In 2014 in Russia produced 1059.0 billion kWh of electricity, ✓Federal - Federal Grid Company, FGC :
including by type of generation : • JSC "Rosseti” - subsidiary company;
• carries out activity by:
- power transmission by 700 - 200 kV power lines;
✓Interregional - Interregional Distribution Grid Companies (IDGC):
• subsidiaries of JSC "Rosseti”;
• carries out activity by:
- power transmission by 110 - 0,4 kV power lines;
- grid connection of consumers
✓ Regional – regional grid companies
✓subsidiaries of JSC "Rosseti”
2
Wind Power Potential in Russia
It is estimated that Russia has large wind potential, its gross theoretical wind energy potential is defined to be 197477 billion kWh/year (H=100m)
and gross technical wind energy potential – 21850 billion kWh/year (H=100m).
The favourable zones for wind energy development include territories of South and North Caucasus federal districts (FD), territories of the North
West, Ural, Siberian, Far East FD located in the Arctic Circle; coastal areas northeast of the country, as well as the Kamchatka Peninsula and
Sakhalin Island. But the sources haven’t been realized to its full potential, only 13 MW are installed in Russia nowadays .
3
Solar Power Technical Potential in Russia
4
Animal Wastes Power Potential
in Russia
5
Plant cultivation Wastes Power Potential
in Russia
6
Small Rivers Power Potential in Russia
7
Peat Power Potential in Russia
8
State Support for Wind Power Development
in Russia
RF Government Decree № 1839 of 04.10.2012 "On approval of a package of measures to stimulate production of power by generating
facilities operating on the basis of renewable energy sources“ became the legal basis for large-scale development of renewable energy
sector in Russia
Federal Law No. 35-FZ on the Electric Power Industry RF Government Decree № 1472-r dated July 28, 2015
States: Defines:
The obligation of grid companies to buy power generated by RES to cover Target volumes of generating facilities commissioning on the basis of RES
grid losses. till 2024;
Target indicators of local content of the primary and/or auxiliary wind
Conditions for implementation:
energy equipment in Russian Federation till 2020;
• Low tariff rate;
The CapEx limits for construction of 1 kW installed capacity on the basis of
• Impossibility of getting the tariff for the entire payback period of the project;
• Feed-in-tariff could be calculated and approved only after commissioning RES, rub. /kW
and qualification of generating facility; The limits for fixed OpEx costs for 1 kW of installed capacity;
• Inability of entering into PPA for the entire payback period of the project; The limits for variable OpEx for generation of MWh.
• Lack of economic incentives for grid companies to purchase power energy
generated from RES.
9
Installed capacity commissioning target volumes
Installed capacity commissioning target volumes for generating units operating on the basis of wind power and the of local content
indicators in Russia for the main (or) of the auxiliary generating equipment used for power generation on the basis of wind energy
(RF Government Degree of July 28, 2015 № 1472-p)
COD 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Total
Wind energy
- 51 50 200 400 500 500 500 500 500 399 3600
Target value, MW
Wind energy
Target local content - - 25 40 55 65 65 65 65 65 65
degree, %
Solar energy
120 140 200 250 270 270 270 1520
Target value, MW
Solar energy
Target local content 50 70 70 70 70 70 70 70 70 70
degree, %
Hydro energy
Target local content 20 45 45 65 65 65 65 65 65 65
degree, %
10
Capacity Purchase Agreement – Parties/Transactions
Organization of
Confirmation of the Qualification Capacity Purchase
achievement of the Tender
required indicator of
WF localization Selection of projects is
carried out for next4
JSC “TSA“ years
NP "Market Council" (Trade System
Administrator)
11
Russian Wind Energy Sector Governance Structure
Technological platforms
Power generation companies Federal level
The Ministry of Energy – energy policy, R&D Combine the efforts of government, science and business in the design
Enel and manufacture of unique products in the framework of Russia's
financing;
E.On economic modernization.
