Documente Academic
Documente Profesional
Documente Cultură
net/publication/323004886
CITATIONS READS
0 30
1 author:
SEE PROFILE
All content following this page was uploaded by Samadhi Sankalpani Wijesinghe on 08 February 2018.
Figure 2- Evolution of the area 2001 Figure 3- Evolution of the area 2003
In 2003 the bus stand started to develop and above two figures show that.
1
Figure 4- Evolution of the area 2007 Figure 5- Present Situation of the area (2018)
In 2007 bus stand development hand over to the community and until 2018 there are
development in surrounding area.
2. Site Details
2.1. Surrounding Activitie
All the long distance buses go across CTB bus stand and existing car park is behind this Bus stand.
Ground floor and Upper floor of the Bus Stand have allocated for the commercial activities. People
movements are functioning only within CTB bus stand and private bus stand premises. Also all the
activities play their roles within 500m from the town center.
Others 4 5% Others
Table 1- Uses of buildings (500m radius) Figure 6- Uses of Buildings (500m radius)
Ownership
Ownership
Private 51 20%
Private
Government 13 Government
80%
2
2.2. Road connection and pedestrian movements around the site
This site directly connect with the Colombo- Batticaloa highway and Avissawella bypass road.
Long distance bus routes that connect Rathnapura and Badulla districts pass the Avissawella town
through these two roads
Consider about two main roads and Yatiyanthota road there is pedestrian movements with the
vehicle movements. Pedestrian movements are higher in Yatiyanthota Road because education
institutes and one school here. Less movements in Avissawella bypass road because bypass road
have not any commercial or residential activities.
3
3. Issues and Problems of the site
UDA owned land is at behind the bus stand and not open to Avissawella town. This land
connect with the Avissawella bypass road but it is in upper than 5m from site. There are steps
that irregular road for come down from bypass road.
Approximately 50% of bus stand upper floor is not functioning and people not used to go there
because the entrances are not pleasant and safety to go.
Backside of the Central bus stand also less functioning and only have parking facilities.
Bus stand use for the buses which are going around Avissawella area. Long distance buses
come across this but not stay more than 3 minutes. Considering the number of buses and time
that buses go, central bus stand receive more land than the service that it give.
Only one vegetable shop and fish shop is in the Avissawella Central bus stand area. And there
is no more vegetable or fish market within the area for everybody.
4
4. Photographs of the site
Figure 11- Behind the CTB bus stand Figure 10- Foot path that connect bypass and main road
Figure 13- Behind the CTB bus stand Figure 12- Upper floor is not functioning
Avissawella has CTB and private bus stand for proper transportation system.
This site is passing area for 122, 98, 99 routes and all the bus routes for Yatiyanthota and
Kandy road.
Site is use by children, students, workers, bus drivers, adults, teenagers for various uses.
Bank facilities, government services centers are very near to this site.
Site belongs to Colombo district and Avissawella has upcoming development projects by
UDA.
5
6. Why Avissawella need a development?
Avissawella is one of the urban area that belongs to Colombo district. Colombo district go with the
rapid development in every area. Colombo city center develop as commercial area and people move
away from the city. Avissawella has that attraction because Avissawella has less land value than
other area of Colombo district. Also natural setting and transportation facilities can develop this
attraction more than now. With the development trend Avissawella is facing issues and problems.
Solution is not enough to reduce the congetion and today also pedestrian movements are high
in Main road
For pedestrian movements there is food path behind the bus stand. It is used by people who living
in bypass road area.
Considering above site details and activities this site area has attraction but it limited from the
Central bus stand. Other main thing is, this is only area that touching Colombo Batticaloa Hwy and
also Avissawella Bypass road directly as government property. This site can create connection
between these two roads.
Because of above issues and problems Avissawella Bus stand area want planning intervention for
solve the above problems using potential and community perceptions. Also proposal should come
with,
Functioning upper floor of the bus stand and bypass road
Regenerate the CTB bus stand compare with the number of buses
Prepare the place that user friendly and environment friendly for make image to
Avissawella
6
7