Sunteți pe pagina 1din 14

PESO ESPECIFICO CEMENTO PU CEMENTO Bs / BOLSA

1350
PU ARENA Bs /m3
1 BOLSA CEMENTO Kg 50 PU RIPIO Bs /m3

PU AGUA Bs /m3
COEF. ACOM. PIEDRA PU PIEDRAS Bs /m3
1.3
1,25 - 1,4

HORMIGON VOLUMEN DE HORMIGON (m3) 1.143


MATERIALES VA CA VR
CEMENTO 1 0.47 0.47
ARENA 3 0.63 1.89
RIPIO 5 0.68 3.4
AGUA 1.125 1 1.125
TOTAL VR 6.885

% DE PIEDRA 50
HORMIGON CICLOPEO VOLUMEN DE HORMIGON (m3) 6.545
MATERIALES VA CA VR
CEMENTO 1 0.47 0.47
ARENA 3 0.63 1.89
RIPIO 3 0.68 2.04
AGUA 0.875 1 0.875
TOTAL VR 5.275

MORTERO VOLUMEN DE HORMIGON (m3) 1.739


MATERIALES VA CA VR
CEMENTO 1 0.47 0.47
ARENA 3 0.63 1.89
AGUA 0.48 1 0.48
TOTAL VR 2.84

LADRILLO
PU Bs / Ladrillo 1.35
Dimensiones H
H (cm) 15
B (cm) 10
L (cm) 24 L
% PERDIDA B
4
3-5%

BARRAS DE ACERO LONG. TOTAL (m) 25.4 ESTRIBO


% PERDIDA 7
(mm) (m)
POSICION ESQUEMA
DIAMETRO LONG. UNITARIA

1 1m 8 1

2 1m 8 1

3 H 6 1

LOSA ALIVIANADA (m2) 56.67 HORMIGON DE LA LOSA


N° DE VIGUETAS / m2 2 VOL. DE LA LOSA VOL. TOTAL DE
N° COMPLEMENTO Pza/m2 2 (m3 / m2) LA LOSA (m3)
ESPESOR DE LA LOSA (cm) 5
0.062 3.514
P.U. VIGUETA (Bs/ml) 36
P.U. COMPLEMENTO DE % PERDIDA BARRAS N° BARRAS /m2
13
PLASTOFOR (Bs / Pieza) 7 10
LONGITUD BARRAS (ml/m2) DIAMETRO (mm) PESO UNIT. (Kg/m) PESO/m2 (Kg/m2)
10 6 0.22 2.2
HORMIGON DE LA LOSA VOLUMEN DE HORMIGON (m3) 3.514
MATERIALES VA CA VR
CEMENTO 1 0.47 0.47
ARENA 2 0.63 1.26
RIPIO 3 0.68 2.04
AGUA 0.72 1 0.72
TOTAL VR 4.49
56 NOTA 1: LA UNIDAD DEL CEMENTO ES Kg EN LAS TABLAS
75 LA ARENA, RIPIO, AGUA, PIEDRA SU UNIDA ES EL m3
125 NOTA 2: SOLO EDITAR LAS CASILLAS DE COLOR AMARILLO

6 AUTOR: KEVIN AQUILES MONTERO DU


115

CANTIDAD DE AGUA % 12.5 VOLUMEN APARENTE


INSUMO/m3 VOL. PERDIDA VOL. COMPRA MATERIAL TOTAL PARA:
196.08 19.608 215.69 5
0.44 0.044 0.48 0.55
0.73 0.073 0.8 0.91
0.16 0.016 0.18 0.21
m3

VOL. DE PIEDRA 8.51 VOLUMEN TOTAL HORMIGON CICLOPEO


CANTIDAD DE AGUA % 12.5 VOLUMEN APARENTE
INSUMO/m3 VOL. PERDIDA VOL. COMPRA MATERIAL TOTAL PARA:
255.92 25.592 281.51 37
0.57 0.057 0.63 4.12
0.57 0.057 0.63 4.12
0.17 0.017 0.19 1.24
m3

