2
= 89.30 Pa
-3
Length – 7.75 m + 1.5 m = 9.25 m, take “f” – 0.005, ρ- 1.5 kgm
-3
Length – 4 m + 1.5 m = 5.5 m, take “f” – 0.005, ρ- 1.5 kgm
∆Pb = C x ρ×Ut2
2
= 0.8 × 1.5 kgm-3×11.182 m2s-2/ 2
= 74.99 Pa
Hence Ok.
Q = 4.206 m3s-1
V = 20.33 ms-1
D =500 mm
Node 2
3 -1
Q = 2.806 m s
V = 11.18 ms-1
D = 450 mm
D =400 mm
Node 1
Q = 1.525 m3s-1
V= 12.2 ms-1
Q = 1.281 m3s-1
D= 400 mm
V = 10.16 ms-1
D =400 mm