EuroSibEnergo The Ministry of Education and Science –
LUKOIL scientific and educational policy, R&D Smart grid of Russia
RusHydro financing; Advanced Technologies of RES
INTER RAO UES Small scale and decentralized power systems
The Ministry of Economic Development –
economic policy, financing of state programs R&D Directions
Russian local content partners and projects Development of wind turbines
Group of companies The Ministry of Industry and Trade – promoting Development of technologies for offshore wind farms, providing a
“RUSCOMPOZIT” localization of generating equipment long and reliable operation of the installations at large depths and far
Composite Holding Company manufacture in Russia from the coast
Galen Creating the control systems of optimal automatic operation of wind
Proelektrotechnika The Ministry of Regional Development – power plants
Atomenergomash coordination the of RES projects Research aimed at improving the correct assessment and
Penzkhimmash implementation at the regional level forecasting of wind potential
Yesk Aircraft Engine Repair
Plant Research Centers
Regional level
Joint Institute for High Temperatures of the Russian Academy of
• Regional Ministries of power sector Sciences
OEM • Regional and municipal administrations St. Petersburg State Polytechnical University
• Regional centers of energy-saving and International Research and Educational Foresight Centre
Vestas energy efficiency
Gamesa The Faculty of Geography at Lomonosov Moscow State University
GE National Research University "Moscow Power Engineering Institute”
New Wind South Ural State University (National Research University)
Developers
Platov South-Russian State Polytechnic University (NPI)
Wind Energy Systems Central Aerohydrodynamic Institute
Bright Capital Research Centre “Atmograph”
Wind Power Generation Company G.M. Krzhizhanovsky Power Engineering Institute
Russian Wind Energy Wentrus Bauman Moscow State Technical University
Association Falcon Capital Skolkovo Innovation Centre
Sowitec
VetroSGC Noncommercial Partnership
Wetroen Yug MARKET COUNCIL
Operation of the wholesale and retail power and capacity markets
12
Wind Farm Advanced Projects in Russia
Wind Power
Generation Company
Krasnodar Region
WF «Beregovaya» 92,4 MW Sowitec
Kurgan Region
WF «Kurgan» 55 MW
Wind#5
Karachay–Cherkess Republic
WF «Sparta-1» 60-75 MW WentRus
WF «Sycheva Gora» 25-27 Altai Kray
MW
WF «Altai» 250-300 MW
ComplexIndustry
Wind Power
Alten Astrakhan Region Generation Company
Republic of Kalmykia WF «Aksarayskaya» 15 MW
Astrakhan Region
WF «Kalmykia» 302,4 MW WF «Funtovo» 15 MW WF «Narimanovskaya» 24
13 MW
Solar Power Advanced Projects in Russia
Volga region,
Stavropol region,
Republic Kalmykia Avelar Solar Technology
12 SPP 165 MW total
Orenburg Region
Bashkortostan 1
2 SPP 99MW total
EvroSibEnergo
Khakassia 1SPP 5.2 MW
ComplexIndustry
Astrakhan Region
Volgograd Region
Lipetsk region
6 SPP
14
Risks of Investing in Russian Wind Power
Sector
Capacity supply agreement Competitive capacity selection
Localization conditions, not taking into account real capabilities of No regulations for entering CCS for generating capacities based
the Russian industry; on renewable energy;
Underestimated capital costs for the construction of 1 kW Failure to provide return of investments because:
installed capacity; • CCS contract until 2016 is for 1 year after 2016 – for 4 years;
Change of the Governmental Decree № 449 and the pricing • Deadline for the transition from a one-year to a four –year CCS
formula for capacity; permanently postponed;
Change of localization indicators; • The risk of being unselected for capacity payments on the next
Penalties for: period.
• certification of less capacity amount;
• failure to achieve capacity factor fixed number by Governmental
Decree № 449;
• delay of the WF commissioning;
• failure to achieve the required localization indicators on results
of the qualification.
Electricity sales for covering grid losses Electricity sales on retail market
Due to lack of regulations it is impossible to: Installed capacity can not exceed 25 MW:
• enter into PPA before commissioning of the power plant; • Increased connection cost;
• enter into PPA for more than a year. • Increased the price of electricity;
Necessity of wind farm construction near the end user:
• Not everywhere there is good resource;
Instability of power supply;
Risk of the final user refusal in the power purchase;
The risk of non-payment for supplied power by the end user;
15
Thank you!
germolenko@hse.ru