CANTIDAD DE AGUA % 12 VOLUMEN APARENTE


INSUMO/m3 VOL. PERDIDA VOL. COMPRA MATERIAL TOTAL PARA:
475.35 47.535 522.89 19
1.06 0.106 1.17 2.03
0.17 0.017 0.19 0.33
m3

ESPESOR MORTERO (cm) 2 MORTERO DE CEMENTO


AREA DE 1 LADRILLO Y ESPESOR AREA DEL MORTERO (m2)
0.0442
Aladrillo =H*L (m2) VOL. MORTERO /m2
NUMERO DE LADRILLOS/m2 22.62 VOL. TOTAL MORTERO (m3)
CANTIDAD LADRILLOS + PERDIDA
23.3
(CANTIDAD / m2)
m2 DE MURO 93.49
CANTIDAD TOTAL DE LADRILLOS 2179
COSTO TOTAL DE LADRILLOS (Bs) 2941.65

H (m) 0.26 B (m) 0.11


ESPACIOS/ESTRIBO (m) 0.15 N° DE ESPACIOS 170
(m) (Kg)/m (Kg)
N° DE REPETICION LONG. TOTAL PESO UNITARIO PESO TOTAL

2 50.8 0.4 20.32

3 76.2 0.4 30.48

171 80.37 0.11 18.81

VIGUETAS COMPLEMENTOS
LONGITUD VIGUETAs/m2 COSTO TOTAL COSTO TOTAL
(ml/m2) VIGUETAS (Bs) COMPLEMENTO (BS)
2 4080.24 1473.42

BARRAS DE ACERO
PESO TOTAL (Kg) PESO PERDIDA (Kg) PESO COMPRA (Kg) PRECIO UNITARIO (Bs)
124.68 8.73 133.41 8.07
CANTIDAD DE AGUA % 12 VOLUMEN APARENTE
INSUMO/m3 VOL. PERDIDA VOL. COMPRA MATERIAL TOTAL PARA:
300.67 30.067 330.74 24
0.45 0.045 0.5 1.76
0.67 0.067 0.74 2.6
0.16 0.016 0.18 0.63
m3
U UNIDA ES EL m3

S MONTERO DUABYAKOSKY

MEN APARENTE 9 % PERDIDA 10


1.143 PU COSTO
Bolsas 56 280
m3 75 41.25
m3 125 113.75
m3 6 1.26
COSTO TOTAL 436.26 Bs

13.089 COSTO DE PIEDRA 978.65


MEN APARENTE 7 % PERDIDA 10
6.545 PU COSTO
Bolsas 56 2072
m3 75 309
m3 125 515
m3 6 7.44
COSTO TOTAL HORMIGON 2903.44 Bs
COSTO TOTAL H° CICLOPEO 3882.09 Bs

MEN APARENTE 4 % PERDIDA 10


1.739 PU COSTO
Bolsas 56 1064
m3 75 152.25
m3 6 1.98
COSTO TOTAL 1218.23 Bs

0.18568
0.0186
1.739

N° GANCHO = 2 (m) 0.1 PU BARRAS (Bs/Kg) 8.07


N° DE ESTRIBO 171 P.E. ACERO (Kg/m3) 7850
(Kg) (Kg) (Bs/Kg) (Bs)
PESO DE PERDIDA PESO DE COMPRA PRECIO UNITARIO PRECIO TOTAL

1.43 21.75 8.07 175.53

2.14 32.62 8.07 263.25

1.32 20.13 8.07 162.45

PESO TOTAL 74.5 COSTO TOTAL 601.23

COSTO TOTAL (Bs)


1076.6187
MEN APARENTE 6 % PERDIDA 10
3.514 PU COSTO
Bolsas 56 1344
m3 75 132
m3 125 325
m3 6 3.78
COSTO TOTAL 1804.78 Bs
12 m (m)
N° DE BARRAS LONG. TOTAL + PERDIDA

5 54.36

7 81.54

8 86

N° TOTAL BARRAS 20
PESO ESPECIFICO CEMENTO PU CEMENTO Bs / BOLSA
1300
SUELTO 1200 - 1400 KG/m3 PU ARENA Bs /m3
1 BOLSA CEMENTO Kg 50 PU RIPIO Bs /m3

PU AGUA Bs /m3
COEF. ACOM. PIEDRA PU PIEDRAS Bs /m3
1.3
1,25 - 1,4

HORMIGON VOLUMEN DE HORMIGON (m3) 0.504


MATERIALES VA CA VR
CEMENTO 1 0.47 0.47
ARENA 2 0.63 1.26
RIPIO 4 0.68 2.72
AGUA 0.875 1 0.875
TOTAL VR 5.325

% DE PIEDRA 50
HORMIGON CICLOPEO VOLUMEN DE HORMIGON (m3) 6.545
MATERIALES VA CA VR
CEMENTO 1 0.47 0.47
ARENA 3 0.63 1.89
RIPIO 3 0.68 2.04
AGUA 0.875 1 0.875
TOTAL VR 5.275

MORTERO VOLUMEN DE HORMIGON (m3) 1.739


MATERIALES VA CA VR
CEMENTO 1 0.47 0.47
ARENA 3 0.63 1.89
AGUA 0.48 1 0.48
TOTAL VR 2.84

LADRILLO
PU Bs / Ladrillo 1.35
Dimensiones H
H (cm) 15
B (cm) 10
L (cm) 24 L
% PERDIDA B
4
3-5%

BARRAS DE ACERO LONG. TOTAL (m) 25.4 ESTRIBO


% PERDIDA 7
(mm) (m)
POSICION ESQUEMA
DIAMETRO LONG. UNITARIA

1 1m 8 1

2 1m 8 1

3 H 6 1

LOSA ALIVIANADA (m2) 56.67 HORMIGON DE LA LOSA


N° DE VIGUETAS / m2 2 VOL. DE LA LOSA VOL. TOTAL DE
N° COMPLEMENTO Pza/m2 2 (m3 / m2) LA LOSA (m3)
ESPESOR DE LA LOSA (cm) 5
0.062 3.514
P.U. VIGUETA (Bs/ml) 36
P.U. COMPLEMENTO DE % PERDIDA BARRAS N° BARRAS /m2
13
PLASTOFOR (Bs / Pieza) 7 10
LONGITUD BARRAS (ml/m2) DIAMETRO (mm) PESO UNIT. (Kg/m) PESO/m2 (Kg/m2)
10 6 0.22 2.2
HORMIGON DE LA LOSA VOLUMEN DE HORMIGON (m3) 3.514
MATERIALES VA CA VR
CEMENTO 1 0.47 0.47
ARENA 2 0.63 1.26
RIPIO 3 0.68 2.04
AGUA 0.72 1 0.72
TOTAL VR 4.49
60 NOTA 1: LA UNIDAD DEL CEMENTO ES Kg EN LAS TABLAS
75 LA ARENA, RIPIO, AGUA, PIEDRA SU UNIDA ES EL m3
125 NOTA 2: SOLO EDITAR LAS CASILLAS DE COLOR AMARILLO

6 AUTOR: KEVIN AQUILES MONTERO DU


115

CANTIDAD DE AGUA % 12.5 VOLUMEN APARENTE


INSUMO/m3 VOL. PERDIDA VOL. COMPRA MATERIAL TOTAL PARA:
244.13 24.413 268.54 3
0.38 0.038 0.42 0.21
0.75 0.075 0.83 0.42
0.16 0.016 0.18 0.09
m3

VOL. DE PIEDRA 8.51 VOLUMEN TOTAL HORMIGON CICLOPEO


CANTIDAD DE AGUA % 12.5 VOLUMEN APARENTE
INSUMO/m3 VOL. PERDIDA VOL. COMPRA MATERIAL TOTAL PARA:
246.45 24.645 271.1 36
0.57 0.057 0.63 4.12
0.57 0.057 0.63 4.12
0.17 0.017 0.19 1.24
m3

CANTIDAD DE AGUA % 12 VOLUMEN APARENTE


INSUMO/m3 VOL. PERDIDA VOL. COMPRA MATERIAL TOTAL PARA:
457.75 45.775 503.53 18
1.06 0.106 1.17 2.03
0.17 0.017 0.19 0.33
m3

ESPESOR MORTERO (cm) 2 MORTERO DE CEMENTO


AREA DE 1 LADRILLO Y ESPESOR AREA DEL MORTERO (m2)
0.0442
Aladrillo =H*L (m2) VOL. MORTERO /m2
NUMERO DE LADRILLOS/m2 22.62 VOL. TOTAL MORTERO (m3)
CANTIDAD LADRILLOS + PERDIDA
23.3
(CANTIDAD / m2)
m2 DE MURO 93.49
CANTIDAD TOTAL DE LADRILLOS 2179
COSTO TOTAL DE LADRILLOS (Bs) 2941.65

H (m) 0.26 B (m) 0.11


ESPACIOS/ESTRIBO (m) 0.15 N° DE ESPACIOS 170
(m) (Kg)/m (Kg)
N° DE REPETICION LONG. TOTAL PESO UNITARIO PESO TOTAL

2 50.8 0.4 20.32

3 76.2 0.4 30.48

171 80.37 0.11 18.81

VIGUETAS COMPLEMENTOS
LONGITUD VIGUETAs/m2 COSTO TOTAL COSTO TOTAL
(ml/m2) VIGUETAS (Bs) COMPLEMENTO (BS)
2 4080.24 1473.42

BARRAS DE ACERO
PESO TOTAL (Kg) PESO PERDIDA (Kg) PESO COMPRA (Kg) PRECIO UNITARIO (Bs)
124.68 8.73 133.41 8.07
CANTIDAD DE AGUA % 12 VOLUMEN APARENTE
INSUMO/m3 VOL. PERDIDA VOL. COMPRA MATERIAL TOTAL PARA:
289.53 28.953 318.48 23
0.45 0.045 0.5 1.76
0.67 0.067 0.74 2.6
0.16 0.016 0.18 0.63
m3
U UNIDA ES EL m3

S MONTERO DUABYAKOSKY

MEN APARENTE 7 % PERDIDA 10


0.504 PU COSTO
Bolsas 60 180
m3 75 15.75
m3 125 52.5
m3 6 0.54
COSTO TOTAL 248.79 Bs

13.089 COSTO DE PIEDRA 978.65


MEN APARENTE 7 % PERDIDA 10
6.545 PU COSTO
Bolsas 60 2160
m3 75 309
m3 125 515
m3 6 7.44
COSTO TOTAL HORMIGON 2991.44 Bs
COSTO TOTAL H° CICLOPEO 3970.09 Bs

MEN APARENTE 4 % PERDIDA 10


1.739 PU COSTO
Bolsas 60 1080
m3 75 152.25
m3 6 1.98
COSTO TOTAL 1234.23 Bs

0.18568
0.0186
1.739

N° GANCHO = 2 (m) 0.1 PU BARRAS (Bs/Kg) 8.07


N° DE ESTRIBO 171 P.E. ACERO (Kg/m3) 7850
(Kg) (Kg) (Bs/Kg) (Bs)
PESO DE PERDIDA PESO DE COMPRA PRECIO UNITARIO PRECIO TOTAL

1.43 21.75 8.07 175.53

2.14 32.62 8.07 263.25

1.32 20.13 8.07 162.45

PESO TOTAL 74.5 COSTO TOTAL 601.23

COSTO TOTAL (Bs)


1076.6187
MEN APARENTE 6 % PERDIDA 10
3.514 PU COSTO
Bolsas 60 1380
m3 75 132
m3 125 325
m3 6 3.78
COSTO TOTAL 1840.78 Bs
12 m (m)
N° DE BARRAS LONG. TOTAL + PERDIDA

5 54.36

7 81.54

8 86

N° TOTAL BARRAS 20

S-ar putea să vă placă și